EPC FOR RHCU ISBL AND FEED OSBL

PROJECT No. JI-2048

DATASHEET FOR HOT OIL DRAIN DRUM (T-1020)

Doc No. JI2048-977-MS-DAT-0041 Rev. 002 Page: 1 of 9

EPC FOR RHCU ISBL AND FEED OSBL

CONTRACT No: 308523


PETROFAC JOB No.: JI-2048

DATASHEET FOR HOT OIL DRAIN DRUM (T-1020)

LICENSOR DOCUMENT REFERENCE No.


(-)

Contractor Logo: Subcontractor Logo:

CLIENT NAME/ LOGO:

FACILITY NUMBER AND NAME: 460-00, Ir-4,


S-1000 Residue Hydrocracking

002 ISSUED FOR REVIEW 21-May-22 ASK VMP SSS RSJ DESIGN NUMBER: OLP01443

PROJECT NAME: Residue Hydrocracking


001 ISSUED FOR RECORD 29-Apr-22 ASK VMP SSS RSJ
Unit (RHCU)
DESCRIPTION
REV.
Name of change(reason)
DATE PRPD CHKD APPD APPD Doc. Size A4
EPC FOR RHCU ISBL AND FEED OSBL
PROJECT No. JI-2048

DATASHEET FOR HOT OIL DRAIN DRUM (T-1020)

Doc No. JI2048-977-MS-DAT-0041 Rev. 002 Page No. 2 of 9

TABULATION OF REVISED SECTIONS / PAGES

Revision Page / Section Description


001 - First Issue
Changes are highlighted with blue and revision mark
002 -
"2"

TABULATION OF HOLDS

Page /
Hold
Section Description of Holds
No.
No.
6 1 Pump mounting nozzle (M1) - Size & Rating
6 2 Nozzle S03 A/B - Size & Location
6 3 Nozzle Projection
7 4 Internal Steam Coil and Internal Flanges - Corrosion Allowance
8, 9 5 Boot Dimensions & LLLL (Low Low Liquid Level)
8 6 Steam Coil Dimensions
9 7 Nozzle Location - Orientation & Elevation
9 8 Drain Drum Dimensions
9 9 Support Location

9 10 Vessel elevation from Grade

`
EPC FOR RHCU ISBL AND FEED OSBL
PROJECT No. JI-2048

DATASHEET FOR HOT OIL DRAIN DRUM (T-1020)

Doc No. JI2048-977-MS-DAT-0041 Rev. 002 Page No. 3 of 9

DESIGN DATA Rev


1 Design Pressure (barg): INTERNAL: 3.5 EXTERNAL: FV @ 166 °C
2 Design Temperature (°C): 200
3 Critical Exposure Temperature, CET (MDMT) (°C): : -36
4 Other pressure-temperature combinations : (MPa): Not Applicable (°C): Not Applicable
5 Steam-Out Conditions : Yes No (Note P7)
6 Orientation : Vertical Horizontal

7 Special Services: Not Applicable : Hydrogen HF acid HF acid with Residue WET H2S

8 : Cyclic Carbonate Caustic Amine Lethal

9 In Creep Range : Yes No

10 Process Fluid : Hot Oil Drain


11 Density Of Fluid kg/m3 : 1063 (Liquid)
12 Operating Pressure bar g : 0.2 / 1.01 (Min. / Max.)
13 Operating Temperature deg C : Amb. / 100 (Min. / Max.)
14 Insulation / Type / Thk. : Not Applicable
15 Fireproofing / Thk. : Not Applicable
16 Heat Tracing : Not Applicable
17 Maximum allowable stress at Design Temperature (MPa) : **
18 Maximum allowable working pressure at Design Temperature and specified Corrosion Allowance, stating
19 governing component and second limiting component of the vessel : ** (Minor components such as reinforcing shall not limit MAWP) 002
Stringent of (a) PED 2014/68/EU OR (b) ASME SEC VIII Division 1
20 Hydrostatic test pressure at uppermost part of the vessel (barg): **
(c) Lithuanian legislations and Regulations
21 Actual hydrostatic test temperature (Metal) (°C): **
22 Orientation of vessel during shop or field hydrotest: : Shop : Horizontal ; Field : Horizontal
23 Corrosion Allowance: : Note M1, M2, M3 & M4
24 (a) Shell (mm) : : 3
25 (b) Head (mm): : 3
26 (c) Nozzles (mm): : 3
27 (d) Drop Leg / Drop Leg Head (mm) : 3
28 (e) Manway Necks (mm): : 3
29 Weld Efficiency of shell joints: Longitudinal (%): : 100% Girth (%): 100%
30 Weld Efficiency of head joints (multipiece heads) (%): 100%
31 Vessel post-weld heat treated (**) Yes No Minimum Temperature (°C): **
32 Vessel (100%) / (Spot) radiographed: : 100%
33 Flanges for nozzles and manways are: Class: : 150# & 300# Per ASME B16.5 Standard
34 Or Designed According To : ASME Section VIII Division 1, Mandatory Appendix 2
35 Design Wind Velocity (m/s): : 24 m/s ; The wind pressure and wind forces shall be as per STR 2.05.04:2003 002

36 OL-TR-CR-001 and OL-TR-MVR-001 002

37 Earthquake Design Criteria: : Not Applicable


38 SPECIFICATION
ASME, PED, Lithuanian legislations and Regulations, Orlen and UOP
39 This Vessel Constructed to Code: :
Specifications.
40 MATERIALS
41 Basis used for establishing allowable stresses: As per ASME Section II, Part D Code used or basis
42 Impact requirement (each component): ** (avg/min) joules
43 at: -36 (°C) (Specified Critical Exposure Temperature)
** SUPPLIER TO CONFIRM / FURNISH WHERE INDICATED.
EPC FOR RHCU ISBL AND FEED OSBL
PROJECT No. JI-2048

DATASHEET FOR HOT OIL DRAIN DRUM (T-1020)


Doc No. JI2048-977-MS-DAT-0041 Rev. 002 Page No. 4 of 9
1 MATERIAL OF CONSTRUCTION Rev
2 PARTS MATERIAL SPECIFICATION PARTS MATERIAL SPECIFICATION
3 SHELL/HEAD/DROP LEG/DROP LEG HEAD SA 516 Gr. 70N FIXED INTERNALS SA 516 Gr. 70N / SA 333 Gr.6 002

4 REINFORCING PADS / INSERT PLATE SA 516 Gr. 70N LOOSE INTERNALS Not Applicable 002

5 CLADDING /WOL Not Applicable EXTERNAL ATTACHMENTS SA 516 Gr. 70N


6 STIFFENING RINGS SA 516 Gr. 70N INSULATION SUPPORT RINGS / CLEATS Not Applicable
7 SKIRT (TOP/BOTTOM) Not Applicable STRUCTURAL CLEATS SA 516 Gr. 70N
8 BASE RING & ANCHOR CHAIR Not Applicable FITTINGS SA 420 WPL6
9 SADDLES/LEGS/LUGS SA 516 Gr. 70N (Saddles) STUDS / BOLTS (EXTERNAL) SA 320 L7M
10 LUG REINFORCING PADS SA 516 Gr. 70N NUTS (EXTERNAL) SA 194 Gr.7M + S3
11 NOZZLE NECKS (PIPE) SA 333 Gr. 6 BOLTS (INTERNAL) SA 193 Gr. B8
12 NOZZLE NECKS (PLATE) SA 516 Gr. 70N NUTS /DOUBLE LOCK NUT(INTERNAL) SA 194 Gr. 8
13 FORGED NOZZLES SA 350 GR LF2 Cl. 1 GASKETS (EXTERNAL) (#)
14 NOZZLE FLANGES SA 350 GR LF2 Cl. 1 GASKETS (INTERNAL) Not Applicable 002

15 BODY/GIRTH FLANGES Not Applicable NAMEPLATE SS 304


16 LIFTING LUGS/TRUNIONS SA 516 Gr. 70N DEMISTER Not Applicable
17 INTERNAL STEAM COIL SA 333 Gr. 6 EARTHING CLEAT SS 304
18 002
# Gasket - Spiral wound in accordance with ASME B16.20 with type 316 stainless steel windings and flexible graphite filler. Type 316 stainless steel inner ring for all sizes. Outer
19 centering ring shall be carbon steel, protected against corrosion.

20 DESIGN, FABRICATION AND INSPECTION DATA


21 CRITICALITY RATING II
ASME SEC.VIII-Div. 1 (Edition-2021) + UOP specification 3-11-10 + PED Directive 2014/ 68/EU + Lithuanian legislations
22 DESIGN CODE, STANDARD AND SPECIFICATION and Regulations + OL-TR-MVR-001 + Buoyancy Check Design
23 CODE STAMP U U2 OTHERS
24 CERTIFICATION/REGISTRATION CE NBR OTHERS
25 INSPECTION AUTHORITY Petrofac / Third party inspection agency / Notified Body / OL - Authorized Inspector
26 SUBJECT TO REGULATION Yes, PED Directive 2014/68/EU, Lithuanian Rules
27 PED Group / Category / Module 1 / I / **

Material test certification shall be as per Type 3.1 under Quality Assurance route as stated in EU directive for all pressure
28 MILL TEST CERTIFICATE (EN10204) parts, non pressure parts welded to pressure parts, Welding consumables, Fasteners, Gaskets, load bearing parts. Otherwise
they shall be Type 3.2 certification. And Type 2.2 certification for non pressure parts/balance items.

29 IMPACT TESTING As per Code & Project Specification


30 PRODUCTION TEST As per Code & Project Specification
31 PMI Not Applicable
32 PICKLING AND PASSIVATION Not Applicable
33 IGC TEST Not Applicable
34 TECHNICALPASSPORT Yes to be provided by Supplier as per ANNEX D OF OL-TR-MVR-001.
35 WEIGHT DATA
FABRICATED (INCLUDING ALL FIXED
36 INTERNALS) kgs ** LOOSE INTERNALS kgs **
ERECTION - DRESSED (INCLUDING ALL
37 LADDER & PLATFORMS,FIXED & kgs ** HYDROTEST kgs **
REMOVABLE INTERNALS)
38 OPERATING kgs ** SHIPPING kgs **
39 INTERNALS
40 BAFFLES (YES / NO) No VORTEX BREAKER (YES / NO) No
41 WEIR PLATES (YES / NO) No INLET DEVICE (YES / NO) No
42 DEMISTER (YES / NO) No STILLING WELLS (YES / NO) No
43 VANE PACK (YES / NO) No TRAYS (YES / NO) No
44 DISTRIBUTORS (YES / NO) No OTHERS (STEAM COIL) Yes
45 CONSTRUCTION DATA
46 LIFTING LUGS / TRUNNIONS Yes LADDER / PLATFORM NO CLEATS ONLY COMPLETE
47 EARTHING LUGS Yes PIPE SUPPORT CLEATS Yes
48 NAME PLATE Yes ANCHOR BOLTS / HOLD DOWN BOLTS Yes (By Others) / Not Applicable
49 INSULATION NO CLEATS ONLY COMPLETE VESSEL TOP DAVIT No
50 FIRE PROOFING NO CLEATS ONLY COMPLETE CATHODIC PROTECTION(Yes / No)&TYPE No
51 PAINTING (INTERNAL) No TAILING LUG No
52 PAINTING (EXTERNAL) Yes (As per App. A of OL-TR-CR-011)
** SUPPLIER TO CONFIRM / FURNISH WHERE INDICATED.
EPC FOR RHCU ISBL AND FEED OSBL
PROJECT No. JI-2048

DATASHEET FOR HOT OIL DRAIN DRUM (T-1020)


Doc No. JI2048-977-MS-DAT-0041 Rev. 002 Page No. 5 of 9
1 UOP SPECIFICATION Rev
2 External Low Temperature Insulation 9-12-7 BASIC ENGINEERING DESIGN QUESTIONNAIRE 9036973 - A4
3 Vessel Internals Low Chrome and Stainless Steel 3-26-8 Mist Eliminators 3-35-5
4 Hard Surfacing 3-27-7 Pressure Vessels Austenitic Steel 3-15-8
5 External Insulation and Weather shielding 9-11-9 Pressure Vessels Low Alloy Steel 3-12-10
6 Pressure Vessels Carbon Steel 3-11-10 Pressure Vessels ASME Sect VIII Div. 2 3-17-8
7
8 ORLEN SPECIFICATION
9 General Requirements OL-TR-GR-000 Mechanical. Piping OL-TR-MPR-001
10 Mechanical. General OL-TR-MR-000 Civil- Structural Design OL-TR-CR-001
11 General Welding, Fabrication and Inspection OL-TR-MR-001 Heat Insulation OL-TR-CR-002
12 Positive Material Identification OL-TR-MR-002 Corrosion Protection and Lining : Painting OL-TR-CR-011
13 Positive Material Identification OL-TR-MR-RP2 Corrosion Protection and Lining : Lining for Pressure OL-TR-CR-012
Pressure Vessels OL-TR-MVR-001 Vessels and Piping
14
15 Internals for Towers, Drums and Fixed Bed OL-TR-MVR-002 Corrosion Protection and Lining : CP OL-TR-CR-014
Reactors Fire Proofing OL-TR-CR-003
16
17
18 ADDENDUM TO SPECIFICATIONS
19 Addendum to Corrosion Protection and Lining : JI2048-000-MC-SPE-0001

20 Painting OL-TR-CR-011
21
22 APPLICABLE STANDARD DRAWINGS (UOP)
23 Vessel Skirt Details (Cylindrical Skirts) 3-102-7 Distributors - One Pass - Top Entry(3-140- to 3-182) -
24 Vessel Skirt Details (Conical Skirts) 3-103-6 Pipe Distributors For Horizontal Vessels 3-183-7
25 Baffles 3-115-9 Baffle Distributor For Horizontal Vessels 3-185-8
26 Grid Support And Baffle 3-116-10 Baffle and Wear Plate for Tangential Nozzle 3-187-5
27 Vortex Breakers 3-122-8 Tee Distributor For Horizontal And Vertical Vessels 3-190-12
28 Raised Vortex Breakers 3-123-8 Bubble Cap Tray Layout ID ≤ 2'-0" (600) 3-376-4
29 Coke Trap Details 3-127-7 Bubble Cap Tray Layout ID ≥ 2'-6" (750) 3-377-4
30 Distributor Trap (3-192- to 3-251) - Bubble Cap 3-378-4
31 Mesh Blanket Support(3-264- to 3-269) 3-265-8 Disc And Donut Pans 3-252-7
32 Withdrawal Nozzle (3-335- to 3-339) - Distributor Trap - Four Pass Intermediate 3-253-1
33 Skim Baffle In Partial Accumulator Tray 3-396-6 or Center - Side Tray Above Side to Side Pan
34 Collector Trays (3-340- to 3-353) - Side To Side Pan - (3-254 to 3-262) 3-256-7
35 Accumulator Trays(3-288- to 3-298) - Accumulator Trays (Chordal Vapor Riser) 3-276-6
36 Distributor Trap (3 pass & 4 pass)(3-402- to 3-418) - Draw off Sump 3-278-6
37 Top Head Inlet Distributor 3-425-7 Traps 3-280-7
38 Main Column Vapor Inlet Nozzle Detail 3-426-5 Support Grid 3-306-5
39 Top Head Inlet Deflection Plate 3-427-5 Distributors (3-312 to 3-315) -
40 Vessel Skirt Details - Cylindrical - Type 2 3-445-1 Wear Plate For Tangential Nozzle 3-315-8
41 Outlet Collector 3-447-1 Vortex Breakers 3-322-8
42 Spray Nozzle Assembly 8-148 Collector Assemblies - 6" Laterals 3-369-8
43 Collector Headers - 6" Laterals 3-370-7 Skim Baffle Details 3-392-7
44 Collector Laterals - 6" Laterals 3-371-8 Skim Baffle with Deflector Plate 3-393-0
45 Vent Gas Bed Support 3-380-4 Support Grid - 3'-0" (900) ID & Larger 3-384-7
46 Thermowell & skin thermocouple Installation 6-108-8
47 Assemblies
48
49 APPLICABLE STANDARD DRAWINGS (PETROFAC)
50 Vessel Tolerances For Vertical Vessel PEC-EN-SDR-M-3215 Internal Ladders For Vessel PEC-EN-SDR-M-3229
51 Vessel Tolerances For Horizontal Vessel PEC-EN-SDR-M-3216 Lifting Lug Top Head Type Or Trunnion PEC-EN-SDR-M-3230
52 Standard Bolt Hole Orientation PEC-EN-SDR-M-3218 Fireproofing And Insulation Support PEC-EN-SDR-M-3232
53 Skirt Base & Opening Details PEC-EN-SDR-M-3219 Name Plate With Bracket For Vessel PEC-EN-SDR-M-3233
54 Saddle Details For Horizontal Vessel PEC-EN-SDR-M-3220 Weld Deposit Detail For Nozzles And Internals PEC-EN-SDR-M-3239
55 Bracket Support For Vertical Vessel PEC-EN-SDR-M-3221 Base Ring Template PEC-EN-SDR-M-3240
56 Angle Leg Support PEC-EN-SDR-M-3222 Typical Weld Details PEC-EN-SDR-M-3238
57 Typical Earthing Lug PEC-EN-SDR-M-3223
58 Nozzle Reinforcement And Projection PEC-EN-SDR-M-3224
59 Manhole With Davit PEC-EN-SDR-M-3225
60 Manhole With Hinge Support PEC-EN-SDR-M-3226
61
62 LOCAL, STATE, NATIONAL CODES AND LEGISLATIONS
63 Law on the Supervision of Potentially Dangerous Equipment No. I-1324 Technical Regulations for Equipment and Protection Systems Used in
64 Law on Assessment of Conformity VIII-870 Potentially Explosive Atmosphere
65 Technical Regulation on Pressure Equipment Fire protection safety rules
66 Technical regalement’s of construction (STR 1, 2)
67
Order of Precedence for referring standard drawings : UOP standards / Specification requirements > Orlen standards / Specification requirements > Petrofac Standards
** SUPPLIER TO CONFIRM / FURNISH WHERE INDICATED.
EPC FOR RHCU ISBL AND FEED OSBL
PROJECT No. JI-2048

DATASHEET FOR HOT OIL DRAIN DRUM (T-1020)


Doc No. JI2048-977-MS-DAT-0041 Rev. 002 Page No. 6 of 9
1 NOZZLE TABLE (HOLD 3) Rev
RATING
2 Number Qty. NPS (Inch) SCH/THK TYPE SERVICE REMARKS
(Note N7)
3 PROCESS CONNECTIONS
4 I01 1 4 ** 150# WNRF Feed Inlet (Hot Oil) Note P9
5 I02 1 2 ** 150# LWNRF Nitrogen Blanketing / Vapour Outlet
6 M1 1 40 ** 150# WNRF Pump mounting nozzle Note N8, N9 (HOLD 1) 002

7 O01 1 1.5 ** 150# LWNRF Hot oil to hot oil surge drum T-1076 N9
Extended connection to the (Min from) bottom
8 S01 1 2 ** 150# LWNRF Vaccum truck connection
of the boot
9 I03 1 2 ** 150# LWNRF Pump minimum recirculation Note P9
10 S02 1 2 ** 150# LWNRF Utility connection
11 S03A 1 1.5" ** 150# WNRF LP Steam inlet (HOLD 2)
12 S03B 1 1.5" ** 150# WNRF LP condensate out (HOLD 2)
13
14 INSTRUMENT CONNECTIONS
15 C01 1 2 ** 150# LWNRF Pressure Transmitter
16 J01 1 2 ** 150# LWNRF Temperature Transmitter
17 L01 1 2 ** 150# LWNRF Level Interlock Transmitter Guided wave radar
18 L02 1 2 ** 150# LWNRF Level Control Transmitter Guided wave radar
19
20 MANWAYS, HANDHOLES, ETC.
21 MW1 1 24 ** 150# WNRF Manhole With Blind, Davit, gasket & fasteners
22
23 LEGEND : WNRF - Weld Neck raised Face; LWNRF - Long Weld Neck Raised Face;
24 NOZZLE NOTES
25 N1 All bolt holes shall to straddle the North, South, East, West, Vertical or Horizontal centerlines.
26 N2 Flanges up to NPS 24 shall conform to ASME B16.5. Flanges greater than NPS 24 shall conform to ASME B16.47 Series B.
27 N3 Flanges that are intended for use with spiral wound gaskets shall have a flange surface finish of 125 microinch Ra minimum to 250 microinch Ra maximum.
28 N4 Process nozzles in the corroded condition shall be capable of withstanding the moments and forces as per JI2048-000-PI-TES-0001. Actual loads on nozzles
29 will be communicated after order placement, if greater than specified in the table. Vendor has to check nozzles under actual loads too without extra cost.
30 N5 The minimum neck thickness for all nozzles including manholes (unless design conditions dictate a heavier wall) is to be Schedule 80 (or EN equivalent)
31 up to and including DN200 (8") size, and 12mm (1/2") wall for DN250 (10") and larger.
32 N6 The minimum nozzle projection for the nozzles located on shell shall be as per PEC-EN-SDR-M-3224. For SR nozzles, Vendor to specify the nozzle projection.
33 The nozze located on top dish center shall have minimum 700 mm projection. All top nozzles on top dish shall be in same level of the center nozzle. This is to
34 ensure all nozzle flanges have adequate projection above top platform.
35 N7 Flange rating are specified in accordance with ASME B16.5 or ASME B16.47, Series B. Flange rating indicated in above table are based upon design pressure
36 and temperature conditions only, and do not account for other loads. The final design of all flanges shall account for gasket seating and external loads.
37 Differential thermal expansion, including joints between materials, and transient thermal conditions such as start-up/shut down and operational upset
38 (as applicable) shall be accommodated.
39 N8 Pump mounting nozzle M1 shall be designed for pump load. FEA shall be performed for this nozzle.
40 N9 Pump with mounting Flange and Discharge Nozzle O01 along with Gasket and Fasteners by Pump Vendor.
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
** Vendor TO CONFIRM / FURNISH WHERE INDICATED.
EPC FOR RHCU ISBL AND FEED OSBL
PROJECT No. JI-2048

DATASHEET FOR HOT OIL DRAIN DRUM (T-1020)


Doc No. JI2048-977-MS-DAT-0041 Rev. 002 Page No. 7 of 9
1 UOP NOTES Rev
2
3 GENERAL NOTES
4 G1 Unless noted otherwise, all vessels shall be designed to permit full hydrostatic testing fully corroded condition, in the final erected position with all dead loads
5 at operating condition (includes vessel, insulation, internals, platforms, ladders, external piping, etc., but excludes operating liquid, catalyst, packing, etc.)
6 and 25% of design winds
7 G2 When the vessel has internals or vessel surfaces of austenitic materials, the vessel Vendor shall provide a positive nitrogen pressure of 3 psig (20 kPA(g))
8 minimum on the vessels to provide protection against possible chloride attack by the sea water. Vendor is invited to submit alternate methods for
9 consideration. Vessels shall be assumed to be deck cargo. Manway blinds shall be marked "NITROGEN PURGED - DO NOT OPEN";
10 G3 Gasket used for hydro test shall be of the same material and size of the service gasket. Supplier to provide a separate set of gaskets for all covers during hydro test.
11 G4 Equipment drawings are subject to UOP / Lithuanian Authority & Orlen review and approval. Comments received shall be implemented by Vendor.
12 G5 Nozzles shall be located so that the nozzle and nozzle to vessel weld are at least 3 inches (75 mm) from all pressure containing shell and head welds.
13 If intersecting pressure containing welds cannot be avoided, the nozzle shall be fully reinforced and low stress welding details used (e.g., grind fillets to a
14 smooth concave radius). All pressure containing welds shall be 100 percent radiographed to a minimum of 6 inches (150mm) beyond the nozzle
15 to vessel weld.
16 G6 The inner edge of all manways and nozzles shall be rounded to 3mm (1/8") radius.
17 G7 Deleted 002
18 G8 All internals bolts shall be provided with double-nutting or by using self-locking nuts.
19
20 MECHANICAL NOTES
21 M1 Horizontal vessels shall be supported by two saddle supports fabricated to fit the outside surface of the vessel within the applicable tolerances. Saddles shall extend over
o
22 a vessel arc of at least 120 . Saddles shall not be placed over vessel girth welds. A corrosion or wear plate shall be provided between the saddle and the vessel shell. The
23 plate shall extend at least 2 inches (50 mm) in all directions beyond the saddle. The corners shall be rounded to a radius of at least 2 inches (50 mm). After removal of free
24 moisture from between the shell and the plate, the plate shall be continuously seal welded to the shell around the plate’s perimeter. At least one 1/4 inch (6 mm) diameter vent
25 hole shall be provided in each plate section. Vent holes shall be tapped for future plugging. Vent holes shall remain open until the completion of pressure testing. The vent
26 shall then be plugged with a material adequate for the operating temperature but not be capable of retaining pressure.
27 M2 Fixed internals carbon steel and low alloyed steel (up to 9%Cr) made shall have the full corrosion allowance on each face (in total 2 times the designed CA of
28 shell). No corrosion allowance will be given for removable internals made ofstainless steel (13%Cr and above) as also for those made of non-ferrous high alloyed.
29 Removable internals in CS/LAS shall have minimum half the vessel shell CA applied on each side as per OL-TR-GR-000
30 M3 Provide a minimum of 1/16 inch (1.6mm) corrosion allowance on vessel supports.
31 M4 Provide Corrosion Allowance of 4.5 mm for LP Steam Coil and Internal Flanges. (HOLD 4)
32 M5 External reinforcing pads shall have a minimum of one 1/4 inch (6 mm) diameter vent hole. Pads for nozzles greater than NPS16 (DN 400) shall have a minimum of
33 2 vent holes and pads for nozzles in excess of NPS 36 (DN 900) shall have a minimum of 4 vent holes.Pads installed in sections shall have at least one vent hole per
34 section. Vent holes shall be tapped for testing purposes. Vent holes shall remain open until the completion of pressure testing. The material used for plugging shall be
35 adequate for the operating temperature but shall not be capable of retaining pressure.
36 M6 Saddle supports and Anchor Bolts shall be checked for Buoyancy Calculations.
37 M7 Vendor shall advise the Anchor Bolt requirements. Anchor Bolts will be supplied by PETROFAC. Anchor bolt shall be designed to an allowable stress of
38 100MPa (15,000psi) based on tensile stress area unless otherwise specifically noted on OL design drawings.
39 The minimum anchor bolt size shall be M24 (1”) in diameter. 3 mm on diameter corrosion allowance has to be taken into account.
40
41 MATERIAL NOTES
42 S1 Good weldability of steel to be assured by limiting carbon, phosphorus or sulphur content as per Table 3 of OL-TR-MVR-001.
43 S2 Carbon steel components used in this equipment shall be suitable for low MDMT of - 36 Deg C. Supplier to select suitable low temperature grade material or carbon steel
44 shall be suitably qualified for low MDMT.
45
46 QUALITY NOTES
47 Q1 Materials subject to post weld heat treatment (PWHT) shall be purchased with mill test reports indicating heat treating time sufficient to allow
48 at least one full PWHT cycle in addition to all planned PWHT.
49 Q2 100% radiography or ultrasonic tests are required, regardless of material, thickness or service, for all welds of pressure-bearing parts.
50 Tests shall be done after post weld heat treatment.
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
EPC FOR RHCU ISBL AND FEED OSBL
PROJECT No. JI-2048

DATASHEET FOR HOT OIL DRAIN DRUM (T-1020)


Doc No. JI2048-977-MS-DAT-0041 Rev. 002 Page No. 8 of 9
1 PROCESS DATA Rev
2
3 PROCESS NOTES
4 P1 Vessel is located in the pit.
5 P2 Vessel is provided with internal steam heating coil.
6 P3 All removable internals shall pass through manhole.
7 P4 Vessel contains one submersible pump. In view of installation of this one vertical submersible pumps in vessel, confirmation of following details will be taken from
8 pump vendor and will be communicated to vessel vendor:
9 1. Pump Mounting Nozzle size & its projection from Vessel Centre Line (HOLD 1 & 3)
10 2. Boot Dimensions (diameter & height) & LLLL requirement based on NPSHA requirement of submersible pumps (HOLD 5)
11 P5 All equipment component shall be suitable for - 36 deg C MDMT as per the ambient conditions.
12 P6 Vendor shall note that vessel shall have a minimum design life of 20 years.
13 P7 Vessel is subjected to steam out conditions with LP steam conditions 4/5/6 barg and 152/159/166 deg C.
14 P8 LP Steam operating conditions and design conditions
15 Operating pressure (min/Nor/Max) barg : 3.5 barg / 4.5 barg / 5.5 barg
16 Design pressure barg : 8 barg
17 Operating temperature (min/Nor/Max), deg C : 152 deg C / 159 deg C/ 166 deg C
18 Design temperature, deg C : 290 deg C
19 P9 Dip pipe with antisiphon shall be provided for drain inlet lines to terminate below LLLL
20 P10 Following are the Water Levels considered :
21 HHLL = 1150 mm 002
22 HLL = 1050 mm 002
23 NLL = 830 mm 002
23 LLL = 600 mm 002
24 LLLL = 500 mm (HOLD 5) 002
25
26 HEATER DATA
27
28 Heater Item Name Hot Oil Drain Drum Heater
29 Item Number TK-1103
30 Material of Construction Killed Carbon Steel
31 Vessel Diameter, m ID 1.5
32 Vessel Length, m 5.2
33 Fluid to be Heated Hot Oil
34 Density, kg/m3 @ 43 deg C 1064
35 Viscosity, cP 4.29 @ 20°C
36 Temperature to be Maintained, 20°C
37 Initial Temperature, Not Applicable
38 Final Temperature, Not Applicable
39 Time Required to Heat Up, hours Continuous
40 Ambient Temperature, -23°C
41 Heating Medium LP Steam
42 Condensate Outlet Temperature, Saturated @ 4.2 barg
43 Estimated Heat Loss, Kw 7
44 Steam Consumption , Kg/hr 12
45 Steam coil size , inch [HOLD 6] 1 1/2 " NPS
46 Steam Coil Length for 1 1/2 " coil size , m [HOLD 6] Refer sketch (Sheet 9-Detail A) 002
47 Vessel Insulation NO
48 Vessel Manway 24"
49
50
51 HEATER NOTES
52
53 H1 Design and fabricate heaters in accordance with this specification and appropriate ANSI and ASME Codes.
54 H2 Unless otherwise noted, all heater materials shall be killed carbon steel.
55 H3 Heat loss shown is estimated with 15 % margin. Heater vendor shall be responsible for calculating heat loss based on dimensions reported in the datasheet
56 H4 Design and fabricate heater coils to pass through a manway of size indicated. Size of manway shall be considered accordingly.
57 H5 Drain vessel vendor shall provide steam heating coil plus necessary supports as required. Steam coil to maintain drain vessel contents at temperature of
58 20°C minimum.
59 H6 Preliminary steam coil duty is 7 kW. Steam coil to be selected as 1.5" NB and it should cover atleast 70% of the Vessel Diameter. Steam coil to be
60 located below Low Low Liquid Level.Vendor scope include detail mechanical design and supply of steam heating coil.
61 H7 Connections on the drain vessels shall be 1 1/2 inch for steam inlet and condensate return piping. Heaters shall connect to 1 1/2” pipe running 002
62 through these 1 1/2”. 002
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
EPC FOR RHCU ISBL AND FEED OSBL
PROJECT No. JI-2048

DATASHEET FOR HOT OIL DRAIN DRUM (T-1020)


Doc No. JI2048-977-MS-DAT-0041 Rev. 002 Page No. 9 of 9

002

Remarks
a) ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIED.
b) NOZZLE LOCATIONS ARE INDICATIVE & SHALL BE FINALISED LATER (HOLD 7)
c) (**) - BY VENDOR

You might also like