False Ceiling Situation Distance between finished Floor and false Ceiling 2700mm
Distance between finished Floor and concrete Ceiling 3900mm
max. weight 412,4kg/909lbs
tensile force on the ceiling 6828N
moment on the ceiling flange 7136Nm
Cable Length outside of Ceiling Bearing (reference only) 650mm minimum
Hose Length outside of Ceiling Bearing (reference only) 650mm minimum
Separate Pre-installation material Included Pre-installation material
1x G14287 CSU anchor assembly CF-1200
1x G25927 Terminal strip c-flange, UK
4x G13862 Hose nozzle 6,3mm/8-12-15mm
1x G25927 Terminal strip c-flange, UK
4x G13862 Hose nozzle 6,3mm/8-12-15mm
included Accessories
1x G15799 Set of components Infu AS2
1x M26145 Basket 300
Remark
Electric Outlets
Brand Outlet Outlet Pos Connect Comment
PE bolts (Dräger) PE bolt 4x Dräger B05
Special Outlets
Brand Outlet Outlet Pos Connect Comment
Controls Control element 2x brake (Agila column plate A07 1
A)
Zumtobel GED2-box + cover B07
Light
Brand Outlet Outlet Pos Connect Comment
included Accessories
1x M25121 Basket 600
1x M26145 Basket 300
Remark
Electric Outlets
Brand Outlet Outlet Pos Connect Comment
PE bolts (Dräger) PE bolt 4x Dräger B05
Special Outlets
Brand Outlet Outlet Pos Connect Comment
Controls Control element 2x brake (Agila column plate A07 3
A)
Telegaertner 2x RJ45, CAT 6a, 500 MHz, with cable B06
Light
Brand Outlet Outlet Pos Connect Comment