Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

QCS Summary

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 157

S.

no Portion Line Name

1 P-2 JRBSP-NIGC
2 P-2 JRBSP-BERRI BGL CKT 1 & 2
3 P-2 JRBSP-GHAZLAN
4 P-2 JRBSP-SWCC 2B
5 P-2 JRBSP-JSE CKT 1
6 P-2 JRBSP-JSE CKT 2
7 P-2 JRBSP-JSW
8 P-2 SWCC 2A-JSW
9 P-2 FADHILI-IBN ZAHR
10 P-2 FAD-JUPC
11 P-2 FAD-JN
12 P-2 J2-KAYAN
13 P-2 JN-JUPC
14 P3-Part A New Juaymah BSP to Ext. Juaymah BSP
15 P3-Part B New Juaymah to Ext. Juaymah NGL
16 P3-Part CA New Juaymah to Ext. Ghazlan PP
17 P3-Part
P3-Part CB
D && P7 New Juaymah BSP to Rastanura Sub 80
18 P7
P3-Part D & Ext. Qatif BSP to Rastanura Sub 80
19 P7 New Juaymah BSP to Rastanura Sub 80

Total Required
Stock Available
Qty to be released
Tension Set Tension Plate
For Pass through
Suspension as Termination
splicing (Non splicing)
120 KN 70 KN 120 KN 70 KN 120 KN 70 KN
PAD FINAL 10 6 36 22 0 0
BALA 12 0 52 0 0 0
BALA 14 18 35 4 0 0
BALA 10 6 26 2 0 0
BALA 10 0 50 0 0 0
BALA 10 0 42 0 0 0
CABLE 8 0 32 0 0 0
BALA 10 8 18 14 0 0
CANCEL 9 12 14 18 0 0
INPRO 10 12 28 22 0 0
COMPLETED 10 8 14 12 0 0
RETROFIT 20 4 60 8 0 0
RETROFIT 4 0 10 0 0 0
COMPLETED 8 0 12 0 0 0
BALA 12 0 42 0 0 0
COMPLETED 14 0 48 0 0 0
COMPLETED 10 6 24 4 0 0
COMPLETED 10 16 15 10 0 0
OPGW 9 8 25 8 0 0

200 104 583 124 0 0


204 108 1093 128
-4 -4 -510 -4 0 0
DELL: DELL:
5set full & 123 393 full & 117
Incomplete Incomplete
Junction Box
Suspension Vibration Extra Armor Grip /rod for Down-lead
Set Damper Damper Clamp
OPGW 120- OPGW 120-
OPGW 120 OPGW 70
120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN
23 27 90 123 0 41 190 170 2 2
16 0 90 0 0 0 200 0 2 0
28 79 88 270 0 90 180 280 3 2
32 29 98 99 0 33 180 120 2 2
20 0 98 0 0 0 180 0 3 0
23 0 96 0 0 0 180 0 3 0
12 0 62 0 0 0 140 0 2 0
29 45 84 168 0 56 180 160 2 2
31 49 84 192 0 64 180 240 2 2
15 64 92 204 0 68 180 240 2 2
31 33 82 129 0 38 180 160 2 2
48 22 172 84 0 28 380 80 4 4
8 0 18 0 0 0 60 0 0 0
0 0 12 0 0 0 120 0 0 0
30 0 104 0 0 0 320 0 2 0
54 0 164 0 0 0 260 0 4 0
22 9 114 215 40 173 230 170 2 2
37 76 151 393 55 215 215 360 2 2
29 30 90 114 0 38 180 200 2 1

488 463 1789 1991 95 844 3735 2180 41 23


510 401 2388 1681 1460 910 5145 3075 46 13
-22 62 -599 310 -1365 -66 -1410 -895 -5 10
Junction Box
OPGW 70 OPGW 120-
FSTP Pig Tails
OPGW 70 UGNMFOC

3 2 1 48 96
0 4 4 192 192
6 3 3 144 144
2 2 2 96 96
0 2 2 96 96
0 2 2 96 96
0 2 2 96 96
3 2 2 96 96
5 2 2 96 96
5 2 2 96 96
3 2 2 96 96
0 8 2 96 192
0 2 2 96 96
0 4 4 192 192
0 4 4 192 192
0 4 3 144 192
1 2 1 48 192
7 2 2 96 96
4 2 2 96 96

39 53 44 2112
49 49 2381
39 4 -5 -269
Description Drg No in one
117 set Available Shortage
120 kN OPGW Suspension
1 AGS Clamp with armor rod 182 913 7016 1 117 117
2 Double eye twisted 182 905 231 1 117 117
3 Shackle 182 901 209 1 117 117 0
3 PG Clamp 182 927 105 1 117 117 0
4 Tower Clamp 182 928 250 1 117 117 0

Description Drg No in one


123 set Available Shortage
70 kN OPGW Tension
1 Shackle 182 901 201 1 123 96 27
2 Chain Link 182 905 042 1 123 123 0
3 Thimble clevis 182 918 004 1 123 123 0
4 Dead end set 182 929 568 1 123 0 123
5 PG Clamp 182 927 103 1 123 123 0
6 Earthing Clamp 182 928 250 1 123 123 0
S.no Line Name S/S Name UGNMFOC Required
1 Ghazlan to JRBSD Ghazlan PP 360
2 JRBSP to JSW JSW 260
3 SWCC 2A to JSW JSW 240
4 Jubail2 to NIGC NIGC 130
5 JRBSP to JSE Ckt 2 JSE 130
6 JRBSP to JSE Ckt 1 JSE 240
7 JRBSP to Berri NGL CKT 1 & 2 Berri NGL 600
8 SWCC 2A to JSW SWCC 2A 850
9 SWCC 2A to JRBSP SWCC 2A 850
10 Fahili to Jubail North JN 160
11 Fahili to JUPC JUPC 50
12 Jubail North to JUPC JUPC 70
13 Jubail North to JUPC JN 280
14 Jubail 2 to Kayan Ckt 1 & 2 Kayan S/S 360
15 Jubail 2 to Kayan Ckt 1 & 2 Jubail 2 300
16 Jubail 2 to Kayan Ckt 1 & 2 MP-MP 300
17 Fadhili to JUPC Fadhili 120
18 Fadhili to Jubail North Fadhili 170
19 Fadhili to Ibn Zahr Fadhili 230
20 Fadhili to Ibn Zahr Ibn Zahr 400
21 JRBSP to 09 Ckts JRBSP 3200
22 New Juyamah to Ghazlan Ckt 1 & Ckt 2 -175*2 Ghazlan p/p 350
23 New Juyamah to Ext. Juyamah Ckt 1 & Ckt 2 - 200*2 Ext. Juyamah 400
24 New Juyamah to Juyamah NGL Ckt 1 & Ckt 2 – 250*2 Juyamah NGL 500
25 New Juyamah to Rastanurah Ckt 1 & Ckt 2 – 250*2 Rastanurah Sub 80 500
26 New Juyamah to Rastanurah Sub 80 Rastanurah Sub 80 300
27 Qatif to Rastanurah sub 80 Rastanurah Sub 80 300
28 Qatif to Rastanurah sub 80 Qatif BSP 250
11900
M504_ P3 & P7 OPGW Summary

Tension Set Tension Plate Suspension Vibration Down-lead Junction Box


Pass through Suspension as Extra Armor Grip /rod for Damper
For splicing Set Damper Clamp
Required Drum Received Drum (Non splicing) Termination OPGW OPGW OPGW OPGW Vibration
Portion & Line Name No. of Circuits Section Length length Length Warning Warning lights Tower
Part (m) 120- 120- 70 120- Spheres Damper for
(m) (m) (Both Cicuits) Beacons
120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN OPGW OPGW OPGW UGNMF Conductor
120 70 70 OC

P3_Part A New Juaymah BSP to Ext. 2 1001.74 1639.22 1679.00 8 0 12 0 0 0 0 0 12 0 0 0 120 0 0 0 0 4 0 0 0 0


Juaymah BSP

New Juaymah to Ext. Juaymah


P3_Part B NGL 2 14037.00 14974.37 15135.00 12 0 42 0 0 0 30 0 104 0 0 0 320 0 2 0 0 4 0 0 0 0

P3_Part CA New Juaymah to Ext. Ghazlan PP 2 22884.99 24172.44 24742.00 14 0 48 0 0 0 54 0 164 0 0 0 260 0 4 0 0 4 0 0 0 0

P3_Part CB & New Juaymah BSP to Rastanura 2 46059.46 48575.90 50265.00 10 6 24 4 0 0 22 9 114 215 40 173 230 170 2 2 1 2 156 124 62 6
P7 Sub 80

P3_Part D & Ext. Qatif BSP to Rastanura Sub


1 43655.75 45586.07 44537.00 10 16 15 10 0 0 37 76 151 393 55 215 215 360 2 2 7 2
P7 80
181 156 78 6
P3_Part D & New Juaymah BSP to Rastanura 1 25373.68 26734.31 25712.00 9 8 25 8 0 0 29 30 90 114 0 38 180 200 2 1 4 2
P7 Sub 80

Total Quantity P3 & P7 = 153012.62 161682.31 162070.00 63 30 166 22 0 0 172 115 635 722 95 426 1325 730 12 5 12 18 337 280 140 12

Warning Spheres VD: Warning Spheres Armor Rods:


REMARKS 120kN: 95 Nos. 120kN: 95 Nos.
70KN: 242 Nos. 70KN: 242 Nos.

511 230 402 490 1352 1776 3492 2810

1537 264 628 669 3922 2460 1570 660 6424 3650

QTY Requirement for Portion 7


Item Descrition Section
Ext GRT# 74 to
70 KN OPGW Drum 2 1365.51 1507.97 3200.00
Ext GRT# 78

New Juaymah BSP to Rastanura


P7
Sub 80
2 1 3 2 2 0 0 0 1 14 179 10 156 50 90 0 1 0 0 156 ### 124 62 6
Ext. Qatif BSP to Rastanura Sub
P7
80
1 0 0 2 6 0 0 0 0 7 29 3 21 0 0 0 0 0 0
181 ### 156 78 6
New Juaymah BSP to Rastanura
P7 Sub 80 1 0 0 2 6 0 0 0 0 4 12 0 4 0 0 0 0 0 0

Total Quantity P7 = 1365.51 1507.97 3200.00 1.00 3.00 6.00 14.00 0.00 0.00 0.00 1.00 25.00 220.00 13.00 181.00 50.00 90.00 0.00 1.00 0.00 0.00 337.00 ### 280.00 140.00 12.00

Warning Spheres VD: Warning Spheres Armor Rods:


REMARKS 120kN: 95 Nos. 120kN: 95 Nos.
70KN: 242 Nos. 70KN: 242 Nos.
Project M 504 <Constr

Line :- JRBSP-NIGC, 230kv, 1X48 OPGW DRUM SCHEDULE - Retrofitting


70 KN 120 KN
Towers Spans
Horizonta Section
Progressive
Tower Tower Height in l Line Length in mtrs
Length in
Number Type mtrs Span in Angle
mtrs
mtrs
(1) (2) (3) (4) (5) (6) (7)
GANTRY JRSD BSP Gantry JR BSP 23.85 86.56 86.56 0.00
PROP-E1 AT+E0+1.5 43.25 216.68 303.24 2° 18' 8"R
PROP-E2 HA+E0+1.5 43.25 222.00 525.24 88° 17' 5"L
PROP-E2/1 TT+E6+1.5 49.50 271.16 796.40
PROP-E3 LA+E0+9 50.75 316.00 1112.40 13° 14' 47"L
PROP-E3/1 TT+E0+6 48.00 367.50 1479.90
PROP-E4 HA+E0+3 44.75 319.84 1799.74 8° 51' 35"R
BPM-18 AT 46.50 229.95 2029.69 0.00
BPM-18A AT 46.50 230.85 2260.54 0.00 4597.04
BPM-19 TT 33.90 335.30 2595.84 0.00
BPM-20 TT 36.80 242.30 2838.14 0.00
BPM-21 TT 38.90 214.90 3053.04 0.00
BPM-22 TT 38.90 228.60 3281.64 0.00
BPM-23 TT 37.20 335.25 3616.89 0.00
BPM-24 TT 34.80 335.15 3952.04 0.00
BPM-25 TT 34.80 310.00 4262.04 0.00
BPM-26 AT 38.10 335.00 4597.04 0.00
BPM-27 AT 54.20 360.85 4957.89 0.00
BPM-28 TT 34.80 200.45 5158.34 02°38'20"L
BPM-28A MONOPOLE 39.80 220.95 5379.29 08°47'35"R 1302.40
BPM-29 TT 43.90 276.95 5656.24 06°10'58"L
BPM-30 MONOPOLE 63.10 243.20 5899.44 02°49'33"R
BPM-30A AT 69.60 203.60 6103.04 08°14'39"L
BPM-31 MONOPOLE 43.30 199.15 6302.19 09°08'59"R
BPM-32 TT 34.80 335.30 6637.49 02°26'12"L
BPM-33 TT 34.80 144.35 6781.84 0.00
PROP- JN-1 MASD-34m 33.65 126.35 6908.19 14° 44' 15"R
PROP-JN-2 MASH-25 24.65 104.00 7012.19 20° 2' 20"L 2336.05
PROP-JN-3 MASH-25 24.65 115.00 7127.19 15° 18' 56"L
PROP-JN-4 MASD-34m 33.65 193.75 7320.94 14° 36' 03"R
J2NC-50 TT 34.80 332.30 7653.24 0.00
J2NC-51 TT 32.80 292.25 7945.49 0.00
J2NC-52 AT 32.80 290.00 8235.49 0.00
J2NC-53 TT 32.80 312.30 8547.79 0.00
J2NC-54 TT 32.80 304.80 8852.59 0.00
J2NC-55 TT 29.70 281.95 9134.54 0.00
J2NC-56 TT 32.80 326.60 9461.14 0.00
J2NC-57 HA 35.80 304.40 9765.54 0.00 2879.15
J2NC-58 TT 43.30 304.60 10070.14 0.00
J2NC-59 TT 43.30 335.00 10405.14 0.00
J2NC-60 TT 46.50 341.40 10746.54 0.00
2879.15

J2NC-61 TT 50.90 368.10 11114.64 0.00


J2NC-62 HA 49.00 283.55 11398.19 19°43'01"R
J2NC-63 TT 46.50 335.25 11733.44 0.00
J2NC-64 TT 46.50 301.70 12035.14 0.00
J2NC-65 TT 48.00 353.60 12388.74 0.00
J2NC-66 TT 43.30 332.25 12720.99 0.00
J2NC-67 TT 43.30 332.20 13053.19 0.00
J2NC-68 TT 43.30 347.40 13400.59 0.00
4478.70
J2NC-69 TT 43.30 344.30 13744.89 0.00
J2NC-70 TT 43.30 347.50 14092.39 0.00
J2NC-71 TT 43.30 335.20 14427.59 0.00
J2NC-72 TT 48.00 251.45 14679.04 0.00
J2NC-73 TT 54.10 266.70 14945.74 0.00
J2NC-74 TT 48.00 289.50 15235.24 0.00
J2NC-75 TT 48.00 358.10 15593.34 0.00
J2NC-76 TT 44.90 358.15 15951.49 0.00
J2NC-77 TT 43.30 358.15 16309.64 0.00
J2NC-78 TT 43.30 358.10 16667.74 0.00
J2NC-79 TT 44.90 250.50 16918.24 0.00 1825.75
J2NC-80 HA 44.80 312.45 17230.69 89°58'33"R
J2NC-81 HA 46.10 23.00 17253.69 0.00
J2NC-82 Gantry 23.30 165.40 17419.09 0.00
J2NC-83 HA 44.00 309.70 17728.79 90°35'46"L
J2NC-84 HA 45.40 218.00 17946.79 0.00
J2NC-85 HA 44.00 137.90 18084.69 85°7'19"R
J2NC-86 HA 43.00 304.80 18389.49 4°51'26"R
J2NC-87 TT 43.00 305.10 18694.59 0.00
J2NC-88 TT 56.50 304.90 18999.49 0.00
J2NC-89 TT 58.00 285.75 19285.24 0.00 3760.25
J2NC-90 AT 72.40 334.20 19619.44 0.00
J2NC-91 AT 70.10 270.50 19889.94 0.00
J2NC-92 TT 55.30 344.45 20234.39 0.00
J2NC-93 TT 47.60 314.95 20549.34 0.00
J2NC-94 TT 43.00 315.00 20864.34 0.00
J2NC-95 TT 44.50 315.00 21179.34 0.00
J2NC-96 TT 42.90 314.95 21494.29 0.00
J2NC-97 TT 53.60 257.00 21751.29 0.00
J2NC-98 HA 56.40 312.55 22063.84 87°20'00"R
J2NC-99 TT 44.80 347.95 22411.79 0.00
J2NC-100 TT 53.70 349.00 22760.79 0.00
2356.20
J2NC-101 TT 41.50 275.95 23036.74 0.00
J2NC-102 TT 43.00 179.80 23216.54 4°2'23"R
J2NC-103 HA 44.80 279.00 23495.54 84°55'55"R
J2NC-104 HA 44.80 40.00 23535.54 0.00
NIGC Gantry GANTRY 23.30 0.00 23535.54 0.00

23535.54 23535.54
Project M 504 <Construction and Configuration of OHTL and UG Cable in Jubail and Shedgum Areas> /4400003961/Portion
6310.32
E - Retrofitting

Tension Set Tension Plate


Length Suspension
of Adjusted For Pass through Suspension as Set
OPGW in Drum Length splicing (Non splicing) Termination
mtrs 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN
(8) (9) (10) (11) (12) (13) (14) (15) (16)
2
3
2
1
2
1
2
2
4728.07 4772.00 2
1
1
1
1
1
1
1
2
2
1
1462.71 1515.00 2
1
2
1 1
2

2
2480.13 2473.00 2
2
2

2
2

3005.35 3020.00 2
3005.35 3020.00

4624.99 4739.00

1953.78 2820.00
2
2
2
1 1
2
2
2
1
1
3895.95 4174.00 1
2
2
1
1
1
1
2
1
2
1
1
2504.18 2566.00
1
1
2
3
2

24655.17 26079.00
Total 10 6 36 22 0 0 23
6 4 17 11 0 0 23
Areas> /4400003961/Portion 2

Junction Box
Suspension Vibration Extra Armor Grip Down-lead
Set Damper /rod for Damper Clamp OPGW
OPGW
120- OPGW 70
120-
OPGW OPGW 70
70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN OPGW 70
120
(17) (18) (19) (20) (21) (22) (23) (24) (25) (26)
2 30
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2 30 1
2
2
2
2
3 0 1 20 20 1
3 0 1
1 3 0 1
1 3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
1 3 0 1
1 3 0 1
3 0 1
3 0 1 40 1
1 3 0 1
1 3 0 1
1 3 0 1
3 0 1
1 3 0 1
1 3 0 1
1 3 0 1
1 3 0 1
3 0 1 40 1
1 3 0 1
1 3 0 1
1 3 0 1
1 3 0 1
1 3 0 1
1 3 0 1
1 3 0 1
1 3 0 1
1 3 0 1
1 3 0 1
1 3 0 1
1 3 0 1
1 3 0 1
3 0 1 40 1
1 3 0 1
1 3 0 1
1 3 0 1
3 0 1
3 0 1
3 0 1
2 30 30 1
2
2
2
2
2
2
2
2
2
2
2
2
2 40 1
2
2
2
2
2
2
2
2
2 40

27 90 123 0 41 190 170 2 2 3


27 45 41 41 41 6 5 2 2 3
on Box
OPGW
120-
UGNMFO
C
(27)
1
1

2
2
Project M 504 <Constructio

Line :- JRBSP to BERRI NGL 230 KV, 2X48 OPGW DRUM SCHEDULE - Retrofitting
70 KN 120 KN
Towers Spans
Length
Horizonta Progressive Section of
Tower Tower Height in l Line Length in mtrs OPGW in
Length in
Number Type mtrs Span in mtrs Angle mtrs
mtrs
(1) (2) (3) (4) (5) (6) (7) (8)
GANTRY JRSD BSP Gantry SS 23.85 86.36 86.36
I-1 AT+E0+1.5 43.25 320.89 407.25 2° 17' 59"R
I-2 LA+E0+1.5 43.25 288.55 695.81 17° 0' 1"L
1617.81 1713.40
I-3 MA+E0+4.5 46.25 371.25 1067.06 28° 16' 38"L
I-4 HA+E6+6 53.75 206.48 1273.53 46° 29' 34"R
END-I HA+E6+6 53.75 344.28 1617.81 87° 6' 35"R
BK-11 TT 33.65 359.65 1977.46 0
BK-10 TT 38.40 371.85 2349.31 0
BK-9 TT 36.90 289.55 2638.86 0
BK-8 TT 35.60 335.30 2974.16 0
BK-7 TT 35.60 274.25 3248.41 0
BK-6 TT 38.40 224.25 3472.66 0
BK-5 TT 38.40 232.90 3705.56 0
BK-4 TT 38.40 205.40 3910.96 0
BK-3 HA 36.10 312.15 4223.11 91°25ʹ51ʺRT 3550.40 3754.70
BK-2 TT 34.00 260.55 4483.66 0
BJN-1(NEW) MHA 27.30 131.25 4614.91 89°59ʹ59ʺLT
BPU-2 MHA 27.30 135.95 4750.86 0
BPU-1 MHA 20.00 91.50 4842.36 9°39ʹ30ʺRT
BJN-2(NEW) MHA 40.05 206.56 5048.92 79°32ʹ21ʺRT
BJN-3(NEW) MHA 40.40 19.99 5068.91 89°32ʹ37ʺLT
BPP-3(EXT) HA 40.40 99.30 5168.21 0°3ʹ32ʺLT
BNGL GANTRY GANTRY 23.60 0.00 5168.21 0

5168.21 5168.21 5468.10


Total
roject M 504 <Construction and Configuration of OHTL and UG Cable in Jubail and Shedgum Areas> /4400003961/Portion 2

SCHEDULE - Retrofitting

Tension Set Tension Plate


Suspension Vibration
For Pass through Suspension as Set Damper
Ratio splicing (Non splicing) Termination
120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN
(9) (10) (11) (12) (13) (14) (15) (16) (17) (18)
4 4
6 4
4 4
1728/1741
4 4
4 4
4 4
4 4
2 4
2 4
2 4
2 4
2 4
2 4
2 4
3890/3842 4 4
2 4
4 4
4 4
4 4
4 4
4 4
6 4
4 2

105.80%
Total 12 0 52 0 0 0 16 0 90

3 0 12 0 0 0 8 0 23
1/Portion 2

Junction Box
Vibration Extra Armor Grip Down-lead
Damper /rod for Damper Clamp OPGW OPGW OPGW
120- OPGW 70 120-
120-
OPGW OPGW 70 OPGW 70 UGNMFO
70 KN 120 KN 70 KN 120 KN 70 KN 120 C
(19) (20) (21) (22) (23) (24) (25) (26) (27)
60 2

80 2

60 2

0 0 0 200 0 2 0 0 4

0 0 0 3 0 1 0 0 2
Project M 504 <Constr

Line :- JRBSP to Ghazlan (2x48 & 1x48) OPGW DRUM SCHEDULE - New OHTL and Retrofitting
70 KN 120 KN
Towers Spans
Length
Horizontal Progressive Section of
Tower Tower Height in Line Length in mtrs OPGW in
Span in Length in
Number Type mtrs mtrs mtrs Angle mtrs

(1) (2) (3) (4) (5) (6) (7) (8)


GHAZLAN P/P GANTRYGantry 23.00 90.00 90.00 0
1 HA 35.90 337.50 427.50 0
2 TT 34.40 350.00 777.50 0
3 MA 35.90 335.15 1112.65 34°08'47"R
4 TT 34.40 335.75 1448.40 0
3115.25 3308.23
5 TT 34.40 338.15 1786.55 0
6 TT 34.40 338.15 2124.70 0
7 TT 34.40 329.30 2454.00 0
8 TT 35.80 330.60 2784.60 0
9 TT 35.80 330.65 3115.25 0
10 TT 34.40 323.10 3438.35 0
11 TT 34.40 335.15 3773.50 0
12 TT 34.40 347.40 4120.90 0
13 TT 38.70 365.70 4486.60 0
14 TT 38.70 350.50 4837.10 0 3079.40 3193.60
15 TT 37.30 352.10 5189.20 0
16 HA 35.90 333.80 5523.00 89°54'25"R
17 TT 38.70 335.20 5858.20 0
18 TT 34.40 336.45 6194.65 0
19 TT 34.40 334.50 6529.15 0
20 TT 34.40 335.00 6864.15 0
21 TT 34.40 334.05 7198.20 0
22 TT 34.40 335.15 7533.35 0
23 TT 34.40 335.30 7868.65 0
24 TT 34.40 335.15 8203.80 0
4023.61 4142.53
25 TT 34.40 337.60 8541.40 0
26 TT 34.40 339.05 8880.45 0
27 TT 34.40 338.26 9218.71 0
28 TT 34.40 335.10 9553.81 0
29 TT 34.40 336.95 9890.76 0
30 TT 34.40 327.50 10218.26 0
31 TT 34.40 329.10 10547.36 0
32 TT 34.40 335.45 10882.81 0
33 TT 34.40 334.80 11217.61 0
34 TT 34.40 341.00 11558.61 0
35 TT 37.30 347.80 11906.41 0
36 TT 40.60 344.35 12250.76 0
4735.75 4861.13
37 TT 34.40 348.85 12599.61 0
4735.75 4861.13
38 TT 34.40 342.95 12942.56 0
39 TT 34.40 333.30 13275.86 0
40 TT 34.40 337.10 13612.96 0
41 TT 34.40 335.35 13948.31 0
42 TT 34.40 335.10 14283.41 0
43 TT 34.40 335.30 14618.71 0
44 TT 34.40 335.30 14954.01 0
45 TT 37.30 335.10 15289.11 0
46 TT 40.60 341.30 15630.41 0
47 TT 40.60 323.05 15953.46 0
48 AS 34.20 335.20 16288.66 0
49 TT 35.80 347.35 16636.01 0
50 TT 34.40 329.15 16965.16 0
51 TT 34.40 335.20 17300.36 0
4692.95 4818.11
52 TT 34.40 335.25 17635.61 0
53 TT 34.40 335.20 17970.81 0
54 TT 34.40 335.30 18306.11 0
55 TT 34.40 335.20 18641.31 0
56 TT 34.40 329.10 18970.41 0
57 TT 34.40 341.30 19311.71 0
58 TT 34.40 335.25 19646.96 0
59 TT 34.40 329.10 19976.06 0
60 TT 34.40 274.60 20250.66 0
61 TT 34.40 274.30 20524.96 0
62 LA 35.90 340.75 20865.71 06°51'60"L
63 TT 40.50 310.75 21176.46 0
64 TT 40.50 359.60 21536.06 0
65 TT 43.60 374.80 21910.86 0
66 TT 41.80 341.35 22252.21 0 4747.50 4871.24
67 TT 38.70 359.65 22611.86 0
68 TT 34.40 356.50 22968.36 0
69 TT 37.30 228.55 23196.91 0
70 TT 37.30 198.05 23394.96 0
71 TT 37.30 310.75 23705.71 0
72 TT 38.70 310.90 24016.61 0
73 TT 37.30 377.85 24394.46 0
74 AS 35.60 322.90 24717.36 0
75 TT 35.80 317.05 25034.41 0
76 TT 35.80 335.30 25369.71 0
77 TT 35.80 319.95 25689.66 0
78 TT 34.40 335.25 26024.91 0
79 TT 34.40 335.20 26360.11 0
80 TT 34.40 341.30 26701.41 0 4306.15 4429.18
81 TT 34.40 335.20 27036.61 0
82 TT 34.40 329.20 27365.81 0
83 TT 34.40 332.20 27698.01 0
4306.15 4429.18

84 TT 34.40 332.20 28030.21 0


85 TT 34.40 335.20 28365.41 0
86 TT 34.40 335.20 28700.61 0
87 MA 35.90 335.20 29035.81 49°43'34"R
88 TT 37.30 320.05 29355.86 0
89 TT 35.80 310.90 29666.76 0
90 TT 35.80 338.15 30004.91 0
91 MA 35.90 335.50 30340.41 49°48'28"L
92 TT 35.80 335.25 30675.66 0 3681.65 3804.66
93 TT 35.80 335.20 31010.86 0
94 TT 34.40 335.20 31346.06 0
95 TT 35.80 335.25 31681.31 0
96 TT 38.70 335.20 32016.51 0
97 TT 38.70 365.75 32382.26 0
98 TT 38.70 274.30 32656.56 0
99 TT 37.30 335.20 32991.76 0
100 TT 38.70 350.45 33342.21 0
101 TT 38.70 350.50 33692.71 0
102 TT 37.30 274.30 33967.01 0
103 TT 38.70 335.20 34302.21 0 3474.25 3596.12
104 TT 35.80 304.75 34606.96 0
105 TT 35.80 304.75 34911.71 0
106 TT 35.80 304.80 35216.51 0
107 TT 35.80 335.25 35551.76 0
108 TT 35.80 304.75 35856.51 0
109 TT 35.80 315.45 36171.96 0
110 TT 35.80 304.70 36476.66 0
111 TT 31.20 294.10 36770.76 0
112 TT 32.90 289.55 37060.31 0
113 TT 34.40 289.50 37349.81 0
114 TT 35.80 289.50 37639.31 0
115 TT 37.30 133.50 37772.81 0
116 HA 38.70 146.05 37918.86 00°00'00"
3 HA 38.70 126.40 38045.26 70°28'53"R
4788.76 4922.00
4 HA 40.10 121.30 38166.56 70°13'37"L
5 TT 56.70 290.00 38456.56 0
6 TT 61.00 287.10 38743.66 0
7 TT 61.00 269.90 39013.56 0
8 TT 61.00 336.00 39349.56 0
9 TT 49.50 288.90 39638.46 0
10 TT 49.50 372.92 40011.38 0
11 TT 41.60 359.00 40370.38 0
BSE-12 TT 45.40 274.89 40645.27 0
BSE-13 TT 43.50 114.49 40759.76 0
END-H HA+E0+9 50.75 349.24 41109.00 89° 59' 49"R
H-4 MA+E6+9 56.75 362.42 41471.42 43° 55' 18"R
H-3 MA+E0+1.5 43.25 296.42 41767.84 28° 28' 23"L 1508.57 1699.66
1508.57 1699.66
H-2 LA+E0+1.5 43.25 299.80 42067.64 16° 53' 59"L
H-1 AT+E0+1.5 43.25 86.20 42153.84 2° 33' 52"R
JRSD BSP Gantry 23.85 0.00 42153.84 0

42153.84 42153.84 43646.46


Total
Project M 504 <Construction and Configuration of OHTL and UG Cable in Jubail and Shedgum Areas> /4400003961/Portion 2

OHTL and Retrofitting

Tension Set Tension Plate


Suspension
For Pass through Suspension as Set
Ratio splicing (Non splicing) Termination
120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN
(9) (10) (11) (12) (13) (14) (15) (16) (17)
2
3
1
2
1
3327.00
1
1
1
1
1
2
1
1
1
3209.00 1
1
2
1
1
1 1
1
1
1
1
1
4163.00
1
1
1
1
1
1
2
1
1
1
1
1
4885.00
1
4885.00
1
1
1
1
1
1
1
2
1
1
2
1
1
1
4842.00
1
1
1
1
1
1
1
2
1
1
2

1
1
4895.00 1
1
1
1
1
1
1
1
2
1
1
1
1
1
4451.00 1
1
1
1
4451.00

1
1
1
2
1
1
1
2
3823.00 1
1
1
1
2 1
1
2
1
1
1
1
3613.00 1
1
1
1
1
1
1 1
1
1
1
1
1
1
2
2
4916.00
2
1
1
1
1
1
1
1
1
4
4
4
1723/1515 4
1723/1515
4
6
4

103.54%
Total 14 18 35 4 0 0 28 79

6 10 11 2 0 0 28 79
4400003961/Portion 2

Junction Box
Vibration Extra Armor Grip Down-lead
Damper /rod for Damper Clamp OPGW OPGW OPGW
120- OPGW 70 120-
120-
OPGW OPGW 70 OPGW 70 UGNMFO
120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 C
(18) (19) (20) (21) (22) (23) (24) (25) (26) (27)
2 30 1
2
2
2
2
2
2
2
2
2
2 40 1
2
2
2
2
2
2
2
2
3 0 1 20 20 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1 40 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1 40 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1 40 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1 40 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1 40 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1 40 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
2 20 20 1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2 40 2
2
2
2
2
2
2 30 2

88 270 0 90 180 280 3 2 6 3

44 90 90 90 6 8 2 2 6 2
Project M 504 <Construction

Line :- JRBSP to SWCC 2B, 230 KV , 1X48 OPGW DRUM SCHEDULE - Retrofitting
70 KN 120 KN
Towers Spans
Length
Horizonta Progressive Section of
Tower Tower Height in l Line Length in mtrs OPGW in
Length in
Number Type mtrs Span in mtrs Angle mtrs
mtrs
(1) (2) (3) (4) (5) (6) (7) (8)
SWCC 2B GANTRY Gantry 16.00 60.00 60.00 0
65 HA 43.10 312.00 372.00 90°00'00"L
64 TT 49.00 354.70 726.70 0
63 TT 47.50 349.92 1076.62 0
62 TT 45.70 294.93 1371.55 0
61 TT 47.50 354.19 1725.74 0
60 TT 45.70 276.97 2002.71 0
59 TT 45.70 265.47 2268.18 0 4381.85 4492.76
58 TT 45.70 279.85 2548.03 0
57 TT 43.00 264.49 2812.52 0
56 HA 44.50 305.97 3118.49 55°04'46"R
55 HA 40.00 315.57 3434.06 50°26'48"L
54 TT 41.30 357.64 3791.70 0
53 TT 41.30 316.10 4107.80 0
52 TT 41.30 274.05 4381.85 0
51 TT 43.00 323.92 4705.77 0
50 TT 43.00 331.83 5037.60 0
49 TT 44.50 336.10 5373.70 0
48 TT 44.50 353.92 5727.62 0
2768.55 2910.39
47 TT 44.50 331.30 6058.92 0
46 TT 43.00 374.55 6433.47 0
45 TT 49.00 356.90 6790.37 0
44 TT 56.60 360.03 7150.40 0
43 TT 55.00 299.83 7450.23 0
42 TT 55.00 327.75 7777.98 0
41 TT 49.00 330.93 8108.91 0
40 TT 43.00 329.10 8438.01 0
39 TT 43.00 330.05 8768.06 0
38 TT 41.30 333.90 9101.96 0 3612.19 3756.55
37 TT 41.30 333.81 9435.77 0
36 AT 43.00 337.20 9772.97 0
35 TT 40.00 329.76 10102.73 0
34 TT 41.30 329.92 10432.65 0
33 TT 41.30 329.94 10762.59 0
32 TT 41.30 329.92 11092.51 0
31 TT 41.30 329.92 11422.43 0
30 TT 43.00 299.96 11722.39 0

3945.22 4080.75
29 TT 43.00 335.95 12058.34 0
28 TT 41.30 334.03 12392.37 0
27 TT 43.00 333.78 12726.15 0
3945.22 4080.75
26 TT 41.30 336.28 13062.43 0
25 TT 46.40 333.79 13396.22 0
24 TT 44.50 335.92 13732.14 0
23 TT 41.30 363.90 14096.04 0
22 TT 52.20 276.56 14372.60 0
21 TT 53.90 335.21 14707.81 0
20 TT 44.50 350.87 15058.68 0
19 TT 44.50 352.00 15410.68 0
18 TT 46.40 273.01 15683.69 0
17 TT 41.30 337.88 16021.57 0
16 TT 43.00 302.06 16323.63 0
3177.53 3309.22
15 TT 41.30 303.90 16627.53 0
14 TT 43.00 303.93 16931.46 0
13 TT 43.00 333.95 17265.41 0
12 TT 41.30 306.04 17571.45 0
11 TT 41.30 313.89 17885.34 0
10 TT 41.30 308.02 18193.36 0
9 TT 43.00 289.81 18483.17 0
8 TT 41.30 304.02 18787.19 0
7 TT 41.30 275.95 19063.14 0
6 TT 41.30 224.98 19288.12 0
5 TT 41.30 267.91 19556.03 0
BSE-4NEW HA HA+E6+9 69.86 19625.89 6°22'50"R
PRO-8G MADH 0.00 76.02 19701.90 10°29'31"R
5 HA 53.90 233.66 19935.56 16°37'00"R
6 TT 58.40 321.91 20257.47 0 4710.24 4850.09
7 TT 47.60 286.80 20544.27 0
8 TT 53.50 310.51 20854.78 0
9 TT 44.50 324.70 21179.48 0
10 TT 50.50 224.78 21404.26 0
11 TT 41.50 260.07 21664.33 0
12 TT 47.50 358.91 22023.24 0
13 TT 50.50 275.30 22298.54 0
BPU-14 TT 45.70 189.03 22487.58 0
END-G HA+E0+1.5 43.25 108.00 22595.58 89° 29' 12"R
G-5/2 MHA-SC45M 45.00 290.37 22885.94 3° 25' 35"L
G-5 LA+E12+3 56.75 211.96 23097.90 9° 57' 46"L
G-4 MA+E0+6 47.75 183.57 23281.47 37° 39' 30"R
G-3 MA+E0+9 50.75 336.07 23617.54 29° 50' 37"R 1386.32 1492.10
G-2 HA+E6+9 56.75 277.89 23895.43 58° 1' 6"L
G-1 AT+E0+1.5 43.25 86.47 23981.90 2° 17' 31"R
JRSD BSP Gantry JR BSP 23.85 0.00 23981.90 0

23981.90 23981.90 24891.86


Total
oject M 504 <Construction and Configuration of OHTL and UG Cable in Jubail and Shedgum Areas> /4400003961/Portion 2

CHEDULE - Retrofitting

Tension Set Tension Plate


Suspension Vibration
For Pass through Suspension as Set Damper
Ratio splicing (Non splicing) Termination
120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN
(9) (10) (11) (12) (13) (14) (15) (16) (17) (18)
2 2
3 2
1 2
1 2
1 2
1 2
1 2
4675.00 1 2
1 2
1 2
2 2
2 2
1 2
1 2
1 2
2 2
1 2
1 2
1 2
3083.00
1 2
1 2
1 2
1 2
1 1
1
1
1
1
3778.00 1
1
2
1
1
1
2
1
1

4199.00
1
1
1
4199.00
1
1
1
1
1
1
2
1
1
1
1
3681.00
1
1
1
1
1
1 1 2
1 2
1 2
1 2
1 2
1 2
2 2
2 2
2 2
4851.00 1 2
1 2
1 2
1 2
1 2
1 2
1 2
1 2
1 2
2 2
2 2
2 2
2 2
1570.00 2 2
2 2
3 2
2 2

103.79%
Total 10 6 26 2 0 0 32 29 98

6 4 12 1 0 0 32 29 49
61/Portion 2

Junction Box
Vibration Extra Armor Grip Down-lead
Damper /rod for Damper Clamp OPGW OPGW OPGW
120- OPGW 70 120-
120-
OPGW OPGW 70 OPGW 70 UGNMFO
70 KN 120 KN 70 KN 120 KN 70 KN 120 C
(19) (20) (21) (22) (23) (24) (25) (26) (27)
30 1

40 1

3 0 1 20 20 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1 40 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1 40 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
20 20 1

40 1

30 1
99 0 33 180 120 2 2 2 2

33 33 33 6 4 2 2 2 2
Project M 504 <Construction

Line :- F. JRBSP- JSE , 1X48 OPGW DRUM SCHEDULE - Retrofitting


70 KN 120 KN
Towers Spans
Length
Horizonta Progressive Section of
Tower Tower Height in l Line Length in mtrs OPGW in
Length in
Number Type mtrs Span in mtrs Angle mtrs
mtrs
(1) (2) (3) (4) (5) (6) (7) (8)
JRSD BSP GANTRY 23.85 86.33 86.33
D.C-1 AT+E0+1.5 43.25 255.58 341.92 2° 31' 49"R
D.C-2 HA+E0+1.5 43.25 280.01 621.92 88° 15' 55"L
D.C-2/1 TT+E0+9 51.00 294.91 916.83
D.C-3 HA+E0+6 47.75 116.74 1033.57 86° 12' 52"R
D.C-4 MA+E0+1.5 43.25 129.55 1163.12 43° 17' 36"R
D.C-5 MA+E0+6 47.75 342.00 1505.12 41° 51' 60"L
D.C-5/1 TT+E6+6 54.00 290.00 1795.12
D.C-5/2 AT+E12+3 56.75 96.75 1891.87
END-D.C HA+E12+9 62.75 232.26 2124.13 89° 50' 6"L
4618.88 4835.66
BPU-16 TT 41.30 339.25 2463.38 0.00
BPU-17 LA 46.30 236.30 2699.68 0.00
BPU-18 Ten monopole 38.20 74.00 2773.68 90°05'51"R
BPU-19 Ten monopole 39.60 99.95 2873.63 0.00
BPU-20 HA 46.30 195.70 3069.33 15°55'57"R
BPU-21 TT 47.40 334.90 3404.23 0.00
BPU-22 AT 54.60 293.10 3697.33 0.00
BPU-23 TT 59.50 250.50 3947.83 0.00
BPU-24 TT 41.50 336.65 4284.48 0.00
BPU-25 TT 47.40 334.40 4618.88 0.00
BPU-26 TT 53.50 321.30 4940.18 0.00
BPU-27 TT 53.50 340.20 5280.38 0.00
1377.35 1514.04
BPU-28 TT 47.40 366.05 5646.43 0.00
BPU-29 TT 46.00 349.80 5996.23 0.00
BPU-30 MA 46.30 300.00 6296.23 05°23'55"R
BPU-31 AT 47.70 301.15 6597.38 0.00
BPU-32 TT 53.50 303.85 6901.23 0.00
BPU-33 HA 47.80 298.70 7199.93 89°21'03"L
BPU-34 TT 46.00 263.20 7463.13 0.00
BPU-35 AT 47.80 334.95 7798.08 0.00
3782.75 3950
BPU-36 TT 43.10 337.50 8135.58 0.00
BPU-37 TT 71.50 342.20 8477.78 0.00
BPU-38 TT 71.50 366.10 8843.88 0.00
BPU-39 TT 47.50 354.90 9198.78 0.00
BPU-40 TT 45.00 220.80 9419.58 0.00
BPU-41 TT 71.30 359.40 9778.98 0.00
BPU-42 AT 71.70 101.32 9880.30 71°49'30"R
Pro-1 HA 54.60 274.26 10154.56 16°43'50"R
Pro-2 HA 54.60 334.54 10489.10 0°39'30"R
Pro-3 AT 53.75 257.47 10746.57 0.00
Pro-4 MASH 25.15 182.63 10929.20 5°12'35"L
Pro-5 MASH 25.15 117.85 11047.05 0.00
Pro-6 HA 35.10 289.80 11336.85 5°59'19"R 2354.92 2581.12
Pro-7 TT 43.50 278.62 11615.47 0.00
Pro-8 TT 43.50 268.35 11883.82 0.00
Pro-9 AT 43.25 107.18 11991.00 0.00
Pro-10 MASH 25.15 45.92 12036.92 89°7'47"L
Pro-11 MASH 25.15 96.98 12133.90 87°19'20"R
JSE SS GANTRY 15.75 0.00 12133.90 0.00

12133.90 12133.90 8044.83


Total
oject M 504 <Construction and Configuration of OHTL and UG Cable in Jubail and Shedgum Areas> /4400003961/Portion 2

- Retrofitting

Tension Set Tension Plate


Suspension Vibration
For Pass through Suspension as Set Damper
Ratio splicing (Non splicing) Termination
120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN
(9) (10) (11) (12) (13) (14) (15) (16) (17) (18)
2 2
3 2
2 2
1 2
2 2
2 2
2 2
1 2
2 2
2 2
4895.00
1 2
2 2
2 2
2 2
2 2
1 2
2 2
1 2
1 2
1 2
2 2
1 2
1548.00
1 2
1 2
2 2
2 2
1 2
2 2
1 2
2 2
3992.00
1 2
1 2
1 2
1 2
1 2
1 2
2 2
2 2
2 2
2 2
2 2
2 2
2732.00 2 2
1 2
1 2
2 2
2 2
3 2
2 2

66.30%
Total 10 0 50 0 0 0 20 0 98

5 0 24 0 0 0 20 0 49
61/Portion 2

Junction Box
Vibration Extra Armor Grip Down-lead
Damper /rod for Damper Clamp OPGW OPGW OPGW
120- OPGW 70 120-
120-
OPGW OPGW 70 OPGW 70 UGNMFO
70 KN 120 KN 70 KN 120 KN 70 KN 120 C
(19) (20) (21) (22) (23) (24) (25) (26) (27)
30 1

40 1

40 1

40 1
30 1

0 0 0 180 0 3 0 0 2

0 0 0 5 0 3 0 0 2
Project M 504 <Construction

Line :- G. JRBSP- JSE , 1X48 OPGW DRUM SCHEDULE - Retrofitting


70 KN 120 KN
Towers Spans
Length
Horizonta Progressive Section of
Tower Tower Height in l Line Length in mtrs OPGW in
Length in
Number Type mtrs Span in mtrs Angle mtrs
mtrs
(1) (2) (3) (4) (5) (6) (7) (8)
JRSD BSP GANTRY 23.85 86.33 86.33
D.C-1 AT+E0+1.5 43.25 255.58 341.92 2° 31' 49"R
D.C-2 HA+E0+1.5 43.25 280.01 621.92 88° 15' 55"L
D.C-2/1 TT+E0+9 51.00 294.91 916.83
D.C-3 HA+E0+6 47.75 116.74 1033.57 86° 12' 52"R
D.C-4 MA+E0+1.5 43.25 129.55 1163.12 43° 17' 36"R
D.C-5 MA+E0+6 47.75 342.00 1505.12 41° 51' 60"L
D.C-5/1 TT+E6+6 54.00 290.00 1795.12
D.C-5/2 AT+E12+3 56.75 96.75 1891.87
END-D.C HA+E12+9 62.75 232.26 2124.13 89° 50' 6"L
4618.88 4835.66
BPU-16 TT 41.30 339.25 2463.38 0.00
BPU-17 LA 46.30 236.30 2699.68 0.00
BPU-18 Ten monopole 38.20 74.00 2773.68 90°05'51"R
BPU-19 Ten monopole 38.20 99.95 2873.63 0.00
BPU-20 HA 46.30 195.70 3069.33 15°55'57"R
BPU-21 TT 47.40 334.90 3404.23 0.00
BPU-22 AT 54.60 293.10 3697.33 0.00
BPU-23 TT 59.50 250.50 3947.83 0.00
BPU-24 TT 41.50 336.65 4284.48 0.00
BPU-25 TT 47.40 334.40 4618.88 0.00
BPU-26 TT 53.50 321.30 4940.18 0.00
BPU-27 TT 53.50 340.20 5280.38 0.00
1377.35 1514.04
BPU-28 TT 47.40 366.05 5646.43 0.00
BPU-29 TT 46.00 349.80 5996.23 0.00
BPU-30 MA 46.30 300.00 6296.23 05°23'55"R
BPU-31 AT 47.70 301.15 6597.38 0.00
BPU-32 TT 53.50 303.85 6901.23 0.00
BPU-33 HA 47.80 298.70 7199.93 89°21'03"L
BPU-34 TT 46.00 263.20 7463.13 0.00
BPU-35 AT 47.80 334.95 7798.08 0.00
3782.75 3949.66
BPU-36 TT 43.10 337.50 8135.58 0.00
BPU-37 TT 71.50 342.20 8477.78 0.00
BPU-38 TT 71.50 366.10 8843.88 0.00
BPU-39 TT 47.50 354.90 9198.78 0.00
BPU-40 TT 45.00 220.80 9419.58 0.00
BPU-41 TT 71.30 359.40 9778.98 0.00
BPU-42 AT 71.70 60.80 9839.78 0.00
BPU-43 MONOPOLE 27.80 99.25 9939.03 16°37'56"R
Prop-6J MONOPOLE 27.80 30.30 9969.33 81°29'14"R
BSE-43 MONOPOLE 67.60 330.30 10299.63 0.00
BSE-44 AT 62.10 212.45 10512.08 3°0'04"R
BSE-45 TT 58.20 336.95 10849.03 2°52'24"L
2458.75 2588.74
BSE-46 TT 47.20 335.90 11184.93 0.00
BSE-47 TT 46.00 335.95 11520.88 0.00
BSE-48 TT 47.40 335.95 11856.83 0.00
BSE-49 TT 44.70 250.90 12107.73 0.00
BSE-50 HA 53.50 130.00 12237.73 0.00
Jubail southeast s/s Gantry0 16.00 0.00 12237.73 0.00

12237.73 12237.73 12888.10


Total
oject M 504 <Construction and Configuration of OHTL and UG Cable in Jubail and Shedgum Areas> /4400003961/Portion 2

- Retrofitting

Tension Set Tension Plate


Suspension Vibration
For Pass through Suspension as Set Damper
Ratio splicing (Non splicing) Termination
120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN
(9) (10) (11) (12) (13) (14) (15) (16) (17) (18)
2 2
3 2
2 2
1 2
2 2
2 2
2 2
1 2
2 2
2 2
4895.00
1 2
2 2
2 2
2 2
2 2
1 2
2 2
1 2
1 2
1 2
2 2
1 2
1548.00
1 2
1 2
2 2
2 2
1 2
2 2
1 2
2 2
3992.00
1 2
1 2
1 2
1 2
1 2
1 2
2 2
2 2
2 2
2 2
2 2
1 2
2899.00
1 2
1 2
1 2
1 2
3 2
2 2

105.31%
Total 10 0 42 0 0 0 23 0 96

5 0 20 0 0 0 23 0 48
61/Portion 2

Junction Box
Vibration Extra Armor Grip Down-lead
Damper /rod for Damper Clamp OPGW OPGW OPGW
120- OPGW 70 120-
120-
OPGW OPGW 70 OPGW 70 UGNMFO
70 KN 120 KN 70 KN 120 KN 70 KN 120 C
(19) (20) (21) (22) (23) (24) (25) (26) (27)
0 30 1

40 1

40 1

40 1
30 1

0 0 0 180 0 3 0 0 2

1 0 0 5 0 3 0 0 2
Project M 504 <Construction

Line :- JRBSP to JSW 230 KV, 1X48 OPGW DRUM SCHEDULE - Retrofitting
70 KN 120 KN
Towers Spans
Length
Horizonta Progressive Section of
Tower Tower Height in l Line Length in mtrs OPGW in
Length in
Number Type mtrs Span in mtrs Angle mtrs
mtrs
(1) (2) (3) (4) (5) (6) (7) (8)
JRSD BSP Gantry JR BSP 23.85 86.47 86.47 0
G-1 AT+E0+1.5 43.25 277.89 364.36 2° 17' 31"R
G-2 HA+E6+9 56.75 336.07 700.43 58° 1' 6"L
G-3 MA+E0+9 50.75 183.57 884.00 29° 50' 37"R
G-4 MA+E0+6 47.75 211.96 1095.96 37° 39' 30"R
1891.12 2005.17
G-5 LA+E12+3 56.75 290.37 1386.32 9° 57' 46"L
G-5/1 MHA-SC45M 45.00 57.10 1443.43 4° 40' 51"L
G-6A MASH-25 25.00 120.20 1563.63 78° 56' 43"L
BSE-14 NEW AT+E0+1.5 43.25 105.38 1669.01 0
G-7A MASH-25 25.00 222.11 1891.12 7° 34' 26"R
BSE-15 NEW AT+E0+9 50.75 299.00 2190.12 0
16 TT 49.00 229.95 2420.07 2°21'00"L
Prop-17A AT 50.00 295.00 2715.07 2°27'58"R
Prop-17B AT 50.00 175.50 2890.57 2°41'10"R
18 TT 43.00 349.85 3240.42 2°50'48"L
19 TT 43.00 300.00 3540.42 0
20 TT 55.00 325.00 3865.42 0
21 TT 44.50 349.95 4215.37 0
4848.30 5005
22 TT 41.30 329.90 4545.27 0
23 TT 41.30 345.00 4890.27 0
24 TT 44.50 344.90 5235.17 0
25 AT 45.80 344.20 5579.37 0
26 HA 62.90 229.80 5809.17 89°44'53"R
27 TT 50.50 269.85 6079.02 0
28 TT 49.10 285.00 6364.02 0
29 LA 48.80 375.40 6739.42 20°32'00"R
30 TT 52.10 375.00 7114.42 0
31 TT 44.50 361.50 7475.92 0
32 TT 49.20 367.20 7843.12 0 1173.70 1347.67
33 HA 43.60 70.00 7913.12 0
Jubail Southwest s/s gantry0 16.00 0.00 7913.12 0

7913.12 7913.12 8358.23


Total
oject M 504 <Construction and Configuration of OHTL and UG Cable in Jubail and Shedgum Areas> /4400003961/Portion 2

DULE - Retrofitting

Tension Set Tension Plate


Suspension Vibration
For Pass through Suspension as Set Damper
Ratio splicing (Non splicing) Termination
120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN
(9) (10) (11) (12) (13) (14) (15) (16) (17) (18)
2 2
3 2
2 2
2 2
2 2
2019.00
2 2
2 2
2 2
2 2
2 2
2 2
1 2
2 2
2 2
1 2
1 2
1 2
1 2
5078.00
1 2
1 2
1 2
2 2
2 2
1 2
1 2
2 2
2 2
1 2
1366.00 1 2
3 2
2 2

105.63%
Total 8 0 32 0 0 0 12 0 62

4 0 15 0 0 0 12 0 31
61/Portion 2

Junction Box
Vibration Extra Armor Grip Down-lead
Damper /rod for Damper Clamp OPGW OPGW OPGW
120- OPGW 70 120-
120-
OPGW OPGW 70 OPGW 70 UGNMFO
70 KN 120 KN 70 KN 120 KN 70 KN 120 C
(19) (20) (21) (22) (23) (24) (25) (26) (27)
30 1

40 1

40 1

30 1

0 0 0 140 0 2 0 0 2

0 0 0 4 0 2 0 0 2
Project M 504 <Construction

Line :- SWCC 2A-JSW, 230 KV , 1X48 OPGW DRUM SCHEDULE - Retrofitting


70 KN 120 KN
Towers Spans
Length
Horizonta Progressive Section of
Tower Tower Height in l Line Length in mtrs OPGW in
Length in
Number Type mtrs Span in mtrs Angle mtrs
mtrs
(1) (2) (3) (4) (5) (6) (7) (8)
SWCC 2A GANTRY Gantry 16.00 60.00 60.00 0
65 HA 43.10 312.00 372.00 90°00'00"L
64 TT 49.00 354.70 726.70 0
63 TT 47.50 349.92 1076.62 0
62 TT 45.70 294.93 1371.55 0
61 TT 47.50 354.91 1726.46 0 3119.21 3280.81
60 TT 45.70 276.97 2003.43 0
59 TT 45.70 265.47 2268.90 0
58 TT 45.70 279.85 2548.75 0
57 TT 43.00 264.49 2813.24 0
56 HA 44.50 305.97 3119.21 55°04'46"R
55 HA 40.00 315.57 3434.78 50°26'48"L
54 TT 41.30 357.64 3792.42 0
53 TT 41.30 316.10 4108.52 0
52 TT 41.30 274.05 4382.57 0
51 TT 43.00 323.92 4706.49 0 2940.43 3068.13
50 TT 43.00 331.83 5038.32 0
49 TT 44.50 336.10 5374.42 0
48 TT 44.50 353.92 5728.34 0
47 TT 44.50 331.30 6059.64 0
46 TT 43.00 374.55 6434.19 0
45 TT 49.00 356.90 6791.09 0
44 TT 56.60 360.03 7151.12 0
43 TT 55.00 299.83 7450.95 0
42 TT 55.00 327.75 7778.70 0
41 TT 49.00 330.93 8109.63 0
4043.81 4178.33
40 TT 43.00 329.10 8438.73 0
39 TT 43.00 330.05 8768.78 0
38 TT 41.30 333.90 9102.68 0
37 TT 41.30 333.81 9436.49 0
36 AT 43.00 337.20 9773.69 0
35 TT 40.00 329.76 10103.45 0
34 TT 41.30 329.92 10433.37 0
33 TT 41.30 329.94 10763.31 0
32 TT 41.30 329.92 11093.23 0
31 TT 41.30 329.92 11423.15 0
30 TT 43.00 299.96 11723.11 0

4605.08 4743.91
29 TT 43.00 335.95 12059.06 0
28 TT 41.30 334.03 12393.09 0
4605.08 4743.91
27 TT 43.00 333.78 12726.87 0
26 TT 41.30 336.28 13063.15 0
25 TT 46.40 333.79 13396.94 0
24 TT 44.50 335.92 13732.86 0
23 TT 41.30 363.90 14096.76 0
22 TT 52.20 276.56 14373.32 0
21 TT 53.90 335.21 14708.53 0
20 TT 44.50 350.87 15059.40 0
19 TT 44.50 352.00 15411.40 0
18 TT 46.40 273.01 15684.41 0
17 TT 41.30 337.88 16022.29 0
16 TT 43.00 302.06 16324.35 0
3177.53 3309.22
15 TT 41.30 303.90 16628.25 0
14 TT 43.00 303.93 16932.18 0
13 TT 43.00 333.95 17266.13 0
12 TT 41.30 306.04 17572.17 0
11 TT 41.30 313.89 17886.06 0
10 TT 41.30 308.02 18194.08 0
9 TT 43.00 289.81 18483.89 0
8 TT 41.30 304.02 18787.91 0
7 TT 41.30 275.95 19063.86 0
6 TT 41.30 224.98 19288.84 0
5 TT 41.30 267.91 19556.75 0
BSW-4NEW HA 59.75 126.75 19683.50 13°29'02"L
5 HA 53.90 233.66 19917.16 16°37'00"R
6 TT 58.40 321.91 20239.07 0
7 TT 47.60 286.80 20525.87 0
4844.12 4964.64
8 TT 53.50 310.51 20836.38 0
9 TT 44.50 324.70 21161.08 0
10 TT 50.50 224.78 21385.86 0
11 TT 41.50 260.07 21645.93 0
12 TT 47.50 358.91 22004.84 0
13 TT 50.50 275.30 22280.14 0
14 TT 45.70 189.03 22469.17 0
END-G HA+E0+1.5 43.25 36.00 22505.17 89° 29' 12"R
G-6B MASH-25 25.00 119.64 22624.80 67° 58' 45"R
BSE-14 NEW AT+E0+1.5 43.25 105.38 22730.18 0
G-7B MASH-25 25.00 222.12 22952.30 7° 40' 25"L
BSE-15 NEW AT+E0+9 50.75 299.00 23251.30 0
16 TT 49.00 229.95 23481.25 2°21'00"L
PRO-17A AT 50.00 295.00 23776.25 2°27'58"R
PRO-17B AT 50.00 175.50 23951.75 2°41'10"R
18 TT 43.00 349.85 24301.60 2°50'48"L
19 TT 43.00 300.00 24601.60 0 3910.37 4047.82
20 TT 55.00 325.00 24926.60 0
3910.37 4047.82

21 TT 44.50 349.95 25276.55 0


22 TT 41.30 329.90 25606.45 0
23 TT 41.30 345.00 25951.45 0
24 TT 44.50 344.90 26296.35 0
25 AT 45.80 344.20 26640.55 0
26 HA 62.90 229.80 26870.35 89°44'53"R
27 TT 50.50 269.85 27140.20 0
28 TT 49.10 285.00 27425.20 0
29 LA 48.80 375.40 27800.60 20°32'00"R
30 TT 52.10 375.00 28175.60 0 2343.75 2544.37
31 TT 44.50 361.50 28537.10 0
32 TT 49.20 367.20 28904.30 0
33 HA 43.60 80.00 28984.30 0
Jubail Southwest s/s gantry0 16.00 0.00 28984.30 0

28984.30 28984.30 30137.22


Total
oject M 504 <Construction and Configuration of OHTL and UG Cable in Jubail and Shedgum Areas> /4400003961/Portion 2

ULE - Retrofitting

Tension Set Tension Plate


Suspension Vibration
For Pass through Suspension as Set Damper
Ratio splicing (Non splicing) Termination
120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN
(9) (10) (11) (12) (13) (14) (15) (16) (17) (18)
2 2
3 2
1 2
1 2
1 2
3306.00 1 2
1 2
1 2
1 2
1 2
2 2
2 2
1 2
1 2
1 2
3083.00 1 2
1 2
1 2
1 2
1 2
1 1
1
1
1
1
1
4199.00
1
1
1
1
2
1
2
1
1
1
1

4767.00
1
1
4767.00
1
1
1
1
1
1
1
2
1
1
1
1
3402.00
1
1
1
1
1
2
1
1
1
1
1
2
2
2
1
4967.00
1
1
1
1
1
1
1
2
2
2
1 1 2
2 2
1 2
2 2
2 2
1 2
4222.00 1 2
1 2
4222.00

1 2
1 2
1 2
1 2
2 2
2 2
1 2
1 2
2 2
2566.00 1 2
1 2
1 2
3 2
2 2

103.98%
Total 10 8 18 14 0 0 29 45 84

6 5 8 7 0 0 29 45 42
61/Portion 2

Junction Box
Vibration Extra Armor Grip Down-lead
Damper /rod for Damper Clamp OPGW OPGW OPGW
120- OPGW 70 120-
120-
OPGW OPGW 70 OPGW 70 UGNMFO
70 KN 120 KN 70 KN 120 KN 70 KN 120 C
(19) (20) (21) (22) (23) (24) (25) (26) (27)
30 1

40 1

3 0 1 20 20 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1 40 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1 40 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1 40 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
3 0 1
20 20 1
40 1

30 1

168 0 56 180 160 2 2 3 2

56 56 56 6 5 2 2 3 2
Project M 504 <Construction and Confi

Line :- Fadhili-Ibn Zahr, 230KV (1X48)


70 KN 120 KN
Towers Spans

Length
Horizontal Section
Tower Tower Height in Progressive Line of
Span in mtrs Length in mtrs
Number Type mtrs Length in mtrs Angle OPGW in mtrs

(1) (2) (3) (4) (5) (6) (7) (8)


Fadhili S/S GANTRY 26.00
160.00 160.00
1 HA 40.20 00°00'00"
338.40 498.40
2 SA 41.30 5°15'5"L
310.20 808.60
3 TT 39.60
335.00 1143.60
4 TT 41.30
2818.40 3104
335.00 1478.60
5 TT 42.60
335.10 1813.70
6 TT 39.60
335.00 2148.70
7 TT 39.60
335.00 2483.70
8 TT 41.30
334.70 2818.40
9 TT 41.30
350.10 3168.50
10 TT 39.60
320.00 3488.50
11 TT 39.60
335.00 3823.50
12 TT 39.60
335.00 4158.50
13 TT 45.50
335.00 4493.50
3349.90 3494
14 TT 42.60
335.00 4828.50
15 TT 41.30
335.00 5163.50
16 TT 39.60
335.00 5498.50
17 TT 39.60
334.80 5833.30
18 TT 42.60
335.00 6168.30
19 TT 39.60
299.00 6467.30
20 TT 42.60
313.70 6781.00
21 AT 47.50 00°00'00"
267.20 7048.20
22 AT 44.60 00°00'00"
385.10 7433.30
23 TT 39.60
340.00 7773.30
24 TT 39.60
340.00 8113.30
3984.80 4134
25 TT 39.60
340.00 8453.30
26 TT 39.60
340.00 8793.30
27 TT 39.60
339.90 9133.20
28 TT 39.60
340.00 9473.20
29 TT 39.60
340.00 9813.20
30 TT 39.60
339.90 10153.10
31 TT 39.60
339.95 10493.05
32 TT 39.60
339.80 10832.85
33 TT 39.60
335.30 11168.15
34 TT 41.60
334.90 11503.05
35 TT 42.60
335.00 11838.05
3364.85 3522
36 TT 39.60
334.90 12172.95
37 TT 39.60
355.00 12527.95
38 TT 42.60
290.00 12817.95
39 TT 39.60
360.00 13177.95
40 AT 54.20 2°21'46"R
340.00 13517.95
41 AT 54.20 2°41'47"R
320.60 13838.55
42 TT 42.60
340.00 14178.55
43 TT 39.60
340.00 14518.55
44 TT 39.60
339.90 14858.45
45 TT 41.30
310.00 15168.45
46 TT 41.30
335.00 15503.45
47 TT 39.60
324.80 15828.25
4669.00 4864
48 TT 39.60
355.00 16183.25
49 TT 41.30
344.90 16528.15
50 TT 39.60
354.90 16883.05
51 TT 39.60
340.00 17223.05
52 TT 41.30
355.00 17578.05
53 TT 39.60
339.90 17917.95
54 TT 51.60
269.00 18186.95
55 AT 64.30 00°00'00"
323.60 18510.55
56 HA 70.00 82°49'40"R
295.50 18806.05
57 LA 56.40 12°33'32"L
301.90 19107.95
58 HA 40.20 87°18'49"L
209.80 19317.75
59 TT 43.30
2774.90 2943
304.60 19622.35
60 TT 43.30
335.00 19957.35
61 TT 46.50
341.40 20298.75
62 TT 50.90
373.90 20672.65
63 LA 49.00 19°42'12"R
289.20 20961.85
64 TT 46.50
335.30 21297.15
65 TT 46.50
301.60 21598.75
66 TT 48.00
353.60 21952.35
67 TT 43.50
332.20 22284.55
68 TT 41.30
332.10 22616.65
3280.80 3444
69 TT 43.50
347.50 22964.15
70 TT 43.50
344.40 23308.55
71 TT 43.50
347.50 23656.05
72 TT 43.50
335.20 23991.25
73 TT 48.00
251.40 24242.65
74 TT 54.10
266.70 24509.35
75 TT 48.00
289.50 24798.85
76 TT 48.00
358.10 25156.95
77 TT 44.90
358.10 25515.05
78 TT 43.50
2499.40 2627
358.20 25873.25
79 TT 44.90
358.00 26231.25
80 TT 43.50
283.10 26514.35
81 VH 43.50
190.10 26704.45
82 U.C GANTRY 19.00
37.60 26742.05
83 U.C GANTRY 19.00
70.00 26812.05
84 HA 47.50
265.10 27077.15
85 TT 59.40
299.90 27377.05
86 TT 59.40
200.00 27577.05
87 TT 53.40
330.00 27907.05
88 TT 44.50
3477.50 3616
330.00 28237.05
3477.50 3616
89 TT 44.50
330.00 28567.05
90 TT 44.50
330.00 28897.05
91 TT 44.50
330.00 29227.05
92 TT 44.50
330.00 29557.05
93 TT 44.50
330.00 29887.05
94 TT 62.70
332.50 30219.55
95 HA 55.20 90°00'37"R
316.50 30536.05
96 TT 50.60
332.00 30868.05
97 TT 44.50
333.90 31201.95
98 TT 44.50
334.00 31535.95
99 TT 44.50
334.00 31869.95
100 TT 44.50
2948.80 3179
333.10 32203.05
101 HA 47.60
333.10 32536.15
SEZN-15 TT 44.50
280.60 32816.75
SEZN-16 HA 46.20 84°48'56"L
261.60 33078.35
SEZN-17 HA 46.20
90.00 33168.35
Ibn Zahr Gantry 26.00
0.00 33168.35

33168.35 33168.35 34929.63


Total
truction and Configuration of OHTL and UG Cable in Jubail and Shedgum Areas> /4400003961

OPGW DRUM SCHEDULE - Retrofitting


Tension Set Tension Plate
Suspension Vibration
For Pass through Set Damper
Suspension as Termination
Ratio splicing (Non splicing)

120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN

(9) (10) (11) (12) (13) (14) (15) (16) (17) (18)
2 2

3 2

2 2

1 2

1 2
3306.00
1 2

1 2

1 2

1 2

2 2

1 2

1 2

1 2

1 2
3494.00
1 2

1 2

1 2

1 2
1 2

1 1

1
4134.00
1

4430.00
1

2
1

4818.00
1

1
2943.00
1

2
1

1
3444.00
1

1
2662.00
1

1 1 2

2 2

1 2

1 2

1 2

1 2
4515.00
4515.00
1 2

1 2

1 2

1 2

1 2

1 2

2 2

1 2

1 2

1 2

1 2

1 2
3179.00
2 2

1 2

2 2

3 2

1 2

105.31%
Total 9 12 14 18 0 0 31 49 84

Count 6 7 6 9 0 0 31 49 42
eas> /4400003961/Portion 2

Junction Box
Vibration Extra Armor Grip /rod for Down-lead
Damper Damper Clamp
OPGW 120- OPGW 120- OPGW 70 OPGW 120-
OPGW 120 OPGW 70 OPGW 70 UGNMFOC
70 KN 120 KN 70 KN 120 KN 70 KN

(19) (20) (21) (22) (23) (24) (25) (26) (27)


30 1

40 1
3 0 1 20 20 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1 40 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1 40 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1 40 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1 40 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1 40 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
3 0 1
0 0
20 20 1
40 1

30 1

192 0 64 180 240 2 2 5 2

64 128 128 6 7 2 2 5 2
Project M 504 <Construction and Con

Line :- Fadhili-JUPC (1X48) OPGW D


70 KN 120 KN
Towers Spans

Length
Horizontal Section
Tower Tower Height in Progressive Line of
Span in mtrs Length in mtrs
Number Type mtrs Length in mtrs Angle OPGW in mtrs

(1) (2) (3) (4) (5) (6) (7) (8)


Fadhili S/S Gantry 26.00
155.00 155.00
1 AT 40.20 00°00'00"
336.66 491.66
2 SA 42.80 3°6'14"L
309.72 801.38
3 TT 39.60
334.90 1136.28
4 TT 42.60
2811.10 3090
335.03 1471.31
5 TT 39.60
335.15 1806.46
6 TT 39.60
334.93 2141.39
7 TT 39.60
335.05 2476.44
8 TT 39.60
334.66 2811.10
9 TT 39.60
350.05 3161.15
10 TT 39.60
320.05 3481.20
11 TT 41.00
334.88 3816.08
12 TT 39.60
335.00 4151.08
13 TT 39.60
335.00 4486.08
3349.68 3495
14 TT 42.80
335.00 4821.08
15 TT 42.80
334.90 5155.98
16 TT 39.60
335.00 5490.98
17 TT 39.60
334.80 5825.78
18 TT 39.60
335.00 6160.78
19 TT 42.60
299.00 6459.78
20 TT 47.00
313.90 6773.68
21 AT 47.60 00°00'00"
267.10 7040.78
22 AT 47.60 00°00'00"
385.10 7425.88
23 TT 39.60
339.95 7765.83
24 TT 39.60
339.93 8105.76
3984.83 4137
25 TT 39.60
340.05 8445.81
26 TT 39.60
339.90 8785.71
27 TT 39.60
339.90 9125.61
28 TT 39.60
340.00 9465.61
29 TT 39.60
340.00 9805.61
30 TT 39.60
340.00 10145.61
31 TT 39.60
340.00 10485.61
32 TT 39.60
339.90 10825.51
33 TT 39.60
335.30 11160.81
34 TT 41.00
334.90 11495.71
35 TT 41.00
335.00 11830.71
3364.85 3522
36 TT 39.50
334.90 12165.61
37 TT 40.50
354.95 12520.56
38 TT 39.60
290.00 12810.56
39 TT 41.00
359.80 13170.36
40new AT 54.20 2°21'48"L
340.10 13510.46
41new AT 54.20 2°25'42"L
320.65 13831.11
42 TT 39.60
340.00 14171.11
43 TT 39.60
340.10 14511.21
44 TT 39.60
339.80 14851.01
45 TT 39.60
310.10 15161.11
46 TT 39.60
335.10 15496.21
47 TT 39.60
324.75 15820.96
4669.35 4863
48 TT 39.60
355.00 16175.96
49 TT 41.00
344.95 16520.91
50 TT 41.00
355.00 16875.91
51 TT 39.60
339.95 17215.86
52 TT 39.60
355.00 17570.86
53 TT 39.60
339.90 17910.76
54 TT 51.60
269.05 18179.81
55 AT 62.80 00°00'00"
275.20 18455.01
56 HA 62.80 82°49'23"R
253.90 18708.91
57 LA 65.50 12°33'6"L
410.85 19119.76
58 HA 70.30 89°58'56"L
264.15 19383.91
59 TT 56.30
2816.00 2977
303.95 19687.86
60 TT 44.40
359.90 20047.76
61 TT 45.70
318.05 20365.81
62 TT 42.80
357.00 20722.81
63 LA 47.00 19°43'13"R
273.00 20995.81
64 TT 39.60
335.50 21331.31
65 TT 48.60
301.55 21632.86
66 TT 48.60
353.60 21986.46
67 TT 39.60
332.25 22318.71
68 TT 44.40
351.75 22670.46
3281.05 3432
69 TT 48.60
327.70 22998.16
70 TT 51.60
344.40 23342.56
71 TT 51.60
347.50 23690.06
72 TT 39.60
335.10 24025.16
73 TT 39.60
251.70 24276.86
74 HA 49.00 89°58'02"R
314.00 24590.86
75 TT 48.60
342.00 24932.86
76 TT 48.60
340.00 25272.86
77 TT 48.60
342.00 25614.86
78 TT 48.60
337.00 25951.86
79 TT 48.60
327.00 26278.86
80 MONOPOLE 47.80
4358.00 4530
328.13 26606.99
81 AT 54.20
379.87 26986.86
82 AT 54.20
325.00 27311.86
83 MONOPOLE 47.80
330.00 27641.86
84 TT 39.60
336.00 27977.86
85 TT 39.60
335.00 28312.86
86 TT 39.60
322.00 28634.86
87 HA 49.00 90°00'00"R
43.00 28677.86
FJ-1 MASH-25 25.00
22.35 28700.21
FJ-2 MASH-25 25.00
72.51 28772.72
FJ-3 MASH-25 25.00
92.69 28865.41
FJ-4 MASH-25 25.00
56.48 28921.89
FJ-5 MP-SP 68.15
109.45 29031.34
BSE-35 TT 66.00
321.05 29352.39
BSE-36 TT 59.80
325.65 29678.04
BSE-37 TT 44.50
3152.53 3289
319.90 29997.94
BSE-38 TT 44.50
320.30 30318.24
BSE-39 TT 44.50
275.95 30594.19
BSE-40 TT 41.50
348.00 30942.19
BSE-41 TT 41.00
348.90 31291.09
BSE-42 TT 59.80
92.10 31383.19
BSE-43 HA 51.40
170.30 31553.49
PRO 5Z MP-SP 25.50
36.00 31589.49
BPU-44 MP 25.50
197.90 31787.39
BPU-45 HA 57.00
361.10 32148.49
BPU-46 TT 43.10
315.00 32463.49
BPU-47 TT 44.60
315.00 32778.49
BPU-48 TT 43.10
314.70 33093.19
BPU-49 TT 47.50
344.70 33437.89 2512.90 2648
BPU-50 TT 59.60
270.50 33708.39
BPU-51 AT 71.70
334.05 34042.44
BPU-52 HA 71.70
222.85 34265.29
BPU-53 HA 57.00
35.00 34300.29
JUPC Gantry 23.00
0.00 0.00

34300.29 34300.29 35982.59


Total
struction and Configuration of OHTL and UG Cable in Jubail and Shedgum Areas> /4400003961

OPGW DRUM SCHEDULE - Retrofitting


Tension Set Tension Plate
Suspension
For Pass through Set
Suspension as Termination
Ratio splicing (Non splicing)

120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN

(9) (10) (11) (12) (13) (14) (15) (16) (17)


2

1
109.91%
1

1
104.35%
1

1
1

1 1

1
103.82%
1

104.68%
1

2
1

104.15%
1

1
105.70%
1

2
1

1
104.61%
1

2
103.94%
2

1 1

2
2

2
2

104.90%
Total 10 12 28 22 0 0 15 64

Count 6 7 13 11 0 0 15 64
um Areas> /4400003961/Portion 2

Junction Box
Vibration Extra Armor Grip /rod for Down-lead
Damper Damper Clamp
OPGW 120- OPGW 120- OPGW 70 OPGW 120-
OPGW 120 OPGW 70 OPGW 70 UGNMFOC
120 KN 70 KN 120 KN 70 KN 120 KN 70 KN

(18) (19) (20) (21) (22) (23) (24) (25) (26) (27)
30 1
2

2
40 1
2

2
2
20 20 1
3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1
40 1
3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1
40 1
3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1
40 1
3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1
40 1
3 1
3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1
40 1
3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1
20 20 1
2
2

2
40 1
2

2
2

2 30 1

92 204 0 68 180 240 2 2 5 2

46 68 0 68 6 7 2 2 5 2
Project M 504 <Construction and Con

Line :- Fadhili to Jubail North 230 KV (1x48) OPGW DRU


70 KN 120 KN
Towers Spans

Length
Horizontal Section
Tower Tower Height in Progressive Line of
Span in mtrs Length in mtrs
Number Type mtrs Length in mtrs Angle OPGW in mtrs

(1) (2) (3) (4) (5) (6) (7) (8)


Fadhili S/S GANTRY 26.00
150.00 150.00
1 AT 40.20 00°00'00"
337.20 487.20
2 SA 41.50 4°12'2"L
310.25 797.45
3 TT 41.00
334.90 1132.35
4 TT 41.00
335.00 1467.35
5 TT 41.00
335.10 1802.45
3812.15 4096
6 TT 39.60
335.00 2137.45
7 TT 39.60
335.00 2472.45
8 TT 41.00
334.70 2807.15
9 TT 39.60
350.00 3157.15
10 TT 41.00
320.10 3477.25
11 TT 39.60
334.90 3812.15
12 TT 39.60
335.00 4147.15
13 TT 41.00
335.00 4482.15
14 TT 44.20
335.00 4817.15
15 TT 41.00
335.00 5152.15
16 TT 39.60
2957.70 3103
335.00 5487.15
17 TT 39.60
334.80 5821.95
2957.70 3103

18 TT 41.00
335.00 6156.95
19 TT 41.00
299.00 6455.95
20 TT 44.20
313.90 6769.85
21 AT 46.10 00°00'00"
267.00 7036.85
22 AT 47.60 00°00'00"
385.15 7422.00
23 TT 39.60
340.00 7762.00
24 TT 39.60
340.00 8102.00
25 TT 39.60
340.00 8442.00
3372.05 3521
26 TT 39.60
340.00 8782.00
27 TT 39.60
339.90 9121.90
28 TT 39.60
340.00 9461.90
29 TT 39.60
340.00 9801.90
30 TT 39.60
340.00 10141.90
31 TT 39.60
340.00 10481.90
32 TT 39.60
339.90 10821.80
33 TT 39.60
335.30 11157.10
34 TT 42.80
334.90 11492.00
35 TT 39.60
335.00 11827.00
3364.80 3522
36 TT 39.60
334.90 12161.90
37 TT 39.60
354.90 12516.80
38 TT 41.00
290.00 12806.80
39 TT 39.60
359.70 13166.50
40 AT 54.20 2°21'35"R
340.20 13506.70
41 AT 54.20 2°41'27"R
320.65 13827.35
42 TT 39.60
339.95 14167.30
43 TT 41.00
340.10 14507.40
44 TT 39.60
339.85 14847.25
45 TT 41.00
310.00 15157.25
46 TT 41.00
335.00 15492.25
47 TT 39.60
324.75 15817.00
4669.05 4863
48 TT 39.60
355.00 16172.00
49 TT 41.00
344.90 16516.90
50 TT 42.60
355.00 16871.90
51 TT 39.60
339.95 17211.85
52 TT 39.60
355.00 17566.85
53 TT 39.60
339.90 17906.75
54 TT 51.60
269.00 18175.75
55 AT 62.80 00°00'00"
299.00 18474.75
56 HA 65.70 82°39'24"R
274.70 18749.45
57 LA 68.50 12°33'19"L
381.00 19130.45
58 HA 65.70 89°52'37"L
235.00 19365.45
59 TT 56.30
2811.10 2981
304.00 19669.45
60 TT 45.70
359.90 20029.35
61 TT 50.20
318.00 20347.35
62 TT 45.70
361.70 20709.05
63 LA 50.20 19°43'31"R
277.80 20986.85
64 TT 48.70
335.50 21322.35
65 TT 48.70
301.50 21623.85
66 TT 48.70
353.60 21977.45
67 TT 39.60
332.25 22309.70
68 TT 42.60
3029.15 3185
335.40 22645.10
69 TT 47.20
344.00 22989.10
70 TT 51.60
344.30 23333.40
71 TT 51.60
347.50 23680.90
72 TT 39.60
335.10 24016.00
73 TT 47.20
251.10 24267.10
74 HA 58.30 0°7'25"R
267.40 24534.50
75 TT 45.90
288.50 24823.00
76 TT 45.90
358.15 25181.15
77 TT 47.40
358.15 25539.30
78 TT 46.10
358.15 25897.45
79 TT 49.20 2940.70 3174
358.25 26255.70
80 TT 44.50
218.00 26473.70
81 HA 50.40 89°24'34"R
314.00 26787.70
82 HA 50.40 92°44'08"L
68.00 26855.70
83 HA 39.60
101.00 26956.70
Jubail North
Gantry 26.00
S/S
0.00 26956.70

26956.70 28445.67
Total
struction and Configuration of OHTL and UG Cable in Jubail and Shedgum Areas> /4400003961

OPGW DRUM SCHEDULE - Retrofitting


Tension Set Tension Plate
Suspension
For Pass through Set
Suspension as Termination
Ratio splicing (Non splicing)

120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN

(9) (10) (11) (12) (13) (14) (15) (16) (17)


2

1
107.44%
1

1
104.91%
1
104.91%

1 1

1
104.43%
1

104.68%
1

2
1

104.15%
1

1
106.03%
1

1 1
1

1
105.16%
1

107.94% 1

105.52%
Total 10 8 14 12 0 0 31 33

6 5 6 6 0 0 31 33
um Areas> /4400003961/Portion 2

Junction Box
Vibration Extra Armor Grip /rod for Down-lead
Damper Damper Clamp
OPGW 120- OPGW 120- OPGW 70 OPGW 120-
OPGW 120 OPGW 70 OPGW 70 UGNMFOC
120 KN 70 KN 120 KN 70 KN 120 KN 70 KN

(18) (19) (20) (21) (22) (23) (24) (25) (26) (27)
30 1
2

2
40 1
2

2
2

2
20 20 1
3 0

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1
40 1
3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 0
40 1
3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1
40 1
3 0

3 0

3 0

3 1

3 1

3 1

3 1

3 1

3 1
20 20 1
2
2

2
40 1
2

2
1
30

82 129 0 38 180 160 2 2 3 2

41 43 0 43 6 5 2 2 3 2
Project M 504 <Construction and Con

Line :- Jubail 2-Kayan, 230 KV, 2X48


70 KN 120 KN
Towers Spans

Length
Horizontal Section
Tower Tower Height in Progressive Line of
Span in mtrs Length in mtrs
Number Type mtrs Length in mtrs Angle OPGW in mtrs

(1) (2) (3) (4) (5) (6) (7) (8)


Jubail 2 S/S Gantry 26.00
120.00 120.00
1 HA 47.20 00°00'00"
321.00 441.00
2 HA 57.50 93°21'20"L
295.70 736.70
3 TT 44.10
340.00 1076.70
4 TT 44.10
334.90 1411.60
3031.45 3282
5 TT 44.10
309.90 1721.50
6 TT 44.10
330.00 2051.50
7 TT 44.10
329.95 2381.45
8 TT 44.10
320.00 2701.45
9 TT 44.10
330.00 3031.45
10 TT 44.10
320.00 3351.45
11 TT 44.10
344.90 3696.35
12 TT 44.10
349.80 4046.15
13 TT 44.10
285.00 4331.15
14 TT 44.10
310.00 4641.15
2974.75 3123
15 TT 44.10
345.00 4986.15
16 TT 44.10
306.15 5292.30
17 TT 44.10
331.95 5624.25
18 HA 51.40 00°00'00"
31.55 5655.80
19 HA 51.40 00°00'00"
350.40 6006.20
20 TT 44.10
345.00 6351.20
21 TT 44.10
319.90 6671.10
22 TT 44.10
334.90 7006.00
23 TT 47.10
300.10 7306.10
24 TT 44.10
329.90 7636.00
25 TT 44.10
319.95 7955.95
26 TT 44.10
343.40 8299.35
4469.25 4638
27 HA 44.00 9°44'43"R
276.05 8575.40
28 TT 47.10
345.00 8920.40
29 TT 44.10
334.95 9255.35
30 TT 44.10
334.90 9590.25
31 TT 44.10
347.00 9937.25
32 TT 44.10
335.80 10273.05
33 HA 44.00 23°21'48"L
202.40 10475.45
34 HA 49.90 89°59'03"L
349.00 10824.45
35 TT 50.30
335.20 11159.65
36 TT 44.10
335.20 11494.85
37 TT 44.10
335.20 11830.05
38 TT 44.10
335.20 12165.25
39 TT 44.10
308.80 12474.05
3700.80 3862
40 AT 45.60
264.60 12738.65
41 TT 66.80
3700.80 3862

212.95 12951.60
42 AT 80.60
515.10 13466.70
43 AT 80.60
212.90 13679.60
44 HZ 66.80
242.05 13921.65
45 AT 45.50
254.60 14176.25
46 TT 44.10
302.00 14478.25
J2K1 MP 34.00
60.00 14538.25
J2K2 MP 34.00
21.00 14559.25
BPM 34 HA 44.00
335.15 14894.40
BPM 35 TT 44.00
349.95 15244.35
BPM 36 TT 47.00
2386.90 2511
330.20 15574.55
BPM 37 TT 50.30
289.10 15863.65
BPM 38 TT 48.50
309.00 16172.65
BPM 39 MA 49.90
340.50 16513.15
BPM 40 HA 54.70
50.00 16563.15
Kayan S/S Gantry 26.00
0.00 16563.15

16563.15 16563.15 17415.18


Total
struction and Configuration of OHTL and UG Cable in Jubail and Shedgum Areas> /4400003961

OPGW DRUM SCHEDULE - Retrofitting


Tension Set Tension Plate
Suspension
For Pass through Set
Suspension as Termination
Ratio splicing (Non splicing)

120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN

(9) (10) (11) (12) (13) (14) (15) (16) (17)


4

2
108.26%
2

2
104.97%
2

2
4

2 2

2
103.77%
4

2 2

2
104.35%
4

2
104.35%

2
105.19%
2

105.14%
Total 20 4 60 8 0 0 48 22

6 2 14 2 0 0 24 11
um Areas> /4400003961/Portion 2

Junction Box
Vibration Extra Armor Grip /rod for Down-lead
Damper Damper Clamp
OPGW 120- OPGW 120- OPGW 70 OPGW 120-
OPGW 120 OPGW 70 OPGW 70 UGNMFOC
120 KN 70 KN 120 KN 70 KN 120 KN 70 KN

(18) (19) (20) (21) (22) (23) (24) (25) (26) (27)
60 2
4

4
80 2
4

4
4

4
40 40 2
6 2

6 2

6 2

6 2

6 2

6 2

6 2

6 2

6 2

6 2

6 2

6 2

6 2

6 2
40 40 2
4

4
4

4
80 2
4
2
4
2
4

4 80 2

172 84 0 28 380 80 4 4 0 8

43 14 0 14 6 2 2 2 0 4
Project M 504 <Construction and Con

Line :- P. Jubail North-JUPC, 1X48 OPGW


70 KN 120 KN
Towers Spans

Length
Horizontal Section
Tower Tower Height in Progressive Line of
Span in mtrs Length in mtrs
Number Type mtrs Length in mtrs Angle OPGW in mtrs

(1) (2) (3) (4) (5) (6) (7) (8)


J North S/S Gantry 26.00
170.00 170.00
1 HA 40.30
99.55 269.55
2 HA 46.30
198.00 467.55
3 TT 41.90
307.75 775.30
4 TT 41.60
304.75 1080.05
1888.65 1990
5 TT 55.00
305.00
6 TT 59.60
248.60
7 HA 71.50
205.00
8 HA 60.00
50.00
JUPC S/S Gantry 26.00
0.00 1080.05

1888.65 1888.65 1989.54


Total
struction and Configuration of OHTL and UG Cable in Jubail and Shedgum Areas> /4400003961

OPGW DRUM SCHEDULE - Retrofitting


Tension Set Tension Plate
Suspension
For Pass through Set
Suspension as Termination
Ratio splicing (Non splicing)

120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN

(9) (10) (11) (12) (13) (14) (15) (16) (17)


2

2
105.34%
2

105.34%
Total 4 0 10 0 0 0 8 0

2 0 4 0 0 0 4 0
um Areas> /4400003961/Portion 2

Junction Box
Vibration Extra Armor Grip /rod for Down-lead
Damper Damper Clamp
OPGW 120- OPGW 120- OPGW 70 OPGW 120-
OPGW 120 OPGW 70 OPGW 70 UGNMFOC
120 KN 70 KN 120 KN 70 KN 120 KN 70 KN

(18) (19) (20) (21) (22) (23) (24) (25) (26) (27)
30 1
2

2
30 1

18 0 0 0 60 0 0 0 0 2

9 0 0 0 2 0 0 0 0 2
SAUDI ELECTRICITY COMPANY.

230kV OHTL in Juaymah & Shedgum Area (PORTION-3)

70 KN 120 KN
Tension Set Tension Plate Junction Box
Suspension Vibration Down-lead
Pass through Suspension as Extra Armor Grip /rod for Damper
For splicing Set Damper Clamp
(Non splicing) Termination OPGW OPGW OPGW OPGW
Sr No Tower No. Tower Type Span Ahead(m) Deviation Angle Section Drum length Received
120- 120- 70 120-
(Deg) Drum
Length (2 circuits) OPGW OPGW OPGW UGNMF
Length
120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 70 70 OC

Part-A No. of Circuits 2


1 New J SS Gantry New J SS Gantry 00° 00' 00" 4 60 2
110 4
2 A1 HA+E12+9 89° 33' 17"L 6
269.14 500.87 1639.2174 1679 4
3 A2 HA+E12+9 89° 45' 03"L 6
121.73 4
4 Ext J SS Gantry Ext J SS Gantry 00° 00' 00" 4 60 2

11670.00 1002 1639 1679 8 0 12 0 0 0 0 0 12 0 0 0 120 0 0 0 0 4


Project M 504 <Construction and Configuration of OHTL and UG Cable in Jubail and Shedgum Areas> /4400003961/Portion 3 & 7

Line :- New Juaymah BSP-Ras Tanurah -C.B OPGW DRUM SCHEDULE - New OHTL and Retrofitting
70 KN 120 KN
Towers Spans Tension Set Tension Plate Junction Box
Suspension Vibration Extra Armor Grip Down-lead
Length For Pass through Suspension as OPGW OPGW
Horizontal Progressive Section Set Damper /rod for Damper Clamp OPGW Warning Vibration
Tower Tower Height in Line of Received drum splicing (Non splicing) Termination 120- OPGW 70 120- Warning lights Tower
Span in mtrs Length in Length in mtrs 120- Spheres Damper for
Number Type mtrs Angle OPGW in mtrs OPGW OPGW 70 UGNMF (Both Cicuits) Beacons
mtrs 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN OPGW 70 (Both Cicuits) Conductor
120 OC
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25) (26) (27)
New Juaymah BSP-Ras Tanurah -C.B (Circuit 1)
New Juaymah S/S Gantry 26.00 00° 00' 00" 2 30 1
121.00 121.00 2
1 C.B AT 43.25 3
332.19 453.19 2
2 C.B MA 43.25 36° 44' 2"L 2
188.60 641.78 2
1101.26 1323.67 1407.00
3 C.B MHA 40.05 3° 24' 55"L 2
150.31 792.09 2
4 C.B 3P-1STAGE 42.00 3° 19' 35"R 2
63.79 855.88 2
7 C.B 3P-2STAGE 42.00 90° 23' 18"R 2
245.38 1101.26 2
EXT GRT# 35 TT 34.40 2 40 1
345.25 1446.51 2
EXT GRT# 36 TT 35.85 1
346.05 1792.56 2
EXT GRT# 37 TT 34.40 1
342.80 2135.36 2
EXT GRT# 38 TT 35.10 1
346.90 2482.26 2
EXT GRT# 39 TT 34.40 1
345.35 2827.61 2
EXT GRT# 40 TT 36.00 1
344.45 3172.06 2
EXT GRT# 41 HA 39.00 88°43'43"L 2
402.55 3574.61 2
EXT GRT# 42 TT 38.80 4865.35 5032.80 5121.00 1
343.90 3918.51 2
EXT GRT# 43 LA 39.10 13°41'36"L 2
344.55 4263.06 2
EXT GRT# 44 TT 34.40 1
344.40 4607.46 2
EXT GRT# 45 TT 34.40 1
341.30 4948.76 2
EXT GRT# 46 TT 34.40 1
341.30 5290.06 2
EXT GRT# 47 TT 34.40 1
341.30 5631.36 2
EXT GRT# 48 TT 34.40 1
335.25 5966.61 2
EXT GRT# 49 TT 34.40 1 1 40 40 1
347.30 6313.91 3 1
EXT GRT# 50 TT 37.50 1
329.15 6643.06 3 1
EXT GRT# 51 TT 37.50 1
341.75 6984.81 3 1
EXT GRT# 52 TT 34.40 1
305.20 7290.01 3 1
EXT GRT# 53 TT 34.40 1
304.50 7594.51 3080.15 3248.95 3408.00 3 1
EXT GRT# 54 SA 32.90 06°58'27"R 2
349.70 7944.21 3 1
EXT GRT# 55 TT 36.30 1
399.35 8343.56 3 1
EXT GRT# 56 TT 42.00 1
337.60 8681.16 3 1
EXT GRT# 57 TT 42.00 1
365.60 9046.76 3 1
EXT GRT# 58 MA 43.60 47°56'14"R 2 40 1
365.25 9412.01 9 8 6 4 2
EXT GRT# 59 TT 45.30 1
195.00 9607.01 6 5 3 4 2
END MA+E0+8 38.50 2
280.49 9887.50 7 6 4 4 2
22 TT+E0+8 38.65 1
331.00 10218.50 8 7 5 4 2
21 AT+E12+8 49.55 1
360.00 10578.50 8 7 5 4 2
20 AT+E12+8 49.55 1
275.00 10853.50 3496.74 3638.86 3730.00 7 6 4 4 2
19 TT+E6+6 42.65
339.00 11192.50 8 7 5 4 2
18 TT+E6+4 40.65
Project M 504 <Construction and Configuration of OHTL and UG Cable in Jubail and Shedgum Areas> /4400003961/Portion 3 & 7

Line :- New Juaymah BSP-Ras Tanurah -C.B OPGW DRUM SCHEDULE - New OHTL and Retrofitting
70 KN 120 KN
Towers Spans 3496.74 3638.86 3730.00 Tension Set Tension Plate Junction Box
Suspension Vibration Extra Armor Grip Down-lead
Length For Pass through Suspension as OPGW OPGW
Horizontal Progressive Section Set Damper /rod for Damper Clamp OPGW Warning Vibration
Tower Tower Height in Line of Received drum splicing (Non splicing) Termination 120- OPGW 70 120- Warning lights Tower
Span in mtrs Length in Length in mtrs 120- Spheres Damper for
Number Type mtrs Angle OPGW in mtrs OPGW OPGW 70 UGNMF (Both Cicuits) Beacons
mtrs 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN OPGW 70 (Both Cicuits) Conductor
120 OC
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25) (26) (27)
344.00 11536.50 8 7 5 4 2
17 TT+E6+4 40.65
336.00 11872.50 8 7 5 4 2
16 TT+E0+8 38.65
325.00 12197.50 8 7 5 4 2
15 TT+E0+8 38.65
346.00 12543.50 8 7 5 4 2
14 TT+E6+6 42.65 2 40
342.00 12885.50 8 7 5 4 2
13 TT+E0+8 38.65
340.00 13225.50 8 7 5 4 2
12 TT+E6+4 40.65
272.00 13497.50 7 6 4 4 2
11 TT+E6+6 42.65
352.00 13849.50 8 7 5 4 2
10 TT+E0+8 38.65
326.00 14175.50 8 7 5 4 2
9 TT+E6+6 42.65
350.00 14525.50 8 7 5 4 2
8 TT+E0+8 38.65
327.00 14852.50 4333.00 4492.48 4607.00 8 7 5 4 2
7 TT+E6+6 42.65
342.00 15194.50 8 7 5 4 2
6 TT+E0+8 38.65 1
342.00 15536.50 8 7 5 4 2
5 TT+E6+6 42.65 1
344.00 15880.50 8 7 5 4 2
4 TT+E0+8 38.65
343.00 16223.50 8 7 5 4 2
3 TT+E6+6 38.65 1
277.00 16500.50 7 6 4 4 2
2 TT+E12+6 48.65 1
376.00 16876.50 9 8 6 4 2
1 AT+E6+8 43.50 1 1 50 50 1
330.00 17206.50 7 5 5 4 2
START HA+E6+8 44.70 2
335.00 17541.50 7 5 5 4 2
EXT GRT# 83 TT 37.30 1
379.48 17920.98 8 6 6 4 2
EXT GRT# 84 TT 37.30 1
387.40 18308.38 2584.94 2724.29 3118.00 8 6 6 4 2
EXT GRT# 85 TT 40.40 1
365.76 18674.14 8 6 6 4 2
EXT GRT# 86 LA 40.00 16°45'42"L 2
394.41 19068.55 8 6 6 4 2
EXT GRT# 87 TT 37.30 1
392.89 19461.44 8 6 6 4 2
EXT GRT# 88 LA 40.00 25°58'12"R 2 40 1
375.21 19836.65 2
EXT GRT# 89 TT 38.80 1
374.90 20211.55 2
EXT GRT# 90 TT 37.30 1
381.00 20592.55 2
EXT GRT# 91 TT 40.40 1
381.00 20973.55 2
EXT GRT# 92 TT 37.30 1
365.76 21339.31 2
EXT GRT# 93 TT 37.30 3584.75 3839 3839 1
384.05 21723.36 2
EXT GRT# 94 TT 38.80 1
393.19 22116.55 2
EXT GRT# 95 TT 37.30 1
402.95 22519.50 2
EXT GRT# 96 LA 40.00 16°4'25"R 2
404.77 22924.27 2
EXT GRT# 97 AS 40.00 16°4'25"L 3
121.92 23046.19 2
rastanura s/s
S/S Gantry 26.00 2 30 1
Gantry

Sub Total (Circuit 1) = 23046.19 24299.57 25230.00 10.00 6.00 24.00 4.00 0.00 0.00 22.00 9.00 114.00 215.00 40.00 173.00 230.00 170.00 2.00 2.00 1.00 2.00

New Juaymah BSP-Ras Tanurah -C.B (Circuit 2)


New Juaymah S/S Gantry 26.00 00° 00' 00"
121.00 121.00

1068.35 1290.43 1189.00


Project M 504 <Construction and Configuration of OHTL and UG Cable in Jubail and Shedgum Areas> /4400003961/Portion 3 & 7

Line :- New Juaymah BSP-Ras Tanurah -C.B OPGW DRUM SCHEDULE - New OHTL and Retrofitting
70 KN 120 KN
Towers Spans Tension Set Tension Plate Junction Box
Suspension Vibration Extra Armor Grip Down-lead
Length For Pass through Suspension as OPGW OPGW
Horizontal Progressive Section Set Damper /rod for Damper Clamp OPGW Warning Vibration
Tower Tower Height in Line of Received drum splicing (Non splicing) Termination 120- OPGW 70 120- Warning lights Tower
Span in mtrs Length in Length in mtrs 120- Spheres Damper for
Number Type mtrs Angle OPGW in mtrs OPGW OPGW 70 UGNMF (Both Cicuits) Beacons
mtrs 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN OPGW 70 (Both Cicuits) Conductor
120 OC
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25) (26) (27)
1 C.B AT 43.25
332.19 453.19
2 C.B MA 43.25 36° 44' 2"L
188.60 641.78
1068.35 1290.43 1189.00
3 C.B MHA 40.05 3° 24' 55"L
150.29 792.07
5 C.B 3P-1STAGE 42.00 3° 19' 35"R
48.51 840.58
6 C.B 3P-2STAGE 42.00 90° 23' 18"R
227.77 1068.35
EXT GRT# 35 TT 34.40
345.25 1413.60
EXT GRT# 36 TT 35.85
346.05 1759.65
EXT GRT# 37 TT 34.40
342.80 2102.45
EXT GRT# 38 TT 35.10
346.90 2449.35
EXT GRT# 39 TT 34.40
345.35 2794.70
EXT GRT# 40 TT 36.00
344.45 3139.15
EXT GRT# 41 HA 39.00 88°43'43"L
402.55 3541.70
EXT GRT# 42 TT 38.80 4865.35 5042.80 5121.00
343.90 3885.60
EXT GRT# 43 LA 39.10 13°41'36"L
344.55 4230.15
EXT GRT# 44 TT 34.40
344.40 4574.55
EXT GRT# 45 TT 34.40
341.30 4915.85
EXT GRT# 46 TT 34.40
341.30 5257.15
EXT GRT# 47 TT 34.40
341.30 5598.45
EXT GRT# 48 TT 34.40
335.25 5933.70
EXT GRT# 49 TT 34.40
347.30 6281.00
EXT GRT# 50 TT 37.50
329.15 6610.15
EXT GRT# 51 TT 37.50
341.75 6951.90
EXT GRT# 52 TT 34.40
305.20 7257.10
EXT GRT# 53 TT 34.40
304.50 7561.60 3080.15 3248.95 3408.00
EXT GRT# 54 SA 32.90 06°58'27"R
349.70 7911.30
EXT GRT# 55 TT 36.30
399.35 8310.65
EXT GRT# 56 TT 42.00
337.60 8648.25
EXT GRT# 57 TT 42.00
365.60 9013.85
EXT GRT# 58 MA 43.60 47°56'14"R
365.25 9379.10
EXT GRT# 59 TT 45.30
195.00 9574.10
END MA+E0+8 38.50
280.49 9854.58
22 TT+E0+8 38.65
331.00 10185.58
21 AT+E12+8 49.55
360.00 10545.58
20 AT+E12+8 49.55
275.00 10820.58 3496.74 3638.86 3730.00
19 TT+E6+6 42.65
339.00 11159.58
18 TT+E6+4 40.65
344.00 11503.58
17 TT+E6+4 40.65
336.00 11839.58
Project M 504 <Construction and Configuration of OHTL and UG Cable in Jubail and Shedgum Areas> /4400003961/Portion 3 & 7
3496.74 3638.86 3730.00
Line :- New Juaymah BSP-Ras Tanurah -C.B OPGW DRUM SCHEDULE - New OHTL and Retrofitting
70 KN 120 KN
Towers Spans Tension Set Tension Plate Junction Box
Suspension Vibration Extra Armor Grip Down-lead
Length For Pass through Suspension as OPGW OPGW
Horizontal Progressive Section Set Damper /rod for Damper Clamp OPGW Warning Vibration
Tower Tower Height in Line of Received drum splicing (Non splicing) Termination 120- OPGW 70 120- Warning lights Tower
Span in mtrs Length in Length in mtrs 120- Spheres Damper for
Number Type mtrs Angle OPGW in mtrs OPGW OPGW 70 UGNMF (Both Cicuits) Beacons
mtrs 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN OPGW 70 (Both Cicuits) Conductor
120 OC
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25) (26) (27)
16 TT+E0+8 38.65
325.00 12164.58
15 TT+E0+8 38.65
346.00 12510.58
14 TT+E6+6 42.65
342.00 12852.58
13 TT+E0+8 38.65
340.00 13192.58
12 TT+E6+4 40.65
272.00 13464.58
11 TT+E6+6 42.65
352.00 13816.58
10 TT+E0+8 38.65
326.00 14142.58
9 TT+E6+6 42.65
350.00 14492.58
8 TT+E0+8 38.65
327.00 14819.58 4333.00 4492.48 4607.00
7 TT+E6+6 42.65
342.00 15161.58
6 TT+E0+8 38.65
342.00 15503.58
5 TT+E6+6 42.65
344.00 15847.58
4 TT+E0+8 38.65
343.00 16190.58
3 TT+E6+6 38.65
277.00 16467.58
2 TT+E12+6 48.65
376.00 16843.58
1 AT+E6+8 43.50
330.00 17173.58
START HA+E6+8 44.70
335.00 17508.58
EXT GRT# 83 TT 37.30
379.48 17888.06
EXT GRT# 84 TT 37.30
387.40 18275.46 2584.94 2724.29 3118.00
EXT GRT# 85 TT 40.40
365.76 18641.22
EXT GRT# 86 LA 40.00 16°45'42"L
394.41 19035.63
EXT GRT# 87 TT 37.30
392.89 19428.52
EXT GRT# 88 LA 40.00 25°58'12"R
375.21 19803.73
EXT GRT# 89 TT 38.80
374.90 20178.63
EXT GRT# 90 TT 37.30
381.00 20559.63
EXT GRT# 91 TT 40.40
381.00 20940.63
EXT GRT# 92 TT 37.30
365.76 21306.39
EXT GRT# 93 TT 37.30 3584.75 3839 3862
384.05 21690.44
EXT GRT# 94 TT 38.80
393.19 22083.63
EXT GRT# 95 TT 37.30
402.95 22486.58
EXT GRT# 96 LA 40.00 16°4'25"R
404.77 22891.35
EXT GRT# 97 AS 40.00 16°4'25"L
121.92 23013.27
rastanura s/s
S/S Gantry 26.00
Gantry

Sub Total (Circuit 2) = 23013.27 24276.33 25035.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Grand Total (Circuit 1 & 2) = 46059.46 48575.90 50265.00 10.00 6.00 24.00 4.00 0.00 0.00 22.00 9.00 114.00 215.00 40.00 173.00 230.00 170.00 2.00 2.00 1.00 2.00 156 0 124 62 6

P7 NJRT OPGW Quantity = 1 3 2 2 0 0 0 1 14 179 10 156 50 90 0 1 0 0 156 0 124 62 6


Project M 504 <Construction and Configuration of OHTL and UG Cable in Jubail and Shedgum Areas> /4400003961/Portion 3 & 7
Part D :- QATIF Transition yard-RAS TANURA
OPGW DRUM SCHEDULE - Retrofitting
70 KN 120 KN
Towers Spans Tension Set Tension Plate Junction Box
Suspension Vibration Extra Armor Grip /rod Down-lead
Section Length For Pass through Set Damper for Damper Clamp
of Received Drum Suspension as Termination Warning Vibration
Tower Tower Height in Horizontal Progressive Line Length in mtrs OPGW in mtrs splicing (Non splicing) OPGW 120- OPGW 120- OPGW 70 OPGW 120- Tower
Number Type mtrs Span in mtrs Length in mtrs Angle OPGW 120 OPGW 70 OPGW 70 UGNMFOC Spheres Damper for Warning lights
120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN (Both Cicuits) Conductor Beacons

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25) (26) (27)

Qatif
2 30 1
Qatif Transition yard Monopole 25.00
101.66 101.66 2
EXT QRT # 1 HA 33.60 54°17'25"Lt 3
189.40 291.06 2
EXT QRT # 2 LA 34.90 29°16'55"Rt 2
309.60 600.66 2
EXT QRT # 3 TT 36.60 1
271.00 871.66 2
EXT QRT # 4 TT 41.10 1
338.00 1209.66 2
EXT QRT # 5 TT 42.60 1
257.90 1467.56 2
EXT QRT # 6 TT 33.60 1
307.00 1774.56 2
EXT QRT # 7 TT 41.10 3898.56 4132 4120 1
335.95 2110.51 2
EXT QRT # 8 TT 33.60 1
328.90 2439.41 2
EXT QRT # 9 TT 33.60 1
346.95 2786.36 2
EXT QRT # 10 TT 38.10 1
329.85 3116.21 2
EXT QRT # 11 TT 33.60 1
278.95 3395.16 2
EXT QRT # 12 TT 35.10 1
218.00 3613.16 2
EXT QRT # 13 TT 33.60 1
285.40 3898.56 2
EXT QRT # 14 LA 37.90 25°59'38"Rt 2 40 1
286.50 4185.06 2
EXT QRT # 15 TT 42.60 1
336.86 4521.92 2
EXT QRT # 16 TT 33.60 1
329.81 4851.73 2
EXT QRT # 17 TT 33.60 1
330.00 5181.73 2
EXT QRT # 18 TT 33.60 1
329.85 5511.58 2
EXT QRT # 19 TT 33.60 3167.79 3299 3299 1
330.10 5841.68 2
EXT QRT # 20 TT 33.60 1
329.85 6171.53 2
EXT QRT # 21 TT 35.10 1
342.92 6514.45 2
EXT QRT # 22 TT 39.60 1
266.95 6781.40 2
EXT QRT # 23 TT 33.60 1
284.95 7066.35 2
EXT QRT # 24 LA 31.90 5°38'18"Rt 1 1 40 40 1
345.00 7411.35 3 1
EXT QRT # 25 TT 36.60 1
327.85 7739.20 3 1
EXT QRT # 26 TT 33.60 1
341.92 8081.12 3 1
EXT QRT # 27 TT 33.60 1
335.95 8417.07 3 1
EXT QRT # 28 TT 36.60 1
343.92 8760.99 3 1
EXT QRT # 29 TT 33.60 1
323.90 9084.89 3 1
EXT QRT # 30 TT 33.60 1
335.96 9420.85 3 1
EXT QRT # 31 TT 33.60 1
305.95 9726.80 4923.93 5078 5078 3 1
EXT QRT # 32 TT 33.60 1
335.83 10062.63 3 1
EXT QRT # 33 TT 33.60 1
335.95 10398.58 3 1
EXT QRT # 34 TT 35.10 1
336.00 10734.58 3 1
EXT QRT # 35 TT 33.60 1
322.85 11057.43 3 1
EXT QRT # 36 TT 35.10 1
315.00 11372.43 3 1
EXT QRT # 37 TT 35.10 1
359.00 11731.43 3 1
EXT QRT # 38 TT 42.60 1
4923.93 5078 5078

Part D :- QATIF Transition yard-RAS TANURA


OPGW DRUM SCHEDULE - Retrofitting
70 KN 120 KN
Towers Spans Tension Set Tension Plate Junction Box
Suspension Vibration Extra Armor Grip /rod Down-lead
Length Set Damper for Damper Clamp
Section For Pass through
Length in mtrs of Received Drum splicing (Non splicing) Suspension as Termination Warning Vibration
Tower Tower Height in Horizontal Progressive Line OPGW in mtrs OPGW 120- OPGW 120- OPGW 70 OPGW 120- Tower
Number Type mtrs Span in mtrs Length in mtrs Angle OPGW 120 OPGW 70 OPGW 70 UGNMFOC Spheres Damper for Warning lights
120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN (Both Cicuits) Conductor Beacons

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25) (26) (27)

258.85 11990.28 3 1
EXT QRT # 39 TT 42.60 2 40 1
382.90 12373.18 3 1
EXT QRT # 40 TT 38.10 1
338.95 12712.13 3 1
EXT QRT # 41 TT 33.60 1
327.95 13040.08 3 1
EXT QRT # 42 TT 39.60 1
343.90 13383.98 3 1
EXT QRT # 43 TT 33.60 1
323.92 13707.90 3 1
EXT QRT # 44 TT 35.10 1
343.90 14051.80 3 1
EXT QRT # 45 TT 35.10 4006.13 4158 4158 1
336.00 14387.80 3 1
EXT QRT # 46 TT 33.60 1
358.92 14746.72 3 1
EXT QRT # 47 TT 33.60 1
336.92 15083.64 3 1
EXT QRT # 48 TT 33.60 1
261.00 15344.64 3 1
EXT QRT # 49 TT 35.10 1
344.90 15689.54 3 1
EXT QRT # 50 TT 36.60 1
306.87 15996.41 3 1
EXT QRT # 51 TT 39.60 2 40 1
358.90 16355.31 3 1
EXT QRT # 52 TT 33.60 1
358.95 16714.26 3 1
EXT QRT # 53 TT 33.60 1
342.92 17057.18 3 1
EXT QRT # 54 TT 36.60 1
347.00 17404.18 3 1
EXT QRT # 55 TT 33.60 1
356.95 17761.13 3 1
EXT QRT # 56 TT 41.10 1
337.80 18098.93 3 1
EXT QRT # 57 TT 35.10 4123.99 4268 4268 1
356.92 18455.85 3 1
EXT QRT # 58 TT 39.60 1
344.65 18800.50 3 1
EXT QRT # 59 MA 34.90 39°34'12"Rt 2
300.15 19100.65 3 1
EXT QRT # 60 TT 35.10 1
351.90 19452.55 3 1
EXT QRT # 61 TT 33.60 1
327.90 19780.45 3 1
EXT QRT # 62 TT 35.10 1
339.95 20120.40 3 1
EXT QRT # 63 TT 33.60 2 40 1
350.93 20471.33 3 1
EXT QRT # 64 TT 35.10 1
339.95 20811.28 3 1
EXT QRT # 65 TT 33.60 1
327.92 21139.20 3 1
EXT QRT # 66 TT 33.60 1
330.90 21470.10 3 1
EXT QRT # 67 TT 35.10 1
330.00 21800.10 3 1
EXT QRT # 68 TT 33.60 1
302.82 22102.92 3 1
EXT QRT # 69 TT 36.60 3963.09 4100 4100 1
340.00 22442.92 3 1
EXT QRT # 70 TT 33.60 1
334.90 22777.82 3 1
EXT QRT # 71 TT 35.10 1
335.87 23113.69 3 1
EXT QRT # 72 TT 33.60 1
337.90 23451.59 3 1
EXT QRT # 73 TT 33.60 1
339.90 23791.49 3 1
EXT QRT # 74 TT 36.60 1
292.00 24083.49 3 1
EXT QRT # 75 HA 33.40 77°58'52"Rt 2 40 1
305.99 24389.48 3 1
EXT QRT # 76 TT 36.60 1
344.00 24733.48 3 1
EXT QRT # 77 TT 33.60 1
350.00 25083.48 3 1

3745.89 3885 3885


Part D :- QATIF Transition yard-RAS TANURA
OPGW DRUM SCHEDULE - Retrofitting
70 KN 120 KN
Towers Spans Tension Set Tension Plate Junction Box
Suspension Vibration Extra Armor Grip /rod Down-lead
Length Set Damper for Damper Clamp
Section For Pass through
Length in mtrs of Received Drum splicing (Non splicing) Suspension as Termination Warning Vibration
Tower Tower Height in Horizontal Progressive Line OPGW in mtrs OPGW 120- OPGW 120- OPGW 70 OPGW 120- Tower
Number Type mtrs Span in mtrs Length in mtrs Angle OPGW 120 OPGW 70 OPGW 70 UGNMFOC Spheres Damper for Warning lights
120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN (Both Cicuits) Conductor Beacons

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25) (26) (27)

EXT QRT # 78 TT 36.60 1


352.00 25435.48 3 1
EXT QRT # 79 TT 33.60 1
339.00 25774.48 3 1
EXT QRT # 80 TT 42.60 1
315.00 26089.48 3 1
EXT QRT # 81 TT 38.10 3745.89 3885 3885 1
324.00 26413.48 3 1
EXT QRT # 82 TT 33.60 1
305.00 26718.48 3 1
EXT QRT # 83 TT 41.10 1
215.00 26933.48 3 1
EXT QRT # 84 TT 41.10 1
317.00 27250.48 3 1
EXT QRT # 85 TT 36.60 1
284.00 27534.48 3 1
EXT QRT # 86 TT 36.60 1
294.90 27829.38 3 1
EXT QRT # 87 LA 37.90 7°56'48"Lt 2 40 1
273.10 28102.48 7 5 4 4 2
EXT QRT # 88 TT 42.60 1
330.00 28432.48 8 6 5 4 2
EXT QRT # 89 TT 33.60 1
310.00 28742.48 8 6 5 4 2
EXT QRT # 90 TT 33.60 1
320.00 29062.48 8 6 5 4 2
EXT QRT # 91 TT 33.60 1
282.00 29344.48 7 5 4 4 2
START A MA 48.50 48°11'08"Rt 2
432.00 29776.48 10 8 7 4 2
PI-1 MA 48.50 3772.35 3912 3988 2
234.00 30010.48 6 4 3 4 2
PI-2 MA 36.50 2
211.00 30221.48 6 4 3 4 2
EXT GRT # 60 LA 39.30 13°36'22"L 2
404.90 30626.38 9 7 6 4 2
EXT GRT # 61 TT 42.00 1 1
274.32 30900.70 7 5 4 4 2
EXT GRT # 62 TT 42.00 1 1
362.70 31263.40 9 7 6 4 2
EXT GRT # 63 TT 34.40 1
338.33 31601.73 8 6 5 4 2
EXT GRT # 64 TT 34.40 2 40 1
335.28 31937.01 8 6 5 4 2
EXT GRT # 65 TT 34.40 1
338.33 32275.34 8 6 5 4 2
EXT GRT # 66 TT 34.40 1
341.38 32616.72 8 6 5 4 2
EXT GRT # 67 TT 34.40 1
338.33 32955.05 8 6 5 4 2
EXT GRT # 68 TT 34.40 1
341.38 33296.43 8 6 5 4 2
EXT GRT # 69 TT 34.40 3322.34 3454 3554 1
341.38 33637.81 8 6 5 4 2
EXT GRT # 70 TT 34.40 1
268.22 33906.03 7 5 4 4 2
EXT GRT # 71 TT 34.40 1
338.33 34244.36 8 6 5 4 2
EXT GRT # 72 TT 34.40 1
341.38 34585.74 8 6 5 4 2
EXT GRT # 73 TT 34.40 1
338.33 34924.07 8 6 5 4 2
EXT GRT # 74 TT 34.40 2 40 1
341.38 35265.45 8 6 5 4 2
EXT GRT # 75 TT 34.40 1
338.33 35603.78 8 6 5 4 2
EXT GRT # 76 TT 34.40 1365.51 1508 1 1
341.38 35945.16 8 6 5 4 2
EXT GRT # 77 TT 34.40 1 1
344.42 36289.58 8 6 5 4 2
EXT GRT # 78 TT 34.40 1 1 40 40 1
341.38 36630.96 7 5 5 4 2
EXT GRT # 79 TT 35.80 1 1
283.46 36914.42 6 4 4 4 2
EXT GRT # 80 TT 34.40 1 1
338.63 37253.05 7 5 5 4 2
EXT GRT # 81 TT 34.40 1
335.28 37588.33 7 5 5 4 2
EXT GRT # 82 MA 43.60 63°16'52"L 2

3737.75 3873 4169


Part D :- QATIF Transition yard-RAS TANURA
OPGW DRUM SCHEDULE - Retrofitting
70 KN 120 KN
Towers Spans Tension Set Tension Plate Junction Box
Suspension Vibration Extra Armor Grip /rod Down-lead
Length Set Damper for Damper Clamp
Section For Pass through
Length in mtrs of Received Drum splicing (Non splicing) Suspension as Termination Warning Vibration
Tower Tower Height in Horizontal Progressive Line OPGW in mtrs OPGW 120- OPGW 120- OPGW 70 OPGW 120- Tower
Number Type mtrs Span in mtrs Length in mtrs Angle OPGW 120 OPGW 70 OPGW 70 UGNMFOC Spheres Damper for Warning lights
120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN (Both Cicuits) Conductor Beacons

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25) (26) (27)

135 37723.33 4 2 2 4 2
START B MA 36.5 2
120 37843.33 3 1 1 4 2
EXT QRT # 117 TT 33.60 1
320.00 38163.33 3737.75 3873 4169 7 5 5 4 2
EXT QRT # 118 TT 33.60 1
320.00 38483.33 7 5 5 4 2
EXT QRT # 119 TT 33.60 1
201.00 38684.33 5 3 3 4 2
EXT QRT # 120 TT 41.10 1
383.00 39067.33 8 6 6 4 2
EXT QRT # 121 TT 38.10 1
300.00 39367.33 6 4 4 4 2
EXT QRT # 122 TT 33.60 1
330.00 39697.33 7 5 5 4 2
EXT QRT # 123 TT 33.60 1
330.00 40027.33 7 5 5 4 2
EXT QRT # 124 TT 33.60 2 40 1
330.00 40357.33 2
EXT QRT # 125 TT 33.60 1
335.00 40692.33 2
EXT QRT # 126 TT 35.10 1
345.00 41037.33 2
EXT QRT # 127 TT 33.60 1
343.78 41381.11 2
EXT QRT # 128 LA 31.90 09°08'01"Rt 2
321.22 41702.33 2
EXT QRT # 129 TT 35.10 1
371.00 42073.33 3628.42 3918 3918 2
EXT QRT # 130 TT 33.60 1
341.00 42414.33 2
EXT QRT # 131 TT 39.60 1
371.00 42785.33 2
EXT QRT # 132 TT 33.60 1
331.08 43116.41 2
EXT QRT # 133 MA 34.90 38°50'25"Rt 2
374.24 43490.65 2
EXT QRT # 134 HA 36.40 90°58'10"Lt 2
165.10 43655.75 2

rastanura s/s Gantry S/S Gantry 24.60 2 25 1

Total Quantity QRT = 43655.75 43655.75 45586.07 44537.00 10.00 16.00 15.00 10.00 0.00 0.00 37.00 76.00 151.00 393.00 55.00 215.00 215.00 360.00 2.00 2.00 7.00 2.00 181 0 156 78 6

P7 QRT OPGW Quantity = 0 0 2 6 0 0 0 0 7 29 3 21 0 0 0 0 0 0 181 0 156 78 6


Project M 504 <Construction and Configuration of OHTL and UG Cable in Jubail and Shedgum Areas> /4400003961/Portion 3 & 7
Line Part D :-New Juaymah - RAS TANURA
OPGW DRUM SCHEDULE - Retrofitting
70 KN 120 KN
Towers Spans Tension Set Tension Plate Junction Box
Suspension Vibration Extra Armor Grip /rod Down-lead
Section Length For Pass through Set Damper for Damper Clamp
of Received Drum Suspension as Termination
Tower Tower Height in Horizontal Progressive Line Length in mtrs splicing (Non splicing) OPGW 120- OPGW 120- OPGW 70 OPGW 120-
OPGW in mtrs
Number Type mtrs Span in mtrs Length in mtrs Angle OPGW 120 OPGW 70 OPGW 70 UGNMFOC
120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25) (26) (27)

NJ S/S GANTRY GANTRY SS 25.50 2 30 1


110.00 110.00 2
1D AT+E0+1.5 43.25 3
337.57 447.57 2
2D MA+E0+1.5 43.25 36° 42' 22"L 2
334.43 782.00 2
3D TT+E12+9 63.00 1
306.00 1088.00 2
4D TT+E12+9 63.00 1
303.40 1391.40 2
5D HA+E0+1.5 43.25 88° 9' 43"R 2805.17 3046 3046.00 2
262.60 1654.00 2
6D TT+E0+6 48.00 1
296.00 1950.00 2
7D TT+E0+1.5 43.50 1
285.00 2235.00 2
8D TT+E0+1.5 43.50 1
278.00 2513.00 2
9D TT+E0+1.5 43.50 1
292.17 2805.17 2
10D HA+E0+6 47.75 89° 59' 40"R 2 40 1
279.83 3085.00 2
11D TT+E0+4.5 46.50 1
215.24 3300.24 2
12D HA+E0+1.5 43.25 89° 54' 26"L 2
330.76 3631.00 2
13D TT+E0+1.5 43.50 1
263.00 3894.00 2
14D TT+E0+3 45.00 1
230.56 4124.56 2
15D AT+E12+9 63.00 2
93.58 4218.14 2996.25 3137 3152 2
16D AT+E12+9 62.75 2
405.86 4624.00 2
17D TT+E12+7.5 61.50 1
306.00 4930.00 2
18D TT+E0+9 51.00 1
321.89 5251.89 2
19D HA+E0+1.5 43.25 88° 45' 3"L 2
242.53 5494.42 2
20D TT+E0+3 50.75 1
307.00 5801.42 2
EXT QRT # 75 HA 33.40 77°58'52"Rt 1 1 40 1
305.99 6107.41 3 1
EXT QRT # 76 TT 36.60 1
344.00 6451.41 3 1
EXT QRT # 77 TT 33.60 1
350.00 6801.41 3 1
EXT QRT # 78 TT 36.60 1
352.00 7153.41 3 1
EXT QRT # 79 TT 33.60 1
339.00 7492.41 3 1
EXT QRT # 80 TT 42.60 1
315.00 7807.41 3 1
EXT QRT # 81 TT 38.10 3745.89 3885 3885 1
324.00 8131.41 3 1
EXT QRT # 82 TT 33.60 1
305.00 8436.41 3 1
EXT QRT # 83 TT 41.10 1
215.00 8651.41 3 1
EXT QRT # 84 TT 41.10 1
317.00 8968.41 3 1
EXT QRT # 85 TT 36.60 1
284.00 9252.41 3 1
EXT QRT # 86 TT 36.60 1
3745.89 3885 3885
Line Part D :-New Juaymah - RAS TANURA
OPGW DRUM SCHEDULE - Retrofitting
70 KN 120 KN
Towers Spans Tension Set Tension Plate Junction Box
Suspension Vibration Extra Armor Grip /rod Down-lead
Length Set Damper for Damper Clamp
Section of Received Drum For Pass through Suspension as Termination
Tower Tower Height in Horizontal Progressive Line Length in mtrs splicing (Non splicing) OPGW 120- OPGW 120- OPGW 70 OPGW 120-
OPGW in mtrs
Number Type mtrs Span in mtrs Length in mtrs Angle OPGW 120 OPGW 70 OPGW 70 UGNMFOC
120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25) (26) (27)

294.90 9547.31 3 1
EXT QRT # 87 LA 37.90 7°56'48"Lt 2 40 1
273.10 9820.41 3 1
EXT QRT # 88 TT 42.60 1
330.00 10150.41 3 1
EXT QRT # 89 TT 33.60 1
310.00 10460.41 3 1
EXT QRT # 90 TT 33.60 1
320.00 10780.41 3 1
EXT QRT # 91 TT 33.60 1
282.00 11062.41 3 1
START A MA 48.50 48°11'08"Rt 2
432.00 11494.41 3 1
PI-1 MA 48.50 3772.35 3912 3988 2
234.00 11728.41 3 1
PI-2 MA 36.50 2
211.00 11939.41 3 1
EXT GRT # 60 LA 39.30 13°36'22"L 2
404.90 12344.31 3 1
EXT GRT # 61 TT 42.00 1
274.32 12618.63 3 1
EXT GRT # 62 TT 42.00 1
362.70 12981.33 3 1
EXT GRT # 63 TT 34.40 1
338.33 13319.66 3 1
EXT GRT # 64 TT 34.40 2 40 1
335.28 13654.94 3 1
EXT GRT # 65 TT 34.40 1
338.33 13993.27 3 1
EXT GRT # 66 TT 34.40 1
341.38 14334.65 3 1
EXT GRT # 67 TT 34.40 1
338.33 14672.98 3 1
EXT GRT # 68 TT 34.40 1
341.38 15014.36 3 1
EXT GRT # 69 TT 34.40 3322.34 3454 3554 1
341.38 15355.74 3 1
EXT GRT # 70 TT 34.40 1
268.22 15623.96 3 1
EXT GRT # 71 TT 34.40 1
338.33 15962.29 3 1
EXT GRT # 72 TT 34.40 1
341.38 16303.67 3 1
EXT GRT # 73 TT 34.40 1
338.33 16642.00 3 1
EXT GRT # 74 TT 34.40 2 40 1
341.38 16983.38 3 1
EXT GRT # 75 TT 34.40 1
338.33 17321.71 3 1
EXT GRT # 76 TT 34.40 1365.51 1508 1
341.38 17663.09 3 1
EXT GRT # 77 TT 34.40 1
344.42 18007.51 3 1
EXT GRT # 78 TT 34.40 1 1 40 40 1
341.38 18348.89 2
EXT GRT # 79 TT 35.80 1
283.46 18632.35 2
EXT GRT # 80 TT 34.40 1
338.63 18970.98 2
EXT GRT # 81 TT 34.40 1
335.28 19306.26 2
EXT GRT # 82 MA 43.60 63°16'52"L 2
135 19441.26 2
START B MA 36.5 2
120 19561.26 2
EXT QRT # 117 TT 33.60 1
320.00 19881.26 3737.75 3873 4169 2
EXT QRT # 118 TT 33.60 1
320.00 20201.26 2
EXT QRT # 119 TT 33.60 1
Line Part D :-New Juaymah - RAS TANURA
OPGW DRUM SCHEDULE - Retrofitting
70 KN 120 KN
Towers Spans Tension Set Tension Plate Junction Box
Suspension Vibration Extra Armor Grip /rod Down-lead
Length Set Damper for Damper Clamp
Section of Received Drum For Pass through Suspension as Termination
Tower Tower Height in Horizontal Progressive Line Length in mtrs splicing (Non splicing) OPGW 120- OPGW 120- OPGW 70 OPGW 120-
3737.75 OPGW in mtrs
3873 4169
Number Type mtrs Span in mtrs Length in mtrs Angle OPGW 120 OPGW 70 OPGW 70 UGNMFOC
120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25) (26) (27)

201.00 20402.26 2
EXT QRT # 120 TT 41.10 1
383.00 20785.26 2
EXT QRT # 121 TT 38.10 1
300.00 21085.26 2
EXT QRT # 122 TT 33.60 1
330.00 21415.26 2
EXT QRT # 123 TT 33.60 1
330.00 21745.26 2
EXT QRT # 124 TT 33.60 2 40 1
330.00 22075.26 2
EXT QRT # 125 TT 33.60 1
335.00 22410.26 2
EXT QRT # 126 TT 35.10 1
345.00 22755.26 2
EXT QRT # 127 TT 33.60 1
343.78 23099.04 2
EXT QRT # 128 LA 31.90 09°08'01"Rt 2
321.22 23420.26 2
EXT QRT # 129 TT 35.10 1
371.00 23791.26 3628.42 3918 3918 2
EXT QRT # 130 TT 33.60 1
341.00 24132.26 2
EXT QRT # 131 TT 39.60 1
371.00 24503.26 2
EXT QRT # 132 TT 33.60 1
331.08 24834.34 2
EXT QRT # 133 MA 34.90 38°50'25"Rt 2
374.24 25208.58 2
EXT QRT # 134 HA 36.40 90°58'10"Lt 2
165.10 25373.68 2

rastanura s/s Gantry S/S Gantry 24.60 1 30 1

Total Quantity NJRT = 25373.68 25373.68 26734.31 25712.00 9.00 8.00 25.00 8.00 0.00 0.00 29.00 30.00 90.00 114.00 0.00 38.00 180.00 200.00 2.00 1.00 4.00 2.00

P7 NJRT OPGW Quantity = 0 0 2 6 0 0 0 0 4 12 0 4 0 0 0 0 0 0


Project M 504 <Construction and Configuration of OHTL and UG Cable in Jubail and Shedgum Areas> /4400003961/Portion 3

Line :-New Juaymah BSP - Existing Juaymah NGL BSP - Part(B) OPGW Tower SCHEDULE - New OHTL and Retrofitting
70 KN 120 KN
Towers Spans Tension Set Tension Plate Junction Box
Length Suspension Vibration Extra Armor Grip Down-lead
Section of Received For Pass through Suspension as OPGW OPGW
Horizontal Progressive Set Damper /rod for Damper Clamp OPGW
Tower Tower Height in Line Length in mtrs OPGW in Drums splicing (Non splicing) Termination 120- OPGW 70 120-
Span in mtrs Length in 120-
Number Type mtrs Angle mtrs OPGW OPGW 70 UGNMF
mtrs 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN OPGW 70
120 OC
(1) (2) (3) (4) (5) (6) (7) (8) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25) (26) (27)
NJBSP GANTRY-> JNGL Gantry (Circuit 1)
New Juaymah S/S
2 30 1
(Start B) Gantry 27.00 00° 00' 00"
110.00 110.00 2
1B AT 43.25 3
336.79 446.79 2
2B MA 43.25 36° 43' 13"L 2
167.48 614.26 2
3B MHA 40.05 0° 47' 17"R 2
150.04 764.30 2
5B 3PH-1STAGE 42.00 0° 54' 10"L 2
63.15 827.46 2
7B 3PH-2STAGE 42.00 97° 41' 1"L 2
82.48 909.94 2
EXT# 34 GRT TT 36.00 6° 30' 46"L 2 1
345.25 1255.19 3471.35 3721 3888 2
EXT# 33 GRT LA 37.35 24°38'17"R 2
328.50 1583.69 2
EXT# 32 GRT TT 34.40 1
350.40 1934.09 2
EXT# 31 GRT TT 40.30 1
350.65 2284.74 2
EXT# 30 GRT TT 42.00 1
402.10 2686.84 2
EXT# 29 GRT TT 42.00 1
353.50 3040.34 2
EXT# 28 GRT TT 38.80 1
390.40 3430.74 2
27(GZN-NEW) HA 49.25 74°48'33"R 2
40.61 3471.35 2
26(NGL-NEW) HA 47.75 33°20'04"R 2 100 1
290.66 3762.01 2
EXT# 27 GNGL LA 48.80 18°04'07"R 2
402.42 4164.43 2
EXT# 28 GNGL TT 48.20 1
313.90 4478.33 2
EXT# 29 GNGL TT 40.50 1
350.35 4828.68 2
EXT# 30 GNGL TT 35.90 1
304.80 5133.48 2
EXT# 31 GNGL TT 34.40 1
304.80 5438.28 2
EXT# 32 GNGL TT 32.90 3564.88 3784 3784 1
304.80 5743.08 2
EXT# 33 GNGL TT 34.40 1
304.80 6047.88 2
EXT# 34 GNGL TT 37.30 1
268.15 6316.03 2
EXT# 35 GNGL TT 40.90 1
311.20 6627.23 2
EXT# 36 GNGL TT 40.90 1
329.00 6956.23 2
EXT# 37 GNGL HA 45.00 2
80.00 7036.23 2
Juaymah NGL S/S Gantry 26.00 2 30 1
Sub total (Circuit 1)= 7036.23 7505.09 7672.00 6.00 0.00 21.00 0.00 0.00 0.00 15.00 0.00 52.00 0.00 0.00 0.00 160.00 0.00 1.00 0.00 0.00 2.00

NJBSP GANTRY-> JNGL Gantry (Circuit 2)


New Juaymah S/S
2 30 1
(Start B) Gantry 27.00 00° 00' 00"
110.00 110.00 2
1B AT 43.25 3
336.79 446.79 2
2B MA 43.25 36° 43' 13"L 2
167.48 614.26 2
3B MHA 40.05 0° 47' 17"R 2
150.87 765.13 2
4B 3PH-1STAG 42.00 4° 12' 45"R 2
46.79 811.92 2
6B 3PH-2STAG 42.00 83° 23' 18"L 2
62.56 874.48 2
EXT# 34 GRT TT 36.00 6° 30' 46"L 2 1
3435.89 3685 3679
Line :-New Juaymah BSP - Existing Juaymah NGL BSP - Part(B) OPGW Tower SCHEDULE - New OHTL and Retrofitting
70 KN 120 KN
Towers Spans Tension Set Tension Plate Junction Box
Length Suspension Vibration Extra Armor Grip Down-lead
Section of Received For Pass through Suspension as OPGW OPGW
Horizontal Progressive Set Damper /rod for Damper Clamp OPGW
Tower Tower Height in Line Length in mtrs OPGW in Drums splicing (Non splicing) Termination 120- OPGW 70 120-
Span in mtrs Length in 120-
Number Type mtrs Angle mtrs OPGW OPGW 70 UGNMF
mtrs 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN OPGW 70
120 OC
345.25 1219.73 3435.89 3685 3679 2
EXT# 33 GRT LA 37.35 24°38'17"R 2
328.50 1548.23 2
EXT# 32 GRT TT 34.40 1
350.40 1898.63 2
EXT# 31 GRT TT 40.30 1
350.65 2249.28 2
EXT# 30 GRT TT 42.00 1
402.10 2651.38 2
EXT# 29 GRT TT 42.00 1
353.50 3004.88 2
EXT# 28 GRT TT 38.80 1
390.40 3395.28 2
27(GZN-NEW) HA 49.25 74°48'33"R 2
40.61 3435.89 2
26(NGL-NEW) HA 47.75 33°20'04"R 2 100 1
290.66 3726.55 2
EXT# 27 GNGL LA 48.80 18°04'07"R 2
402.42 4128.97 2
EXT# 28 GNGL TT 48.20 1
313.90 4442.87 2
EXT# 29 GNGL TT 40.50 1
350.35 4793.22 2
EXT# 30 GNGL TT 35.90 1
304.80 5098.02 2
EXT# 31 GNGL TT 34.40 1
304.80 5402.82 2
EXT# 32 GNGL TT 32.90 3564.88 3784 3784 1
304.80 5707.62 2
EXT# 33 GNGL TT 34.40 1
304.80 6012.42 2
EXT# 34 GNGL TT 37.30 1
268.15 6280.57 2
EXT# 35 GNGL TT 40.90 1
311.20 6591.77 2
EXT# 36 GNGL TT 40.90 1
329.00 6920.77 2
EXT# 37 GNGL HA 45.00 2
80.00 7000.77 2
Juaymah NGL S/S Gantry 26.00 2 30 1
Sub total (Circuit 2)= 7000.77 7469.28 7463.00 6.00 0.00 21.00 0.00 0.00 0.00 15.00 0.00 52.00 0.00 0.00 0.00 160.00 0.00 1.00 0.00 0.00 2.00

Grand Total 14037.00 14974.37 15135.00 12.00 0.00 42.00 0.00 0.00 0.00 30.00 0.00 104.00 0.00 0.00 0.00 320.00 0.00 2.00 0.00 0.00 4.00
Project M 504 <Construction and Configuration of OHTL and UG Cable in Jubail and Shedgum Areas> /4400003961/Portion 3

Line :- New Juaymah BSP- Ghazlan P/P, (Part C.A) (2X48) OPGW DRUM SCHEDULE -New OHTL and Retrofitting No. of Circuits = 2
70 KN 120 KN
Towers Spans Tension Set Tension Plate Junction Box
Length Suspension Vibration Extra Armor Grip Down-lead
Section of For Pass through Suspension as Set Damper /rod for Damper Clamp OPGW OPGW
Horizontal Progressive Received Drum OPGW
Tower Tower Height in Line Length in mtrs OPGW in splicing (Non splicing) Termination 120- OPGW 70 120-
Span in Length in 120-
Number Type mtrs Angle mtrs OPGW OPGW 70 UGNMFO
mtrs mtrs 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN OPGW 70
120 C
(1) (2) (3) (4) (5) (6) (7) (8) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25) (26) (27)
Ghazlan P/P
Gantry GANTRY 26.00 2 50 2

113.00 113.00 4

1 SA 34.40 6

225.80 338.80 4

2 LA 34.85 14°07'02"R 4

180.60 519.40 4

B7GJ2A MONOPOLE 34.85 05°17'32"R 4

179.00 698.40 4

3 HA 45.00 77°02'38"L 4

171.45 869.85 4

4 LA 48.00 26°43'10"R 4

226.00 1095.85 4

5 TT 40.40 2

396.15 1492.00 4

6 TT 37.30 2
4196.45 4442 4607
351.95 1843.95 4

7 TT 34.40 2

345.80 2189.75 4

8 TT 34.40 2

315.40 2505.15 4

9 TT 35.80 2

359.65 2864.80 4

10 TT 35.80 2

348.90 3213.70 4

11 TT 32.75 2

307.75 3521.45 4

12 TT 34.40 2

344.40 3865.85 4

13 TT 34.30 2

330.60 4196.45 4

14 TT 34.40 4 80 2

350.45 4546.90 4

15 TT 35.80 2

344.30 4891.20 4

16 TT 34.40 2

335.30 5226.50 4

17 TT 34.40 2

324.50 5551.00 4

18 TT 32.60 2

327.65 5878.65 4

19 TT 34.40 2

332.10 6210.75 4

20 TT 34.40 4013.09 4164 4164 2

339.80 6550.55 4

21 TT 34.40 2

338.25 6888.80 4

22 TT 34.40 2
Project M 504 <Construction and Configuration of OHTL and UG Cable in Jubail and Shedgum Areas> /4400003961/Portion 3

Line :- New Juaymah BSP- Ghazlan P/P, (Part C.A) (2X48) OPGW DRUM SCHEDULE -New OHTL and Retrofitting No. of Circuits = 2
4013.09 4164 4164
70 KN 120 KN
Towers Spans Tension Set Tension Plate Junction Box
Length Suspension Vibration Extra Armor Grip Down-lead
Section of For Pass through Suspension as Set Damper /rod for Damper Clamp OPGW OPGW
Horizontal Progressive Received Drum OPGW
Tower Tower Height in Line Length in mtrs OPGW in splicing (Non splicing) Termination 120- OPGW 70 120-
Span in Length in 120-
Number Type mtrs Angle mtrs OPGW OPGW 70 UGNMFO
mtrs mtrs 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN 120 KN 70 KN OPGW 70
120 C
(1) (2) (3) (4) (5) (6) (7) (8) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25) (26) (27)
331.55 7220.35 4

23 TT 34.40 2

340.35 7560.70 4

24 TT 34.40 2

335.35 7896.05 4

25 TT 34.40 2

313.49 8209.54 4

CA1 HA+E0+4.5 46.25 90° 0' 7"R 4 80 2

248.78 8458.32 4

CA2 TT+E0+6 48.00 2

132.10 8590.42 4

CA3 MA+E0+1.5 43.25 40° 7' 51"L 4

315.13 8905.55 4

CA4 TT+E6+9 57.00 2

259.59 9165.14 4

CA5 HA+E0+6 47.75 84° 47' 36"R 4

159.41 9324.55 4

CA6 TT+E0+3 45.00 2

261.10 9585.65 4

CA7 HA+E0+3 44.75 89° 49' 51"L 4

254.90 9840.55 4

CA8 TT+E0+4.5 46.50 3232.96 3481 3600 2

279.00 10119.55 4

CA9 TT+E0+4.5 46.50 2

335.00 10454.55 4

CA10 TT+E0+3 45.00 2

225.51 10680.05 4

CA11 HA+E0+3 44.75 89° 59' 7"R 4

238.49 10918.55 4

CA12 TT+E12+9 63.00 2

268.33 11186.87 4

CA13 HA+E12+7.5 61.25 89° 58' 44"R 4

142.63 11329.50 4

CA14 AT+E0+7.5 49.25 6

113.00 11442.50 4

NJ Gantry GANTRY SS 26.00 4 50 2

Grand Total 22884.99 24172.44 24742.00 14 0 48 0 0 0 54 0 164 0 0 0 260 0 4 0 0 4

No. of Towers 4 0 11 0 0 0 27 0 41 0 0 0 4 0 2 0 0 2
Total req Stock Qty to be
S.No Material Description UOM Portion-2 Portion-3
Qty Available released
Insulators
Insulator 160 KN No 1308.00 276 1584 1072 512
Insulator 120 KN No 401.00 156 557 631 -74
Hardware Fittings for Conductor 0
Single suspension Set 129.00 51 180 354 -174
Double Suspension Set 15.00 6 21 17 4
Double Tension Set 654.00 138 792 585 207
Jumper suspension Fitting Set 254.00 93 347 118 229 DELL:
Vibration Damper for conductor No 1928.00 798 2726 2332 394 25 kg Cou
Spacer Damper for conductor No 3450.00 600 4050 3780 270 required 1
available
Conductor ACSR Km 200.00 61 261 220.51 40
MP Post insulator No 28.00 12 40 16 24
T connectors for JRSD No 27
po Qty

3217
1859

1102
72

DELL:
25 kg Counter weight
required 118 X 2 =236
available 146 nos only
Span
Tower Conductor
Tower No Tower Type Ahead in Insulator in Nos
Height (mtrs)
Mtr
Span Single Double Pilot
Tower Conductor
Tower No Tower Type Ahead in suspensio Suspensio Suspensio
Height (mtrs)
Mtr n n n
120kN 120kN 120kN
JRBSP-Khursaniya, NIGC & Jubail2 -Kayan
GRT-JRS Gantry SS 24.16 86.56 - - 3.00
E1 AT 43.25 216.68 - - -
E2 HA 43.25 222.00 - - -
E2/1 TT 49.50 271.16 - - -
E3 LA 50.75 316.00 - - -
E3/1 TT 48.00 367.50 - - -
E4 HA 44.75 319.84 3838.08
BPM-18 BPM-18-AT 46.95 0.00 0.00 - - 3.00

BMP-33 BPM33(Delta Susp) 34.00 144.35 866.10


JN-1 MASD-34m 33.65 126.34 - - 3.00
JN-2 MASH-25 24.65 95.00 - -
JN-3 MASH-25 24.65 125.00 - -
JN-4 MASD-34m 33.65 193.75 1162.50 - - 3.00
EX-35 BPM35(Delta Susp) 34.00 0.00 0.00 - -

J2NC46 TT 44.10 311.25


1C MP SP 34 34.00 42.99 257.94 - - 1.00
2C MP SP 15.7 45.70 16.02 96.12 - - 1.00
BPM34 HA 44.00

J2NC46 TT 44.10 302.21


1B MP SP 19.9 19.90 45.75 274.50 - - 1.00
2B MP SP 19.9 19.90 21.58 129.48 - - 1.00
BPM34 HA 44.00

J2NC46 TT 44.10 291.99


1A MP SP 15.7 15.70 50.95 305.70 - - 1.00
2A MP SP 34 34.00 29.42 176.52 - - 1.00
BPM34 HA 44.00

GANTRY JR BSP Gantry SS 23.85 86.33 1036.01 - - 6.00


D.C-1 AT 43.25 255.58 3066.97 - - 3.00
D.C-2 HA 43.25 280.01 3360.06 - - 3.00
D.C-2/1 TT 51.00 294.91 3538.96 6.00 - -
D.C-3 HA 47.75 116.74 1400.87 - - 3.00
D.C-4 MA 43.25 129.55 1554.56 - - 3.00
D.C-5 MA 47.75 342.00 4104.01 - - 3.00
D.C-5/1 TT 54.00 290.00 3480.00 - 12.00 -
D.C-5/2 AT 56.75 96.75 1160.99 - - 3.00
END-D.C HA 62.75 232.26 2787.11 - - 3.00
Exist- BPU-16 TT 41.30 339.25 2035.50 3.00 - -
BPU-17 TT 236.30 1417.80 3.00 - -
BPU-18 MAA 73.99 443.94 - - 3.00
BPU-19 MAA 99.93 599.58 - - 3.00
BPU-20 HA 195.64 1173.84 - - 3.00
BPU-21 TT 334.89 2009.34 3.00 - -
BPU-22 AT 293.09 1758.54 - - 3.00
BPU-23 TT 250.51 1503.06 - 6.00 -
BPU-24 TT 336.64 2019.84 3.00 - -
BPU-25 TT 334.34 2006.04 3.00 - -
BPU-26 TT 321.34 1928.04 3.00 - -
BPU-27 TT 340.21 2041.26 3.00 - -
BPU-28 TT 366.05 2196.30 3.00 - -
BPU-29 TT 249.83 1498.98 3.00 - -
BPU-30 MA 300.03 1800.18 - - 3.00
BPU-31 AT 301.14 1806.84 - - 3.00
BPU-32 TT 303.83 1822.98 - 6.00 -
BPU-33 HA 298.69 1792.14 - - 3.00
BPU-34 TT 263.18 1579.08 - 6.00 -
BPU-35 AT 334.94 2009.64 - - 3.00
BPU-36 TT 337.49 2024.94 3.00 - -
BPU-37 TT 342.19 2053.14 3.00 - -
BPU-38 TT 366.10 2196.60 3.00 - -
BPU-39 TT 354.88 2129.28 3.00 - -
BPU-40 TT 220.83 1324.98 3.00 - -
BPU-41 TT 359.41 2156.46 3.00 - -
BPU-42 AT 0.00 - - 3.00
1 HA 54.60 274.26 1645.56 - - 3.00
2 HA 54.60 334.54 2007.24 - - 3.00
3 AT 53.75 257.47 1544.82 - - 3.00
4 MASH-25 25.15 182.63 1095.78 - - 2.00
5 MASH-25 25.15 117.85 707.10 - - 2.00
6 HA 35.10 289.80 1738.80 - - 3.00
7 TT 43.50 278.62 1671.72 3.00 - -
8 AT 43.25 107.18 643.08 - - 3.00
9A SP-15.7 25.15 57.86 347.14 - - 1.00
9B SP-34 25.15 82.15 164.31 - - 1.00
BSE-50 SA 15.75 123.03 246.05 - -
8 AT 43.25 107.18
10A SP-19.9 57.94 115.88 - - 1.00
10B SP-19.9 75.00 150.00 - - 1.00
BSE-50 SA 0.00 0.00

8 AT 43.25 107.18
11A SP-34 58.02 116.05 - - 1.00
11B SP-15.7 67.86 135.71 - - 1.00
BSE-50 SA 0.00 0.00

BPU-43 MONOPOLE 99.25 595.50 - - 2.00


pro-6J (5G) MASH-25 30.30 181.80 - - 2.00
BSE-43 monopole 330.30

Gantry Gantry SS 24.16 86.47 1037.64 - - 6.00


G-1 AT 43.25 277.89 3334.64 - - 3.00
G-2 HA 43.50 336.07 4032.88 - - 3.00
G-3 MA 48.00 183.57 2202.82 - - 3.00
G-4 MA 40.40 211.96 2543.48 - - 3.00
G-5 LA 40.60 290.37 3484.38 - - 3.00
G-5/2 MHA-SC45M 45.00 108.00 648.00 - - 3.00
END-G AT 47.75 189.03 1134.20 - - 3.00
EXT BPU-14 TT 0.00
G-5 LA 40.60 290.28 0.00 - - 1.50
G-5/1 MHA-SC45M 45.00 61.38 368.27 - - 3.00
G-6A MASH-25 44.65 125.60 753.59 - - 2.00
BSE-14 NEW AT 44.50 105.37 632.23 - - 1.50
G-7A MASH-25 40.10 222.11 1332.66 - - 1.00
BSE-15 NEW AT 41.50 298.84 1793.05 - - 1.50
16 TT 0.00
EXT BPU-14 TT 189.03 1134.20 6.00 - -
END-G HA 47.75 34.23 205.38 - - 1.50
G-6B MASH-25 25.00 125.60 753.57 - - 1.00
BSE-14 NEW AT 44.50 105.38 632.29 - - 1.50
G7B MASH-25 25.00 222.12 1332.69 - - 1.00
BSE-15 NEW AT 41.50 298.84 1793.05 - - 1.50
EXT BSE-16 TT - -

BSWC5-EX TT 40.50 267.91 1607.46 3.00 - -


BSWC4-NEW HA 59.75 69.86 419.16 - - 3.00
BPU5-EX TT 53.90 233.66 1401.96 3.00 - -
BPU-6 HA 321.90 1931.40 - - 3.00
BPU-7 TT 286.80 1720.80 3.00 - -
BPU-8 TT 310.51 1863.06 3.00 - -
BPU-9 TT 318.00 1908.00 3.00 - -
BPU-10 TT 224.78 1348.68 3.00 - -
BPU-11 TT 260.07 1560.42 3.00 - -
BPU-12 TT 358.91 2153.46 3.00 - -
BPU-13 TT 117.40 704.40 3.00 - -
BPU-14 TT 189.03 1134.18 3.00 - -

BSWC5-EX TT 40.50 267.91 1607.46 6.00 - -


BSWC4-NEW HA 59.75 69.86 419.16 - - -
8G 3PH1STAGE 42M 54.00 76.02 456.12 - - 3.00
BPU5-EX TT 53.90 233.66 1401.96

GANTRY JR BSP GANTRY GRT - JRS 23.85 86.20 1034.39 - - 6.00


H-1 AT 43.25 299.80 3597.58 - - 3.00
H-2 LA 43.25 296.42 3557.03 - - 3.00
H-3 MA 43.25 360.42 4325.04 - - 3.00
H-4 MA 56.75 349.24 4190.89 - - 3.00
END-H HA 50.75 114.49 1373.82 - - 3.00
EXT - BSE-13 TT 43.50 274.89 3298.63 6.00 -

BSE3 HA 315.00 3780.00 - - 3.00


115 TT 0.00 6.00 - -

GANTRY JR BSPGANTRY GRT - JRS 24.16 86.36 1036.32 - - 6.00


I-1 AT 43.25 320.80 3849.60 - - 3.00
I-2 LA 43.50 293.49 3521.88 - - 3.00
I-3 MA 54.00 279.71 3356.52 - - 3.00
I-4 HA 40.40 174.77 2097.24 - - 3.00
END-I HA 45.00 344.04 0.00 - - 3.00
BPM-11 TT 33.60 0.00 0.00 6.00 -

BK#2 (Existing) TT 34.00 260.57 6.00 - -


BNJ1 (New) MAA (Type II AC) 27.30 131.26 1575.12 - - 3.00
BPU#2 (Existing) MAA (Type II AC) 27.30 135.95 - - 3.00
BPU#1 (Existing) MAA (Type I) 20.00 91.47 - - 3.00
BNJ2 (New) MHA 40.05 206.57 2478.84 - - 6.00
BNJ3 (New) MHA 40.05 19.99 239.88 - - 6.00
BNGL-Gantry (Existing)BNGL-Gantry 23.60 0.00 6.00

FJN-48 TT 353.00 2118.00 3.00 - -


FJN-49 TT 0.00 0.00 3.00 - -
F-JSW 87 HA 43.00
FJ-1 MASH-25 25.00 22.35 134.10 - - 2.00
FJ-2 MASH-25 25.00 72.51 435.06 - - 2.00
FJ-3 MASH-25 25.00 92.69 556.14 - - 2.00
FJ-4 MASH-25 25.00 56.48 338.88 - - 2.00
FJ-5 MP-SP 68.15 109.45 656.70 - - 3.00
BSE-35 TT 3.00

43 HA 170.30 1021.80 - - 3.00


PRO 5Z MASH-25 36.00 216.00 - - 2.00
44 MP

Total 29079.22 190.61 129.00 30.00 242.00

0.19060748
or in Nos Hardware Fittings for Conductor
Single Double Conductor
Double Double Vib MP Post
suspensio Suspensio Pilot Spacer Damper for
Tension Tension Damper Insulator
n n Jumper
160kN 120kN 120kN 120kN 160kN Cond Jumper

- - - 3.00 - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -

12.00 0 3 6 12 12 144

9
12.00 0 3 6 12 9 6
6 2 72
6 0 72
12.00 0 3 6 12 12 6 72

4.00 0 1 2 12 3 6 0 36
4.00 0 1 2 12 3 6 0 36

4.00 0 1 2 12 3 6 0 36
4.00 0 1 2 12 3 6 0 36

4.00 0 1 2 12 3 6 0 36
4.00 0 1 2 12 3 6 0 36

12.00 0 6 6 24 6 18 144
24.00 0 3 12 24 30 15 144
24.00 0 3 12 24 36 15 144
- 6 0 0 24 36 0 0
24.00 0 3 12 24 18 15 144
24.00 0 3 12 24 18 15 144
24.00 0 3 12 24 42 15 144
- 0 6 0 0 24 36 0 0
24.00 0 3 12 24 12 15 144
24.00 0 3 12 24 30 15 144
- 3 0 0 12 21 0
- 3 0 0 12 15 0
12.00 0 3 6 12 3 15 72
12.00 0 3 6 12 6 15 72
12.00 0 3 6 12 12 15 72
- 3 0 0 12 21 0 0
12.00 0 3 6 12 18 15 72
- 0 3 0 0 12 15 0 0
- 3 0 0 12 21 0 0
- 3 0 0 12 21 0 0
- 3 0 0 12 18 0 0
- 3 0 0 12 21 0 0
- 3 0 0 12 21 0 0
- 3 0 0 12 15 0 0
12.00 0 3 6 12 18 15 72
12.00 0 3 6 12 18 15 72
- 0 3 0 0 12 18 0 0
12.00 0 3 6 12 18 15 72
- 0 3 0 0 12 15 0 0
12.00 0 3 6 12 21 15 72
- 3 0 0 12 21 0 0
- 3 0 0 12 21 0 0
- 3 0 0 12 21 0 0
- 3 0 0 12 21 0 0
- 3 0 0 12 12 0 0
- 3 0 0 12 21 0 0
12.00 0 3 6 12 3 15 72
12.00 0 3 6 12 18 15 72
12.00 0 3 6 12 21 15 72
12.00 0 3 6 12 15 15 72
12.00 0 2 6 12 12 15 2 72
12.00 0 2 6 12 9 15 2 72
12.00 0 3 6 12 18 15 72
- 3 0 0 12 18 0 0
12.00 0 3 6 12 6 15 72
4.00 0 1 2 12 3 15 0 36
4.00 0 1 2 12 3 15 72
4.00 0 1 2 12 3 6 0 36
4.00 0 1 2 12 3 6 0 36

4.00 0 1 2 12 3 6 0 36
4.00 0 1 2 12 3 6 0 36

12.00 0 2 6 12 6 12 2 72
12.00 0 2 6 12 3 12 2 72

12.00 0 6 6 6 6 18 144
24.00 0 3 12 24 36 15 144
24.00 0 3 12 24 42 15 144
24.00 0 3 12 24 24 15 144
24.00 0 3 12 24 24 15 144
12.00 0 3 6 24 18 15 144
12.00 0 3 6 12 6 15 72
12.00 0 3 6 12 12 15 144
0 0
12.00 0 3 6 12 18 15 72
12.00 0 3 6 12 3 15 72
12.00 0 2 6 12 9 15 2 72
12.00 0 3 6 12 6 15 72
12.00 0 2 6 12 15 15 2 72
12.00 0 3 6 12 18 15 72
0 0
- 6 0 0 12 12 0 0
12.00 0 3 6 12 3 15 72
12.00 0 2 6 12 9 15 2 72
12.00 0 3 6 12 6 15 72
12.00 0 2 6 12 15 15 2 72
12.00 0 3 6 12 18 15 0
0

- 3 0 0 30 0 0
24.00 0 3 12 24 6 15 144
- 3 0 0 12 30 0 0
12.00 0 3 6 12 36 15 144
- 3 0 0 12 36 0 0
- 3 0 0 12 36 0 0
- 3 0 0 12 36 0 0
- 3 0 0 12 30 0 0
- 3 0 0 12 30 0 0
- 3 0 0 12 42 0 0
- 3 0 0 12 18 0 0
- 3 0

- 6 0 0 30 0 0
24.00 0 0 12 24 6 15 144
12.00 0 3 6 12 6 15 144

12.00 0 6 6 12 6 18 144
24.00 0 3 12 24 36 15 144
24.00 0 3 12 24 36 15 144
24.00 0 3 12 24 42 15 144
24.00 0 3 12 24 42 15 144
- 0 3 0 24 18 15 144
6 12 0

- 0 3 0 24 36 15 144
24.00 6 0 12 24 6 0 0

12.00 0 6 6 12 6 18 144
24.00 0 3 12 24 36 15 144
24.00 0 3 12 24 36 15 144
24.00 0 3 12 24 36 15 144
24.00 0 3 12 24 24 15 144
24.00 0 3 12 24 42 15 144
6 12

- 6 0 0 12 30 0
24.00 0 3 12 24 18 15 144
24.00 0 3 12 24 18 15 144
24.00 0 3 12 24 12 15 144
24.00 0 6 12 24 24 15 144
24.00 0 6 12 24 6 15 144
12.00 0 6 6 12 18 144

- 3 0 0 12 21 0 0
- 3 0 0 12 3 0 0
12.00 0 2 6 12 6 15 2 144
12.00 0 2 6 13 6 15 2 144
12.00 0 2 6 14 12 15 2 144
12.00 0 2 6 15 6 15 2 144
12.00 0 3 6 16 12 15 144
3

12.00 0 3 6 16 24 15 144
12.00 0 2 6 12 6 15 2 144

1308.00 129.00 15.00 254.00 654.00 1928.00 2190.00 1260.00 28.00 9.40
Compress
Mid span
ion dead
Joint
end

SC
SC
SC
SC
6 SC
12

6
6
SAUDI ELECTRICITY COMPANY.

230kV OHTL in Juaymah & Shedgum Area (PORTION-3)


Conductor Line Hardware
Insulator
ASKEC Deviation Angle Span for Single Double Jumper
Sr No Tower No. Tower Type Span Ahead(m) Twin spacer Double Twin Spacer VD for MP Post
TWRs (Deg) Actual Conductor length Suspension Tension suspension Conductor for Jumper
Damper 160 kN 120 kN Fittings suspensions Fittings Fitting damper Conductor Insulator

Part-A
1 SS Gantry SS Gantry 00° 00' 00" 0 6 0 6 18 12 144
110 110 0 0
2 1 A1 HA+E12+9 89° 33' 17"L 12 6 6 6 15 24 144
269.14 269.14 3229.68 30
3 2 A2 HA+E12+9 89° 45' 03"L 24 6 12 6 15 24 144
121.73 121.73 1460.76 18
4 SS Gantry SS Gantry 00° 00' 00" 12 6 6 6 18 12 144
Part-B
5 Ext.28(7GRT) Delta Sus-38.8 00° 00' 00" 6 6 0 24 144
344.81 344.81 4137.72 42
6 3 27(GZN-New) HA+E0+6 34° 44' 56"R 24 6 12 6 15 24 144
68.45 68.45 821.4 12
7 4 26(NGL-New) HA+E0+6 73° 22' 13"R 24 6 12 6 15 24 144
290.66 290.66 3487.92 36
8 EX27(7GNGL) Delta-LA 00° 00' 00" 24 12 6 12 6 15 24

9 EX25(7GNGL) EX.T24(Delta Sus) 00° 00' 00" 6 6 0 24


296.41 296.41 3556.92 36
10 5 EX26A(NGL-NEW) HA+E0+6 00° 00' 00" 24 6 12 6 15 24 144

11 SS Gantry SS Gantry 00° 00' 00" 0 6 6 18 12 144


110 110
12 6 1B AT+E0+1.5
336.79 336.79
13 7 2B MA+E0+1.5 36° 43' 13"L
167.47 167.47 2009.64
14 8 3B MHA 00° 47' 17"R
150.04 150.04 1800.48
15 9 5B 3Ph- 1Stage (42M) 00° 54' 10"L 6 2 3 2 10 12 2 72
63.15 63.15 757.8 12
16 10 7B 3Ph- 2Stage (42M) 97° 41' 1"L 12 4 6 4 13 12 2 72
82.48 82.48 989.76 12
17 EXT-34 EX.T35(DELTA SUS) 06° 30' 46"L 3 3 0 24

18 3B MHA 00° 47' 17"R


150.87 150.87 1810.44
19 11 4B 3Ph- 1Stage (42M) 04° 12' 45"R 6 2 3 2 10 12 2 72
46.79 46.79 561.48 12
20 12 6B 3Ph- 2Stage (42M) 83° 23' 18"L 12 4 6 4 13 12 2 72
62.56 62.56 750.72 12
21 EXT-34 EX.T35(DELTA SUS) 06° 30' 46"L 3 3 0 24
Part-CA
22 EXT#25 T25(DELTA SUS) 6 6 24
313.49 313.49 3761.88 36
23 13 CA1 HA+E0+4.5 90° 00' 07"R 24 3 12 3 15 24 144
248.78 248.78 2985.36 30
24 14 CA2 TT+E0+6 6 6 24
132.1 132.1 1585.2 18
25 15 CA3 MA+E0+1.5 40° 07' 51"L 12 3 6 3 15 24 144
315.13 315.13 3781.56
26 16 CA4 TT+E6+9
259.59 259.59 3270.834
27 17 CA5 HA+E0+6 84° 47' 36"R
159.41 159.41
28 18 CA6 TT+E0+3
261.1 261.1
29 19 CA7 HA+E0+3 89° 49' 51"L 12 3 6 3 15 24 144
254.9 254.9 3211.74 30
30 20 CA8 TT+E0+4.5 12 6 24
279 279 3515.4 36
31 21 CA9 TT+E0+4.5 6 6 24
335 335 4221 42
32 22 CA10 TT+E0+3 6 6 24
225.51 225.51 2841.426 30
33 23 CA11 HA+E0+3 89° 59' 07"R 12 3 6 3 15 24 144
238.49 238.49
34 24 CA12 TT+E12+9
268.325 268.325
35 25 CA13 HA+E12+7.5 89° 58' 44"R 0
142.625 142.625
36 26 CA14 AT+E0+7.5
110 110
37 SS Gantry SS Gantry 12 6 6 6 18 12 144
Part-CB
38 SS Gantry SS Gantry 0 3 0 3 9 0 72
115 115
39 27 1CB AT+E0+1.5 0 0 0 0 0 0
332.19 332.19
40 28 2CB MA+E0+1.5 36° 44' 02"L
188.6 188.6
41 29 3CB MHA 3° 24' 55"L
150.31 150.31
42 30 4CB 3Ph- 1Stage (42M) 3°19' 35"R 12 3 6 3 10 12 2 72
63.79 63.79 803.754 12
43 31 7CB 3Ph- 2Stage (42M) 90° 23' 18"R 12 3 6 3 13 12 2 72
245.38 245.38 3091.788 30
44 EXT.35 EXT.35(DELTA SUS) 3 3 0 24
0 12
45 3CB MHA 3° 24' 55"L
150.29 150.29
46 32 5CB 3Ph- 1Stage (42M) 03° 30' 49"L
48.51 48.51
47 33 6CB 3Ph- 2Stage (42M) 86° 32' 39"R
227.77 227.77
48 EXT.35 EXT.35(DELTA SUS)

7737 0 7737 58 276 156 51 6 138 93 798 600 12 3

You might also like