Laporan Minggu Ke-1
Laporan Minggu Ke-1
Laporan Minggu Ke-1
No : SAJR/SCS/CRF/MS/01
PT SURYACIPTA SWADAYA Date : 22 December 2020
KARAWANG Rev. :2
Desember Januari februari Maret April Mei Juni
No Uraian Pekerjaan Satuan Volume Bobot W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16 W17 W18 W19 W20 W21 W22 W23 W24 W25 W26
11-20 21-27 28-3 4-10 11-17 18-24 25-31 1-7 8-14 15-21 22-28 1-7 8-14 15-21 22-28 29-4 5-11 12-18 19-25 26-2 3-9 11-16 17-23 24-30 31-6 7-9
A Pekerjaan Persiapan
1 Mobilisasi dan Demobilisasi ( Tenaga,Alat Kerja Dan Matrial ) ls 1.00 0.557% 0.139% 0.139% 0.139% 0.139%
2 Keamanan Lapangan ls 1.00 0.414% 0.069% 0.069% 0.069% 0.069% 0.069% 0.069%
3 Direksi Keet + Listrik , Air kerja ls 1.00 1.588% 0.265% 0.265% 0.265% 0.265% 0.265% 0.265%
4 Shop & As-built Drawing ls 1.00 0.413% 0.103% 0.029% 0.074% 0.103% 0.088% 0.015%
5 Laporan Progress & Foto Dokumentasi ls 1.00 0.236% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020%
6 C.A.R ( Include 3 Person Owner ) ls 1.00 0.787% 0.047% 0.028% 0.028% 0.033% 0.033% 0.033% 0.033% 0.033% 0.028% 0.033% 0.033% 0.028% 0.028% 0.033% 0.033% 0.028% 0.033% 0.033% 0.033% 0.028% 0.033% 0.009% 0.033% 0.028% 0.028% 0.014%
7 Tes Kebocoran / Tes Rendam ls 1.00 0.331% 0.050% 0.116% 0.033% 0.116% 0.017%
8 Tes Tarik Besi Beton / Tes Tekan Mutu Beton ( I T B ) ls 1.00 0.427% 0.131% 0.033% 0.033% 0.066% 0.033% 0.033% 0.066% 0.033%
9 Pengukuran / bouplank ls 1.00 0.315% 0.079% 0.067% 0.011% 0.034% 0.011% 0.022% 0.011% 0.022% 0.011% 0.011% 0.011% 0.011% 0.011%
10 Proteksi Lokasi Kerja ls 1.00 0.413% 0.025% 0.015% 0.015% 0.017% 0.017% 0.017% 0.017% 0.017% 0.015% 0.017% 0.017% 0.015% 0.015% 0.017% 0.017% 0.015% 0.017% 0.017% 0.017% 0.015% 0.017% 0.005% 0.017% 0.015% 0.015% 0.007%
11 Safety / HSE ls 1.00 0.497% 0.030% 0.018% 0.018% 0.021% 0.021% 0.021% 0.021% 0.021% 0.018% 0.021% 0.021% 0.018% 0.018% 0.021% 0.021% 0.018% 0.021% 0.021% 0.021% 0.018% 0.021% 0.006% 0.021% 0.018% 0.018% 0.009%
12 Pembersihan Lokasi ls 1.00 0.241% 0.052% 0.021% 0.021% 0.016% 0.037% 0.010% 0.016% 0.005% 0.021% 0.026% 0.016%
B Pekerjaan Clarifier
1 Bor pile f 40 cm , L = 15 m ( K 350 ) nos 9.00 3.386% 0.806% 1.129% 1.129% 0.322%
3 Galian tanah dan Buang Disposal ( Jarak 2 km ) m3 76.50 1.109% 0.222% 0.222% 0.259% 0.259% 0.148%
6 Bekisting (EXPOSE) m2 394.43 6.065% 0.217% 1.300% 0.433% 1.083% 1.300% 1.083% 0.650%
7 Water stop PVC Lebar 25 cm e Estopper atau Setara m1 45.60 0.513% 0.257% 0.128% 0.128%
8 Beton K - 350 m3 139.87 5.944% 1.717% 0.264% 1.717% 0.264% 1.585% 0.396%
10 Besi D 13 - 150 kg 3023.44 1.810% 0.217% 0.434% 0.145% 0.434% 0.362% 0.217%
11 Besi D 16 - 100 kg 4921.25 2.946% 0.184% 0.644% 0.644% 0.644% 0.644% 0.184%
13 Surface Protection setara Araldite tebal 300 mikron ( luar, dalam ) m2 488.23 5.533% 2.075% 2.421% 1.037%
1 Pipa Galvanise f 400 + Pengecatan m1 35.14 5.254% 0.233% 0.817% 0.700% 0.817% 0.817% 0.817% 0.700% 0.350%
2 Butterfly Valve f 400 ( Kitz 10 K) bh 6.00 6.752% 0.844% 1.266% 0.844% 0.844% 1.266% 0.844% 0.844%
4 Butterfly Valve f 350 ( Kitz 10 K ) bh 10.00 9.208% 0.921% 0.921% 1.381% 1.842% 0.921% 0.921% 0.921% 1.381%
1 Tee Equal f 400 + Pengecatan bh 6.00 3.015% 0.603% 0.905% 0.603% 0.905%
2 Tee Equal f 350 + Pengecatan bh 6.00 2.302% 0.691% 0.460% 0.691% 0.460%
4 Elbow 900 f 350 + Pengecatan bh 6.00 1.927% 0.385% 0.193% 1.156% 0.193%
5 Flange SO 10 K f 400 + Pengecatan bh 12.00 2.899% 0.870% 0.580% 0.580% 0.580% 0.290%
7 Relokasi PJU & Pompa + Aksesoris ls 1.00 1.023% 0.146% 0.438% 0.438%
Day
1.610% 1.597% 1.247% 1.852% 3.495% 3.713% 2.928% 3.320% 2.940% 2.654% 2.207% 2.154% 3.637% 5.449% 7.862% 10.542% 12.609% 9.961% 9.163% 6.079% 4.391% 0.053% 0.187% 0.077% 0.226% 0.046%
100%
TOTAL A + B + C + D 1.610% 3.207% 4.454% 6.306% 9.801% 13.514% 16.442% 19.762% 22.703% 25.357% 27.563% 29.717% 33.354% 38.803% 46.665% 57.207% 69.816% 79.777% 88.939% 95.019% 99.410% 99.463% 99.650% 99.728% 99.954% 100.000%
NO URAIAN PEKERJAAN
A Pekerjaan Persiapan
1 Mobilisasi dan Demobilisasi (Tenaga,alat kerja dan Material
2 Keamanan Lapangan
3 Direksi keet + Listrik, Air kerja
4 Shop & As Built Drawing
5 Laporan progres dan Foto dokumentasi
6 C.A.R ( include 3 person owner )
7 Tes kebocoran / Tes Rendam
8 Tes tarik besi beton / Tes tekan Mutu beton
9 Pengukuran / bouwplank
10 Proteksi lokasi kerja
11 Safety / HSE
12 Pembersihan Lokasi
13 Soil test /Sondir
B Pekerjaan Clarifier
1 Bor Pile f40 cm , L = 15 m ( k350)
2 Bobok borplie f40 cm
3 Galian tanah & Buang Disposal ( jarak 2 km )
4 Lean Concrete t=5cm K175
5 Compacted Sand = 10 cm
6 Bekisting (EXPOSE)
7 Water stop PVC lebar 25 cm ex Estoper atau setara
8 Beton K-350
9 Besi D 10-150
10 Besi D 13-150
11 Besi D 16-100
12 Besi D 19-100
13 Surface Porotection setara Araldite tebal 300 mikron (luar,dalam)
(ex Delta floor TC301SF)
90
A. PEKERJAAN PERSIAPAN
MINGGU KE : 1 hari kalender 1 Mobilisasi dan Demobilisasi (Tenaga,alat kerja dan Material 0.56% 0.000% 0.000% 0.000% 0.000% 0.010% 0.010% 0.000% 0.010% 0.010%
TGL DIBUAT 18-Dec-20 2 Keamanan Lapangan 0.41% 0.000% 0.069% 0.069% 0.000% 0.069% 0.069% 0.000% 0.000% 0.000%
TERPAKAI SISA 3
4
Direksi keet + Listrik, Air kerja
0.41%
0.000%
0.000%
0.265%
0.103%
0.265%
0.103%
0.000%
0.000%
0.265%
0.050%
0.265%
0.050%
0.000%
0.000%
0.000%
-0.053%
0.000%
-0.053%
RENCANA MINGGU LALU (%) : 0.00%
PERIODE
DARI SAMPAI (hari) (%) (hari) (%) 5
6
Laporan progres dan Foto dokumentasi
0.79%
0.000%
0.000%
0.020%
0.047%
0.020%
0.047%
0.000%
0.000%
0.020%
0.000%
0.020%
0.000%
0.000%
0.000%
0.000%
-0.047%
0.000%
-0.047%
11-Dec-20 18-Dec-20
7 Tes kebocoran / Tes Rendam 0.33% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% REALISASI MINGGU LALU (%) : 0.00%
8 8.889 82 91.111 8 Tes tarik besi beton / Tes tekan Mutu beton 0.43% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
9 Pengukuran / bouwplank 0.31% 0.000% 0.079% 0.079% 0.000% 0.079% 0.079% 0.000% 0.000% 0.000%
10 Proteksi lokasi kerja 0.41% 0.000% 0.025% 0.025% 0.000% 0.025% 0.025% 0.000% 0.000% 0.000%
DATA PROYEK 11 Safety / HSE 0.50% 0.000% 0.030% 0.030% 0.000% 0.030% 0.030% 0.000% 0.000% 0.000% SELISIH MINGGU LALU (%) : 0.00%
12 Pembersihan Lokasi 0.24% 0.000% 0.052% 0.052% 0.000% 0.052% 0.052% 0.000% 0.000% 0.000%
PROPINSI : JAWA BARAT 13 Soil test /Sondir 1.84% 0.000% 0.921% 0.921% 0.000% 0.921% 0.921% 0.000% 0.000% 0.000%
2
Bor Pile f40 c m , L = 15 m ( k350)
0.11%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
7 W ater stop PVC lebar 25 cm ex Estoper atau setara 0.51% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
SUPERVISOR : NOVRIANTO SYAFRUDIN 8 Beton K-350 5.94% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
11 Besi D 16-100 2.95% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
INSPECTOR : AGUS SURYANTO 12 Besi D 19-100 6.92% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
6 Tangga baja ( H 4 m) 0.20% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
TGL & NO KONTRAK : 4 Desember 2020 - 010/SCS-EDM/SPP/XII/2020
TGL & NO SPMK : 04 Desember 2020 - 004/SCS-EDM/SPMK/XII/2020 D. PEKERJAAN LAIN-LAIN RENCANA S/D MINGGU INI (%) : 1.61%
1 Tee Equal f400+pengecatan 3.02% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
NILAI KONTRAK : Rp 2,389,000,000.00
2 Tee Equal f350+pengecatan 2.30% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
MASA PELAKSANAAN : 90 (Sembilan Puluh) Hari Kalender 3 Elbow 90' f400 + pengecatan 2.21% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
5
Elbow 90' f350 + pengecatan
2.90%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
REALISASI S/D MINGGU INI (%) : 1.52%
6 Flange SO 10 K f350 + pengecatan 2.59% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
TGL BERAKHIR : 18-Mar-21
7 Relokasi PJU & pompa + aksesoris 1.02% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
Dibuat Oleh :
NO PERMASALAHAN PROYEK USULAN SOLUSINYA KETERANGAN
1 Gambar desain tidak sesuai dengan kondisi aktual lapangan Melakukan inventarisir dan steakout aktual kondisi lapangan
Novrianto Syafrudin
Supervisor
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) % %
1 UANG MUKA (10%) - - - - - - - - 1,386,000,000 1,386,000,000 10% 6.04%
WAKTU
NO JENIS KONTRAK NILAI KONTRAK CATATAN PERUBAHAN KONTRAK
PELAKSANAAN
7
88
PERIODE
STATUS LAPORAN
DARI SAMPAI
MINGGU KE : 1
11-Dec-20 18-Dec-20
TGL DIBUAT 18-Dec-20
PROGRESS RENCANA PROGRESS REALISASI SELISIH PROGRESS
BOBOT
NO URAIAN PEKERJAAN S/D S/D S/D KET
(%) S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
MINGGU INI MINGGU MINGGU MINGGU INI MINGGU
LALU LALU INI LALU
INI INI INI
A. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi (Tenaga,alat kerja dan Material 0.56% 0.000% 0.000% 0.000% 0.000% 0.010% 0.010% 0.000% 0.010% 0.010%
2 Keamanan Lapangan 0.41% 0.000% 0.069% 0.069% 0.000% 0.069% 0.069% 0.000% 0.000% 0.000%
3 Direksi keet + Listrik, Air kerja 1.59% 0.000% 0.265% 0.265% 0.000% 0.265% 0.265% 0.000% 0.000% 0.000%
4 Shop & As Built Drawing 0.41% 0.000% 0.103% 0.103% 0.000% 0.050% 0.050% 0.000% -0.053% -0.053%
5 Laporan progres dan Foto dokumentasi 0.24% 0.000% 0.020% 0.020% 0.000% 0.020% 0.020% 0.000% 0.000% 0.000%
6 C.A.R ( include 3 person owner ) 0.79% 0.000% 0.047% 0.047% 0.000% 0.000% 0.000% 0.000% -0.047% -0.047%
7 Tes kebocoran / Tes Rendam 0.33% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
8 Tes tarik besi beton / Tes tekan Mutu beton 0.43% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
9 Pengukuran / bouwplank 0.31% 0.000% 0.079% 0.079% 0.000% 0.079% 0.079% 0.000% 0.000% 0.000%
10 Proteksi lokasi kerja 0.41% 0.000% 0.025% 0.025% 0.000% 0.025% 0.025% 0.000% 0.000% 0.000%
11 Safety / HSE 0.50% 0.000% 0.030% 0.030% 0.000% 0.030% 0.030% 0.000% 0.000% 0.000%
12 Pembersihan Lokasi 0.24% 0.000% 0.052% 0.052% 0.000% 0.052% 0.052% 0.000% 0.000% 0.000%
13 Soil test /Sondir 1.84% 0.000% 0.921% 0.921% 0.000% 0.921% 0.921% 0.000% 0.000% 0.000%
B. PEKERJAAN CLARIFIER
1 Bor Pile f40 cm , L = 15 m ( k350) 3.39% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
2 Bobok borplie f40 cm 0.11% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
3 Galian tanah & Buang Disposal ( jarak 2 km ) 1.11% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
4 Lean Concrete t=5cm K175 0.19% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
5 Compacted Sand = 10 cm 0.17% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
6 Bekisting (EXPOSE) 6.07% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
7 Water stop PVC lebar 25 cm ex Estoper atau setara 0.51% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
8 Beton K-350 5.94% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
9 Besi D 10-150 0.08% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
10 Besi D 13-150 1.81% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
11 Besi D 16-100 2.95% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
12 Besi D 19-100 6.92% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
13 Surface Porotection setara Araldite tebal 300 mikron (luar,dalam) 5.53% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
2 Buterfly Valve f400 (kit2 10K) 6.75% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
3 Pipa Galvanise f350+ pengecatan 16.70% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
4 Buterfly Valve f350 (kit2 10K) 9.21% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
5 Tiang Suport (Baja) 8 titik 3.11% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
6 Tangga baja ( H 4 m) 0.20% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
D. PEKERJAAN LAIN-LAIN
1 Tee Equal f400+pengecatan 3.02% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
2 Tee Equal f350+pengecatan 2.30% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
3 Elbow 90' f400 + pengecatan 2.21% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
4 Elbow 90' f350 + pengecatan 1.93% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
5 Flange SO 10 K f400 + pengecatan 2.90% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
6 Flange SO 10 K f350 + pengecatan 2.59% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
7 Relokasi PJU & pompa + aksesoris 1.02% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
TOTAL (%) = 100% 0.000% 1.610% 1.610% 0.000% 1.521% 1.521% 0.000% -0.089% -0.089%
DATA PROYEK
PROPINSI : JAWA BARAT
: --
DATA KONTRAKTOR
NAMA KONTRAKTOR : PT. SARANA ABADI JAYA RAYA
ALAMAT KANTOR : Jl. Raya Galuh Mas, Ruko Casabella No. 3-5, Ds. Sukaharja
NO PERMASALAHAN PROYEK
90 hari kalender
TERPAKAI SISA
8 8.889 82 91.111
LAPORAN HARIAN
PEKERJAAN PEMBANGUNAN CLARIFIER IWTP PHASE-1