You are on page 1of 87

Date 11KG

Date Days
Destination Plant batch no. QTY. delivered to
Finished worked
plant
Generic Brent
Pasig Plant - 110
Malabon Plant - -
Pangasinan Plant - -
Benguet Plant - -
Tagaytay Plant Err:509 -
Pililia Plant - -
Dau Plant - -
Cabuyao Plant - -
Pamplona - -
Pura Plant - -
Balayan Plant - 108
San Pablo Plant - -
11KG 50 kg 22kg 2.7KG 5kg
Superkalan
Pol Snap-on Brent Superkalan Brent Superkalan SK Shine Brent SK
- - 127 360 39 - - - 1 -
- - - - - - 6 - - 294
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - 3 - 21
- - - 7 5 - - - - -
- - - - - - - - - -
- - - 40 26 - 9 2 - 22
- - - - - - 1 - - -
- - - - - - - - - -
- - 235 87 14 - 3 1 - 30
- - - - - - 5 - - -
total
Charges Remarks
cylinders

637
300
-
-
Err:509
12
-
Daily Production Monito
DATE:
Total Plant Production Batch No.:
Date: total under Process
Rebranding/ Maintenance/Repair
Work Brand Brand Rebrand To
Process Scope (Embossed) (Logo)

Incoming Inventory
Incoming Inventory
Incoming Inventory
Incoming Inventory
1. Sorting/Visual inspection of cylinder
2. De valving/Degassing of cylinder
3. Internal washing
4. Gas cutting category
Gas cutting collar support assembly and footring
Gas cutting collar support assembly only
Gas cutting footring only
5. Burrs grinding
Grinding on collar support and footring burrs
Grinding on collar support burrs only
Grinding on footring burrs only
6. Repair process
Install name plate
Replace collar support assembly & footring
Replace collar support assembly only
Replace footring only
Body dent removal
7. Inspection of repaired cylinder
8. Annealing
9. Hydrotesting
10 . Cylinder shotblasting
BDR
11 . Cylinder 1st coating
12 . Cylinder final coating
13 . Loading/unloading cylinder to hanging conveyor
14 . Vacuum cleaning/tare weighing on painted cylinder
15 . Stamping T.W. & date Tested
16 . Logo application
17 . T.W., Warning & Requalification date application
18 . Re-valving/Change valve to cylinder
19 . Air filling to cylinder
20 . Air leak testing with air filled cylinder
21 . Soap sud testing and final inspection
22 . Scrap
23 . rejected (Other Embossed)
24 . Cylinder for pick up
Daily Production Monitor Summary

11KG 50 kg 22kg 2.7KG


4,890 - - - 12 5 1 106 26 22
Superkalan

Generic Brent Pol Snap-on Brent Superkalan Brent Superkalan SK Shine


653 - - - - - - 24 1 3
1,898 - - - 12 4 1 26 13 3
1,174 - - - - 1 - 56 12 3
1,165 - - - - - - - - 13
- - - - - - - - 18 19
250 - - - - - - 2 1 -
159 - - - - - - - - -
- - - - - - - - - -
- 2 - - - - - - 1 -
- 7 - - - - - - - 1
- - - - 19 - - - 62 22
- - - - #NAME? - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - #NAME? - - -
200 - - - - - - - - -
- - - - - - - - - -
- - - - 1 - - - - -
- 6 - - - - - 20 - -
- - - - - - - - - 2
- Err:509 - - - - - 4 - -
529 - 3 - 12 - - - - -
190 #NAME? - - - - - 3 50 -
- - - 13 #NAME? 4 - - - -
- 10 - - 1 - - - - -
- - - - 2 - - 4 - -
- - - - - - - - #NAME? -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
#NAME? Err:509 1 1 - - 9 - - -
- - - - - - - - - -
- - - - 29 - - 1 18 -
- - - - - - - 4 15 -
- - - - - - - - - Err:509
- - - - #NAME? - - - - -
919 1 #NAME? - - - - - - -
Err:509 218 - - 362 494 84 - 24 6
#VALUE! 25 4 14 76 9 10 144 191 66
5kg
25 #NAME?

Brent SK
1 #NAME?
14 19
10 -
- -
3 15
3 #NAME?
- -
- -
- 6
- -
22 19
- -
- -
- -
- 4
- -
3 -
- -
- -
1 67
- -
- -
#VALUE! -
3 -
#NAME? #NAME?
- 37
2 -
#NAME? -
- -
- -
- -
- 85
- -
- 28
- -
- -
#NAME? -
- 32
1 367
77 645
DATE: January 23,2023
Batch Number:
Date Received: (ALLOCATION) December 27,2022 total under Process
Rebranding/ Maintenance/Repair
Brand
Work (Embossed Brand Rebrand
Process Scope (Logo) To
)
Incoming Inventory
Incoming Inventory
Incoming Inventory
Incoming Inventory
1. Sorting/Visual inspection of cylinder
2. De valving/Degassing of cylinder
3. Internal washing
4. Gas cutting category
Gas cutting collar support assembly and footring
Gas cutting collar support assembly only
Gas cutting footring only
5. Burrs grinding
Grinding on collar support and footring burrs
Grinding on collar support burrs only
Grinding on footring burrs only
6. Repair process
Install name plate
Replace collar support assembly & footring
Replace collar support assembly only
Replace footring only
Body dent removal
7. Inspection of repaired cylinder
8. Annealing
9. Hydrotesting
10 . Cylinder shotblasting
BDR/REPLACE NEW VALVE
11 . Cylinder 1st coating
12 . Cylinder final coating
13 . Loading/unloading cylinder to hanging conveyor
14 . Vacuum cleaning/tare weighing on painted cylinder
15 . Stamping T.W. & date Tested
16 . Re-valving to cylinder
17 . T.W., Warning & Requalification date application
18 . Logo application
19 . Air filling to cylinder
20 . Air leak testing with air filled cylinder
21 . Soap sud testing and final inspection
22 . Scrap
23 . Cylinder for pick up
Daily Production Monitor Per Plant

11KG
580 - - - - - - - - -
Brentgas Superkalan

Generic TWG POL TWG SO TWG com Pol Snap-on Com Liqui Pol Liqui Com Pol Snap-on

308 219
272 276

25

341

13 8
13

6
309 110 298 127 360
605 341 0 0 0 0 13 0 516 0 0
6 0 0 0 0 0 0 0 0 0 0
0 309 0 0 110 0 0 298 0 127 360

12 BG 11KG 138 32
2.7 100
SO SK 30
TG PV 50
SK PV 7
SK 50KG 7
50 kg 22kg 2.7KG 5kg
- - 2 - - - 1 - 3 -
Superkalan

Com Liqui TWG Brent Superkalan Liqui Brent SK SK Shine Brent SK


3
2 1

1 13 15 2
14 74 34

1 6
1
3 61 9 2 18 19 14

20 2
2 8
22
V
50
4 5 1
37

18 7

32
39 10 1
7 20 0 6 130 25 6 32 78 74 69 39
0 0 0 0 0 0 0 0 32 0 0 0
39 0 10 0 0 0 0 1 0 0 0 0
RATES Charges
11kg 50kg 22kg 2.7kg 5kg 11kg 50kg 22kg 2.7kg 5kg

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - #VALUE! - -
- - - - -
- - #REF! #REF! -
- - - - -
- - - - -
82.65 - #REF! #REF! - 83
- - - - -
- - - - -
- - - - -
#REF! - - - -
- - - - -
1 - - - - 7
- - - - -
- - - - -
- - #REF! - -
0
0
Total

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
#VALUE!
-
#REF!
-
-
#REF!
-
-
-
#REF!
-
7
-
-
#REF!
Daily P
DATE: January 23,2023
From: Malabon Plant Batch Number:
total under Process
Date Received: (ALLOCATION) January 8,2023
Work Brand Brand Rebrand
Process Scope (Embossed) (Logo) To

Incoming Inventory
Incoming Inventory
Incoming Inventory
Incoming Inventory
1. Sorting/Visual inspection of cylinder
2. De valving/Degassing of cylinder
3. Internal washing
4. Gas cutting category
Gas cutting collar support assembly and footring ✘

Gas cutting collar support assembly only ✘

Gas cutting footring only


5. Burrs grinding
Grinding on collar support and footring burrs
Grinding on collar support burrs only
Grinding on footring burrs only
6. Repair process
Install name plate
Replace collar support assembly & footring
Replace collar support assembly only
Replace footring only
Body dent removal
7. Inspection of repaired cylinder
8. Annealing
9. Hydrotesting
10 . Cylinder shotblasting
BDR/REPLACE NEW VALVE
11 . Cylinder 1st coating
12 . Cylinder final coating
13 . Loading/unloading cylinder to hanging conveyor
14 . Vacuum cleaning/tare weighing on painted cylinder
15 . Stamping T.W. & date Tested
16 . Re-valving to cylinder
17 . T.W., Warning & Requalification date application
18 . Logo application
19 . Air filling to cylinder
20 . Air leak testing with air filled cylinder
21 . Soap sud testing and final inspection
22 . Scrap
23 . Cylinder for pick up
Daily Production Monitor Per Plant

11KG
- - - - - - -
Brentgas Superkalan

Generic TWG POL TWG SO TWG com Liqui Pol Pol Snap-on Com Pol Snap-on Com

10

190

90

37
67 4
190 90 0 10 0 0 0 0 1 0 0
37 0 0 0 0 0 0 0 0 0 0
0 67 0 0 4 0 0 0 0 0 0
50 kg 22kg 2.7KG 5kg RATE
- - - - - - - - 11kg

TWG Brent Superkalan Liqui Brent Superkalan SK Shine Brent SK

1 1 2
1 365

1 1

85

28

6 294
0 0 2 1 0 6 482 0 0 00 0
0 0 0 0 0 0 0 0 0 00 0
0 0 6 0 0 0 294 0 0 00 0
RATES Charges
50kg 22kg 2.7kg 5kg 11kg 50kg 22kg 2.7kg 5kg

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0
0
Total

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Daily Production Monitor Pe
DATE: January 23,2023
From: Pangasinan Plant Batch Number:
Date Received: (ALLOCATION) Dec 9,2021 total under Process
Rebranding/ Maintenance/Repair
Work Brand Brand Rebrand
DATE: January 31,2022 DATE: Aug 17,2021 Scope (Embossed) (Logo) To

Incoming Inventory
Incoming Inventory
Incoming Inventory
Incoming Inventory
1. Sorting/Visual inspection of cylinder
2. De valving/Degassing of cylinder ✘

3. Internal washing
4. Gas cutting category
Gas cutting collar support assembly and footring ✘

Gas cutting collar support assembly only


Gas cutting footring only
5. Burrs grinding
Grinding on collar support and footring burrs
Grinding on collar support burrs only
Grinding on footring burrs only
6. Repair process
Install name plate
Replace collar support assembly & footring
Replace collar support assembly only
Replace footring only ✘

Body dent removal


7. Inspection of repaired cylinder
8. Annealing
9. Hydrotesting
10 . Cylinder shotblasting
BDR/REPLACE NEW VALVE
11 . Cylinder 1st coating
12 . Cylinder final coating
13 . Loading/unloading cylinder to hanging conveyor
14 . Vacuum cleaning/tare weighing on painted cylinder
15 . Stamping T.W. & date Tested
16 . DATE: January 22,2022
17 . T.W., Warning & Requalification date application
18 . Logo application
19 . Air filling to cylinder
20 . Air leak testing with air filled cylinder
21 . Soap sud testing and final inspection
22 . Scrap
23 . Cylinder for pick up
Production Monitor Per Plant

11KG 50 kg 22kg
- - - - - - - - - - -
Brentgas Superkalan

Generic Pol Snap-on Com Pol Snap-on Com Brent Superkalan Brent Superkalan

0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
2.7KG 5kg RATES Char
- - - - 11kg 50kg 22kg 2.7kg 5kg 11kg

SK Shine Brent SK

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
82.65 -
-
-
-
-
-
1 -
-
-
-

0 0 0 00 0 0 0 0 83.65
### 0
0 0 0 00 0 0 0 0 ###
0 0
0 0 0 00 0 0 0 0 ###
0 0
Charges
50kg 22kg 2.7kg 5kg Total

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0
0
Daily Production Monitor Per
DATE: January 23,2023
From: Benguet Plant Batch Number:
Date Received: (ALLOCATION) total under Process
Rebranding/ Maintenance/Repair
Work Brand Brand Rebrand
DATE: Oct 2,2021 Scope (Embossed) (Logo) To

Incoming Inventory
Incoming Inventory
Incoming Inventory
Incoming Inventory
1. Sorting/Visual inspection of cylinder
2. De valving/Degassing of cylinder
3. Internal washing
4. Gas cutting category
Gas cutting collar support assembly and footring
Gas cutting collar support assembly only
Gas cutting footring only
5. Burrs grinding
Grinding on collar support and footring burrs
Grinding on collar support burrs only
Grinding on footring burrs only
6. Repair process
Install name plate
Replace collar support assembly & footring
Replace collar support assembly only
Replace footring only
Body dent removal
7. Inspection of repaired cylinder
8. Annealing
9. Hydrotesting
10 . Cylinder shotblasting
BDR/REPLACE NEW VALVE
11 . Cylinder 1st coating
12 . Cylinder final coating
13 . Loading/unloading cylinder to hanging conveyor
14 . Vacuum cleaning/tare weighing on painted cylinder
15 . Stamping T.W. & date Tested
16 . Re-valving to cylinder
17 . T.W., Warning & Requalification date application
18 . Logo application
19 . Air filling to cylinder
20 . Air leak testing with air filled cylinder
21 . Soap sud testing and final inspection
22 . DATE: July 28,2021
23 . Cylinder for pick up
y Production Monitor Per Plant

11KG 50 kg 22kg
- - - - - - - - - - -
Brentgas Superkalan

Generic Pol Snap-on Com Pol Snap-on Com Brent Superkalan Brent Superkalan

0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
2.7KG 5kg RATES Char
- - - - 11kg 50kg 22kg 2.7kg 5kg 11kg

SK Shine Brent SK

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
82.65 -
-
-
-
-
-
1 -
-
-
-

0 0 0 00 0 0 0 0 83.65
### 0
0 0 0 00 0 0 0 0 ###
0 0
0 0 0 00 0 0 0 0 ###
0 0
Charges
50kg 22kg 2.7kg 5kg Total

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0
0
Daily Production Monitor
DATE: January 23,2023
From: Pamplona Plant Batch Number:
Date Received: (ALLOCATION) February 8,2022 total under Process
Rebranding/ Maintenance/Repair
Work Brand Brand Rebrand
Process Scope (Embossed) (Logo) To

Incoming Inventory
Incoming Inventory
Incoming Inventory
Incoming Inventory
1. Sorting/Visual inspection of cylinder
2. De valving/Degassing of cylinder
3. Internal washing
4. Gas cutting category
Gas cutting collar support assembly and footring
Gas cutting collar support assembly only
Gas cutting footring only
5. Burrs grinding
Grinding on collar support and footring burrs
Grinding on collar support burrs only
Grinding on footring burrs only
6. Repair process
Install name plate
Replace collar support assembly & footring
Replace collar support assembly only
Replace footring only
Body dent removal
7. Inspection of repaired cylinder
8. Annealing
9. Hydrotesting
10 . Cylinder shotblasting
BDR/REPLACE NEW VALVE
11 . Cylinder 1st coating
12 . Cylinder final coating
13 . Loading/unloading cylinder to hanging conveyor
14 . Vacuum cleaning/tare weighing on painted cylinder
15 . Stamping T.W. & date Tested
16 . Re-valving to cylinder
17 . T.W., Warning & Requalification date application
18 . Logo application
19 . Air filling to cylinder
20 . Air leak testing with air filled cylinder
21 . Soap sud testing and final inspection
22 . Scrap
23 . Cylinder for pick up
Daily Production Monitor Per Plant

11KG 50 kg 22kg
231 - - - - - - - - -
Brentgas Superkalan

Generic TWGAZ Pol Snap-on Com Pol Snap-on Com Brent Superkalan Brent
116
59
56

1 2

106 29
4 5

1
231 113 0 4 0 29 0 2 4 5 9
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 1 0
22kg 2.7KG 5kg RATES
- - - 5 - 11kg 50kg 22kg 2.7kg 5kg

Superkalan SK Shine Brent SK


3
2

1 1

82.65

11
1 0 6 7 00 0 0 0 0 83.65
###
0 0 0 0 00 0 0 0 0 ###
0
0 0 11 0 00 0 0 0 0 ###
0
Charges
11kg 50kg 22kg 2.7kg 5kg Total

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0
0
Daily Productio
DATE: January 23,2023
From: Tagaytay Plant Batch Number:
Date Received: (ALLOCATION) November 10,2021 total under Process
Rebranding/ Maintenance/Repair
Work Brand
Brand Rebran
Scop (Embosse
Process (Logo) d To
e d)
Incoming Inventory
Incoming Inventory
Incoming Inventory
Incoming Inventory
1. Sorting/Visual inspection of cylinder
2. De valving/Degassing of cylinder
3. Internal washing
4. Gas cutting category
Gas cutting collar support assembly and footring
Gas cutting collar support assembly only
Gas cutting footring only
5. Burrs grinding
Grinding on collar support and footring burrs
Grinding on collar support burrs only
Grinding on footring burrs only
6. Repair process
Install name plate
Replace collar support assembly & footring
Replace collar support assembly only
Replace footring only
Body dent removal
7. Inspection of repaired cylinder
8. Annealing
9. Hydrotesting
10 . Cylinder shotblasting
BDR/REPLACE NEW VALVE
11 . Cylinder 1st coating
12 . Cylinder final coating
13 . Loading/unloading cylinder to hanging conveyor
14 . Vacuum cleaning/tare weighing on painted cylinder
15 . Stamping T.W. & date Tested
16 . Re-valving to cylinder
17 . T.W., Warning & Requalification date application
18 . Logo application
19 . Air filling to cylinder
20 . Air leak testing with air filled cylinder
21 . Soap sud testing and final inspection
22 . Scrap
23 . Cylinder for pick up
Daily Production Monitor Per Plant

11KG 50 kg
486 - - - 12 5 1 104
Brentgas Superkalan

Generic TW POL TW SO TW COM Pol Snap-on Com Pol Snap-on Com Brent
2 23
218 12 4 1 25
258 1 56
10

194

69 1
57 1
680 2 0 0 13 0 1 12 5 1 104
69 0 0 0 1 0 0 0 0 0 0
0 57 0 1 0 0 0 0 0 0 0
50 kg 22kg 2.7KG 5kg RATES
- 19 7 18 42 13 1 11kg 50kg 22kg

Twg SuperkalanBrent Superkalan SK Shine Brent SK


6 1
3 7 18 7 5
3 2
13 35

10 1 2

10

3 21
0 10 29 9 18 42 18 10 0 0 0
0 0 0 0 0 0 0 00 0 0 0
0 0 3 0 21 0 0 00 0 0 0
RATES Charges
2.7kg 5kg 11kg 50kg 22kg 2.7kg 5kg Total

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
82.65 - - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
1 - - - - - -
- - - - - -
- - #REF! - - #REF!
- - - - - -
0
0
Daily Production Monitor Per
DATE: January 23,2023
From: Dau Plant Batch Number:
DATE: February 26,2022 total under Process
Rebranding/ Maintenance/Repair
Work Brand Brand Rebrand
Incoming Inventory Scope (Embossed) (Logo) To

Incoming Inventory
Incoming Inventory
Incoming Inventory
Incoming Inventory
1. Sorting/Visual inspection of cylinder
2. De valving/Degassing of cylinder
3. Internal washing
4. Gas cutting category
DATE: Sept 22,2021
Gas cutting collar support assembly only
Gas cutting footring only
5. Burrs grinding
Grinding on collar support and footring burrs
Grinding on collar support burrs only
Grinding on footring burrs only
6. Repair process
Install name plate
Replace collar support assembly & footring
Replace collar support assembly only
Replace footring only
Body dent removal
7. Inspection of repaired cylinder
8. Annealing
9. Hydrotesting
10 . Cylinder shotblasting
BDR/REPLACE NEW VALVE
11 . Cylinder 1st coating
12 . Cylinder final coating
13 . Loading/unloading cylinder to hanging conveyor
14 . Vacuum cleaning/tare weighing on painted cylinder
15 . Stamping T.W. & date Tested
16 . Re-valving to cylinder
17 . DATE: Nov 12,2021
18 . Logo application
19 . Air filling to cylinder
20 . Air leak testing with air filled cylinder
21 . Soap sud testing and final inspection
22 . Scrap
23 . Cylinder for pick up
y Production Monitor Per Plant

11KG 50 kg 22kg
- - - - - - - - - - -
Brentgas Superkalan

Generic Pol Snap-on Com Pol Snap-on Com Brent Superkalan Brent Superkalan

0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
2.7KG 5kg RATES Char
- - - - 11kg 50kg 22kg 2.7kg 5kg 11kg

SK Shine Brent SK

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

0 0 0 00 0 0 0 0 ###
0 0
0 0 0 00 0 0 0 0 ###
0 0
0 0 0 00 0 0 0 0 ###
0 0
Charges
50kg 22kg 2.7kg 5kg Total

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0
0
Daily Production Monitor Per
DATE: January 23,2023
From: Pililia Plant Batch Number:
Date Received: (ALLOCATION) SEPTEMBER 8,2022 total under Process
Rebranding/ Maintenance/Repair
Work Brand Brand Rebrand
Process Scope (Embossed) (Logo) To

Incoming Inventory
Incoming Inventory
Incoming Inventory
Incoming Inventory
1. Sorting/Visual inspection of cylinder
2. De valving/Degassing of cylinder
3. Internal washing
4. Gas cutting category
Gas cutting collar support assembly and footring
Gas cutting collar support assembly only
Gas cutting footring only
5. Burrs grinding
Grinding on collar support and footring burrs
Grinding on collar support burrs only
Grinding on footring burrs only
6. Repair process
Install name plate
Replace collar support assembly & footring
Replace collar support assembly only
Replace footring only
Body dent removal
7. Inspection of repaired cylinder
8. Annealing
9. Hydrotesting
10 . Cylinder shotblasting
BDR/REPLACE NEW VALVE
11 . Cylinder 1st coating
12 . Cylinder final coating
13 . Loading/unloading cylinder to hanging conveyor
14 . Vacuum cleaning/tare weighing on painted cylinder
15 . Stamping T.W. & date Tested
16 . Re-valving to cylinder
17 . T.W., Warning & Requalification date application
18 . Logo application
19 . Air filling to cylinder
20 . Air leak testing with air filled cylinder
21 . Soap sud testing and final inspection
22 . Scrap
23 . Cylinder for pick up
8-Sep
y Production Monitor Per Plant

11KG 50 kg 22kg
- - - - - - - 1 - - -
Brentgas Superkalan

Generic Pol Snap-on Com Pol Snap-on Com Brent Superkalan Brent Superkalan
1

10

7 5
` 10 0 0 0 0 0 1 0 0 1
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 7 5 0 0 0 0

125 pasig
2.7KG 5kg RATES Char
- - 1 - 11kg 50kg 22kg 2.7kg 5kg 11kg

SK Shine Brent SK
1

-
-
-
-
-
-
3 -
-
-
-
17 -
-
-
-
-
67 1 -
-
-
-
-
-
-
-
-
-
-
-
-
-
1 -
-
-
-

67 17 1 40 0 0 0 0 ###
1 0
0 0 0 00 0 0 0 0 ###
0 0
0 0 0 00 0 0 0 0 ###
0 0
Charges
50kg 22kg 2.7kg 5kg Total

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0
0
Daily Pro
DATE: January 23,2023
From: Cabuyao Plant Batch Number:
Date Received: (ALLOCATION) January 4,2023 total under Process
Rebranding/ Maintenance/Repair
Work Brand Brand Rebrand
Incoming Inventory Scope (Embossed) (Logo) To

Incoming Inventory 21
Incoming Inventory
Incoming Inventory
Incoming Inventory
1. Sorting/Visual inspection of cylinder
2. De valving/Degassing of cylinder
3. Internal washing
4. Gas cutting category
Gas cutting collar support assembly and footring
Gas cutting collar support assembly only
Gas cutting footring only
5. Burrs grinding
Grinding on collar support and footring burrs
Grinding on collar support burrs only
Grinding on footring burrs only
6. Repair process
Install name plate
Replace collar support assembly & footring
Replace collar support assembly only
Replace footring only
Body dent removal
7. Inspection of repaired cylinder
8. Annealing
9. Hydrotesting
10 . Cylinder shotblasting
BDR/REPLACE NEW VALVE
11 . Cylinder 1st coating
12 . Cylinder final coating
13 . Loading/unloading cylinder to hanging conveyor
14 . Vacuum cleaning/tare weighing on painted cylinder
15 . Stamping T.W. & date Tested
16 . Re-valving to cylinder
17 . T.W., Warning & Requalification date application
18 . Logo application
19 . Air filling to cylinder
20 . Air leak testing with air filled cylinder
21 . Soap sud testing and final inspection
22 . Scrap
23 . Cylinder for pick up
Daily Production Monitor Per Plant

11KG
1,675 - - - - - -
Brentgas Superkalan

Generic TWG PV TWG SO TWG Com Pol Snap-on Com Liqui Pol Pol Snap-on Com
213
916

546

25 222 1

80
15 40 26
1700 222 6 0 2 0 0 0 0 0 0
80 0 0 0 0 0 0 0 0 0 0
0 15 0 0 0 0 0 0 0 40 26
50 kg 22kg 2.7KG 5kg RATES
1 25 - 13 - - 11 2 11kg 50kg

TWG Brent Superkalan Brent Superkalan SK Shine Brent SK


11 2
1 13 3
12 10

2 1

1 3

9 2 22 2
0 3 25 0 16 0 0 18 30 0 0
0 0 0 0 0 0 0 0 00 0 0
0 0 9 2 0 22 0 0 20 0 0
RATES Charges
22kg 2.7kg 5kg 11kg 50kg 22kg 2.7kg 5kg Total

- - - - - -
- - - #REF! - #REF!
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
82.65 - - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
1 - - - - - -
- - - - - -
- - - - - -
- - - - - -
0
0
Daily Production Monitor Per
DATE: January 23,2023

From: Pura Plant Batch Number:


Date Received: (ALLOCATION) total under Process
Rebranding/ Maintenance/Repair
Work Brand Brand Rebrand
DATE: January 6,2022 Scope (Embossed) (Logo) To

Incoming Inventory
Incoming Inventory
Incoming Inventory
Incoming Inventory
1. Sorting/Visual inspection of cylinder
2. De valving/Degassing of cylinder
3. Internal washing
4. Gas cutting category
Gas cutting collar support assembly and footring
Gas cutting collar support assembly only
Gas cutting footring only
5. Burrs grinding
Grinding on collar support and footring burrs
Grinding on collar support burrs only
Grinding on footring burrs only
6. Repair process
Install name plate
Replace collar support assembly & footring
Replace collar support assembly only
Replace footring only
Body dent removal
7. Inspection of repaired cylinder
8. Annealing
9. Hydrotesting
10 . Cylinder shotblasting
BDR/REPLACE NEW VALVE
11 . Cylinder 1st coating
12 . Cylinder final coating
13 . Loading/unloading cylinder to hanging conveyor
14 . Vacuum cleaning/tare weighing on painted cylinder
15 . Stamping T.W. & date Tested
16 . Re-valving to cylinder
17 . T.W., Warning & Requalification date application
18 . Logo application
19 . Air filling to cylinder
20 . Air leak testing with air filled cylinder
21 . Soap sud testing and final inspection
22 . Scrap
23 . Cylinder for pick up
y Production Monitor Per Plant

11KG 50 kg 22kg
- - - - - - - - - - -
Brentgas Superkalan

Generic Pol Snap-on Com Pol Snap-on Com Brent Superkalan Brent Superkalan

0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
2.7KG 5kg RATES Char
- - - - 11kg 50kg 22kg 2.7kg 5kg 11kg

SK Shine Brent SK

-
-
-
-
-
-
-
-
-
-
-
#REF!
-
-
-
-
-
-
-
-
-
-
-
82.65 -
-
-
-
-
-
1 -
-
-
-

0 0 0 00 0 0 0 0 83.65
### #REF!
0 0 0 00 0 0 0 0 ###
0 0
0 0 0 00 0 0 0 0 ###
0 0
Charges
50kg 22kg 2.7kg 5kg Total

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - #REF!
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0
0
Daily P
DATE: January 23,2023
From: Balayan Plant Batch Number:
Date Received: (ALLOCATION) January 19,2023 total under Process
Rebranding/ Maintenance/Repair
Work Brand Brand Rebrand
Process Scope (Embossed) (Logo) To

Incoming Inventory
Incoming Inventory
Incoming Inventory
Incoming Inventory
1. Sorting/Visual inspection of cylinder
2. De valving/Degassing of cylinder
3. Internal washing
4. Gas cutting category
Gas cutting collar support assembly and footring
Gas cutting collar support assembly only
Gas cutting footring only
5. Burrs grinding
Grinding on collar support and footring burrs
Grinding on collar support burrs only
Grinding on footring burrs only
6. Repair process
Install name plate
Replace collar support assembly & footring
Replace collar support assembly only
Replace footring only
Body dent removal
7. Inspection of repaired cylinder
8. Annealing
9. Hydrotesting
10 . Cylinder shotblasting
BDR/REPLACE NEW VALVE
11 . Cylinder 1st coating
12 . Cylinder final coating
13 . Loading/unloading cylinder to hanging conveyor
14 . Vacuum cleaning/tare weighing on painted cylinder
15 . Stamping T.W. & date Tested
16 . Re-valving to cylinder
17 . T.W., Warning & Requalification date application
18 . Logo application
19 . Air filling to cylinder
20 . Air leak testing with air filled cylinder
21 . Soap sud testing and final inspection
22 . Scrap
23 . Cylinder for pick up
Daily Production Monitor Per Plant

11KG
181 - - - -
Brentgas Superkalan

Generic Generic Twg Pol Twg So Twg Com Liqui pv Liqui So Pol Snap-on Com Pol

181 208
224
286
2
1

19

168

24
159 1

14

326
72 40 20 187 108 235
349 879 1 14 24 0 1 0 0 0 20
0 326 0 0 0 0 0 0 0 0 0
0 0 72 40 20 187 0 108 0 0 235
50 kg 22kg 2.7KG 5kg RA
- - - - - - - 49 3 - 11kg
Superkalan

Snap-on Com Brent Superkalan Brent Superkalan SK Shine Brent SK


1
37 1
12 1

134 2
2 1

4 69
1
4 2 3

87 14 3 1 30
4 0 6 1 0 3 0 255 5 10 0
0 0 0 0 0 0 0 0 0 00 0
87 14 0 3 1 0 30 0 0 00 0
RATES Charges
50kg 22kg 2.7kg 5kg 11kg 50kg 22kg 2.7kg 5kg

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
#REF! - - - -
- - - - -
- - - - -
- - - - -
82.65 - - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
1 - - - - -
- - - - -
- - - - -
- - - - -
0
0
Total

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
#REF!
-
-
-
-
-
-
-
-
-
-
-
-
-
Daily Pr
DATE: January 23,2023
From: San Pablo Plant Batch Number:
Date Received: (ALLOCATION) January 5,2022 total under Process
Rebranding/ Maintenance/Repair
Work Brand Brand Rebrand
Process Scope (Embossed) (Logo) To

Incoming Inventory
Incoming Inventory
Incoming Inventory
Incoming Inventory
1. Sorting/Visual inspection of cylinder
2. De valving/Degassing of cylinder
3. Internal washing
4. Gas cutting category
Gas cutting collar support assembly and footring
Gas cutting collar support assembly only
Gas cutting footring only
5. Burrs grinding
Grinding on collar support and footring burrs
Grinding on collar support burrs only
Grinding on footring burrs only
6. Repair process
Install name plate
Replace collar support assembly & footring
Replace collar support assembly only
Replace footring only
Body dent removal
7. Inspection of repaired cylinder
8. Annealing
9. Hydrotesting
10 . Cylinder shotblasting
BDR/REPLACE NEW VALVE
11 . Cylinder 1st coating
12 . Cylinder final coating
13 . Loading/unloading cylinder to hanging conveyor
14 . Vacuum cleaning/tare weighing on painted cylinder
15 . Stamping T.W. & date Tested
16 . Re-valving to cylinder
17 . T.W., Warning & Requalification date application
18 . Logo application
19 . Air filling to cylinder
20 . Air leak testing with air filled cylinder
21 . Soap sud testing and final inspection
22 . Scrap
23 . Cylinder for pick up
Daily Production Monitor Per Plant

11KG
1,737 - - - - - -
Brentgas Superkalan

Generic Twg Pol Twg So Twg Com Pol Snap-on Com Pol Snap-on Com Town Gaz
324
216
588
609

225
159

200 8

142 12
3 3

727
280
2463 0 3 3 0 0 0 14 0 0 8
727 0 0 0 0 0 0 0 0 0 0
0 280 0 0 0 0 0 0 0 0 0
50 kg 22kg 2.7KG 5kg RATES
- 1 3 - 5 - - - 4 11kg

Brent Twg Superkalan Town Gaz Brent Superkalan SK Shine Brent SK


1 3 1 4
4

17 1 1

5
6 0 18 3 1 9 0 0 0 90 0
0 0 0 0 0 0 0 0 0 00 0
0 0 5 0 0 0 0 0 0 00 0
RATES Charges
50kg 22kg 2.7kg 5kg 11kg 50kg 22kg 2.7kg 5kg

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
#REF! - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0
0
Total

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
#REF!
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-