3 Travel Time and Delay Form Sample
3 Travel Time and Delay Form Sample
3 Travel Time and Delay Form Sample
Intersection M
Station STOPS SLOWS STOPS
T1 T2 Delay Cause Location Cause T1
O 0'00"
A 0'47" 0'50" 3" T
B 2'26"
C 3'02" 3'04" 2" PED
D 4'16" 4'16"
E 5'48" 6'30" 42" S
F 7'43" 7'43" 7'50"
G 8'46" 9'20" 34" PED 10'10"
H 11'12" 11'20" 18" S
SYMBOLS OF DELAY CAUSE:
LT-Left Turns PC-Parked Cars S - Traffic Signals
PED - Pedestrians BP- Bus Loading or unloading DP - Double Parking
Midblock
STOPS SLOWS
T2 Delay Cause Location Cause
7'55" 5" T
10'53" 45" T
SS - Stop Sign
le Parking T- General Congeestion
ular stations
nce between the time readings, T2-T1
lay, running time will be equal to travel time
me, running time and distance inputs.
RESULTS MONITORING AND EVALUATION OF COMPLETED ROAD PR
TRAVEL TIME AND DELAY SURVEY STUDY
FIELD SHEET
Name of Road Direction:
Trip started at 7:00 AM at
Trip ended at 7:12 AM at
Intersection M
Station STOPS SLOWS STOPS
T1 T2 Delay Cause Location Cause T1
O 7:00
A 7:01 7:05 0:04 T
B 7:07 0.43333333 2.43333
C 7:10 3'04" 2" PED 0.03333333 0.06667
D 4'16" 4'16"
E 5'48" 6'30" 42" S
F 7'43" 7'43" 7'50"
G 8'46" 9'20" 34" PED 10'10"
H 11'12" 11'20" 18" S
SYMBOLS OF DELAY CAUSE:
LT-Left Turns PC-Parked Cars S - Traffic Signals
PED - Pedestrians BP- Bus Loading or unloading DP - Double Parking
Midblock
STOPS SLOWS
T2 Delay Cause Location Cause
7'55" 5" T
10'53" 45" T
SS - Stop Sign
le Parking T- General Congeestion
ular stations
nce between the time readings, T2-T1
lay, running time will be equal to travel time
me, running time and distance inputs.
RESULTS MONITORING AND EVALUATION OF COMPLETED ROAD PROJECT
TRAVEL TIME AND DELAY SURVEY STUDY
SUMMARY SHEET
Name of Road Direction:
Trip started at 7:00 AM at
Trip ended at 7:12 AM at
Delay Time
Passing Travel Running Distance Travel Speed
Station Inter-
time Time Midblock Total Time (m) (km/hr)
section
O 0'00" 50" 3" 3" 47" 120 8.64
A 0'50" 1'36" 1'36" 980 36.75
B 2'26" 0'38" 2" 2" 0'36" 510 48.32
C 3'04" 1'12" 1'12" 780 59.00
D 4'16" 2'14" 42" 42" 1'32" 140 3.76
E 6'30" 1'13" 1'13" 420 20.11
F 7'43" 1'37" 5" 34" 39" 0'58" 740 27.46
G 9'20" 2' 45" 18" 1'3" 0'57" 410 12.80
H 11'20" 11'20" 2"29" 8'51" 4100
Total Trip Length 4100 m Mean Travel Speed 21.71km/hr
Total Travel Time 11'20" Mean Running Speed 27.80km/hr
Total Delay Time 2'29" Date
PROJECT
Running
Speed
(km/hr)
9.19
36.75
51.00
39.00
5.47
20.71
45.92
23.42
21.71km/hr
27.80km/hr
RESULTS MONITORING AND EVALUATION OF COMPLETED
TRAVEL TIME AND DELAY SU
FIELD SHEET
ROUTE: DIRECTION:
BACUAG-TANDAG ROUTE
TRIP STARTED (Time): 6:45'00" TRIP STARTED (Lo
TRIP ENDED (Time): 11:43'56.24" TRIP ENDED (Loc.)
PEAK DATE: TUESDAY RECORDER:
INTERSECTION
STATION STOPS SLOWS ST
T1 T2 DELAY CAUSE CAUSE T1
CLAVER 29'46.30"
CARMEN 3,13'10.69"
BUENAVISTA 4,45'2,68"
TANDAG 4,58'56.24"
MIDBLOCK
STOPS SLOWS
T2 DELAY CAUSE LOCATION CAUSE
SZ - SCHOOL ZONE
WAY MT - MERGING TRAFFIC
URNS S - TRAFFIC SIGNALS
ED CARS SS - STOP SIGNS
LE PARKING T - GE. CONGESTION
H ROAD
RESULTS MONITORING AND EVALUAT
PROJECT ROAD: DAVAO-SURIGAO COASTAL ROAD
TRAVEL TIME AND
SUMMARY
ROUTE: BACUAG-TANDAG ROUTE
DELAY TIME
PASSING TRAVEL
STATION MID INTER-
TIME TIME TOTAL
BLOCK SECTION
TRAVEL RUNNING
DISTANCE
RUNNING TIME SPEED SPEED
(m)
(kph) (kph)
-DO-
O-
-DO-
-DO-
GRAVEL ROAD, FAIR TO BAD. ROCKY MOUNTAIN ON RIGHT SIDE,
WATER ON LEFT SIDE.
GRAVEL ROAD. MOUNTAINOUS IN GOOD CONDITION. NO SIDE
DITCH.
GRAVEL ROAD, CONDITION IS FAIR TO BAD GENERALLY FLAT
TERRAIN WITH 6.00 m CARRIAGEWAY
GRAVEL ROAD, CONDITION IS GOOD TO FAIR. RICE FIELD ON
BOTHSIDE, TERRAIN IS FLAT TO ROLLING.
GRAVEL ROAD IS IN GOOD CONDITION AND TERRAIN IS FLAT TO
ROLLING.
-DO-
-DO-
-DO-
-DO-
-DO-
START OF NEWLY CONSTRUCTED PCC WITH 6.70m CARRIAGEWAY
& GRAVEL SHOULDER W/ SLOPE PROTECTION
RESULTS MONITORING AND EVALUATION OF COMPLETED
TRAVEL TIME AND DELAY SU
FIELD SHEET
ROUTE: QUEZON AVENUE DIRECTION:
TRIP STARTED (Time): 7:00 AM TRIP STARTED (Lo
TRIP ENDED (Time): 7:12 AM TRIP ENDED (Loc.)
PEAK DATE: RECORDER:
INTERSECTION
STATION STOPS SLOWS ST
T1 T2 DELAY CAUSE CAUSE T1
O 0' 00"
B 2' 26"
MIDBLOCK
STOPS SLOWS
T2 DELAY CAUSE LOCATION CAUSE
SZ - SCHOOL ZONE
WAY MT - MERGING TRAFFIC
URNS S - TRAFFIC SIGNALS
ED CARS SS - STOP SIGNS
LE PARKING T - GE. CONGESTION
H ROAD
RESULTS MONITORING AND EVALUAT
PROJECT ROAD:
TRAVEL TIME AND
SUMMARY
ROUTE: QUEZON AVENUE
DELAY TIME
PASSING TRAVEL
STATION MID INTER-
TIME TIME TOTAL
BLOCK SECTION
O 0'00"
50" 3" 3"
A 0'50"
1'36"
B 2'26"
0'38" 2" 2"
C 3'04"
1'12"
D 4'16"
2'14" 42" 42"
E 6'30"
1'13"
7'43"
F
1'37" 34" 39"
5"
9'20"
G
2' 18" 1' 3"
45"
H 11'20"
11' 20" 2' 29"
TOTAL TRAVEL TIME 11' 20" TOTAL TRIP LENGTH
TOTAL DELAY 2' 29" MEAN TRAVEL SPEED
TOTAL RUNNING TIME 8' 51" MEAN RUNNING SPEED
AND EVALUATION OF COMPLETED ROAD PROJET
TRAVEL RUNNING
DISTANCE
RUNNING TIME SPEED SPEED
(m)
(kph) (kph)
TEST VEHICLE:
WEATHER: ITION
ODOMETER ADJ:
-DO-
O-
-DO-
-DO-
GRAVEL ROAD, FAIR TO BAD. ROCKY MOUNTAIN ON RIGHT SIDE,
WATER ON LEFT SIDE.
GRAVEL ROAD. MOUNTAINOUS IN GOOD CONDITION. NO SIDE
DITCH.
GRAVEL ROAD, CONDITION IS FAIR TO BAD GENERALLY FLAT
TERRAIN WITH 6.00 m CARRIAGEWAY
GRAVEL ROAD, CONDITION IS GOOD TO FAIR. RICE FIELD ON
BOTHSIDE, TERRAIN IS FLAT TO ROLLING.
GRAVEL ROAD IS IN GOOD CONDITION AND TERRAIN IS FLAT TO
ROLLING.
-DO-
-DO-
-DO-
-DO-
-DO-
START OF NEWLY CONSTRUCTED PCC WITH 6.70m CARRIAGEWAY
& GRAVEL SHOULDER W/ SLOPE PROTECTION
RESULTS MONITORING AND EVALUATION OF COMPLETED RO
TRAVEL TIME AND DELAY SURVE
FIELD SHEET
ROUTE: DIRECTION:
PEAK
TRIP STARTED (Time): 7:00 AM TRIP STARTED (Lo
TRIP ENDED (Time): 7:12 AM TRIP ENDED (Loc.)
DATE: Tuesday, September 1, 2020 RECORDER:
INTERSECTION
STATION STOPS SLOWS ST
T1 T2 DELAY CAUSE CAUSE T1
O 0:00:00
B 0:02:26
D 0:04:16 0:04:16
F 0:07:43 0:07:43
0:07:50
G 0:08:46 0:09:20 0:00:34 PED
0:10:10
H 0:11:12 0:11:20 0:00:18 SS
DIRECTION: INCREASING
MIDBLOCK
STOPS SLOWS
T2 DELAY CAUSE LOCATION CAUSE
0:07:55 0:00:05 T
0:10:53 0:00:45 T
SZ - SCHOOL ZONE
Y MT - MERGING TRAFFIC
NS S - TRAFFIC SIGNALS
ARS SS - STOP SIGNS
ARKING T - GE. CONGESTION
OAD