002 ISSUED FOR REVIEW 21-May-22 ASK VMP SSS RSJ DESIGN NUMBER: OLP01443
TABULATION OF HOLDS
Page /
Hold
Section Description of Holds
No.
No.
6 1 Pump mounting nozzle (M1) - Size & Rating
6 2 Nozzle S03 A/B - Size & Location
6 3 Nozzle Projection
7 4 Internal Steam Coil and Internal Flanges - Corrosion Allowance
8, 9 5 Boot Dimensions & LLLL (Low Low Liquid Level)
8 6 Steam Coil Dimensions
9 7 Nozzle Location - Orientation & Elevation
9 8 Drain Drum Dimensions
9 9 Support Location
`
EPC FOR RHCU ISBL AND FEED OSBL
PROJECT No. JI-2048
7 Special Services: Not Applicable : Hydrogen HF acid HF acid with Residue WET H2S
4 REINFORCING PADS / INSERT PLATE SA 516 Gr. 70N LOOSE INTERNALS Not Applicable 002
Material test certification shall be as per Type 3.1 under Quality Assurance route as stated in EU directive for all pressure
28 MILL TEST CERTIFICATE (EN10204) parts, non pressure parts welded to pressure parts, Welding consumables, Fasteners, Gaskets, load bearing parts. Otherwise
they shall be Type 3.2 certification. And Type 2.2 certification for non pressure parts/balance items.
20 Painting OL-TR-CR-011
21
22 APPLICABLE STANDARD DRAWINGS (UOP)
23 Vessel Skirt Details (Cylindrical Skirts) 3-102-7 Distributors - One Pass - Top Entry(3-140- to 3-182) -
24 Vessel Skirt Details (Conical Skirts) 3-103-6 Pipe Distributors For Horizontal Vessels 3-183-7
25 Baffles 3-115-9 Baffle Distributor For Horizontal Vessels 3-185-8
26 Grid Support And Baffle 3-116-10 Baffle and Wear Plate for Tangential Nozzle 3-187-5
27 Vortex Breakers 3-122-8 Tee Distributor For Horizontal And Vertical Vessels 3-190-12
28 Raised Vortex Breakers 3-123-8 Bubble Cap Tray Layout ID ≤ 2'-0" (600) 3-376-4
29 Coke Trap Details 3-127-7 Bubble Cap Tray Layout ID ≥ 2'-6" (750) 3-377-4
30 Distributor Trap (3-192- to 3-251) - Bubble Cap 3-378-4
31 Mesh Blanket Support(3-264- to 3-269) 3-265-8 Disc And Donut Pans 3-252-7
32 Withdrawal Nozzle (3-335- to 3-339) - Distributor Trap - Four Pass Intermediate 3-253-1
33 Skim Baffle In Partial Accumulator Tray 3-396-6 or Center - Side Tray Above Side to Side Pan
34 Collector Trays (3-340- to 3-353) - Side To Side Pan - (3-254 to 3-262) 3-256-7
35 Accumulator Trays(3-288- to 3-298) - Accumulator Trays (Chordal Vapor Riser) 3-276-6
36 Distributor Trap (3 pass & 4 pass)(3-402- to 3-418) - Draw off Sump 3-278-6
37 Top Head Inlet Distributor 3-425-7 Traps 3-280-7
38 Main Column Vapor Inlet Nozzle Detail 3-426-5 Support Grid 3-306-5
39 Top Head Inlet Deflection Plate 3-427-5 Distributors (3-312 to 3-315) -
40 Vessel Skirt Details - Cylindrical - Type 2 3-445-1 Wear Plate For Tangential Nozzle 3-315-8
41 Outlet Collector 3-447-1 Vortex Breakers 3-322-8
42 Spray Nozzle Assembly 8-148 Collector Assemblies - 6" Laterals 3-369-8
43 Collector Headers - 6" Laterals 3-370-7 Skim Baffle Details 3-392-7
44 Collector Laterals - 6" Laterals 3-371-8 Skim Baffle with Deflector Plate 3-393-0
45 Vent Gas Bed Support 3-380-4 Support Grid - 3'-0" (900) ID & Larger 3-384-7
46 Thermowell & skin thermocouple Installation 6-108-8
47 Assemblies
48
49 APPLICABLE STANDARD DRAWINGS (PETROFAC)
50 Vessel Tolerances For Vertical Vessel PEC-EN-SDR-M-3215 Internal Ladders For Vessel PEC-EN-SDR-M-3229
51 Vessel Tolerances For Horizontal Vessel PEC-EN-SDR-M-3216 Lifting Lug Top Head Type Or Trunnion PEC-EN-SDR-M-3230
52 Standard Bolt Hole Orientation PEC-EN-SDR-M-3218 Fireproofing And Insulation Support PEC-EN-SDR-M-3232
53 Skirt Base & Opening Details PEC-EN-SDR-M-3219 Name Plate With Bracket For Vessel PEC-EN-SDR-M-3233
54 Saddle Details For Horizontal Vessel PEC-EN-SDR-M-3220 Weld Deposit Detail For Nozzles And Internals PEC-EN-SDR-M-3239
55 Bracket Support For Vertical Vessel PEC-EN-SDR-M-3221 Base Ring Template PEC-EN-SDR-M-3240
56 Angle Leg Support PEC-EN-SDR-M-3222 Typical Weld Details PEC-EN-SDR-M-3238
57 Typical Earthing Lug PEC-EN-SDR-M-3223
58 Nozzle Reinforcement And Projection PEC-EN-SDR-M-3224
59 Manhole With Davit PEC-EN-SDR-M-3225
60 Manhole With Hinge Support PEC-EN-SDR-M-3226
61
62 LOCAL, STATE, NATIONAL CODES AND LEGISLATIONS
63 Law on the Supervision of Potentially Dangerous Equipment No. I-1324 Technical Regulations for Equipment and Protection Systems Used in
64 Law on Assessment of Conformity VIII-870 Potentially Explosive Atmosphere
65 Technical Regulation on Pressure Equipment Fire protection safety rules
66 Technical regalement’s of construction (STR 1, 2)
67
Order of Precedence for referring standard drawings : UOP standards / Specification requirements > Orlen standards / Specification requirements > Petrofac Standards
** SUPPLIER TO CONFIRM / FURNISH WHERE INDICATED.
EPC FOR RHCU ISBL AND FEED OSBL
PROJECT No. JI-2048
7 O01 1 1.5 ** 150# LWNRF Hot oil to hot oil surge drum T-1076 N9
Extended connection to the (Min from) bottom
8 S01 1 2 ** 150# LWNRF Vaccum truck connection
of the boot
9 I03 1 2 ** 150# LWNRF Pump minimum recirculation Note P9
10 S02 1 2 ** 150# LWNRF Utility connection
11 S03A 1 1.5" ** 150# WNRF LP Steam inlet (HOLD 2)
12 S03B 1 1.5" ** 150# WNRF LP condensate out (HOLD 2)
13
14 INSTRUMENT CONNECTIONS
15 C01 1 2 ** 150# LWNRF Pressure Transmitter
16 J01 1 2 ** 150# LWNRF Temperature Transmitter
17 L01 1 2 ** 150# LWNRF Level Interlock Transmitter Guided wave radar
18 L02 1 2 ** 150# LWNRF Level Control Transmitter Guided wave radar
19
20 MANWAYS, HANDHOLES, ETC.
21 MW1 1 24 ** 150# WNRF Manhole With Blind, Davit, gasket & fasteners
22
23 LEGEND : WNRF - Weld Neck raised Face; LWNRF - Long Weld Neck Raised Face;
24 NOZZLE NOTES
25 N1 All bolt holes shall to straddle the North, South, East, West, Vertical or Horizontal centerlines.
26 N2 Flanges up to NPS 24 shall conform to ASME B16.5. Flanges greater than NPS 24 shall conform to ASME B16.47 Series B.
27 N3 Flanges that are intended for use with spiral wound gaskets shall have a flange surface finish of 125 microinch Ra minimum to 250 microinch Ra maximum.
28 N4 Process nozzles in the corroded condition shall be capable of withstanding the moments and forces as per JI2048-000-PI-TES-0001. Actual loads on nozzles
29 will be communicated after order placement, if greater than specified in the table. Vendor has to check nozzles under actual loads too without extra cost.
30 N5 The minimum neck thickness for all nozzles including manholes (unless design conditions dictate a heavier wall) is to be Schedule 80 (or EN equivalent)
31 up to and including DN200 (8") size, and 12mm (1/2") wall for DN250 (10") and larger.
32 N6 The minimum nozzle projection for the nozzles located on shell shall be as per PEC-EN-SDR-M-3224. For SR nozzles, Vendor to specify the nozzle projection.
33 The nozze located on top dish center shall have minimum 700 mm projection. All top nozzles on top dish shall be in same level of the center nozzle. This is to
34 ensure all nozzle flanges have adequate projection above top platform.
35 N7 Flange rating are specified in accordance with ASME B16.5 or ASME B16.47, Series B. Flange rating indicated in above table are based upon design pressure
36 and temperature conditions only, and do not account for other loads. The final design of all flanges shall account for gasket seating and external loads.
37 Differential thermal expansion, including joints between materials, and transient thermal conditions such as start-up/shut down and operational upset
38 (as applicable) shall be accommodated.
39 N8 Pump mounting nozzle M1 shall be designed for pump load. FEA shall be performed for this nozzle.
40 N9 Pump with mounting Flange and Discharge Nozzle O01 along with Gasket and Fasteners by Pump Vendor.
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
** Vendor TO CONFIRM / FURNISH WHERE INDICATED.
EPC FOR RHCU ISBL AND FEED OSBL
PROJECT No. JI-2048
002
Remarks
a) ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIED.
b) NOZZLE LOCATIONS ARE INDICATIVE & SHALL BE FINALISED LATER (HOLD 7)
c) (**) - BY VENDOR