Work Flow

The document provides an overview of the purchase, V.D., and supply chain work flows. The purchase workflow involves stages such as quotation making, cost finalization, design approval, tooling development, and quality approval. The V.D. workflow focuses on development and monitoring, including part localization, tool development, and progress checks. The supply chain workflow manages local part and material supplies through activities like purchase order issuance, delivery scheduling, and stock monitoring.

Uploaded by

Waseem Ashraf
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
143 views

Work Flow

The document provides an overview of the purchase, V.D., and supply chain work flows. The purchase workflow involves stages such as quotation making, cost finalization, design approval, tooling development, and quality approval. The V.D. workflow focuses on development and monitoring, including part localization, tool development, and progress checks. The supply chain workflow manages local part and material supplies through activities like purchase order issuance, delivery scheduling, and stock monitoring.

Uploaded by

Waseem Ashraf
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Introduction to PUR & VD Department (PUR & VD Working Flow)

Purchase Work Flow V.D. Work Flow Supply Chain Work Flow

Planning & Cost Finalization stage Development & status Monitoring satge Local Parts supply (Continuous Process)

Cost Finalization Design Go Tooling=Cut Go Tool Development QAV-II Phase-2 Delivery Scehedule Purchase Orders (PO's) Supply follow-up
Quotation Making
Issuance Arrangements

• Supplier's Quotations • Fix detailed Part by


• Maker layout fix and Part Localization plan
• Making of Quotation by analysis Design GO • Part by Parts developmemnt
• Part Cost comparison • Test Items Finalize • Planning Finalization
Supplier • Localization Plan • Issue Tooling-Cut Go monitoring sheet • PQCT-1 and Process
• Provide quotation to PUR among different supplier Approval • degvelopment plan of
quotation • Tool / Jig Concept flow is defined • Monitoring Raw Materials Stock at
• PQCT-1 and development • PQCT-1 Draft study & finalization individual
• ML proposal for approval • Local Parts & Direct Vendor Warehouse
schedule • Cost target fix Materials Dleivery • Monitoring Child parts Stock at
to issue Design-Go • Isssue Purchase
Schedule issue to Sub con Vendors warehouse
Supplier Orders(PO's) to supplier • Monitoring & Follow-up of current
• 4 Months Forecast based through SAP stock and in-pipe line order of
on Production plan child parts, imported parts &
Materials

QAV=II Phase-3
(Progress Check)
Request For Quotation
(HNMPL Drawings)

Startup
• Plan vs actual progress
MP ISIR Submission & Part
check of localiztaion
• SAP monitoring
• Drawing/SPEC study Trial Lot Line Trial
• Make/issue request for Part Deletion • Documents Prep. check
quotation Parked Invoices
• Drawing and Spec share
with local supplier

After MP
Receiving of IPL

• Monitoring GRN status in


SAP on daily basis for
timely invoice parking.
• Invoice arranged from
Receiving of Drwaings/Spec Suppliers
• Invoice parked in SAP
• Invoices submitted to
Finance dept.with relevant
preparation of Tooling Trial documents
Localization Proposal QAV-II Phase -5 QAV-II Phase-4
(Supplier Readlines for MP) (Quality Maturation) (Parts Quality Levels T1,T2
• Receiving DWG & etc
Spec
• Record the Drawing
and Spec
• DWG's Data issue to PUR • Mass Pro Go & Safety Tooling Trial Judgment by:
Declaratrion. • Online Tooling Trials. • Trials Parts condition
• Tooling Trials @ MP • Parts, Tool & Jig quality • Trials problem's & its
parameter / conditions Confirm C/M's
• Audit of Documents. • Documents finalization • Test Confirmation (if Req)
Approval of Localization • Parts Confirmation • (SAP,PQCT-II,OPS etc) • Tech SPT (if plan & Req)
Proposal from HMC • M/P Condition. check Payment Follow-up

M/L investigation/QAV-II
Request for Drawing/spec Phase 1
• Follow with Finance
• Equipment's / facility Dept. for Timely Payment to
confirmation Supplier
• Prod & Tool dev Preaparation of
• Check the drawing Capacity
availibilty in system Localization Master plan
• Competitive Cost
• Make a Drawing for • Quality evaliuation
Korea

Doc. #:- HNMPL/PV/REC-15, Rev 01 Interns.VD


Issue Date:- 23-08-2022