Abdul Sayeed Resume - PQM
Abdul Sayeed Resume - PQM
Abdul Sayeed Resume - PQM
Mohammed.abdulsayeed76@gmail.com
linkedin.com/in/abdulsayeed
Profile
A highly accomplished and proficient QA/QC Expert with extensive experience (over 26 years) in the QA/QC
related to (upstream/midstream/downstream)Offshore/Onshore Oil & Gas, Renewal energy and areas
involved procurement, fabrication, construction, installation of offshore wind farm 4 leg jackets, TP barrel
installation, process platforms, FPSO Integrity module platforms, Wellhead platforms, Living Quarter
platforms, Bridges, Jacket fabrication, Top side modifications, Laying & Hook-up of subsea pipelines, Riser
installation and jacket fabrication for offshore wind farm, Critical & Non critical valves, Process Piping &
Piping components, heavy fabrication of pressure vessels, Heat exchangers, land rig steel structures, Storage
tanks and Shutdown activities for routine maintenance of Rotary pumps, static equipment’s at process plants.
Adept at providing QMS as well as technical integrity verification, testing activities and ensuring
implementation of QAQC systems, for overall company applications and specific project applications. An
exceptionally customer-driven individual with the ability to mentor, train, and nurture professional teams to
accomplish project aims. An articulate communicator with excellent motivational skills enabling a respected
leadership-style that has achieved desired objectives. Innovative, resourceful, and adaptable, generates
optimal results with a positive work ethic and strong desire to continually build on success.
Core Competencies
Skilled in visual inspection identifying anomalies Interpreting codes, rules & regulations
Strong document control, internal audit, strategy & Organizational skills delivering projects on or
project management abilities before scheduled deadlines
Proven technical abilities Strong negotiating capabilities
Confident to take initiative & manage processes Skilled in nurturing & managing key relationships
Team leadership & team empowerment expertise Effective interpersonal & communication skills
Analytical mind-set; problem-solving abilities Ability to work well under pressure
Education
Certifications
Career History
Project scope (Green Field) at karimun yard- Raiser platforms (6 no’s) including Topsides and
Jackets, Well head platforms (6 no’s) Top sides, Bridges (8 no’s) and fabrication of CRA, SS, CS Piping
spools.
Develop and implement Contract Quality Management Plan, Inspection/Verification Strategies and
Project Audit Plan. Identify & Monitor Project Quality Objectives & KPI’s.
Preparing all Quality Forms and Registers for the project (MIR, Welding Performance, Repair Rates,
Calibration etc.)
Manage the quality control and surveillance plan for inspection activities as per ITP’s.
Leading QA/QC team of QA Engineers, QA/QC supervisors, Inspectors and Managing the team
positioned at multiple locations
Provide weekly, bi-weekly quality reports to project manager for issuance to Qatar Gas.
Review WPSs and PQRs for Piping & steel structure according to company Specs.
Manage the NCR, CAR, programs with a direct link to the Quality Manager on all issues.
Hold weekly meetings with Client & Subcontractors.
Conduct Internal Audit to access the effectiveness of Quality system outlined in Project
Conduct quality awareness training to front line inspection personnel.
Conducting Kick of Meeting, Pre-Inspection Meeting and coordination meetings at Vendor &
Subcontractor premises.
Review and comment on subcontractors’ quality procedures, ITP`s and ensure that it comply with
applicable specifications and codes.
Conduct Quality Induction Program and Flawless Program for all project team personnel.
Surveillance on Sub-Contractor's quality management system and ensure the establishment of a
trained, qualified, and competent quality team.
Project scope, Serial fabrication of (32 no’s) Wind Farm Jackets, Transition Piece Barrel, Flooring
Decks, Boat landing, J-Tubes, Grouting lines, Territory out fittings, E & I and Mechanical activities.
Effectively reviewing and preparing of Project Quality Documents Viz. Contract/Project Quality Plan,
procedures like control of documents/records, NCR Management, Internal audit plans and other
specific documents and managing the team of QAQC Engineers, Coordinators, Supervisors, Inspectors
and NDT team
Identify Quality Related Risks in projects during the project phase and properly assess the identified
risk created by change, review and establish controls in line with the Risk management action plan.
Conducting Kick of Meeting, Pre-Inspection Meeting, Go-No-Go meetings for every jacket and
coordination meetings with subcontractors.
Developing Project Quality Plan to ensure adherence to the requirements of the contractor and
proficiently ensuring the implementation and maintenance of the Project Quality Management
System
Analysing project requirements, quality resources, identifying gaps and implementing mitigation
action
Identifying and providing the resources for verification activities to ensure quality standards are
implemented and maintained
Establishing project specific strategies for quality audit, non-conformance reporting and customer
satisfaction
Managing of Final As-built dossier and follow-up of client comments.
Managing PO vendor and resolving issues by conducting weekly meeting and vendor visits along with
client representatives.
Conducting project quality management system audits & Sub‐Contractors audits to determine
compliance to project quality requirements Follow‐up, monitor close out of non‐conformities raised
during onshore fabrications
Conducting Lessons Learnt sessions and quality awareness sessions with project production
and QC Inspection team.
Review all the recorded NCR’s (Non-conformance Report) CAR’s (Corrective Action Request) and
evaluate the effective implementation of the corrective and preventive action, Root cause analysis to
systematically prevent and solve the underlying issues during the project.
Actively Involved in fabrication and construction welding, Dimensional Control Inspection, Painting,
E &I and Mechanical Inspection activities for Wind Farm Jackets, TP barrel serial fabrication, Flooring
Deck, Boat landing, J-Tubes, Grouting lines, Territory out fittings and Dimensional control
involvement as per DNVGL-OS-C401 standard and project requirements.
Prior to Jacket upending and load out of Jackets Involved in Mechanical completion and pre
commissioning of hydraulic equipment, Davit crane equipment and grillage inspection activities.
Follow up of final punch list and Jacket load out sea fastening activities.
Setting up meetings with sub-contractors’ quality responsible persons to ensure effective
implementation of client’s approved quality plans/procedures
FERNAS CONSTRUCTION CO. INC (EPC), Mesaeed, Qatar Feb 2019 to Aug 2019
Sr.QAQC Engineer/Deputy Quality Manager – Pipeline & Piping
Key Project: NGL-4 MESAEED, Pipeline & Piping Project, EPIC for Domestic Supply of Butane from NGL complex to
QP Refinery Phase 1 UG/AG 16” Pipeline & Tie-In Piping shutdown activities at NGL1,2,4 & QP Refinery
Client: Qatar Petroleum
Established and reviewed ITP (Inspection Test Plans), repair plans, weld maps, welding procedure,
PWHT procedures and hydro pressure testing procedures
Involved in quality of structural, piping, welding, mechanical, dimensional inspection activities with
QC team for FPSO top side process modules
Monitored project trend repair analysis and welder performance reports of welders
Coordinated and involved with company/TPI for Final Inspection Activities prior to paint release and
module load out
Issued Site quality alerts and NCR, s for non-conformance activities
DNV-GL & INTERTEK (TPA), Baoji, China Jan 2015 to Apr 2016
Sr.Inspection Engineer – Rig Structural, Mechanical & High-Pressure Piping
Key Project: LAND RIGS ACQUISITION 2 & 3 (1500 & 2000HP) in China/Client: NDC (National Drilling Company
Main Contractor: BOMCO & subcontractors at Baoji, China
Quality/Integrity of Land Rigs Main Structures, Substructures, Rotary table works, Draw works, Mud pumps,
Water tanks, Sewage Tanks, Hydraulic power units of high-pressure piping, Fabrication/Welding/Mechanical,
New & Repair Painting Inspection, Installation & Commissioning activities
Managed Quality Team to enable delivery of project objectives and monitored all Quality related
activities, including generation of deliverables
Reviewed and approved all relevant ITP and procedures
Issued NCR, s for non-conformance products
Internal and external inspection of static equipment’s and mud tanks
Surveillance and witness inspection of heat treatment process, welding, piping, fabrication, blasting &
painting activities related to rig structures, mud pumps, draw works, sea wage tanks, water tanks and
High-pressure piping for land RIG structures
Implemented project specific strategies for quality audit/construction QC support, non-conformance
reporting and continual improvement
FAT (Factory Acceptance Test) of hydraulic cylinders for RIG structures and equipment
Reviewed Final Documentation after completion of RIG piping
PETROFAC E&C INTERNATIONAL LTD., Abu Dhabi, UAE Jun 2008 to Dec 2014
Deputy QAQC Manager – Piping & Structural Offshore & Onshore (Jul 2013 to Dec 2014)
Key Project: Satah Al Razboot (SARB-3), Field Development Project package 3 EPC Work, Jacket Structures of
Flare platforms, Raiser platforms, Pile pipes, Bridges, Boat Landings & Top Decks (Offshore & Onshore)/Client:
ADMA,
Deputy QAQC Manager – Piping & Test Packs (Nov 2012 to Jun 2013)
Key Project: NGL 4th Train, Petrofac E & C International Ltd./Client: GASCO, Ruwais, Abu Dhabi, UAE
QAQC Engineer/Deputy QAQC Manager – Pipeline & Piping (May 2010 to Oct 2012)
Key Project: EPC for ASAB FFD, Petrofac E & C International Ltd./Client: ADCO, Abu Dhabi, UAE
PANORAMA CONTRACTING & ENGINEERING SERVICES, Dukhan, Qatar Dec 2007 to May 2008
QAQC Supervisor/Sr. Pipeline Inspector
Key Project: Pre-shutdown and shutdown function/Client: Qatar Petroleum
NATIONAL PETROLEUM CONSTRUCTION CO., Doha, Qatar May 2007 to Oct 2007
Senior QC Inspector - Pipeline
Key Project: Offshore & Onshore Pipeline/Client: Qatar Gas
CONTRACTING & TRADING COMPANY, Saudi Arabia Dec 2002 to Jul 2004
QA/QC Supervisor – Pipelines/Piping
Key Project: Haradh/Hawiyah Khuff Gas Pipeline projects/Client: Saudi Aramco, KSA
T. MAXWELL RAFFERTY ENGINEERING LTD., Visakhapatnam India Feb 1995 to May 1997
QC Inspector – Overhaul Pumps & Shutdown Welding/Mechanical
Key Project: Piping, static and rotating equipment installation and shutdown activities/Client: HPCL
2014: BOSIET, EBS (Emergency Breathing System) First Aid, Fire Fighting & HUET Course, GTSC training
centre, UAE
2005: Sea Survival, First Aid, Fire Fighting & HUET Course, MSTS Training Centre, Malaysia
PTW, working at height, Confined space & H2s at Qatar/Oman/UAE/Indonesia/Malaysia/South Korea
Technical Proficiencies
MS Office; Word, Excel, PowerPoint.
Design software - AutoCAD (Advanced Mechanical Desktop); Operating System – Windows 7 & above
Languages
Proficient in English, Hindi, Urdu, Telugu