Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
41 views

Daily Work Report Example

This daily project work report summarizes the progress of an online food ordering system project team from February 1-13, 2021. In the first few days, the team focused on domain research and requirement gathering. From February 8-11, they analyzed website features. On February 12-13, they searched for templates for the user interface. The team worked 6 days a week and took Sundays off. They are building the project with PHP for the front-end and MySQL for the back-end.

Uploaded by

Gauri Gangani
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views

Daily Work Report Example

This daily project work report summarizes the progress of an online food ordering system project team from February 1-13, 2021. In the first few days, the team focused on domain research and requirement gathering. From February 8-11, they analyzed website features. On February 12-13, they searched for templates for the user interface. The team worked 6 days a week and took Sundays off. They are building the project with PHP for the front-end and MySQL for the back-end.

Uploaded by

Gauri Gangani
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Daily Project Work Report (TY BCA)

Shree Shambhubhai V. Patel College of Computer Science & Business Management, Surat

Group No. E - 21 Project Title Online Food Ordering System


Front-End PHP
Seat No. Name Back-End MySQL
_ 2280 Bodar Dhaval
_ 2385 Parmar Sagar Project Guide
_ 2365 Mavani Utsav Asst. Prof. Pratiksha Patel

Database
Sr. Cide/ (Table Document
No. Date Module Name Design name) Work Description URL Sign
1 2/1/2021 Domain Find The Domain
2 2/2/2021 Domain Find The Domain Related Other websites
3 2/3/2021 RG Requirement Gathering
4 2/4/2021 RG Requirement Gathering
5 2/5/2021 RG Requirement Gathering
6 2/6/2021 RG Requirement Gathering
7 2/7/2021 Holiday(Sunday)
8 2/8/2021 Analysis Website Features
9 2/9/2021 Analysis Website Features
10 2/10/2021 Analysis Website Features
11 2/11/2021 Analysis Website Features
12 2/12/2021 Templete Finding Templetes - User Site
13 2/13/2021 Templete Finding Templetes - User Site
14 2/14/2021 Holiday(Sunday)