Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

07 Vol III Section 6 4 RAD Group A Part 1

Download as pdf or txt
Download as pdf or txt
You are on page 1of 100

G U J A R A T S T A T E , P A T A N D I S T R I C T A N D C H A N A S M A T A L U K .

TAKE OFF POINT OF


8 Ø LW#70 TO INSIDE
GGS HEADER
AT CH : 0/000.00KM

LW#70

e
GS-1 Pipelin
EP S to Lanwa G
North Lanwa

-1 Pipeline
North Lanwa EPS to Lanwa GGS

OIL AND NATURAL GAS CORPORATION LIMITED.


ONSHORE ENGINEERING SERVICES
NEW DELHI - 110 070

FOR CARRYING OUT PRE-ENGG. SURVEY, ROU ACQUISITION


& OBTAINING STATUTORY CLEARANCE/PERMISSION FOR
PROJECTS IN ONSHORE MEHSANA ASSET
LANWA AREA

SPURLINE - ALIGNMENT SHEET

TM

SECON PRIVATE LIMITED


BANGALORE - 66
SECON

AS SHOWN 0
SECON/ONGC/LW #70 TO INSIDE GGS HEADER FLOW LINES PIPELINE/ALN-01
GUJARAT STATE, PATAN DISTRICT AND CHANASMA TALUK.

TERMINAL POINT OF
8 Ø LW#70 TO INSIDE
GGS HEADER
AT CH : 2/046.63 KM

Lanwa GGS-1

Nor
th L
anw
a EP
S to
Lan
wa
GGS
-1 P
ipel
ine

OIL AND NATURAL GAS CORPORATION LIMITED.


ONSHORE ENGINEERING SERVICES
NEW DELHI - 110 070

FOR CARRYING OUT PRE-ENGG. SURVEY, ROU ACQUISITION


& OBTAINING STATUTORY CLEARANCE/PERMISSION FOR
PROJECTS IN ONSHORE MEHSANA ASSET
LANWA AREA

SPURLINE - ALIGNMENT SHEET

TM

SECON PRIVATE LIMITED


BANGALORE - 66
SECON

AS SHOWN 0
SECON/ONGC/LW #70 TO INSIDE GGS HEADER FLOW LINES PIPELINE/ALN-02
IP-0/1

IP-0/2

IP-0/3

IP-0/4
IP-0/5

IP-0/6
IP-0/7

IP-2/1
IP-2/2
TP-1

TP-2
Start

End
32°39'2'' 58°38'29''

159.687

162.298

136.856

223.515

156.776
18.216

63.805

67.896

11.562
12.042
7.644

9.973
110
109

ONG
108

CW
107

ELL
106
SN#23 105
SSCTF

SN#
104

35
103
102
101

VB OF JOTANA
VB OF KASALPUR
100

ONG
He Line
99
GGS

t
CTF

igh
ONGC WELL SN#69

r
IP
To SS

6.5 Powe

CW
98 -
2 2/1

ine
-
TP e

rL
m
97

ELL
Kv
IP-

hal

we
2
Lin /2

m H ine

t
11
96

igh
Po
t

ant
eigh
ed

tL

He
s

SN#
Kv
95 po

S
Kv H

m
o

11
-1 Pr

To

6.5
94 TP ther

62
220
15.4
IP-0/6 IP-0/7
93 O
SN#23 IP-0/4 IP-0/5
92 IP-0/2 IP-0/3
91 IP-0/1
Start ONGC WELL SN #14,199 End
90
89
88
9
87 #6
N
S SANTHAL
m H ine

oS
t

86
eigh

T
tL

m H r Line

He Line
Kv H

ONG
85
To J

t
ONGC WELL SN#69

eigh

t
ana

er
igh
we
84

6.5 Pow
220
15.4

otan

v Po

CW
Jot
83

m
Kv
11 K
6.5
To
a

ELL
11
82
81

SN#
80
CS-1/BT ROAD CH.0.331 km

298
79 CS-5/LT LINE CH.0.633 km
CS-7/CART TRACK CH.0.867 km
CS-2/LT LINE CH.0.352 km
78
CS-6/CART TRACK CH.0.712 km
77 CS-3/LT LINE CH.0.413 km
76 CS-4/CART TRACK CH.0.481 km
75
74
73
72
71
70
69
68
67
66
65
64
63
62

69.221
70.791

71.481

GROUND LEVELS
70.962

71.234

70.484

69.677

69.267

68.965

69.808

71.094
70.100

71.218

70.953

70.700

71.919

70.835

70.118

71.499

71.140

71.297

71.745
71.984

72.133

70.853
70.767

69.244
69.174

69.198
70.7

71.5

71.4
71.2
(IN METRES)

DISTANCE BETWEEN LEVEL


40.313

21.985

18.216

27.057

15.299

31.811

31.994

18.006

11.451
12.042

26.507

30.269
9.687

9.799

7.644

8.216
9.973

49.89

0.111
50

50

50

50

50

50

50

50

50

50

50

50

50
0

POINTS (IN METRES)

SURFACE/TERRAIN DETAILS
0+159.687

0+321.985

0+340.201

0+477.057
0+484.701

0+708.216
0+718.189

0+781.994

0+849.889

0+861.451
0+873.493
0+000.00

0+050.00

0+100.00

0+150.00

0+200.00

0+250.00

0+300.00

0+350.00

0+400.00

0+450.00

0+500.00

0+550.00

0+600.00

0+650.00

0+700.00

0+750.00

0+800.00

0+850.00

0+900.00

0+950.00

1+000.00

1+030.27
CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE TRANSFORMER LAMP POST CORPORATION LIMITED.
ENGINEERING SERVICES (C & M) DIVISION
ELECTRIC BOX TELEPHONE POLE
PROPOSED ROW BT ROAD CROSS SECTION NKBPL/ONGC/SN#23 To SSCTF/CS-1 MEHSANA ASSET
OTHER PROPOSED LINE RIVER MEHSANA
ONGC INSTALLATION
NALA
RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
ONGC WELL SITE SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
VILLAGE BOUNDARY
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
EXISTING LINE CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
EXISTING OTHER ROW CART TRACK
4"Ø SN#23 To SSCTF WELL FLUID LINE
ALIGNMENT SHEET
BITUMEN ROAD POND

W.B.M. ROAD TREE


CHAINAGE : FROM 0.00 TO 1.03 KM
RAILWAY LINE / RLY PILLAR TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.
FOREST BOUNDARY BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FIELD BUND WATER TANK MANHOLE Jaipur - 302015
X X FENCING
WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE
LT POLE / LINE
DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SN#23
/ TO
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SSCTF / ALN-1
IP-0/1

IP-1/1

IP-1/2
IP-1/3

IP-2/1

IP-2/2

IP-2/3
IP-2/4

IP-2/5

IP-2/6

IP-2/7

IP-3/1
IP-3/2

IP-3/3

IP-3/4
IP-3/5
119

TP-1

TP-2

TP-3
Start
118
117
116 82°54'20'' 71°50'16'' 17°11'44''
115

173.329

124.086

168.841

168.841

169.216

138.205

138.205

177.396

177.396
11.762

57.674

22.108

66.569

75.535

10.296
34.13

8.929

7.651
8.542
114
113
112
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
111

BL#0293 &2
110
BL#144 109 Balol

eld
108 GGS-III
e
lIn

i
To F
107
pe
Pi

LINE
106

To ONGC Well
11 K
ine

11
r v Po
te

MATCH LIN
rL

wer

Kv
105 a Line
we

H LINE
22 W

MATCH

Po
ine
Po

104 INE
MATCH L 0K /G rL

w
vP U e
Kv

11 Kv Power Line
BL# 245 & 246& 235

er L
oj
103 ow ow

in
vP
11

To Field
er

ine
0K TP-3

Dh
Lin

M ATC
102
BL#192
INE
e MATCH L e 22
Lin

TP

To
101 w er
BL#15

-2
Po
100 Kv

r Line
0
22

Rupen
99

TP-1

11 Kv Powe
Start 98
97

Nadi
BL#144 96 BL#168 lIn
e er
L ine
cut

To K
TP-1 ow
95 i pe v P Any

To Field
rP 0K

anod
e 22
94
BL#168 at

lIne
W
93
BL#276BL#276

a
/G To
U LINE

pe
92 Ka
H

r Pi
n
TC od

E
91 MA
ne e

ate
a

TCH LIN
r Li 22 in

E
BL#238&213
e 0K rL

da
ow

MATCH LIN
vP 90 vP
we

W
BL#236

no
0K

LINE
a
ow
22 Po

od
e

U/G
Ka

To K
89 rL
ine Kv

an
11

To
88 To

K
MA

H
anod
Ka

To

MATC
BL#150
87 no
da

a
86
85
84
BL#238&213
83
82 CS-2/Water Pipe Line CH.0.339 km CS-4/BT ROAD CH.0.64 km CS-7/LT LINE CH.0.857 km CS-9/LT LINE CH.1.089 km CS-12/CART TRACK CH.1.369 km CS-13/CART TRACK CH.1.734 km
81 CS-1/HT LINE CH.0.196 km CS-5/Water Pipe Line CH.0.74 km
CS-11/RIVER CH.1.247 km
80 CS-3/HT LINE CH.0.383 km
CS-8/BT ROAD CH.0.935 km CS-10/HT LINE CH.1.119 km
79
78 CS-6/BT ROAD CH.0.75 km
77
76
75
74
73
72
71
70
69
68
67
66

68.421

69.381

68.821
GROUND LEVELS
68.716

68.873

69.026

69.193

69.057

68.666

68.239

68.128

68.427

68.559

68.639

68.640

68.697

68.392

68.119

67.522

68.058

69.766

69.894

69.609

68.936

68.820

68.893

66.487

68.279

68.749

69.190

69.070

68.749

68.855

68.550

68.518

68.348
68.254

68.416

68.709
68.709

68.245

68.215

69.925
69.945

68.945

68.225

68.848
68.985
69.114

68.748

68.445
68.436
69.19

68.58

69.48
(IN METRES)

DISTANCE BETWEEN LEVEL


23.329

26.671

47.415

16.256

33.744

35.097

11.762

30.989

19.011

38.663

11.337
10.772

39.228

29.987

11.084

27.121

22.879

15.326

34.674

31.894

18.106

26.377

48.981

28.415

10.296
11.289
2.585

3.141

8.929

7.651
8.542

1.019
7.43
50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50
0

POINTS (IN METRES)


Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+173.329

0+297.415

0+466.256

0+635.097
0+646.859

0+680.989

0+738.663

0+760.772

0+929.987
0+938.916

1+077.121

1+215.326

1+281.894

1+365.081
1+373.623

1+551.019

1+728.415
1+738.711
0+000.00

0+050.00

0+100.00

0+150.00

0+200.00

0+250.00

0+300.00

0+350.00

0+400.00

0+450.00

0+500.00

0+550.00

0+600.00

0+650.00

0+700.00

0+750.00

0+800.00

0+850.00

0+900.00

0+950.00

1+357.43
1+000.00

1+050.00

1+100.00

1+150.00

1+200.00

1+250.00

1+300.00

1+350.00

1+400.00

1+450.00

1+500.00

1+550.00

1+600.00

1+650.00

1+700.00

1+750.00
CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE BL#144 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
Balol GGS-III
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
MEHSANA ASSET
PARALLEL LINE BL#168 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/BL#144 TO BALOL GGS-III/CS-4 MEHSANA
Balol GGS-III
PARALLEL LINE BL#183 To
NALA
BT ROAD CROSS SECTION NKBPL/ONGC/BL#144 TO BALOL GGS-III/CS-6 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
Balol GGS-III BT ROAD CROSS SECTION NKBPL/ONGC/BL#144 TO BALOL GGS-III/CS-8 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE BL#190 To
Balol GGS-III
ROAD SIDE DRAIN
RIVER CROSS SECTION NKBPL/ONGC/BL#144 TO BALOL GGS-III/CS-11 CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION

VILLAGE BOUNDARY CART TRACK


4"Ø BL#144 TO BALOL GGS-III WELL FLUID LINE
ALIGNMENT SHEET
EXISTING OTHER LINE / ROW POND

TREE
CHAINAGE : FROM 0.00 TO 1.75 KM
BITUMEN ROAD

W.B.M. ROAD TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.


RAILWAY LINE / PILLAR BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FOREST BOUNDARY WATER TANK MANHOLE Jaipur - 302015
FIELD BUND / FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
X X
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE
LT POLE / LINE
DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC BL#144
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 BALOL GGS-III/ ALN- 1
IP-4/1
IP-4/2

IP-4/3

IP-5/1

IP-5/2
121

TP-4

TP-5

TP-6

End
120
119
118 21°43'48'' 86°3'6'' 96°31'49''
117

135.502

149.315

109.367
99.003

34.943

12.652

29.524

15.982

93.871
116
115
114
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
113
112

ine
BL#144 111

rL
Balol

we
110 GGS-III

ap
Po
ine
wer L

Kv

Mot
Kv Po 109
11

11
End
108

To
107
106 TP-6
To K
105

NE
104
BALOL GGS-III
anod

LI
103 TP-
CH

4
a

102
BL#150
AT
M

101
100
11
99 Kv
Pow
er L
98 ine
97
96

da
no
95
94 Ka
To
93

-5
92 To

TP
Mo
91 dhe
ra R
90 oad
89
88 BL#134
87
86
85
84 CS-16/LT LINE CH.2.202 km
83 CS-14/LT LINE CH.1.763 km
CS-15/BT ROAD CH.1.879 km
82
81 CS-17/BT ROAD CH.2.207 km
80
79
78
77
76
75
74
73
72
71
70
69
68
69.911

GROUND LEVELS
68.348

68.489

68.596

69.529

71.274

69.452
70.819

71.045

70.397

70.746

70.846

70.619

70.033
68.631

68.554
69.458

71.236

70.336

70.746

70.785

70.425

69.312
(IN METRES)

DISTANCE BETWEEN LEVEL


37.714

12.286

22.656

12.652
14.692

20.125

29.524

24.997

25.003

18.868
20.81

29.19

0.352
15.63

34.37
50

50

50

50

50

50

50
POINTS (IN METRES)
Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
1+837.714

1+872.656
1+885.308

2+170.125

2+199.648

2+324.997
2+000.00

2+050.00

2+100.00

2+150.00

2+200.00

2+250.00

2+300.00

2+350.00

2+400.00

2+418.87
2+020.81

2+215.63
1+750.00

1+800.00

1+850.00

1+900.00

1+950.00

CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE BL#144 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
Balol GGS-III
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
BT ROAD CROSS SECTION NKBPL/ONGC/BL#144 TO BALOL GGS-III/CS-15 MEHSANA ASSET
PARALLEL LINE BL#168 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/BL#144 TO BALOL GGS-III/CS-17 MEHSANA
Balol GGS-III
PARALLEL LINE BL#183 To
NALA
RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
Balol GGS-III SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE BL#190 To
Balol GGS-III
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION

VILLAGE BOUNDARY CART TRACK


4"Ø BL#144 TO BALOL GGS-III WELL FLUID LINE
ALIGNMENT SHEET
EXISTING OTHER LINE / ROW POND

TREE
CHAINAGE : FROM 1.75 TO 2.419 KM
BITUMEN ROAD

W.B.M. ROAD TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.


RAILWAY LINE / PILLAR BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FOREST BOUNDARY WATER TANK MANHOLE Jaipur - 302015
FIELD BUND / FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
X X
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE
LT POLE / LINE
DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC BL#144
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 BALOL GGS-III/ ALN- 2
IP-0/1

IP-0/2
IP-0/3

IP-1/1

IP-1/2

IP-1/3
IP-1/4

IP-1/5

IP-1/6

IP-1/7

IP-2/1
IP-2/2

IP-2/3

IP-2/4
IP-2/5

IP-3/1
IP-3/2

IP-3/3
119

TP-1

TP-2

TP-3
Start
118
117
116 71°50'16'' 17°11'44'' 21°43'48''
115

169.114

169.114

166.217

177.129

177.129

135.195
11.706

31.895

57.662

22.169

138.75

138.75

67.417

74.024

10.525

99.253

35.689

12.456
8.825

7.292
9.078
114
113
112 e
G U J A R A T S T A T E / M A H E S A N Aer Lin D I S T R I C T
111
110 0K
v Po
w
BL#0293 & 244
22
BL#168 109

ield
Balol
108 GGS-III

To F
INE

H LINE
22 107 ine

To ONGC Well
el

11
0

CH L
Kv
106 Pip

Kv
Po r
ate

MATC
w

Po
er
W105

MAT

w
Li G
U/

11 Kv Power Line

er
ne

To Field
104

ine

Lin
rL
103 TP-2

To M
e
BL#192

r Line
we
11
BL# 245 & BL#15

Po
102 Kv

To
Po

otap
Kv
we

11 Kv Powe
101 rL

Dh
wer Line

11
ine o
246& 235 11 Kv P

in
To
100

oj

Ru
Dh
99

pe
E

ino
LIN

nN
Start 98

j
H e

TP-
TC Lin

adi
97 MA er
w cut

1
96 Kv
Po Any

To Field
BL#168 22
0
Kv
95
TP-1
22
0

BL#276 Po
we
94 To
Ka
TP-3

NE
rL 93

da

U/G

INE
in no

no
e da

H LI
92
BL#236 Li
ne

Ka

HL
Wa
INE er

To r Pipe
91

C
ow
BL#134

To
L

te

MATC
Ka
U/ CH P

MAT
90 Kv
G
BL#238&213
AT

no
BL# 245 &
W
11
BL#150
at M

To Kanoda
89

da

To K
To er P da o

lIne
88 Ka ipe n

246& 235
no lIne Ka

anod
87 da To
86

a
85
84
83
82 CS-3/BT ROAD CH.0.343 km CS-6/LT LINE CH.0.556 km CS-8/LT LINE CH.0.789 km CS-11/CART TRACK CH.1.067 km CS-12/CART TRACK CH.1.432 km
81 CS-1/Water Pipe Line CH.0.037 km CS-4/Water Pipe Line CH.0.44 km
CS-2/HT LINE CH.0.089 km CS-9/HT LINE CH.0.812 km CS-10/RIVER CH.0.946 km CS-13/LT LINE CH.1.461 km CS-14/BT ROAD CH.1.578 km
80
79 CS-5/BT ROAD CH.0.451 km CS-7/BT ROAD CH.0.633 km
78
77
76
75
74
73
72
71
70
69
68
67
66

68.121
GROUND LEVELS
68.254

68.100

68.414

68.429

68.546

68.643

68.634

68.709

68.426

67.533

68.099

69.774

69.885

69.596

69.399

68.906

68.819

68.897

66.469

68.282

68.772

69.205

69.057

68.818

68.750

68.837

68.550

68.512

68.332

68.498

68.595

69.534

69.928

70.844

71.276
68.416

68.709
68.709

68.245

68.215

69.925
69.945

68.945

68.225

68.848
68.985
69.114

68.748

68.445
68.436

68.631

68.554
69.458

71.236
68.58

69.48
(IN METRES)

DISTANCE BETWEEN LEVEL


19.114

30.886

38.227

11.706

31.828

18.172

39.491

10.509

27.877

13.298

25.452

24.548

14.202

35.798

31.619

18.381

27.987

49.142

26.271

10.525
13.204

36.049

13.951

21.738

12.456

15.806

19.389

30.611
0.067

11.66

38.34

8.825

5.642
7.292
9.078

0.858
50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50
0

POINTS (IN METRES)


Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+169.114

0+338.227
0+349.933

0+381.828

0+439.491

0+627.877
0+636.702

0+775.452

0+914.202

0+981.619

1+055.642
1+062.934
1+072.013

1+249.142

1+426.271
1+436.796

1+536.049

1+571.738
1+584.194

1+719.389
0+000.00

0+050.00

0+100.00

0+150.00

0+200.00

0+250.00

0+300.00

0+350.00

0+400.00

0+450.00

0+500.00

0+550.00

0+600.00

0+650.00

0+700.00

0+750.00

0+800.00

0+850.00

0+900.00

0+950.00
0+461.66

1+000.00

1+050.00

1+100.00

1+150.00

1+200.00

1+250.00

1+300.00

1+350.00

1+400.00

1+450.00

1+500.00

1+550.00

1+600.00

1+650.00

1+700.00

1+750.00
CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE BL#168 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
Balol GGS-III
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
MEHSANA ASSET
PARALLEL LINE BL#144 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/BL#168 TO BALOL GGS-III/CS-3 MEHSANA
Balol GGS-III
PARALLEL LINE BL#183 To
NALA
BT ROAD CROSS SECTION NKBPL/ONGC/BL#168 TO BALOL GGS-III/CS-5 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
Balol GGS-III BT ROAD CROSS SECTION NKBPL/ONGC/BL#168 TO BALOL GGS-III/CS-7 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE BL#190 To
Balol GGS-III
ROAD SIDE DRAIN
RIVER CROSS SECTION NKBPL/ONGC/BL#168 TO BALOL GGS-III/CS-10 CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL BT ROAD CROSS SECTION NKBPL/ONGC/BL#168 TO BALOL GGS-III/CS-14 ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION

VILLAGE BOUNDARY CART TRACK


4"Ø BL#168 TO BALOL GGS-III WELL FLUID LINE
ALIGNMENT SHEET
EXISTING OTHER LINE / ROW POND

TREE
CHAINAGE : FROM 0.00 TO 1.75 KM
BITUMEN ROAD

W.B.M. ROAD TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.


RAILWAY LINE / PILLAR BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FOREST BOUNDARY WATER TANK MANHOLE Jaipur - 302015
FIELD BUND / FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
X X
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE
LT POLE / LINE
DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC BL#168
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 BALOL GGS-III/ ALN- 1
IP-4/1

IP-4/2
122

TP-4

TP-5

End
121
120
119 86°3'6'' 96°31'49''
118

152.447

112.804
15.982

97.234
32.25
117
116
115
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
114
113

11 Kv
BL#168 112 Balol
111
BALOL GGS-III GGS-III

Power
110
109 E
H LIN

Line
108 MATC

End
107
106
E
H LIN
MATC 105
104
103

BL#134
102
101
100
99

TP-5
98
97
96
95 TP-4
94
93
92
To Mod

91
90
89
hera Ro

88
87
a

86
d

85 CS-15/LT LINE CH.1.906 km


84
83 CS-16/BT ROAD CH.1.911 km
82
81
80
79
78
77
76
75
74
73
72
71
70
69

GROUND LEVELS
70.394

70.694

69.536

69.312
71.276

71.028

70.838

70.667

70.173
70.336

70.746
70.785

70.425

(IN METRES)

DISTANCE BETWEEN LEVEL


21.835

28.165

15.982

29.933

32.871

17.129

30.105
4.085
50

50

50

50

POINTS (IN METRES)


Normal soil Normal soil
SURFACE/TERRAIN DETAILS
1+871.835

1+904.085
1+920.067

2+032.871
2+000.00

2+050.00

2+100.00

2+130.10
1+750.00

1+800.00

1+850.00

1+900.00

1+950.00

CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE BL#168 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
Balol GGS-III
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
BT ROAD CROSS SECTION NKBPL/ONGC/BL#168 TO BALOL GGS-III/CS-16 MEHSANA ASSET
PARALLEL LINE BL#144 To
RIVER MEHSANA
Balol GGS-III
PARALLEL LINE BL#183 To
NALA
RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
Balol GGS-III SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE BL#190 To
Balol GGS-III
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION

VILLAGE BOUNDARY CART TRACK


4"Ø BL#168 TO BALOL GGS-III WELL FLUID LINE
ALIGNMENT SHEET
EXISTING OTHER LINE / ROW POND

TREE
CHAINAGE : FROM 1.75 TO 2.13 KM
BITUMEN ROAD

W.B.M. ROAD TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.


RAILWAY LINE / PILLAR BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FOREST BOUNDARY WATER TANK MANHOLE Jaipur - 302015
FIELD BUND / FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
X X
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE
LT POLE / LINE
DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC BL#168
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 BALOL GGS-III/ ALN- 2
IP-3/1

IP-4/1

IP-4/2

IP-4/3
IP-4/4

IP-4/5

IP-4/6

IP-4/7

IP-5/1
IP-5/2

IP-5/3

IP-5/4
IP-5/5

IP-6/1
IP-6/2
119

TP-1

TP-2

TP-3

TP-4

TP-5

TP-6
Start
118
117
116 18°58'47'' 48°52'25'' 42°41'56'' 30°0'49'' 17°11'44'' 21°43'48''
115

105.485

131.516

143.034

172.214

137.659

137.659

177.663

177.663

135.809
12.757

50.746

54.709

22.048

65.721

77.047

10.067

98.753

34.196

12.847
9.033

7.944
8.072
114
113
112
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
111
e
110 er Lin
v Pow

To Field
11 K

To Field

11 Kv Power Line

To
BL#183 109 Balol

M
108 GGS-III
BL#15

ot a
StartT107

Rupe
P-1

p
106

TP

n
105 TP-5

Nadi
To ONG
-2
BL#183 BL#190

11
104

KvP
103

ow
6
TP-
BL#134

C Well
102

er
Lin
101

e
To
100 Dh

11 Kv Power Line
in
99 oj

U/G
98

To Field
Wa
t
BL#150

To Kan
97 TP-3 ycu
BL#192

ine
ter
An

rL
96

we
ne

To
i

Po
ipe
L

e
95 er

oda
Lin

Kv

Kan
ow

lIn
P

er

11
94
Kv

e
ow

oda
0

vP
93 22
BL#236

K
92

11
91 To

U/G
Ka
90 11 no
Kv da
TP-4

Wa
89 Po
we To

ter
rL
88 ine Ka

Pip
n od
87 a
BL#238&213

el
Ine
86
85
84 CS-2/LT LINE CH.0.392 km CS-5/LT LINE CH.0.62 km CS-7/LT LINE CH.0.85 km CS-10/CART TRACK CH.1.131 km CS-11/CART TRACK CH.1.496 km
CS-1/Water Pipe Line CH.0.185 km CS-3/Water Pipe Line CH.0.501 km CS-6/BT ROAD CH.0.698 km CS-8/HT LINE CH.0.886 km CS-12/LT LINE CH.1.525 km
83 CS-4/BT ROAD CH.0.509 km CS-9/RIVER CH.1.008 km CS-13/BT ROAD CH.1.64 km
82
81
80
79
78
77
76
75
74
73
72
71
70
69
68
67
66

69.711

68.411
GROUND LEVELS
69.052

68.865

68.810

68.905

69.113

69.134

68.918

68.407

68.059

68.504

68.198

67.700

67.806

69.553

70.114

69.227

69.478

68.825

68.854

66.729

68.247

68.589

69.155

69.077

68.848

68.767

68.839

68.592

68.550

68.475

68.630

69.473

69.718

70.587
68.815

69.102

68.915

68.245

68.215

69.925

69.945

68.554

68.945

68.225

68.848
68.985
69.114

68.748

68.445

68.436

68.631

68.554
69.458
68.58
69

(IN METRES)

DISTANCE BETWEEN LEVEL


12.757

37.243

13.502

36.498

18.987

31.013

49.497

43.537

48.246

20.293

29.707

42.508

26.859

23.141

19.627

14.358

13.305

36.695

40.968

48.965

49.789

33.985

12.847
0.503

6.463

1.754

7.492

48.46

42.58

7.944
8.072

9.032
1.035

0.211

3.168
1.54

39.2

10.8

7.42
50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+168.987

0+300.503

0+443.537

0+498.246

0+520.293

0+692.508

0+976.859

1+119.627
1+127.571
1+135.642

1+313.305

1+490.968

1+501.035

1+599.789

1+633.985
1+646.832
0+000.00

0+050.00

0+100.00

0+150.00

0+200.00

0+250.00

0+300.00

0+350.00

0+400.00

0+450.00

0+500.00

0+550.00

0+600.00

0+650.00

0+700.00

0+750.00

0+800.00

0+850.00

0+900.00

0+950.00
0+12.757

0+63.502

0+701.54

1+042.58
1+000.00

1+050.00

1+100.00

1+150.00

1+200.00

1+250.00

1+300.00

1+350.00

1+400.00

1+450.00

1+500.00

1+550.00

1+600.00

1+650.00

1+700.00

1+750.00
CUMULATIVE CHAINAGE

0+839.2
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE BL#183 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
Balol GGS-III
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
BT ROAD CROSS SECTION NKBPL/ONGC/BL#183 TO BALOL GGS-III/CS-4 MEHSANA ASSET
PARALLEL LINE BL#144 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/BL#183 TO BALOL GGS-III/CS-6 MEHSANA
Balol GGS-III
PARALLEL LINE BL#168 To
NALA
RIVER CROSS SECTION NKBPL/ONGC/BL#183 TO BALOL GGS-III/CS-9 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
Balol GGS-III BT ROAD CROSS SECTION NKBPL/ONGC/BL#183 TO BALOL GGS-III/CS-13 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE BL#190 To
Balol GGS-III
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION

VILLAGE BOUNDARY CART TRACK


4"Ø BL#183 TO BALOL GGS-III WELL FLUID LINE
ALIGNMENT SHEET
EXISTING OTHER LINE / ROW POND

TREE
CHAINAGE : FROM 0.00 TO 1.75 KM
BITUMEN ROAD

W.B.M. ROAD TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.


RAILWAY LINE / PILLAR BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FOREST BOUNDARY WATER TANK MANHOLE Jaipur - 302015
FIELD BUND / FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
X X
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE
LT POLE / LINE
DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC BL#183
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 BALOL GGS-III/ ALN- 1
IP-6/3

IP-7/1

IP-7/2
122

TP-7

TP-8

End
121
120
119 86°3'6'' 96°31'49''
118

146.183

26.798

15.982

105.93

90.508
117
116
115
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
114
113
BL#183 112 Balol
111 BALOL GGS-III GGS-III
110

To
11
109

d
K
Kv

En
ano
108

Po
we

d
107

a
rL
ine
106
105
104
103
102

8 -
TP
101
100
99 BL#134
98
97
96
95
94 - 7
TP

To
93

M od
92

he
91

ra
90

Ro
a
89

d
88
87 CS-14/LT LINE CH.1.958 km
CS-15/BT ROAD CH.1.963 km
86
85
84
83
82
81
80
79
78
77
76
75
74
73
72
71
70
69

GROUND LEVELS
70.652

69.446

69.312
70.587

71.259

71.217

70.496

70.660

70.835

70.047
71.236

70.336

70.746

70.785

70.425

(IN METRES)

DISTANCE BETWEEN LEVEL


32.641

17.359

28.824

21.176

15.982

28.397

27.533

22.467

18.041
5.621
50

50

50

50
POINTS (IN METRES)
Normal soil Normal soil
SURFACE/TERRAIN DETAILS
1+782.641

1+928.824

1+955.621

1+971.603

2+077.533
2+000.00

2+050.00

2+100.00

2+150.00

2+168.04
1+750.00

1+800.00

1+850.00

1+900.00

1+950.00

CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE BL#183 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
Balol GGS-III
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
BT ROAD CROSS SECTION NKBPL/ONGC/BL#183 TO BALOL GGS-III/CS-15 MEHSANA ASSET
PARALLEL LINE BL#144 To
RIVER MEHSANA
Balol GGS-III
PARALLEL LINE BL#168 To
NALA
RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
Balol GGS-III SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE BL#190 To
Balol GGS-III
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION

VILLAGE BOUNDARY CART TRACK


4"Ø BL#183 TO BALOL GGS-III WELL FLUID LINE
ALIGNMENT SHEET
EXISTING OTHER LINE / ROW POND

TREE
CHAINAGE : FROM 1.75 TO 2.17 KM
BITUMEN ROAD

W.B.M. ROAD TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.


RAILWAY LINE / PILLAR BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FOREST BOUNDARY WATER TANK MANHOLE Jaipur - 302015
FIELD BUND / FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
X X
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE
LT POLE / LINE
DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC BL#183
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 BALOL GGS-III/ ALN- 2
IP-2/1

IP-3/1

IP-3/2

IP-3/3
IP-3/4

IP-3/5

IP-3/6

IP-3/7

IP-4/1
IP-4/2

IP-4/3

IP-4/4

IP-5/1
IP-5/2
119

TP-1

TP-2

TP-3

TP-4

TP-5
Start
118
117
116 48°52'25'' 42°41'56'' 30°0'49'' 17°11'44'' 21°43'48''
115

105.675

129.447

143.126

175.213

155.216

119.012

182.849

182.849

136.116
52.109

51.703

22.027

64.872

78.559

98.504

13.043
9.137

7.612
8.226

33.45
114
113
112
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
111
110 da Line

ld
ano wer

To Field
v Po

To Fie
BL#190 109 K 11 K
To

11 Kv Power Line
Balol

To
108 GGS-III

M
BL#15

ot a
Start107

Rupe

p
106

TP
105 TP-4

n Na
-1

To ONG
BL#183
104
BL#190

11

di
K
103

vP
TP-5

ow
102

C Well
BL#134

er
101

Lin
To

e
100 Dh
in

11 Kv Power Line
99 oj

U/G
98

Wa

To Field
97 TP-2 t
BL#192 ycu BL#150

To Kan
e
Lin
ter
96 An

r
we
ne

Pip

To
95 Li

Po
e
er

Lin

el

oda
Kv

Kan
94 w
Po

Ine
er

11
Kv

ow
93

oda
0

vP
22
BL#236

K
92

11
91 To

U/G
90 Ka
11 no
Kv TP-3 d

Wa
89 Po a
we To

ter
88 r Lin
e Ka

Pip
87 no
d a
BL#238&213
el
86

Ine
85
84
83
82
CS-2/LT LINE CH.0.381 km CS-5/LT LINE CH.0.606 km CS-7/LT LINE CH.0.835 km CS-10/CART TRACK CH.1.118 km CS-11/CART TRACK CH.1.483 km
81 CS-1/Water Pipe Line CH.0.17 km CS-3/Water Pipe Line CH.0.486 km CS-6/BT ROAD CH.0.685 km CS-8/HT LINE CH.0.878 km CS-12/LT LINE CH.1.512 km
80 CS-4/BT ROAD CH.0.493 km CS-9/RIVER CH.0.994 km CS-13/BT ROAD CH.1.626 km
79
78
77
76
75
74
73
72
71
70
69
68
67
66
69.131

68.341

68.591
GROUND LEVELS
69.000

68.822

68.812

69.017

69.114

68.784

68.324

68.215

68.190

68.183

67.538

68.078

69.776

69.890

69.592

69.387

68.925

68.817

68.902

66.454

68.288

68.769

69.193

69.067

68.820

68.754

68.852

68.550

68.516

68.503

69.542

69.958

70.866
68.815

69.102

68.915

68.245

68.215

69.925
69.945

68.954

68.945

68.225

68.848
68.985
69.114

68.748

68.436

68.631

68.554
69.458
68.58
(IN METRES)

DISTANCE BETWEEN LEVEL


47.891

42.216

30.357

19.643

45.913

11.563

43.653

12.665

37.335

27.538

22.462

28.066

45.217

37.632

12.368

36.136

13.864

19.586

13.043

17.372
2.109

7.784

37.23

12.77

32.06

17.94
4.087

9.137

6.347

6.096
7.612
8.226

4.783
29.3
50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+157.784

0+430.357

0+504.087

0+688.437

0+843.653

0+962.665

1+027.538

1+106.096
1+113.708
1+121.934

1+304.783

1+487.632

1+586.136

1+619.586
1+632.628
0+000.00

0+050.00

0+100.00

0+150.00

0+200.00

0+250.00

0+300.00

0+350.00

0+400.00

0+450.00

0+500.00

0+550.00

0+600.00

0+650.00

0+700.00

0+750.00

0+800.00

0+850.00

0+900.00

0+950.00
0+52.109

0+287.23

0+482.06

1+000.00

1+050.00

1+100.00

1+150.00

1+200.00

1+250.00

1+300.00

1+350.00

1+400.00

1+450.00

1+500.00

1+550.00

1+600.00

1+650.00

1+700.00

1+750.00
CUMULATIVE CHAINAGE

0+679.3
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE BL#190 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
Balol GGS-III
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
MEHSANA ASSET
PARALLEL LINE BL#144 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/BL#190 TO BALOL GGS-III/CS-4 MEHSANA
Balol GGS-III
PARALLEL LINE BL#168 To
NALA
BT ROAD CROSS SECTION NKBPL/ONGC/BL#190 TO BALOL GGS-III/CS-6 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
Balol GGS-III RIVER CROSS SECTION NKBPL/ONGC/BL#190 TO BALOL GGS-III/CS-9 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE BL#183 To
Balol GGS-III
ROAD SIDE DRAIN
BT ROAD CROSS SECTION NKBPL/ONGC/BL#190 TO BALOL GGS-III/CS-13 CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION

VILLAGE BOUNDARY CART TRACK


4"Ø BL#190 TO BALOL GGS-III WELL FLUID LINE
ALIGNMENT SHEET
EXISTING OTHER LINE / ROW POND

TREE
CHAINAGE : FROM 0.00 TO 1.75 KM
BITUMEN ROAD

W.B.M. ROAD TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.


RAILWAY LINE / PILLAR BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FOREST BOUNDARY WATER TANK MANHOLE Jaipur - 302015
FIELD BUND / FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
X X
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE
LT POLE / LINE
DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC BL#190
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 BALOL GGS-III/ ALN- 1
IP-5/3

IP-6/1

IP-6/2
122

TP-6

TP-7

End
121
120
119 86°3'6'' 96°31'49''
118

143.051

102.493
24.072

15.982

87.145
117
116
115
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
114
113

To
BL#190 112

K
Balol

an
111 GGS-III

od
a
110
BALOL GGS-III

11
109

Kv

d
P
108

En
ow
er
107

Lin
e
106
105
104
103
102

-7
101

TP
100 BL#134
99
98
97
96
95
-6
94 TP

To
93

M
92

od
he
91

ra
90

Ro
89

ad
88
87
86
85
CS-14/LT LINE CH.1.938 km
84 CS-15/BT ROAD CH.1.943 km
83
82
81
80
79
78
77
76
75
74
73
72
71
70
69
70.871

GROUND LEVELS
70.832

69.620

69.312
70.866

71.277

71.003

70.385

70.463
71.236

70.336

70.746

70.785

70.425

(IN METRES)

DISTANCE BETWEEN LEVEL


18.744

31.256

11.795

24.072

14.133

48.151

45.659

41.486
1.849

4.341
50

50

50

POINTS (IN METRES)


Normal soil Normal soil
SURFACE/TERRAIN DETAILS
1+768.744

1+911.795

1+935.867

1+951.849

2+054.341
2+000.00

2+050.00

2+100.00

2+141.49
1+750.00

1+800.00

1+850.00

1+900.00

1+950.00

CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM) 0
0
@ 1.0m DEPTH 0

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE BL#190 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
Balol GGS-III
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
BT ROAD CROSS SECTION NKBPL/ONGC/BL#190 TO BALOL GGS-III/CS-15 MEHSANA ASSET
PARALLEL LINE BL#144 To
RIVER MEHSANA
Balol GGS-III
PARALLEL LINE BL#168 To
NALA
RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
Balol GGS-III SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE BL#183 To
Balol GGS-III
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION

VILLAGE BOUNDARY CART TRACK


4"Ø BL#190 TO BALOL GGS-III WELL FLUID LINE
ALIGNMENT SHEET
EXISTING OTHER LINE / ROW POND

TREE
CHAINAGE : FROM 1.75 TO 2.14 KM
BITUMEN ROAD

W.B.M. ROAD TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.


RAILWAY LINE / PILLAR BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FOREST BOUNDARY WATER TANK MANHOLE Jaipur - 302015
FIELD BUND / FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
X X
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE
LT POLE / LINE
DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC BL#190
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 BALOL GGS-III/ ALN- 2
IP-3/10
IP-3/11
IP-2/1

IP-2/2
IP-2/3

IP-3/1

IP-3/2
IP-3/3

IP-3/4

IP-3/5
IP-3/6

IP-3/7
IP-3/8

IP-3/9
140

TP-1

TP-2

TP-3

TP-4
Start
139
138
137 52°9'9'' 27°54'50'' 11°5'55'' 46°3'17''
136

129.424

146.212

217.518

144.412

140.097

140.205

125.819

125.819

103.968
149.93

71.338

21.527

175.55

13.833
8.953

9.241

5.857

9.273
135
134
133
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
132
131 To
Fie
SB#176 130 ld

To
129 SOB CTF

To
K

To
SOB CTF # 268/ 216

he
128

Fie

Fie
rv
127

ld

ld

Existing
126 Goga Ji Maharaj Temple
125

ON
124

GC

O
123 Ongc well NE

NGC Lin
LI

Ro
122
CH

ad
AT
e
121 in
rL M

e
120 we
Po
kv
119 66

To
118

e
220 v Power Lin
O
117

NG
116

To
We
115 Goga Ji Maharaj Temple

To Hebu
ll

eb
114
SB#176

uv
ra va
113 bu NE

a
pu e LI
am oH

ne
112 H

va
R T

Li
To TC

er
111
Sobhasan ETP A

w
Po
M
110

Kv
11
109
108
107
106
105
104
103
102 CS-1/BT ROAD CH.0.363 km CS-3/HT LINE CH.0.74 km CS-5/Electric line CH.1.19 km CS-8/BT ROAD CH.1.63 km
CS-2/CART TRACK CH.0.379 km CS-4/BT ROAD CH.0.924 km CS-6/CART TRACK CH.1.217 km
101 CS-7/CART TRACK CH.1.366 km
100
99
98
97
96
95
94
93
92
91
90
89
88
87
91.901

GROUND LEVELS
91.636

91.543

91.554

91.252
91.215

89.443

88.543

89.513
89.486

90.042

89.143
89.126

89.715
89.543

87.314

87.743
87.943

88.465
91.754

91.788

91.743

91.984

91.763

91.658

90.117

89.629

89.406

89.368

89.000

88.380

88.576

89.300

89.402

89.307

89.704

89.907

89.464

89.768

89.208

88.563

87.314

87.330

87.453

88.038

88.316

88.850
91.555

90.915

88.895

88.905

89.355

89.085

89.895
(IN METRES)

DISTANCE BETWEEN LEVEL


29.424

20.576

29.354

20.646

21.527

18.828

27.384

22.616

44.902

20.452

20.307

24.105

25.895

14.202

29.941

10.264
13.833

25.903

49.916

25.736

14.991

38.977

11.023
0.692

8.953

5.098

9.241

5.857

0.084

9.273
50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+129.424

0+279.354

0+350.692

0+372.219
0+381.172

0+527.384

0+744.902

0+920.452
0+929.693

1+074.105

1+214.202
1+220.059

1+360.264
1+374.097

1+499.916

1+625.736
1+635.009

1+738.977
0+000.00

0+050.00

0+100.00

0+150.00

0+200.00

0+250.00

0+300.00

0+350.00

0+400.00

0+450.00

0+500.00

0+550.00

0+600.00

0+650.00

0+700.00

0+750.00

0+800.00

0+850.00

0+900.00

0+950.00

1+000.00

1+050.00

1+100.00

1+150.00

1+200.00

1+250.00

1+300.00

1+350.00

1+400.00

1+450.00

1+500.00

1+550.00

1+600.00

1+650.00

1+700.00

1+750.00
CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#176 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
MEHSANA ASSET
PARALLEL LINE SB#194 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/SB#176 TO SOB CTF/CS-1 MEHSANA
SOB CTF
PARALLEL LINE SB#97 To
NALA
BT ROAD CROSS SECTION NKBPL/ONGC/SB#176 TO SOB CTF/CS-4 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB CTF BT ROAD CROSS SECTION NKBPL/ONGC/SB#176 TO SOB CTF/CS-8 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
OTHER PROPOSED LINE
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION

VILLAGE BOUNDARY CART TRACK


4"Ø SB#176 TO SOB CTF WELL FLUID LINE
ALIGNMENT SHEET
EXISTING OTHER LINE / ROW POND

TREE
CHAINAGE : FROM 0.00 TO 1.75 KM
BITUMEN ROAD

W.B.M. ROAD TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.


RAILWAY LINE / PILLAR BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FOREST BOUNDARY WATER TANK MANHOLE Jaipur - 302015
FIELD BUND / FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
X X
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE
LT POLE / LINE
DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SB#176
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB CTF/ ALN-1
IP-4/1
IP-4/2

IP-5/1
IP-5/2
139

TP-5

End
138
137
136 82°13'49''
135

202.621

100.632
12.566

61.209
202.8

6.119
134
133
132
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
131
130
Ex

SB#176 129
ist
ing

128 SOB CTF


ON

127 OLD HEADER


GC

ine
ON

n
126

sa
L
GC
Lin

er

na
Ro 125

w
e

Pu
Po
ad 124

Kv

To
123

11
NEW HEADER
122
121 Ramdev Seva camp WA SOB CTF
LL
E
120 CR
LIN

OS
119 SIN
G
TCH

118
117
MA

116

1 9
-2
115
Sobhasan ETP ON

ne
SH

Li
114 G C

r
we
Ro

Po
113 a d

Kv
Sobhasan ETP

va
112

11
bu
111

He

ine
110

To

CL
109

NG
To F
108 ield

gO
107

stin
106

Ex i
105
104
103
102
101 CS-9/LT LINE CH.1.911 km CS-13/BT ROAD CH.2.221 km
CS-10/LT LINE CH.1.94 km
100 CS-11/BT ROAD CH.1.949 km
99 CS-12/LT LINE CH.1.978 km
98
97
96
95
94
93
92
91
90
89
88
87
86
86.781

GROUND LEVELS
87.302

87.119

86.343

86.618
86.623
88.850

89.328

88.833

88.026

87.530

86.993

86.436

86.318

86.209

86.446

86.524
86.465
(IN METRES)

DISTANCE BETWEEN LEVEL


41.598

45.836

43.036

18.173

25.709

24.923
8.402
4.164

6.964

6.119
50

50

50

50

50

50

50
POINTS (IN METRES)
Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
1+941.598

1+954.164

2+156.964

2+218.173
2+224.291

2+324.92
2+000.00

2+050.00

2+100.00

2+150.00

2+200.00

2+250.00

2+300.00
1+750.00

1+800.00

1+850.00

1+900.00

1+950.00

CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#176 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
BT ROAD CROSS SECTION NKBPL/ONGC/SB#176 TO SOB CTF/CS-11 MEHSANA ASSET
PARALLEL LINE SB#194 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/SB#176 TO SOB CTF/CS-13 MEHSANA
SOB CTF
PARALLEL LINE SB#97 To
NALA
RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB CTF SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
OTHER PROPOSED LINE
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION

VILLAGE BOUNDARY CART TRACK


4"Ø SB#176 TO SOB CTF WELL FLUID LINE
ALIGNMENT SHEET
EXISTING OTHER LINE / ROW POND

TREE
CHAINAGE : FROM 1.75 TO 2.325 KM
BITUMEN ROAD

W.B.M. ROAD TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.


RAILWAY LINE / PILLAR BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FOREST BOUNDARY WATER TANK MANHOLE Jaipur - 302015
FIELD BUND / FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
X X
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE
LT POLE / LINE
DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SB#176
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB CTF/ ALN-2
IP-0/1
IP-0/2

IP-1/1

IP-1/2

IP-1/3

IP-1/4

IP-2/1
IP-2/2

IP-2/3

IP-2/4

IP-2/5
142

TP-1

TP-2

TP-3
Start
141
140
139 15°24'58'' 62°11'7'' 14°18'8''
138

171.998

238.164

239.642

174.421

175.558

229.357

229.357

126.978
19.391

32.001

88.714

10.228

22.761

31.144
6.318
137
136
135
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
134
133

INE
SB#194 132

HL
131 SOB CTF

MATCH LINE

To Gandhinagar
To

MATC
130

To Himatnagar

Kad
129

vas
128

an
127

e
ura

er Lin
126
SOB CTF WELL

am p

v Pow
125

-4

To R
124

TP

11 K
123
122 TP-2
121 TP-1 TP-3
120 E
LIN
119
SB#194
H
TC
SB#176
118 MA

E
H LIN
117 11 Kv Powe

11 Kv Power Line
r Line
Start

SH-55
116

MATCH LINE

To Mehsana

MATC
115

To Mehsana
To R
114

SH 73
113

amp
112 E

ura
LIN
111 Teja Dhari hotel CH T
110 MA
109
108
107
106
105 CS-3/SH CH.0.686 km CS-5/BT ROAD CH.1.151 km
104 CS-1/LT LINE CH.0.173 km CS-4/LT LINE CH.0.702 km CS-6/SH CH.1.189 km
CS-2/BT ROAD CH.0.175 km
103
102
101
100
99
98
97
96
95
94
93
92
91
90
89

90.271

91.151

91.881
GROUND LEVELS
91.110

91.203

91.916

92.453

92.984

92.939

92.348

90.328

89.704

90.853

90.760

90.640

91.006

90.518

90.809

91.018

90.890

90.723

90.654

91.024

91.793

91.497

91.386

91.290

91.356

91.363

90.992

91.577

91.798

91.858
91.205

90.415

91.835
92.915
93.212

92.985

90.713

90.624

90.951

90.662

91.543
91.613

91.766

91.676

91.454

91.754
89.8
(IN METRES)

DISTANCE BETWEEN LEVEL


21.998

19.391

35.871

14.129

25.513

24.487

42.486

31.935

18.065

42.507

46.207

22.761

20.804

39.698

10.302

19.055

30.945
6.318

2.293

7.514

7.493

3.793
6.435

10.34

39.66
50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+171.998
0+178.316

0+197.707

0+435.871

0+675.513

0+707.514

0+881.935

1+057.493

1+146.207
1+156.435

1+179.196

1+439.698

1+669.055
0+000.00

0+050.00

0+100.00

0+150.00

0+200.00

0+250.00

0+300.00

0+350.00

0+400.00

0+450.00

0+500.00

0+550.00

0+600.00

0+650.00

0+700.00

0+750.00

0+800.00

0+850.00

0+900.00

0+950.00

1+210.34
1+000.00

1+050.00

1+100.00

1+150.00

1+200.00

1+250.00

1+300.00

1+350.00

1+400.00

1+450.00

1+500.00

1+550.00

1+600.00

1+650.00

1+700.00

1+750.00
CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#194 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
MEHSANA ASSET
PARALLEL LINE SB#176 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/ SB#194 TO SOB CTF WELL/CS-2 MEHSANA
SOB CTF
PARALLEL LINE SB#97 To
NALA
SH CROSS SECTION NKBPL/ONGC/ SB#194 TO SOB CTF WELL/CS-3 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB CTF BT ROAD CROSS SECTION NKBPL/ONGC/ SB#194 TO SOB CTF WELL/CS-5 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
OTHER PROPOSED LINE
ROAD SIDE DRAIN
SH CROSS SECTION NKBPL/ONGC/ SB#194 TO SOB CTF WELL/CS-6 CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION

VILLAGE BOUNDARY CART TRACK


4"Ø SB#194 TO SOB CTF WELL FLUID LINE
ALIGNMENT SHEET
EXISTING OTHER LINE / ROW POND

TREE
CHAINAGE : FROM 0.00 TO 1.75 KM
BITUMEN ROAD

W.B.M. ROAD TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.


RAILWAY LINE / PILLAR BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FOREST BOUNDARY WATER TANK MANHOLE Jaipur - 302015
FIELD BUND / FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
X X
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE
LT POLE / LINE
DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SB#194
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB CTF/ ALN-1
IP-6/10
IP-5/1

IP-5/2

IP-6/1

IP-6/2
IP-6/3

IP-6/4

IP-6/5
IP-6/6

IP-6/7
IP-6/8

IP-6/9
140

TP-4

TP-5

TP-6

TP-7
139
138
137 52°9'8'' 27°55'19'' 11°5'27'' 46°3'17''
136

148.725

165.803

224.064

155.573

130.495

245.277

108.736
19.723

148.55

13.683
81.66

8.813

146.4

9.28
135

5.9
134
133
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
132
131 To

To
Fie

To

To
SB#194 130 ld

F
K

iel
Fie
129 SOB CTF

he

Existing
d
rv a

ld
128
127 SOB CTF # 268/ 216 Goga Ji Maharaj Temple

ON
126

GC

ONGC
TP-6
125 Ongc well

Ro
ad
124

Line
INE
123

CH L
122
TP-5 ine
121 er
L
NE
M AT
ow
120 LI

TP
v P
k

-7
CH

r Line
119 66
118 AT

To

220 v Powe
M

ON
117

To
Goga Ji Maharaj Temple

GC

To Heb
TP-3 116

Heb
115 a

We
uv

uv
b
He

ll
114

uva
4 To
113 TP-
a Sobhasan ETP
SB#176 112
am
p ur
rL
ine

e
we
in
111 R rL Po
To E Kv
we

110 N an
11
LI
Po

nas
Kv

Pu
CH
109
INE

To
11

108 AT
M
CH L

107
106
Sobhasan ETP
MAT

105
104
103 CS-7/BT ROAD CH.2.04 km CS-9/HT LINE CH.2.413 km CS-11/Electric line CH.2.855 km CS-14/BT ROAD CH.3.295 km
102 CS-8/CART TRACK CH.2.044 km CS-10/BT ROAD CH.2.588 km CS-12/CART TRACK CH.2.882 km
CS-13/CART TRACK CH.3.038 km
101
100
99
98
97
96
95
94
93
92
91
90
89
88
87
91.161

89.381

89.041

89.481
GROUND LEVELS
91.858

91.658

91.920

91.853

91.569

89.843

89.443

89.327

88.507

88.417

89.077

89.460

89.587

89.494

89.089

89.857

89.819

88.803

88.028

87.317

87.337

87.943

88.280

88.433

89.528
91.605

90.455

88.805

89.265

89.295

89.115
91.636

91.543

91.554

91.215

89.464

88.342

89.513
89.486

90.042

89.143
89.126

89.715
89.543

87.743
87.943

88.465
(IN METRES)

DISTANCE BETWEEN LEVEL


46.033

44.758

26.418

19.723

44.691

10.495

39.505

34.559

48.945

13.683

41.284
3.967

5.242

3.859

5.309

8.813
6.628

1.055

29.44

14.66

31.74

4.577

8.716
40.7

9.28
0.02
5.9
50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
1+796.033

1+944.758

2+026.418

2+046.141

2+194.691

2+360.495

2+584.559
2+593.372

2+748.945

3+045.423

3+408.716
2+000.00

2+050.00

2+100.00

2+150.00

2+200.00

2+250.00

2+300.00

2+350.00

2+400.00

2+450.00

2+500.00

2+550.00

2+600.00

2+650.00

2+700.00

2+750.00

2+800.00

2+850.00

2+900.00

2+950.00

3+000.00

3+050.00

3+100.00

3+150.00

3+200.00

3+250.00

3+300.00

3+350.00

3+400.00

3+450.00

3+500.00
2+879.44
2+885.34

3+031.74

3+299.98
1+750.00

1+800.00

1+850.00

1+900.00

1+950.00

CUMULATIVE CHAINAGE

3+290.7
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#194 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
BT ROAD CROSS SECTION NKBPL/ONGC/ SB#194 TO SOB CTF WELL/CS-7 MEHSANA ASSET
PARALLEL LINE SB#176 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/ SB#194 TO SOB CTF WELL/CS-10 MEHSANA
SOB CTF
PARALLEL LINE SB#97 To
NALA
BT ROAD CROSS SECTION NKBPL/ONGC/ SB#194 TO SOB CTF WELL/CS-14 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB CTF SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
OTHER PROPOSED LINE
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION

VILLAGE BOUNDARY CART TRACK


4"Ø SB#194 TO SOB CTF WELL FLUID LINE
ALIGNMENT SHEET
EXISTING OTHER LINE / ROW POND

TREE
CHAINAGE : FROM 1.75 TO 3.50 KM
BITUMEN ROAD

W.B.M. ROAD TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.


RAILWAY LINE / PILLAR BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FOREST BOUNDARY WATER TANK MANHOLE Jaipur - 302015
FIELD BUND / FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
X X
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE
LT POLE / LINE
DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SB#194
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB CTF/ ALN-2
IP-7/1
IP-7/2

IP-8/1
IP-8/2
139

TP-8

End
138
137
136 82°13'49''
135

TC 205.863

197.509

100.806
12.376

56.952

5.837
134

INE
133
Ex

HL
132
is t

G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
ing

131

MA
ON

130
GC

SB#194 TP 129
Lin

-7
128 SOB CTF
e

in e
127

n
rL

sa
OLD HEADER

we

na
126

Po

Pu

d
125

En
Kv

To
11
124
123
122 Ramdev Seva camp NEW HEADER
121
120
WA
LL
CR
SOB CTF
E

OS
LIN

119 SIN
G
H

118
TC

117

19
Sobhasan ETP
MA

-2
116 ne

SH
Li
Sobhasan ETP 115
Po
we
r

ON
114 Kv
11 GC
va
113 bu Ro
ad
He
112

-8
To

TP
111

e
Lin
110

GC
109
To F

ON
108 ield

ng
107

isti
106

Ex
105
104
103
102 CS-15/LT LINE CH.3.583 km CS-19/BT ROAD CH.3.884 km
101 CS-16/LT LINE CH.3.613 km
CS-17/BT ROAD CH.3.622 km
100 CS-18/LT LINE CH.3.651 km
99
98
97
96
95
94
93
92
91
90
89
88
87
86
88.451

86.181
GROUND LEVELS
87.537

87.036

86.897

86.607

86.564
89.115

86.245

86.405
87.302
87.119

86.343

86.618
86.623

86.524
(IN METRES)

DISTANCE BETWEEN LEVEL


14.579
12.376

23.045

24.465

25.535

31.417

12.746
5.837

38.06
50

50

50

50

50

50
POINTS (IN METRES)
Normal soil Normal soil
SURFACE/TERRAIN DETAILS
3+614.579
3+626.955

3+824.465

3+881.417
3+887.254
3+500.00

3+550.00

3+600.00

3+650.00

3+700.00

3+750.00

3+800.00

3+850.00

3+900.00

3+950.00

3+988.06
CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#194 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
BT ROAD CROSS SECTION NKBPL/ONGC/ SB#194 TO SOB CTF WELL/CS-17 MEHSANA ASSET
PARALLEL LINE SB#176 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/ SB#194 TO SOB CTF WELL/CS-19 MEHSANA
SOB CTF
PARALLEL LINE SB#97 To
NALA
RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB CTF SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
OTHER PROPOSED LINE
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION

VILLAGE BOUNDARY CART TRACK


4"Ø SB#194 TO SOB CTF WELL FLUID LINE
ALIGNMENT SHEET
EXISTING OTHER LINE / ROW POND

TREE
CHAINAGE : FROM 3.50 TO 3.988 KM
BITUMEN ROAD

W.B.M. ROAD TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.


RAILWAY LINE / PILLAR BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FOREST BOUNDARY WATER TANK MANHOLE Jaipur - 302015
FIELD BUND / FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
X X
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE
LT POLE / LINE
DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SB#194
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB CTF/ ALN-3
IP-0/1
IP-0/2

IP-1/1

IP-1/2
IP-1/3

IP-3/1

IP-3/2

IP-3/3

IP-4/1

IP-4/2
IP-4/3

IP-4/4
141

TP-1

TP-2

TP-3

TP-4
Start
140
139
138 12°35'30'' 79°35'6'' 27°54'21'' 11°6'24''
137

118.905

180.329

134.622

242.663

142.984

209.041

187.487

133.251

148.743
128.46

48.941

61.011

20.717

21.414
9.624

9.409
9.68
136
135
134
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
133
132 To
SB#97 131 Fie
ld
130
129
SOB CTF # 268/ 216 SOB CTF

To Ra

To

E
128

MATCH LIN
Kh
127

To Rampura
mpura

erv

To F
126

a
125 TP-4

ield
124
123 TP-3
Goga Ji Maharaj Temple
122
TP-1

E
121 ine

LIN
erL
120 ow

To
P

CH
Start
119
SB#176 66
kv

ON
T
MA
118

GC
SB#97 117

TP-2

We
To ONG
116
a

ll
r
pu

220 v Power Line


115
m ne
114 Ra Li

To
r

C
E To we
MATCH LIN SB#176 Po

Well

He
113

E
Goga Ji Maharaj Temple
Kv

MATCH LIN
b
112 11

uv
E
MATCH LIN

a
111
-2
110 TP
109

E
LIN
108
107

H
TC
106

MA
105
104 CS-2/BT ROAD CH.0.577 km CS-4/BT ROAD CH.0.945 km CS-6/HT LINE CH.1.326 km
103 CS-1/CART TRACK CH.0.133 km CS-3/LT LINE CH.0.583 km CS-5/CART TRACK CH.0.974 km CS-7/BT ROAD CH.1.52 km
102
101
100
99
98
97
96
95
94
93
92
91
90
89
88

90.431
GROUND LEVELS
91.115
91.108

90.805

90.168

89.782
89.629

90.574

91.543

91.554

91.252

91.215

89.443

88.543

89.513
89.486

90.042
92.014

91.592

91.134

91.028

91.084

90.657

90.282

90.203

89.833

90.168

90.853

91.359

92.007

91.723

91.630

89.942

89.552

89.402

89.364

88.697

88.366

88.647

88.928

89.357

89.367

89.416

89.880

89.827

89.290
90.975

90.265

91.645

91.585

90.775

88.865
(IN METRES)

DISTANCE BETWEEN LEVEL


42.955

37.374

12.626

21.996

18.381

30.561

19.439

23.224

26.776

34.235

15.765

21.414

23.634

28.391

21.609

15.878

24.713

41.463
28.46

11.86

7.045

9.624

4.952

19.35

30.65

9.409

8.537
9.68
50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+257.045

0+437.374

0+571.996
0+581.619

0+630.561

0+873.224

0+934.235

0+954.952

0+976.366

1+328.391

1+515.878
1+525.287

1+658.537
0+000.00

0+050.00

0+100.00

0+150.00

0+200.00

0+250.00

0+300.00

0+350.00

0+400.00

0+450.00

0+500.00

0+550.00

0+600.00

0+650.00

0+700.00

0+750.00

0+800.00

0+850.00

0+900.00

0+950.00
0+128.46
0+138.14

1+119.35
1+000.00

1+050.00

1+100.00

1+150.00

1+200.00

1+250.00

1+300.00

1+350.00

1+400.00

1+450.00

1+500.00

1+550.00

1+600.00

1+650.00

1+700.00

1+750.00
CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#97 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
MEHSANA ASSET
PARALLEL LINE SB#194 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/SB#97 TO SOB CTF/CS-2 MEHSANA
SOB CTF
PARALLEL LINE SB#176 To
NALA
BT ROAD CROSS SECTION NKBPL/ONGC/SB#97 TO SOB CTF/CS-4 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB CTF BT ROAD CROSS SECTION NKBPL/ONGC/SB#97 TO SOB CTF/CS-7 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
OTHER PROPOSED LINE
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION

VILLAGE BOUNDARY CART TRACK


4"Ø SB#97 TO SOB CTF WELL FLUID LINE
ALIGNMENT SHEET
EXISTING OTHER LINE / ROW POND

TREE
CHAINAGE : FROM 0.00 TO 1.75 KM
BITUMEN ROAD

W.B.M. ROAD TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.


RAILWAY LINE / PILLAR BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FOREST BOUNDARY WATER TANK MANHOLE Jaipur - 302015
FIELD BUND / FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
X X
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE
LT POLE / LINE
DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SB#97
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB CTF/ ALN-1
IP-4/10
IP-4/11
IP-4/5
IP-4/6

IP-4/7
IP-4/8

IP-4/9

IP-5/1
IP-5/2

IP-6/1
IP-6/2
139

TP-5

TP-6

End
138
137
136 46°3'17'' 82°13'49''
135

129.542

129.542

199.379

100.458
134.85

12.899

99.199

12.757

208.09

65.465
5.932

9.266
134

6.4
133
132
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
131
130 OLD HEADER

End
SB#97 129

MATCH LINE
MATCH LINE

128 SOB CTF

Existi
To
127
SOB # 12
To

F
126
SOB CTF

iel
Fie

ng ON
ON
d
125
Ongc well

san
ld

r Line
G
124 NEW HEADER

CR

una
GC L

Powe
123

oa

To P
WAL

d
Goga Ji Maharaj Temple 122 L CR

ine
OSS

v
11 K
121 Ex IN G
ist
120 in Ramdev Seva camp
g TP-5
O
NG

E
119

LIN
C ONG
118 Li
ne CR

CH
ON oad
117 G CR

T
oad

MA
116
e
ower Lin

115

9
114

-21

ine
MATCH LINE

TP-6
220 v P

113
MATCH LINE

L
SH
To He

er
Goga Ji Maharaj Temple

ow

ine
112 va
u
Sobhasan ETP Sobhasan ETP

vP
eb

GC L
H111
buva

K
o
Ongc well

11
va
T 110

ng ON
bu
109

He
108

To

Existi
107

E
To Field

LIN
106
SB#02

CH
105
Sobhasan ETP

T
104

MA
103
102 CS-8/Electric line CH.1.783 km CS-11/BT ROAD CH.2.225 km CS-12/LT LINE CH.2.497 km CS-16/BT ROAD CH.2.817 km
101 CS-9/CART TRACK CH.1.81 km CS-13/LT LINE CH.2.526 km
CS-10/CART TRACK CH.1.954 km CS-14/BT ROAD CH.2.535 km
100 CS-15/LT LINE CH.2.563 km
99
98
97
96
95
94
93
92
91
90
89
88
87
86

88.121
GROUND LEVELS
89.143
89.126

89.715

89.543

87.314

87.743
87.943

88.465

87.302
87.119

86.343

86.618
86.623

86.524
89.290

89.113

89.553

89.872

89.672

89.068

88.366

87.317

87.334

87.559

89.308

89.236

88.663

87.774

87.084

86.962

86.716

86.329

86.297

86.458
88.335

86.335

86.435
(IN METRES)

DISTANCE BETWEEN LEVEL


36.788

48.062

10.961

39.039

40.503

20.046

20.688

28.511

21.489

12.757

48.737

14.202

29.398
5.932

1.938

9.497

9.266

27.89

9.354

1.263

21.06
7.28

6.4
50

50

50

50

50

50

50

50

50

50

50

50

50

50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
1+813.212

1+948.062

1+960.961

2+090.503

2+220.046
2+229.312

2+328.511

2+540.646

2+748.737

2+814.202
2+820.602
2+000.00

2+050.00

2+100.00

2+150.00

2+200.00

2+250.00

2+300.00

2+350.00

2+400.00

2+450.00

2+500.00

2+550.00

2+600.00

2+650.00

2+700.00

2+750.00

2+800.00

2+850.00

2+900.00
1+807.28

2+527.89

2+921.06
1+750.00

1+800.00

1+850.00

1+900.00

1+950.00

CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#97 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
BT ROAD CROSS SECTION NKBPL/ONGC/SB#97 TO SOB CTF/CS-11 MEHSANA ASSET
PARALLEL LINE SB#194 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/SB#97 TO SOB CTF/CS-14 MEHSANA
SOB CTF
PARALLEL LINE SB#176 To
NALA
BT ROAD CROSS SECTION NKBPL/ONGC/SB#97 TO SOB CTF/CS-16 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB CTF SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
OTHER PROPOSED LINE
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION

VILLAGE BOUNDARY CART TRACK


4"Ø SB#97 TO SOB CTF WELL FLUID LINE
ALIGNMENT SHEET
EXISTING OTHER LINE / ROW POND

TREE
CHAINAGE : FROM 1.75 TO 2.921 KM
BITUMEN ROAD

W.B.M. ROAD TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.


RAILWAY LINE / PILLAR BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FOREST BOUNDARY WATER TANK MANHOLE Jaipur - 302015
FIELD BUND / FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
X X
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE
LT POLE / LINE
DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SB#97
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB CTF/ ALN-2
IP-0/1
IP-0/2

IP-0/3

IP-1/1
IP-1/2

IP-3/1
IP-3/2

IP-3/3
IP-3/4

IP-4/1
IP-4/2

IP-5/1
IP-5/2
139

TP-1

TP-2

TP-3

TP-4

TP-5
Start
138
137
49°44'2'' 40°21'53'' 20°23'26'' 37°1'46'' 93°11'1''
136
135

208.036

185.616

204.153

135.951

211.623

104.007
75.406

127.98

49.727

152.65

10.594

90.148

66.084

14.416
5.876

8.059

7.388

8.029
134
133
NE
LI
132 CH
AT G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
131 M
130

To
SB#17 129 E

Pu
LIN

e
SOB CTF

s an

Lin
128

na
CH

sa
T

ed
127

una
MA

n
n

nasa

os
LINE
126

rop
To

To Pu
125

rP
-21
ine

CH

he
124 rL

To P

SH
we NE To

Ot
o

To

MAT
123 vP LI Pu

To
K
11

unas

P
122 22 CH na

una
0V AT sa
121 Po TP n

an
E

san
M
we - LIN
SB#17 rL 4
120
H

To
ine TC
TP-3

Kh
119 MA

er
Ramdev Seva camp

-
TP

va
Start 118
117
116 ONGC Well

an
11
Kv
115

vas
Po

To
2

To
we

11
114 TP-

Kad
rL

To

Kv
Ka
ine

Khe
113

Po
d
To F

To
Khe

va
To
220V
ield

we
rva

sa

He 9
112

rL
SH
rva

n
LINE

bu

ine
e

-2
Pow
111

Lin

va
1
-5
er Lin
110

ed
TP
CH

os
109

ro p
MAT
108

rP
Sobhasan ETP

he
107

Ot
106
105
104
103
102
101 CS-3/BT ROAD Ch.0.683 km CS-5/WBM ROAD Ch.1.006 km CS-7/CART TRACK Ch.1.491 km
CS-1/LT LINE Ch.0.124 km CS-6/WBM ROAD Ch.1.165 km
100 CS-8/LT LINE Ch.1.497 km
CS-4/Electric line Ch.0.69 km
99 CS-12/LT LINE Ch.1.691 km
CS-2/WBM ROAD Ch.0.21 km
98
CS-11/SH Ch.1.659 km
97
96 CS-10/LT LINE Ch.1.651 km
95 CS-9/LT LINE Ch.1.619 km
94
93
92
91
90
89
88
87
86
89.741

89.621

88.681

90.361

88.711

89.311

87.301
GROUND LEVELS
89.890

89.863

89.807

89.994

90.373

88.559

87.859

87.890

90.339

90.689

90.748

89.533

88.990

89.083

88.894

88.790

88.790

88.139

87.288

87.044

87.878

88.623

89.588

88.387

87.723

86.980

86.747
89.795

89.615
89.595
89.595

90.731
90.737

88.891

88.625

89.705

88.165
90.39

88.79

90.09

89.09

88.88

88.69

88.39

89.69

87.29
87.09
(IN METRES)

DISTANCE BETWEEN LEVEL


36.088

49.528

46.318

29.088

12.853

15.127

34.873

48.922

41.807

10.843
10.594

28.563

33.059

16.941

37.066

35.243

14.757

14.416

34.257
8.036
5.876

0.472

3.682

8.059

1.078

0.804
7.388

8.029
4.905

1.328
50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50
0

POINTS (IN METRES)


Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+208.036
0+213.912

0+399.528

0+603.682

0+679.088
0+687.147

0+815.127

0+951.078

1+000.804
1+008.193

1+160.843
1+171.437

1+383.059

1+487.066
1+495.095

1+585.243

1+651.328
1+665.743
0+000.00

0+050.00

0+100.00

0+150.00

0+200.00

0+250.00

0+300.00

0+350.00

0+400.00

0+450.00

0+500.00

0+550.00

0+600.00

0+650.00

0+700.00

0+750.00

0+800.00

0+850.00

0+900.00

0+950.00

1+000.00

1+050.00

1+100.00

1+150.00

1+200.00

1+250.00

1+300.00

1+350.00

1+400.00

1+450.00

1+500.00

1+550.00

1+600.00

1+650.00

1+700.00

1+750.00
CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#17 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
MEHSANA ASSET
PARALLEL LINE SOB GGS-II
RIVER WBM ROAD CROSS SECTION NKBPL/ONGC/SB#17 To SOB CTF/CS-2 MEHSANA
To SOB CTF
PARALLEL LINE SB#125 To
NALA
BT ROAD CROSS SECTION NKBPL/ONGC/SB#17 To SOB CTF/CS-3 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB CTF WBM ROAD CROSS SECTION NKBPL/ONGC/SB#17 To SOB CTF/CS-5 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
OTHER PROPOSED LINE CANAL WBM ROAD CROSS SECTION NKBPL/ONGC/SB#17 To SOB CTF/CS-6 CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
FOREST BOUNDARY
CART TRACK CROSS SECTION NKBPL/ONGC/SB#17 To SOB CTF/CS-7 ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION
NKBPL/ONGC/SB#17 To SOB CTF/CS-11
VILLAGE SITE CART TRACK
SH CROSS SECTION
4"Ø SB#17 TO SOB CTF WELL FLUID LINE
ALIGNMENT SHEET
VILLAGE BOUNDARY POND

TREE
CHAINAGE : FROM 0.00 TO 1.75 KM
EXISTING OTHER LINE / ROW

BITUMEN ROAD TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.


W.B.M. ROAD BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
RAILWAY LINE / PILLAR WATER TANK MANHOLE Jaipur - 302015
FIELD BUND / FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
X X
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE DGPS POINT, TBM DLH/OES/MM/RC/
SUR_ROU_PERM/X11NC19001NKB / ONGC SB#17
/ To
LT POLE / LINE
1 : 2500 RO
/2019/9010030850 SOB CTF/ ALN-1
IP-6/1
IP-6/2
139

TP-6

End
138
137
82°13'49''
136
135

101.327
180.71

43.439

5.737
134
133
132
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
131
130
Ramdev Seva camp
SB#17 129
128 SOB CTF
NE
127 LI

To
CH
SH
-21

SH
126 AT
9
To
M

-2
Heb
125

19
uva

wer
v Po
11 K 124
123
Line
OLDd HEADER
122 En
121
120 SOB CTF
Ot
119 NEW HEADER
NE he
L I 118 rPr WALL CROSSING
CH 117 op
AT
os
M 116 ed
Lin
115 e
-6
114 TP
113
112

F
111

CT
110

B
SO
109

To
108
107
106
105
104
103
102
101 CS-13/BT ROAD Ch.1.893 km
100
99
98
97
96
95
94
93
92
91
90
89
88
87
86
86.191

GROUND LEVELS
86.747

86.373

86.599

86.409

86.575
86.625
86.19

86.62

(IN METRES)

DISTANCE BETWEEN LEVEL


46.454

39.893

46.956
3.546

5.737
4.371
50

50

POINTS (IN METRES)


Normal soil
SURFACE/TERRAIN DETAILS
1+846.454

1+889.893
1+895.629
1+750.00

1+800.00

1+850.00

1+900.00

1+950.00

1+996.96

CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#17 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
BT ROAD CROSS SECTION NKBPL/ONGC/SB#17 To SOB CTF/CS-13 MEHSANA ASSET
PARALLEL LINE SOB GGS-II
RIVER MEHSANA
To SOB CTF
PARALLEL LINE SB#125 To
NALA
RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB CTF SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
OTHER PROPOSED LINE CANAL CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
FOREST BOUNDARY
ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION

VILLAGE SITE CART TRACK


4"Ø SB#17 TO SOB CTF WELL FLUID LINE
ALIGNMENT SHEET
VILLAGE BOUNDARY POND

TREE
CHAINAGE : FROM 1.75 TO 1.997 KM
EXISTING OTHER LINE / ROW

BITUMEN ROAD TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.


W.B.M. ROAD BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
RAILWAY LINE / PILLAR WATER TANK MANHOLE Jaipur - 302015
FIELD BUND / FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
X X
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE DGPS POINT, TBM DLH/OES/MM/RC/
SUR_ROU_PERM/X11NC19001NKB / ONGC SB#17
/ To
LT POLE / LINE
1 : 2500 RO
/2019/9010030850 SOB CTF/ ALN-2
IP-0/1

IP-0/2

IP-0/3
IP-0/4

IP-1/1

IP-2/1
IP-2/2

IP-2/3

IP-3/1

IP-3/2
IP-3/3
139

TP-1

TP-2

TP-3

TP-4

TP-5
Start

End
138
137
136 43°9'28'' 6°23'54'' 4°16'26'' 44°40'43'' 85°23'41''
135

174.286

205.547

184.478

141.948

118.317

132.619

166.284
15.359

10.412

147.86

15.777

86.065

85.498
6.773

146.1

95.82

8.921
134
133
132
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
131 NE
130 LI
11 Kv Power Line
C H
SB# 86 129 AT WALL CROSSING
To

a
M SOB CTF

ebuv
128
Sh

MATCH LINE
127
-2

NEW HEADER

To H
19

ONGC Well

SB C
To PT
11 Kv Power Line

11
126

_ NG
DS o O
125

ine
SB#35

a
TP

YS Off

T
uv

er L
124 SB#47 - 5

b
He
e

Pow
123

in

e
Lin
rL
OLD HEADER

e
ine
ce ON

in
To
we
122

rL
v
r
rL

we

11 K
11 Kv ONGC WELL

Po

we
Power

we

Po
121

Po
L ine

Kv
E

Po

Kv
G

Kv
N

11
120 LI SOB CTF

11
Kv
C

11
H 4

11
119 TP-1 TP-3 -
C TP En
118 AT d
Start M
117 TP-2

SB#86

ana
116
115

has
SB#02

er Line
114

hob
11 Kv

W ell
113

To S
To ONG

11 Kv Pow

ngc
SB#313

Power

MATCH LINE
112
Su To

To O
111 b s On
tat gc

Line
C Well

110 ion
109
108
107
106
105
104
103
102
101 CS-1/LT LINE CH.0.341 km CS-6/WBM ROAD CH.0.976 km CS-8/BT ROAD CH.1.55 km
CS-2/LT LINE CH.0.492 km CS-7/LT LINE CH.1.156 km
100
99
CS-3/BT ROAD CH.0.567 km
98
97
CS-4/LT LINE CH.0.579 km
96
95 CS-5/LT LINE CH.0.594 km
94
93
92
91
90
89
88
87
86

88.521

86.701

86.731

87.521

87.971

87.021
GROUND LEVELS
87.144

87.308

87.576

87.936

88.043

88.066

88.682

88.890

88.073

87.722

87.159

87.392

87.448

87.500

87.663

86.796

87.110

87.377

87.653

87.969

87.896

87.897

87.898

87.526

87.083

86.962
87.415

88.405

87.275

87.945
87.715

88.582

88.165
88.171

87.118

87.422

87.521
87.585

87.671

87.265

87.896

87.812
87.792

87.787

87.025
87.95
(IN METRES)
24.28572

25.71428

29.83239

20.16761

15.35916

13.55797

28.39037

21.60963

20.31051

10.41155

19.27794

31.65755

18.34245

29.51716

20.48284

15.77711

29.50054

42.06215
DISTANCE BETWEEN LEVEL

14.3101
6.77277

24.4908

25.5092

49.0388

45.8015

4.72235

43.4357
0.9612

4.1985

6.5643
50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50
0

POINTS (IN METRES)


Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+174.286

0+379.832

0+571.083

0+586.442

0+874.491

0+970.311
0+980.722

1+099.039

1+231.658

1+379.517

1+545.802
1+554.722

1+570.499

1+656.564
0+000.00

0+050.00

0+100.00

0+150.00

0+200.00

0+250.00

0+300.00

0+350.00

0+400.00

0+450.00

0+500.00

0+550.00

0+600.00

0+650.00

0+700.00

0+750.00

0+800.00

0+850.00

0+900.00

0+950.00
0+564.31

0+728.39

1+000.00

1+050.00

1+100.00

1+150.00

1+200.00

1+250.00

1+300.00

1+350.00

1+400.00

1+450.00

1+500.00

1+550.00

1+600.00

1+650.00

1+700.00

1+742.06
CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB# 86 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
MEHSANA ASSET
PARALLEL LINE SB# 29 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/SB# 86TO SOB CTF WELL/CS-3 MEHSANA
SOB CTF

NALA
WBM ROAD CROSS SECTION NKBPL/ONGC/SB# 86TO SOB CTF WELL/CS-6 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
OTHER PROPOSED LINE
BT ROAD CROSS SECTION NKBPL/ONGC/SB# 86TO SOB CTF WELL/CS-8 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
ONGC INSTALLATION
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
VILLAGE BOUNDARY CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
EXISTING OTHER LINE / ROW CART TRACK
4"Ø SB# 86 TO SOB CTF WELL FLUID LINE
BITUMEN ROAD
ALIGNMENT SHEET
POND
W.B.M. ROAD TREE
CHAINAGE : FROM 0.00 TO 1.742 KM
RAILWAY LINE / PILLAR TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.
FOREST BOUNDARY BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FIELD BUND WATER TANK MANHOLE Jaipur - 302015
X
FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE
LT POLE / LINE
DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SB#
/ 86To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB CTF/ ALN-1
IP-0/1
IP-0/2

IP-1/1

IP-1/2

IP-2/1

IP-2/2

IP-2/3
IP-2/4

IP-3/1

IP-4/1
IP-4/2
137

TP-1

TP-2

TP-3

TP-4
Start
136
135
134 12°21'8'' 52°40'44'' 43°10'14'' 6°23'8''
133

223.216

209.992

206.523

173.759

205.832

143.037

142.687
25.223

182.96

15.503

98.645
8.383

18.13

6.68

10.1
132
131
NE
130 LI E
129 CH G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
LI
N
AT
128 M CH
SB# 29 127
11 Kv Power Line AT
M

MATCH LINE

MATCH LINE
LINE

ebuv
126 SOB CTF
125

To

To P

To H
H
X

124
To ONGC Well

S
11 Kv Power Line

MATC

h-2

a
S

T
123 h-21

uv
SB#35

YS O
19

eb
9

e in
122

ine

er L
SB#47

rL

To
ff
121 E

we
ce O

Pow
N
LI

Po

ne
120

Li
To Sh-219

v
Kv
CH NE

NGC

11 K

r
11 Kv

we
LI
119 Power

11
AT

Po
Line
M H

Kv
ine
118
TC
SB#29

11
rL
117 A TP-3

we
M

Po
116

Kv
Start TP-4

11
115
114 TP-1 TP-2

ana
113
SB#86

has
112

11 Kv

hob
MATCH LINE
H LINE

MATCH LINE
111

To S
ower Lin
Powe
110 SB#313
Su To

To ON

r Line
109

MATC
b s On

11 Kv P
108 To tat gc
Wo ion
od

GC W
107 Fa
106 cto
ry

ell
105
104
103
102
101
100
99 CS-1/BT ROAD CH.0.228 km CS-2/BT ROAD CH.0.658 km CS-3/LT LINE CH.1.032 km CS-8/WBM ROAD CH.1.666 km
CS-4/LT LINE CH.1.18 km
98
97
CS-5/BT ROAD CH.1.257 km
96
95 CS-6/LT LINE CH.1.268 km
94
93 CS-7/LT LINE CH.1.287 km
92
91
90
89
88
87
86
85
84
89.131

87.301
GROUND LEVELS
89.259

89.397

90.032

90.826

89.410

86.760

87.650

89.084

88.992

88.450

87.796

87.340

88.174

87.180

87.330

87.627

87.993

88.066

88.454

88.726

88.923

88.450

87.509

86.644

86.876

87.187

87.416

87.460

87.510

87.588

87.898
87.435

88.055

88.135
91.466
91.584

89.581

88.194

88.043

87.144

87.715

88.582

88.165
88.171

87.118

87.422

87.521
87.585
87.95
(IN METRES)

DISTANCE BETWEEN LEVEL


50

50

50

50

23

18

50

50

50

42

50

50

50

48

16

25

50

50

50

15

35

50

50

50

21

29

50

50

50

16

24

50

50

19

31

50

50

12

38

50

11
10

29

50
0

4
7
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+223.216

0+441.592

0+648.114

0+666.244

0+691.467

0+865.227

1+071.059

1+254.019
1+260.699
1+276.202

1+419.239

1+561.926

1+660.571
1+670.671
0+000.00

0+050.00

0+100.00

0+150.00

0+200.00

0+250.00

0+300.00

0+350.00

0+400.00

0+450.00

0+500.00

0+550.00

0+600.00

0+650.00

0+700.00

0+750.00

0+800.00

0+850.00

0+900.00

0+950.00

1+000.00

1+050.00

1+100.00

1+150.00

1+200.00

1+250.00

1+300.00

1+350.00

1+400.00

1+450.00

1+500.00

1+550.00

1+600.00

1+650.00

1+700.00

1+750.00
CUMULATIVE CHAINAGE
0+231.6

(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB# 29 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
MEHSANA ASSET
PARALLEL LINE SB# 86 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/SB# 29 TO SOB CTF/CS-1 MEHSANA
SOB CTF

NALA
BT ROAD CROSS SECTION NKBPL/ONGC/SB# 29 TO SOB CTF/CS-2 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
OTHER PROPOSED LINE
BT ROAD CROSS SECTION NKBPL/ONGC/SB# 29 TO SOB CTF/CS-5 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
ONGC INSTALLATION
ROAD SIDE DRAIN
WBM ROAD CROSS SECTION NKBPL/ONGC/SB# 29 TO SOB CTF/CS-8 CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
VILLAGE BOUNDARY CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
EXISTING OTHER LINE / ROW CART TRACK
4"Ø SB# 29 TO SOB CTF WELL FLUID LINE
BITUMEN ROAD
ALIGNMENT SHEET
POND
W.B.M. ROAD TREE
CHAINAGE : FROM 0.00 TO 1.75 KM
RAILWAY LINE / PILLAR TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.
FOREST BOUNDARY BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FIELD BUND WATER TANK MANHOLE Jaipur - 302015
X
FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE
LT POLE / LINE
DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SB#
/ 29To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB CTF/ ALN-1
IP-5/1

IP-5/2
IP-5/3
139

TP-5

TP-6

TP-7

End
138
137
136 4°17'48'' 44°42'5'' 85°23'41''
135

137.166

181.895
248.33

88.815

90.111
8.917
8.858
134
133
132
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
131
SB#11
130

an
SB# 29 129

s
na
128 SOB CTF

Pu
To
127
126 WALL CROSSING
125

MATCH LINE
ONGC FIRE STATION
124

X
123
NEW HEADER

SB C
11 Kv Power Line

11
_ NG
122

X
DS o O
121 TP
-

T
7
120
119
OLD HEADER
X
11 Kv
Power
118 ONGC WELL
Line
117
116
115
TP-5
TP
-6 SOB CTF En
d
114
113
112
111 SB#02 To Puna
110 san

ell
MATCH LINE

W
109

X
ngc
Su To 108

X
b s On

To O
tat gc 107
ion 106
105

X
104
103
102
101 CS-10/BT ROAD CH.2.243 km
CS-9/LT LINE CH.1.836 km
100
99
98
97
96
95
94
93
92
91
90
89
88
87
86
87.501

GROUND LEVELS
87.898

87.529

86.086

87.156

87.784

87.897

87.898

87.899

87.809

87.408

87.010

86.972
87.905
87.265

87.896

87.812
87.792
87.787

87.025

87.021
(IN METRES)

DISTANCE BETWEEN LEVEL


50

50

50

19

31

50

50

44

50

50

38

44

45

50

35
6

9
3
6

5
POINTS (IN METRES)
Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
1+919.001

2+056.167

2+238.062
2+246.979
2+255.838

2+344.653
2+000.00

2+050.00

2+100.00

2+150.00

2+200.00

2+250.00

2+300.00

2+350.00

2+400.00

2+434.76
1+750.00

1+800.00

1+850.00

1+900.00

1+950.00

CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB# 29 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
BT ROAD CROSS SECTION NKBPL/ONGC/SB# 29 TO SOB CTF/CS-10 MEHSANA ASSET
PARALLEL LINE SB# 86 To
RIVER MEHSANA
SOB CTF

NALA
RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
OTHER PROPOSED LINE
SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
ONGC INSTALLATION
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
VILLAGE BOUNDARY CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
EXISTING OTHER LINE / ROW CART TRACK
4"Ø SB# 29 TO SOB CTF WELL FLUID LINE
BITUMEN ROAD
ALIGNMENT SHEET
POND
W.B.M. ROAD TREE
CHAINAGE : FROM 1.75 TO 2.435 KM
RAILWAY LINE / PILLAR TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.
FOREST BOUNDARY BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FIELD BUND WATER TANK MANHOLE Jaipur - 302015
X
FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE
LT POLE / LINE
DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SB#
/ 29To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB CTF/ ALN-2
IP-2/1
IP-2/2

IP-2/3

IP-3/1
IP-3/2

IP-5/1
IP-5/2

IP-5/3
IP-5/4
139

TP-1

TP-2

TP-3

TP-4

TP-5

TP-6
Start
138
137
19°50'36'' 10°17'20'' 49°44'2'' 40°21'53'' 20°23'12'' 37°1'60''
136
135

166.139

116.245

192.307

196.868

125.526

135.042

152.472

105.352
206.76

51.649

10.383

212.43
5.879

73.76

8.005

7.542
134
133
132
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
131

INE
130 ONGC FIRE STATION

HL
TP-4

san
SB#125 129
E N

T
LI

TC

na
oP
128 SOB CTF

Pu
H

san
MA
u
C
127

na
AT

To

a
s

Pun
M
126

an
125

To
To
124

Pu
na
123 ine

sa
er L TP-5

n
122 ow

To P
K vP
11
SB#125 121

NE
u
nasa
120

220

LI
TP

CH

n
V
119

sa
NE -6
Start
SB#17

Pow
TP-4

na
AT
LI
118

u
22
ONGC Well

P
er L
CH

n
0V

asa

To
117 Po AT

INE
TP-2

ne
we

adv
M
116 rL
in

HL
e
TP-1

To
K
115

To
TC

Ka
114

- 3
TP

dva
MA
11
113 Kv

To

sa
Po
112

Kh

n
we

er
rL

To K
111

va
To in
e
Fie
110 ld

herv

NE
109

LI
108

C H
107

AT
M
106
105
104
103
102
101 CS-1/LT LINE CH.0.403 km CS-3/BT ROAD CH.0.962 km CS-5/WBM ROAD CH.1.283 km
CS-6/WBM ROAD CH.1.442 km
100
99 CS-4/Electric line CH.0.968 km
98 CS-2/WBM ROAD CH.0.492 km
97
96
95
94
93
92
91
90
89
88
87
86

89.871

89.911

88.841

88.601

87.741

89.531
GROUND LEVELS
89.390

89.333

89.352

89.608

90.330

89.986

89.890

89.840

89.790

89.696

89.594

90.119

89.896

87.947

87.890

87.939

89.447

90.680

90.752

90.688

89.146

88.990

89.000

88.790

88.764

86.990

87.417

88.372

88.914
89.685
89.595
89.595

90.731
90.737

88.891

88.625
89.39

89.69

89.89

90.39

88.79

90.09

89.09

88.88

88.69

88.39
(IN METRES)

DISTANCE BETWEEN LEVEL


16.139

33.861

32.384

17.616

39.144

34.198

15.802

34.037

41.488

28.179

14.279

38.193

10.383

11.005

38.995
5.879
4.977

37.33

12.67

7.958
8.005

8.512

26.53

23.47

7.542

1.425
50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50
0

POINTS (IN METRES)


Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+166.139

0+282.384

0+489.144
0+495.023

0+884.198

0+957.958
0+965.963

1+091.488

1+278.179
1+285.721

1+438.193
1+448.575

1+661.005
0+000.00

0+050.00

0+100.00

0+150.00

0+200.00

0+250.00

0+300.00

0+350.00

0+400.00

0+450.00

0+500.00

0+550.00

0+600.00

0+650.00

0+700.00

0+750.00

0+800.00

0+850.00

0+900.00

0+950.00
0+687.33

1+226.53
1+000.00

1+050.00

1+100.00

1+150.00

1+200.00

1+250.00

1+300.00

1+350.00

1+400.00

1+450.00

1+500.00

1+550.00

1+600.00

1+650.00

1+700.00

1+750.00
CUMULATIVE CHAINAGE
0+0

(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#125 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
MEHSANA ASSET
PARALLEL LINE SOB GGS-II
RIVER WBM ROAD CROSS SECTION NKBPL/ONGC/SB#125 To SOB CTF/CS-2 MEHSANA
To SOB CTF
PARALLEL LINE SB#17 To
NALA
BT ROAD CROSS SECTION NKBPL/ONGC/SB#125 To SOB CTF/CS-3 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB CTF WBM ROAD CROSS SECTION NKBPL/ONGC/SB#125 To SOB CTF/CS-5 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
OTHER PROPOSED LINE CANAL WBM ROAD CROSS SECTION NKBPL/ONGC/SB#125 To SOB CTF/CS-6 CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
FOREST BOUNDARY
ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION

VILLAGE SITE CART TRACK


4"Ø SB#125 TO SOB CTF WELL FLUID LINE
ALIGNMENT SHEET
VILLAGE BOUNDARY POND

TREE
CHAINAGE : FROM 0.00 TO 1.75 KM
EXISTING OTHER LINE / ROW

BITUMEN ROAD TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.


W.B.M. ROAD BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
RAILWAY LINE / PILLAR WATER TANK MANHOLE Jaipur - 302015
FIELD BUND / FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
X X
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE DGPS POINT, TBM DLH/OES/MM/RC/
SUR_ROU_PERM/X11NC19001NKB / ONGC SB#125
/ To
LT POLE / LINE
1 : 2500 RO
/2019/9010030850 SOB CTF/ ALN-1
IP-6/1
IP-6/2

IP-7/1
IP-7/2

IP-8/1
IP-8/2
139

TP-7

TP-8

End
138
137
93°11'1'' 82°13'49''
136
135

175.295

101.501
85.465

61.765

38.855
7.821

5.783
14.5
134
133
132
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
131
130
SB#125 129
SOB CTF

To Field
128 SOB CTF
127
MATC
126 H LINE

En d
125 OLD HEADER
124 MATC
123 H LINE
122

n a
1 1 Kv
121

unas
120

Powe

To P
119 NEW HEADER

r
118 To SH-219

Line
117
WALL CROSSING
116
115 Ramdev Seva camp
114
TP-7
113
112 To SO

TP-8
B CT
F
111
Other Pro
110 posed Lin
e
109

ine
Heb -219

rL
108

we
uva
SH
Sobhasan ETP

Po
107

Kv
106

11
To
105
104
103
102
101 CS-7/CART TRACK CH.1.771 km CS-13/BT ROAD CH.2.153 km
100 CS-9/LT LINE CH.1.889 km
CS-8/LT LINE CH.1.777 km
99
CS-10/LT LINE CH.1.922 km
98
97
CS-11/SH CH.1.929 km
96
95 CS-12/LT LINE CH.1.961 km
94
93
92
91
90
89
88
87
86
89.531

GROUND LEVELS
89.058

87.463

86.866

86.539

86.190

86.619

86.372

86.549
88.235

87.035

86.575
89.705

88.165

86.625
89.69

87.29

87.09

86.19

86.62
(IN METRES)

DISTANCE BETWEEN LEVEL


16.357

25.822

40.357

21.408

14.092

11.203

38.797

44.159
7.821

9.643

0.058
5.783

7.342
14.5
50

50

50

50

50
POINTS (IN METRES)
Normal soil Normal soil
SURFACE/TERRAIN DETAILS
1+766.357
1+774.178

1+859.643

1+921.408

1+935.908

2+111.203

2+150.058
2+155.841
2+000.00

2+050.00

2+100.00

2+150.00

2+200.00

2+250.00
2+257.34
1+750.00

1+800.00

1+850.00

1+900.00

1+950.00

CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#125 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
SH CROSS SECTION NKBPL/ONGC/SB#125 To SOB CTF/CS-11 MEHSANA ASSET
PARALLEL LINE SOB GGS-II
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/SB#125 To SOB CTF/CS-13 MEHSANA
To SOB CTF
PARALLEL LINE SB#17 To
NALA
RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB CTF SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
OTHER PROPOSED LINE CANAL CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
FOREST BOUNDARY
ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION

VILLAGE SITE CART TRACK


4"Ø SB#125 TO SOB CTF WELL FLUID LINE
ALIGNMENT SHEET
VILLAGE BOUNDARY POND

TREE
CHAINAGE : FROM 1.75 TO 2.26 KM
EXISTING OTHER LINE / ROW

BITUMEN ROAD TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.


W.B.M. ROAD BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
RAILWAY LINE / PILLAR WATER TANK MANHOLE Jaipur - 302015
FIELD BUND / FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
X X
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE DGPS POINT, TBM DLH/OES/MM/RC/
SUR_ROU_PERM/X11NC19001NKB / ONGC SB#125
/ To
LT POLE / LINE
1 : 2500 RO
/2019/9010030850 SOB CTF/ ALN-2
IP-0/1
IP-0/2

IP-0/3
IP-0/4

IP-0/5

IP-1/1

IP-1/2

IP-1/3

IP-1/4

IP-1/5
IP-1/6
136

TP-1

TP-2
Start

End
135
134
133 8°20'42'' 2°47'31''
132

123.889

188.813

227.133

102.985

135.341

135.342

206.636

122.608
239.21

17.908

14.783

29.401
8.844

9.339
131
130
129
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
128
va 127
u
WSB#22 H ed 126 SOB GGS-I
To

To Heduva
125 WSB#8+15 To SOB GGS-I

To

r
ine

a
Well Fluid Pipe Line

He
rL

ag
we
124
wy

du

ti N
o
H vP 123

v
K
55

ak
- 11

n
SH 122

Sh
io
WSB#18+22+23 SOB#22

at
To

St

To
121

ay
120 WSB#18+
SOB GGS-I

ilw
23 To SOB

Ra
119 Well Fluid GGS-I
Pipe Line

e
an

in
118 Start

rL
End

es
TP-2

we
117

ah

Po
M

Kv
116

To

25
115
114 GGS-I
17 To SOB
WSB#12+
113
WSB#6

KU H-2 T
220 v Power Line Pipe Line

A
TP-1

To
Well Fluid

Hwy

KA 19
M
112

Ku
NU

ka
111

EXI
H-55

S
HA

s
110

STIN

A
To S

tio

V
109 y

ta

DU

of
Hw

S
108

ay

VB
HE
55

GAI
WSB#22 T -
o SOB GG

ilw
107 Well Fluid S-I SH

of
Ra
L
Pipe Line
To

To
106

VB
ROW

n
da
Fi
105

el

gu
d

Ja
104

To
103
102
101
CS-4/RAILWAY CH.0.829 km
100 CS-2/EXISTING LINE CH.0.366 km CS-6/SH CH.1.181 km CS-7/BT ROAD CH.1.402 km
99 CS-1/CART TRACK CH.0.128 km CS-5/LT LINE CH.0.837 km
98 CS-3/CART TRACK CH.0.376 km
97
96
95
94
93
92
91
90
89
88
87
86
85
84
83
85.361

87.151
GROUND LEVELS
84.144

85.019

85.568

85.329

86.670

88.140

89.016

89.574

89.992

89.712

90.007

90.688

90.824

91.264

91.340

90.960

90.202

88.626

87.000

87.074

87.370

87.806

87.832

87.867

87.930

88.373

88.264

88.103

87.977
87.900
83.765

88.777
85.5
85.6

88.7

89.6

91.3

90.2

87.7

87.8

88.1

88.3
87

88
(IN METRES)

DISTANCE BETWEEN LEVEL


23.889

17.267

21.943

18.718

20.095

29.905

47.228

49.787

35.554

14.446

20.896

17.908

11.196

10.223

29.401

10.376

12.232
8.844

9.339

2.772

0.213

45.44

4.56
50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+123.889
0+132.733

0+371.943
0+381.282

0+570.095

0+797.228

0+900.213

1+035.554

1+170.896

1+188.804

1+410.223

1+439.624
0+000.00

0+050.00

0+100.00

0+150.00

0+200.00

0+250.00

0+300.00

0+350.00

0+400.00

0+450.00

0+500.00

0+550.00

0+600.00

0+650.00

0+700.00

0+750.00

0+800.00

0+850.00

0+900.00

0+950.00

1+395.44
1+000.00

1+050.00

1+100.00

1+150.00

1+200.00

1+250.00

1+300.00

1+350.00

1+400.00

1+450.00

1+500.00

1+550.00
1+562.23
CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE WSB#22 TO
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB GGS-I
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
RAILWAY CROSS SECTION NKBPL/ONGC/WSB#22 TO SOB GGS-I/CS-4 MEHSANA ASSET
PARALLEL LINE WSB#8+15 To
RIVER SH CROSS SECTION NKBPL/ONGC/WSB#22 TO SOB GGS-I/CS-6 MEHSANA
SOB GGS-I
PARALLEL LINE WSB#12+17 To
NALA
BT ROAD CROSS SECTION NKBPL/ONGC/WSB#22 TO SOB GGS-I/CS-7 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB GGS-I SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE WSB#18+23 To
SOB GGS-I
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION

VILLAGE BOUNDARY CART TRACK


4" Ø WSB#22 TO SOB GGS-I WELL FLUID LINES
ALIGNMENT SHEET
EXISTING OTHER LINE / ROW POND

TREE
CHAINAGE : FROM 0.00 TO 1.56 KM
BITUMEN ROAD

W.B.M. ROAD TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.


RAILWAY LINE / PILLAR BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FOREST BOUNDARY WATER TANK MANHOLE Jaipur - 302015
FIELD BUND / FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
X X
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE DGPS POINT, TBM DLH/OES/MM/RC/
SUR_ROU_PERM/X11NC19001NKB / ONGC WSB#22
/ TO SOB
LT POLE / LINE
1 : 2500 RO
/2019/9010030850 GGS-I/ ALN-1
IP-0/1

IP-1/1

IP-1/2

IP-1/3

IP-1/4
IP-1/5

IP-1/6

IP-2/1

IP-3/1
IP-3/2
133

TP-1

TP-2

TP-3
Start
132
131
130 54°27'25'' 2°11'22'' 14°15'46''
129

138.145

190.769

212.084

172.799

119.299

162.032

197.429

192.548
11.439

156.97

87.907

51.447
58.52

13.14
128
127
126
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
125
124
WSB#12+17 123 SOB GGS-I

tion
Railw esana
122

ay Sta
EXISTING GAIL ROW
121

agar
WSB#8+15

AT
To Ma
120

S
N
WSB#7

KUKA
UM
Line
119 WSB#8+15 To

hakti
SOB GGS-I
Well Fluid Pipe

HAN
118
SOB#26

ower
Line Residential Area

To Ma Station

To S
Railw
117

VB of
P
TP

UVA
25 Kv
116

25 Kv Pow
-1

ay
hesan

SH-219
115

HED
114

er Line
WSB#12+17

f
113

VB o
112 er Line
11 Kv Pow
111
110 Start
Pond
109 TP-2
a

tion
an n WSB#12+17
108
h es tatio To SOB GGS-
Well Fluid Pipe I TP-3

riyavi
ay Sta

e
a
M ay S Line

Lin
107

Railway Station
To Jagudan
To ilw

er
106
Ra

ow
To Bo
Railw
SOB#22

vP
105 Sukheshwar Mahadev Temple

y
K

To SH-55 Hw
11
104

a
e
Lin

v
du
103 er
ow va

He
P
102 Kv To S
H-21 e du

To
25
101
9 Hw
y T oH
100
99
98
CS-6/RAILWAY CH.1.33km
97 CS-2/RAILWAY CH.0.561km CS-4/BT ROAD CH.0.897km CS-9/SH CH.1.566km
96 CS-1/EXISTING LINE CH.0.11km CS-7/LT LINE CH.1.344km
95 CS-8/BT ROAD CH.1.356km
CS-3/LT LINE CH.0.567km CS-5/LT LINE CH.0.901km
94
93
92
91
90
89
88
87
86
85
84
83
82
81
80

85.001

85.341

86.381

86.211
GROUND LEVELS
81.100

81.380

82.174

82.138

81.377

80.810

81.302

81.777

82.433

83.356

83.867

84.442

84.100

84.530

85.469

85.778

86.169

86.236

86.849

87.498

88.553

88.912

87.880

87.930

87.472

87.730

88.087

88.243

88.300

88.300
84.395

88.125
82.7

81.6

84.5

84.4

85.2

85.4

85.3

86.2

87.8

88.7

88.5

87.8
88
(IN METRES)

DISTANCE BETWEEN LEVEL


38.145

11.855

28.914

21.086

40.998

49.518

22.317

27.683

41.615

46.946

10.025

39.975

22.057

27.943

40.036

11.411

38.589
9.002

0.482

8.385
3.054

9.964

13.14

28.02
8.84
50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+138.145

0+328.914

0+540.998

0+599.518

0+772.317

0+891.615

0+903.054

1+060.025

1+222.057

1+309.964

1+361.411
0+000.00

0+050.00

0+100.00

0+150.00

0+200.00

0+250.00

0+300.00

0+350.00

0+400.00

0+450.00

0+500.00

0+550.00

0+600.00

0+650.00

0+700.00

0+750.00

0+800.00

0+850.00

0+900.00

0+950.00

1+558.84
1+571.98
1+000.00

1+050.00

1+100.00

1+150.00

1+200.00

1+250.00

1+300.00

1+350.00

1+400.00

1+450.00

1+500.00

1+550.00

1+600.00

1+650.00

1+700.00

1+750.00
CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE WSB#12+17 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB GGS-I
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
RAILWAY CROSS SECTION NKBPL/ONGC/WSB#12+17 TO SOB GGS-I /CS-2 MEHSANA ASSET
PARALLEL LINE WSB#8+15 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/WSB#12+17 TO SOB GGS-I /CS-4 MEHSANA
SOB GGS-I
PARALLEL LINE WSB#18+23 To
NALA
RAILWAY CROSS SECTION NKBPL/ONGC/WSB#12+17 TO SOB GGS-I /CS-6 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB GGS-I BT ROAD CROSS SECTION NKBPL/ONGC/WSB#12+17 TO SOB GGS-I /CS-8 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE WSB#22 To
SOB GGS-I
ROAD SIDE DRAIN
SH CROSS SECTION NKBPL/ONGC/WSB#12+17 TO SOB GGS-I /CS-9 CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION

VILLAGE BOUNDARY CART TRACK


4" Ø WSB#12+17 TO SOB GGS-I WELL FLUID LINES
ALIGNMENT SHEET
EXISTING OTHER LINE / ROW POND

TREE
CHAINAGE : FROM 0.00 TO 1.75 KM
BITUMEN ROAD

W.B.M. ROAD TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.


RAILWAY LINE / PILLAR BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FOREST BOUNDARY WATER TANK MANHOLE Jaipur - 302015
FIELD BUND / FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
X X
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE DGPS POINT, TBM DLH/OES/MM/RC/
SUR_ROU_PERM/X11NC19001NKB / ONGC WSB#12+17
/ TO
LT POLE / LINE
1 : 2500 RO
/2019/9010030850 SOB GGS-I/ ALN- 1
140

TP-4

End
139
138
137 33°12'37''
AT 136
M

112.287
ANU 135
H S ar
VA
U KA Nag 134
DU f K kt
i 133
HE o Sha G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
of 9
VB To
132
-21

VB 131
SH

WSB#12+17 130 SOB GGS-I


129
128

E
LIN
127

CH
126
GGS-I
WSB#18+23 To SOB

T
125

MA
124 Well Fluid Pipe Line
123
122 SOB GGS-I
SOB#22 121
120
End
119 TP-4
118
117

11
116

Kv
Po
115
E

w
S-I
WSB#22 To SOB GG

er
LIN

114

Lin
Well Fluid Pipe Line

e
Line 113
H

220 v Power
To
TC

Ku

112
MA

ka

111
s

110
109
108
107
106
105
104
103
102
101
100
99
98
97
96
95
94
93
92
91
90
89
88
87

GROUND LEVELS
88.300

88.100

88.100
88.3

87.9

(IN METRES)

DISTANCE BETWEEN LEVEL


14.527

35.473

26.814
50

POINTS (IN METRES)


Normal soil
SURFACE/TERRAIN DETAILS
1+764.527

1+876.81
1+750.00

1+800.00

1+850.00

CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE WSB#12+17 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB GGS-I
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
MEHSANA ASSET
PARALLEL LINE WSB#8+15 To
RIVER MEHSANA
SOB GGS-I
PARALLEL LINE WSB#18+23 To
NALA
RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB GGS-I SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE WSB#22 To
SOB GGS-I
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION

VILLAGE BOUNDARY CART TRACK


4" Ø WSB#12+17 TO SOB GGS-I WELL FLUID LINES
ALIGNMENT SHEET
EXISTING OTHER LINE / ROW POND

TREE
CHAINAGE : FROM 1.75 TO 1.88 KM
BITUMEN ROAD

W.B.M. ROAD TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.


RAILWAY LINE / PILLAR BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FOREST BOUNDARY WATER TANK MANHOLE Jaipur - 302015
FIELD BUND / FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
X X
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE DGPS POINT, TBM DLH/OES/MM/RC/
SUR_ROU_PERM/X11NC19001NKB / ONGC WSB#12+17
/ TO
LT POLE / LINE
1 : 2500 RO
/2019/9010030850 SOB GGS-I/ ALN- 2
IP-0/1

IP-0/2

IP-0/3

IP-0/4
IP-0/5

IP-0/6

IP-1/1

IP-2/1
IP-2/2
134

TP-1

TP-2

TP-3
Start

End
133
132
131 2°11'23'' 14°15'47'' 33°12'37''
130

215.477

171.398

122.766

152.777

163.172

196.886

190.751

105.631
58.206

12.015

87.045

51.777

13.365
129
128
127
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
126
125 I
S-
WSB#8+15 124 GG SOB GGS-I
B

tation
123 SO e
SOB GGS-I

Railw hesana
o
T L i n
122
23 e

ine
ay S
121 WSB#8+ 8+ Pip

wer L
15 1

a
Well Fluid To SOB GGS-I # id
WSB#8+15

To M
SB lu
WSB#7
120 Pipe Line
W ell F
SOB#26

v Po
119 d
W En

T
Start

25 K

gar
UMA
118

To S KAS
i Na
117

To Mah tation
Railwa
Residential Area

HAN

hakt
I

f KU
116
S-

25 Kv Powe
115 GG

A
yS
esana
B e

VB o
DUV
114 SO Lin

SH-219
T o e
113 2 Pip

f HE
-3 #2 uid

r Line
112 TP SB l
W ell F

VB o
tation
111 11 Kv Powe
r Line W
WSB#12

Railw riyavi
110 +17 To S
Well Fluid OB GGS

ay S
Pipe Line -I TP-1
109

o
EX

e
To B

Lin
108 To Kuk
I

TP-2 as
ST

r
we
107
I

Po
NG

Sukheshwar Mahadev Temple

Railway Station
To Jagudan
Kv
106
GA

Pond

11
v
IL

105

du

To SH-55 Hwy
RO

He
104
W

e
SOB#22

To
To S a in
103 H-21 v rL
9 Hw du ow
e
102 y He P
To 0
v
101 22
100
99
98 CS-5/RAILWAY CH.1.003 km
CS-1/RAILWAY CH.0.235 km CS-3/BT ROAD CH.0.574 km CS-8/SH CH.1.239 km
97
CS-6/LT LINE CH.1.017 km
96 CS-4/LT LINE CH.0.578 km
CS-2/LT LINE CH.0.241 km CS-7/BT ROAD CH.1.029 km
95
94
93
92
91
90
89
88
87
86
85
84
83
82
81

88.991
GROUND LEVELS
81.600

82.057

82.962

84.162

84.138

84.226

84.798

85.478

85.428

85.708

86.392

86.316

86.148

87.174

87.849

88.277

88.173

87.863

87.714

87.552

88.016

88.170

88.300

88.300

88.227

88.100

87.900
83.645

84.475

85.225

86.585
85.395
84.29

84.4

85.2

85.4

86.2

87.8

88.7

88.5

87.8

88.3
88
(IN METRES)

DISTANCE BETWEEN LEVEL


15.477

34.523

23.683

26.317

45.081

17.847

12.015

20.138

32.639

17.361

45.811

32.857

17.143

34.633

15.367

13.365

35.635

14.365

41.266
4.919

4.189

31.52

5.116
50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+215.477

0+273.683

0+445.081

0+567.847
0+579.862

0+732.639

0+895.811

0+982.857

1+034.633

1+244.884

1+435.635
0+000.00

0+050.00

0+100.00

0+150.00

0+200.00

0+250.00

0+300.00

0+350.00

0+400.00

0+450.00

0+500.00

0+550.00

0+600.00

0+650.00

0+700.00

0+750.00

0+800.00

0+850.00

0+900.00

0+950.00

1+231.52
1+000.00

1+050.00

1+100.00

1+150.00

1+200.00

1+250.00

1+300.00

1+350.00

1+400.00

1+450.00

1+500.00

1+541.27
CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE WSB#8+15 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB GGS-I
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
RAILWAY CROSS SECTION NKBPL/ONGC/WSB#8+15 TO SOB GGS-I/CS-1 MEHSANA ASSET
PARALLEL LINE WSB#12+17 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/WSB#8+15 TO SOB GGS-I/CS-3 MEHSANA
SOB GGS-I
PARALLEL LINE WSB#18+23 To
NALA
RAILWAY CROSS SECTION NKBPL/ONGC/WSB#8+15 TO SOB GGS-I/CS-5 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB GGS-I BT ROAD CROSS SECTION NKBPL/ONGC/WSB#8+15 TO SOB GGS-I/CS-7 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE WSB#22 To
SOB GGS-I
ROAD SIDE DRAIN
SH CROSS SECTION NKBPL/ONGC/WSB#8+15 TO SOB GGS-I/CS-8 CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION

VILLAGE BOUNDARY CART TRACK


4" Ø WSB#8+15 TO SOB GGS-I WELL FLUID LINES
ALIGNMENT SHEET
EXISTING OTHER LINE / ROW POND

TREE
CHAINAGE : FROM 0.00 TO 1.54 KM
BITUMEN ROAD

W.B.M. ROAD TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.


RAILWAY LINE / PILLAR BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FOREST BOUNDARY WATER TANK MANHOLE Jaipur - 302015
FIELD BUND / FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
X X
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE DGPS POINT, TBM DLH/OES/MM/RC/
SUR_ROU_PERM/X11NC19001NKB / ONGC WSB#8+15
/ TO
LT POLE / LINE
1 : 2500 RO
/2019/9010030850 SOB GGS-I/ ALN-1
IP-0/1
IP-0/2

IP-0/3
IP-0/4

IP-0/5

IP-1/1

IP-1/2

IP-1/3

IP-1/4

IP-1/5
IP-1/6
136

TP-1

TP-2
Start

End
135
134
133 8°20'43'' 2°47'30''
132

183.819

232.533

196.236

225.236

134.456

134.456

199.338
108.26

17.906

14.736

32.993

117.57
9.049

9.295
131
130
129
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
128
127
va
WSB#18+23 e du 126 SOB GGS-I
T oH
125

To Heduva
WSB#8+15 To SOB GGS-I

To

r
124

a
e Well Fluid Pipe Line

ag
in

He
rL 123
we

ti N
wy

du
H v Po

va

ak
55 1K 122

n
H- 1

Sh
io
S 121
SOB#22

at
To
WSB#18+22+23

To
St
120
SOB GGS-I

ay
WSB#18+

ilw
119 23 To SOB

Ra
Well Fluid GGS-I
118 Start Pipe Line

a
End

e
an

in
TP-2

L
117

es

er
w
ah

Po
116

Kv
To
115

25
114
B GGS-I
113 17 To SO
WSB#12+

KU H-2 T
TP-1
WSB#6 220 v Power Line Pipe L in e
112

To
Well Fluid

9
wy

M
1

Ku
NU
111

-55 H

ka
S
EXI

S
KA
HA

s
110

STIN
To SH

VA
109

io
at
y

DU

of
108
Hw

St
GG

VB
HE
55

y
107 WSB#22 T

wa
o SOB GG -
SH

AIL

il
S-I

of
106 Well Fluid

Ra
Pipe Line To

To

VB
ROW

an
105

Fi

d
el

gu
104

Ja
103

To
102
101
100 CS-2/EXISTING LINE CH.0.424 km CS-4/RAILWAY CH.0.893 km CS-6/SH CH.1.243 km CS-7/BT ROAD CH.1.458 km
99 CS-1/CART TRACK CH.0.189 km
98 CS-3/CART TRACK CH.0.43 km CS-5/LT LINE CH.0.901 km
97
96
95
94
93
92
91
90
89
88
87
86
85
84
83
83.991

86.381

88.941

90.551

91.181
GROUND LEVELS
83.500

84.799

85.587

85.464

85.227

87.956

89.464

89.908

89.863

90.819

91.300

91.219

88.993

87.502

87.000

87.000

87.930

87.829

87.859

87.913

87.999

88.294

88.103

88.042

87.900
83.745

89.775

90.335

87.355
85.5
85.6

88.7
88.8

89.6

91.3

90.2

87.7

87.8

88.1

88.3
87

88
(IN METRES)

DISTANCE BETWEEN LEVEL


33.819

25.402

15.303

30.933

19.067

43.831

14.429

35.571

48.885

33.341

16.659

48.753

14.736

32.993

15.885
9.049
7.132

9.295

6.169

1.115

1.247

0.585

1.686
50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+183.819
0+192.868

0+425.402
0+434.697

0+630.933

0+856.169

0+964.429

1+098.885

1+233.341

1+251.247

1+450.585
1+465.321

1+498.314
0+000.00

0+050.00

0+100.00

0+150.00

0+200.00

0+250.00

0+300.00

0+350.00

0+400.00

0+450.00

0+500.00

0+550.00

0+600.00

0+650.00

0+700.00

0+750.00

0+800.00

0+850.00

0+900.00

0+950.00

1+000.00

1+050.00

1+100.00

1+150.00

1+200.00

1+250.00

1+300.00

1+350.00

1+400.00

1+450.00

1+500.00

1+550.00

1+600.00

1+615.88
CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE WSB#18+23 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB GGS-I
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
RAILWAY CROSS SECTION NKBPL/ONGC/WSB#18+23 TO SOB GGS-I/CS-4 MEHSANA ASSET
PARALLEL LINE WSB#8+15 To
RIVER SH CROSS SECTION NKBPL/ONGC/WSB#18+23 TO SOB GGS-I/CS-6 MEHSANA
SOB GGS-I
PARALLEL LINE WSB#12+17 To
NALA
BT ROAD CROSS SECTION NKBPL/ONGC/WSB#18+23 TO SOB GGS-I/CS-7 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB GGS-I SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE WSB#22 To
SOB GGS-I
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION

VILLAGE BOUNDARY CART TRACK


4" Ø WSB#18+23 TO SOB GGS-I WELL FLUID LINES
ALIGNMENT SHEET
EXISTING OTHER LINE / ROW POND

TREE
CHAINAGE : FROM 0.00 TO 1.62 KM
BITUMEN ROAD

W.B.M. ROAD TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.


RAILWAY LINE / PILLAR BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FOREST BOUNDARY WATER TANK MANHOLE Jaipur - 302015
FIELD BUND / FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
X X
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE DGPS POINT, TBM DLH/OES/MM/RC/
SUR_ROU_PERM/X11NC19001NKB / ONGC WSB#18+23
/ TO
LT POLE / LINE
1 : 2500 RO
/2019/9010030850 SOB GGS-I/ ALN-1
IP-0/1

IP-1/1

IP-1/2

IP-1/3

IP-1/4

IP-1/5
IP-1/6

IP-1/7

IP-2/1
IP-2/2

IP-2/3

IP-2/4
142

TP-1

TP-2
Start
141
140
139 93°8'37'' 39°27'9''
138

114.678

139.083

241.171

174.625

166.267

166.825

156.827

119.207
214.48

16.185

204.51

16.874
8.405

7.936
137
136
135
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
134
133

MATCH LINE
SB#109 132 SOB

MATCH LINE
MATCH LINE
131 MATCH LINE GGS-II
ONGC well SOB#
MATCH LINE
130

To
To
129

To San
159'266'238'180'267

K
Kh

NE

och
128

erv

LI
ONGC well

ava
To Kherva

CH
127

ganpu
11

AT
Kv
126

ne

Po

M
t Li
125

r
er
vH

Li
124

ne
K
400
123 ONGC pump House

122

TP-1
TP TP-2
Start 121 -2
120

SB#109
119
118
SOB#113 Well

e
SH
11

in

n
an

er L

a
-2
ONGC well
117

Kv
MATCH LINE

ud
NE
19

agud
To

g
11

Pow
Po

MATCH LINE
Ja
116

MATCH LINE

LI
Ja
Lemon Garden Lemon Garden

To
w

Kv

To
SBN#63'185"207

CH
gu

er
Lemon Garden

To J

v
115

Ja

Po
Lemon Garden

11 K
da

Lin

AT
gu
n

w
114

To Jag
er
da
Well

M
Lin
n
113

e
112

udan
111 Lemon Garden
110
109
108
107
106
105
104 CS-2/LT LINE CH.0.367 km CS-4/SH CH.0.718 km CS-6/LT LINE CH.1.051 km CS-9/BT ROAD CH.1.467 km
CS-1/LT LINE CH.0.169 km CS-3/HT LINE CH.0.463 km
103
CS-7/BT ROAD CH.1.109 km
102
CS-5/LT LINE CH.0.756 km
101 CS-8/LT LINE CH.1.117 km
100
99
98
97
96
95
94
93
92
91
90
89

89.831

91.271

92.191
GROUND LEVELS
90.089

90.106

90.107

90.110

90.092

90.628

91.052

91.056

91.259

91.609

91.792

91.870

91.649

91.744

91.493

90.244

90.079

90.809

91.457

91.779

91.976

91.990

91.712

91.880

91.790

92.114

93.089

93.740
90.085

91.045

91.155

92.305

91.825
91.799

91.891

91.294

91.826

91.598
91.633
90.11

90.09

91.59

90.09

91.39

91.89

91.79

93.69
(IN METRES)

DISTANCE BETWEEN LEVEL


14.678

35.322

46.239

44.932

16.185

24.403

49.778

36.863

29.404

20.596

46.229

13.103

28.962

27.866

22.134

47.073
3.761

5.068

9.412

0.222

4.732
8.405

3.771

7.936

2.927
50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50
0

POINTS (IN METRES)


Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+114.678

0+253.761

0+494.932

0+709.412

0+725.597

0+900.222

1+104.732
1+113.137

1+279.404

1+446.229

1+463.103
1+471.038

1+627.866

1+747.073
0+000.00

0+050.00

0+100.00

0+150.00

0+200.00

0+250.00

0+300.00

0+350.00

0+400.00

0+450.00

0+500.00

0+550.00

0+600.00

0+650.00

0+700.00

0+750.00

0+800.00

0+850.00

0+900.00

0+950.00

1+000.00

1+050.00

1+100.00

1+150.00

1+200.00

1+250.00

1+300.00

1+350.00

1+400.00

1+450.00

1+500.00

1+550.00

1+600.00

1+650.00

1+700.00

1+750.00
CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#109 To ELECTRIC POLE / LINE CORPORATION LIMITED.
SOB GGS-II LT POLE / LINE
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW TRANSFORMER LAMP POST
MEHSANA ASSET
PARALLEL LINE SOB GGS-II ELECTRIC BOX TELEPHONE POLE SH CROSS SECTION NKBPL/ONGC/SB#109 TO SOB GGS-II/CS-4 MEHSANA
To SOB CTF
PARALLEL LINE SB#193+225 RIVER
BT ROAD CROSS SECTION NKBPL/ONGC/SB#109 TO SOB GGS-II/CS-7 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
To SOB GGS-II BT ROAD CROSS SECTION NKBPL/ONGC/SB#109 TO SOB GGS-II/CS-9 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE SB#134 To
SOB GGS-II
NALA CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
OTHER PROPOSED LINE

ONGC INSTALLATION FOREST BOUNDARY


4"Ø SB#109 TO SOB GGS-II WELL FLUID LINE
ALIGNMENT SHEET
VILLAGE SITE CART TRACK

TREE
CHAINAGE : FROM 0.00 TO 1.75 KM
VILLAGE BOUNDARY

EXISTING OTHER LINE / ROW TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.
BITUMEN ROAD
BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
W.B.M. ROAD WATER TANK MANHOLE Jaipur - 302015
RAILWAY LINE / PILLAR WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
Email : nkbpl.ongcwest@gmail.com
FIELD BUND / FENCING TP , IP
X X

HIGH TENSION LINE / POLE DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SB#109
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB GGS-II/ ALN- 1
IP-2/5

IP-3/1
IP-3/2

IP-4/1
IP-4/2

IP-4/3
145

TP-3

TP-4

TP-5

End
144
143
142 25°41'8'' 29°18'49'' 79°46'35''
141

192.082

204.477

121.976
14.693

79.956

15.051

51.554

12.812

141.64

145.4
N
140 A
139 UD
AG
138 J
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T of
137 VB
136
e in
rL

To Koc
we
SB#109 135

To
Po v SOB

Ko
134 1K 1 GGS-II
TP-

ch
GGS WELL 100

hava
133 4

LIN

av
a
132

CH
131

T
SOB GGS-II

MA
130 TP-3
129

n
uda
128

Ja g
127 ll
We
126

To
C
NG

d
11 K

En
O
125

Ex.O
v Po
wer OLD HEADER To
124 Line
Well No. SOB 114/ 283 Chamunda Iron Private Limited

NGC
123
122 an

Pipe
ud
ag
To M
121 E J ain R
To

Line
LIN Ot
oad
120 he
udan

CH rP
119 rop
os
To Jag

T
118 edL
MA
117 ine

ava
116 ne
Li

och
WALL CROSSING

5
115 er

-
TP
w

K
114 Po
SOB#113 Well

To
Kv
113 11
112
111
110
109
108
107 CS-10/BT ROAD CH.1.756 km CS-11/BT ROAD CH.2.042 km CS-13/WBM ROAD CH.2.31 km CS-15/EXISTING LINE CH.2.533 km
CS-12/LT LINE CH.2.193 km CS-14/LT LINE CH.2.49 km
106
105
104
103
102
101
100
99
98
97
96
95
94
93
92

93.031

93.411
GROUND LEVELS
93.740

93.447

93.233

92.890

92.644

93.139

93.482

93.093

93.143

93.290

93.106

92.590

92.590

92.707

92.278

93.087
92.585

92.645

92.705
93.554
93.491

92.534
93.59

93.29

93.09

92.59

92.69

92.59
(IN METRES)

DISTANCE BETWEEN LEVEL


11.765

38.235

41.721

33.803

15.051

49.592

12.812

32.304

40.664

45.264

26.712
8.279

1.146

0.408

4.885

9.336

4.736
50

50

50

50

50

50

50

50

50

50

50

50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
1+761.765

1+841.721

2+033.803
2+048.854

2+100.408

2+304.885
2+317.696

2+459.336

2+604.736

2+726.71
2+000.00

2+050.00

2+100.00

2+150.00

2+200.00

2+250.00

2+300.00

2+350.00

2+400.00

2+450.00

2+500.00

2+550.00

2+600.00

2+650.00

2+700.00
1+750.00

1+800.00

1+850.00

1+900.00

1+950.00

CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#109 To ELECTRIC POLE / LINE CORPORATION LIMITED.
SOB GGS-II LT POLE / LINE
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW TRANSFORMER LAMP POST
BT ROAD CROSS SECTION NKBPL/ONGC/SB#109 TO SOB GGS-II/CS-10 MEHSANA ASSET
PARALLEL LINE SOB GGS-II ELECTRIC BOX TELEPHONE POLE BT ROAD CROSS SECTION NKBPL/ONGC/SB#109 TO SOB GGS-II/CS-11 MEHSANA
To SOB CTF
PARALLEL LINE SB#193+225 RIVER
WBM ROAD CROSS SECTION NKBPL/ONGC/SB#109 TO SOB GGS-II/CS-13 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
To SOB GGS-II SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE SB#134 To
SOB GGS-II
NALA CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
OTHER PROPOSED LINE

ONGC INSTALLATION FOREST BOUNDARY


4"Ø SB#109 TO SOB GGS-II WELL FLUID LINE
ALIGNMENT SHEET
VILLAGE SITE CART TRACK

TREE
CHAINAGE : FROM 1.75 TO 2.73 KM
VILLAGE BOUNDARY

EXISTING OTHER LINE / ROW TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.
BITUMEN ROAD
BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
W.B.M. ROAD WATER TANK MANHOLE Jaipur - 302015
RAILWAY LINE / PILLAR WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
Email : nkbpl.ongcwest@gmail.com
FIELD BUND / FENCING TP , IP
X X

HIGH TENSION LINE / POLE DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SB#109
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB GGS-II/ ALN- 2
IP-1/1
IP-1/2

IP-1/3

IP-1/4
IP-1/5

IP-2/1
IP-2/2

IP-3/1
IP-3/2

IP-3/3
142

TP-1

TP-2

TP-3

TP-4
Start

End
141
140
139 56°8'4'' 25°41'8'' 29°18'49'' 79°46'35''
138

199.479

154.398

133.304

201.859

159.003

133.088

113.619
16.572

13.237

75.755

15.213

193.68

12.815
8.092

46.51
137
136
135
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T

MATCH LINE
134
133
SB#134 132 SOB

va
131 S GGS-II

ocha
ta To
130 rt Ko

a
chav
To K
129 ch
av
SB#134

End
a
SOB GGS-II

o
128

To K
LIN
OLD HEADER
127 TP-3

H
TC
126
TP-2

MA
125

Ex
124

.O
NG
123

To

C
122

S
Oth

Pip
ang
er P
121 rop

eL
ose

anp
120 dL

ine
ine

ur

n
119

MATCH LINE
P-2 11 Kv Pow

da
T er Line

udan
gu
To
118

4
TP-
Ja
Ja
WALL CROSSING
117 TP-1
Well No. SOB 114/ 283
gu

g
To

To Ja
da
116
SOB#113 Well
n

n
a

E
ud

da
115

LIN
g
ONGC well

gu
Ja
114

ine

Ja
To

To

rL
Jag

TC
113

To
we
ud
an
Well No. Sob # 92

MA

Po
112

Kv
Well No. SOB 114/ 283
111

11
110
109 Lemon Garden
108
107
Well No. Sob # 92
106
105
104 CS-1/BT ROAD CH.0.22 km CS-2/BT ROAD CH.0.521 km CS-3/BT ROAD CH.0.811 km
CS-4/LT LINE CH.0.978 km CS-6/LT LINE CH.1.261 km
103
102 CS-7/EXISTING LINE CH.1.291 km
CS-5/WBM ROAD CH.1.064 km
101
100
99
98
97
96
95
94
93
92
91
90
89

93.491
GROUND LEVELS
90.089

90.090

90.108

90.107

89.847

91.927

91.790

93.014

93.560

93.293

92.963

92.700

92.950

93.548

93.214

93.030

93.370

93.276

92.637

92.590

92.590

92.590

92.820

92.293

92.706

93.087
91.655

91.975

93.455

93.045
91.598
91.633

93.554
93.491

92.534
89.79

91.79

93.69
93.59

93.29

93.09

92.59

92.69

92.59
(IN METRES)

DISTANCE BETWEEN LEVEL


49.479

25.858

11.844
13.237

24.919

49.164

15.213

32.092

14.418

35.582

12.815

29.087

29.916

20.084

13.004

36.996

26.622
0.521
16.05
8.092

28.54

21.46

0.836

2.695

8.098
50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50
0

POINTS (IN METRES)


Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+199.479

0+224.142

0+511.844
0+525.081

0+600.836

0+802.695
0+817.908

0+864.418

1+058.098
1+070.913

1+229.916

1+363.004
0+000.00

0+050.00

0+100.00

0+150.00

0+200.00

0+250.00

0+300.00

0+350.00

0+400.00

0+450.00

0+500.00

0+550.00

0+600.00

0+650.00

0+700.00

0+750.00

0+800.00

0+850.00

0+900.00

0+950.00
0+216.05

0+378.54

1+476.62
1+000.00

1+050.00

1+100.00

1+150.00

1+200.00

1+250.00

1+300.00

1+350.00

1+400.00

1+450.00
CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#134 To ELECTRIC POLE / LINE CORPORATION LIMITED.
SOB GGS-II LT POLE / LINE
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW TRANSFORMER LAMP POST
MEHSANA ASSET
PARALLEL LINE SOB GGS-II ELECTRIC BOX TELEPHONE POLE BT ROAD CROSS SECTION NKBPL/ONGC/SB#109 TO SOB GGS-II/CS-1 MEHSANA
To SOB CTF
PARALLEL LINE SB#193+225 RIVER
BT ROAD CROSS SECTION NKBPL/ONGC/SB#109 TO SOB GGS-II/CS-2 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
To SOB GGS-II BT ROAD CROSS SECTION NKBPL/ONGC/SB#109 TO SOB GGS-II/CS-3 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE SB#109 To
SOB GGS-II
NALA WBM ROAD CROSS SECTION NKBPL/ONGC/SB#109 TO SOB GGS-II/CS-5 CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
OTHER PROPOSED LINE

FOREST BOUNDARY
4"Ø SB#134 TO SOB GGS-II WELL FLUID LINE
ONGC INSTALLATION
ALIGNMENT SHEET
VILLAGE SITE CART TRACK

VILLAGE BOUNDARY TREE


CHAINAGE : FROM 0.00 TO 1.48 KM
EXISTING OTHER LINE / ROW TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.
BITUMEN ROAD BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
W.B.M. ROAD WATER TANK MANHOLE Jaipur - 302015
RAILWAY LINE / PILLAR WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
Email : nkbpl.ongcwest@gmail.com
X X FIELD BUND / FENCING TP , IP

HIGH TENSION LINE / POLE DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SB#134
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB GGS-II/ ALN- 1
IP-0/1
IP-0/2
IP-0/3
IP-0/4

IP-0/5
IP-0/6

IP-0/7

IP-1/1

IP-1/2

IP-1/3

IP-1/4
IP-1/5

IP-3/1

IP-3/2

IP-3/3
143

TP-1

TP-2

TP-3
Start
142
141
140 0°25'41'' 40°38'1'' 24°8'43''
139

218.032

218.032

115.331

154.377

120.815

202.594

215.192

152.037

149.588
49.727

13.246
14.721

44.904

43.015

51.109

17.389
8.962

5.739

12.56
138
137
136
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
135
134 Ex.O
SB#135 133 SOB WELL 173,293 NGC
Pipe

To
SOB

n
Line

itasa

D
132 AN GGS-II

ita
TAS

sa
131 I AVA

To D
of D

n
130 VB f KOCH TP
-2
o
129 VB
128
127 san
Dita C Pipe L
ine

ne
To Ex.ONG

Li
126

r
ATPUR

we
SOB WELL 77

ASAN

Po
125 ine

220V
eL

Kv
124 ip

11
CP

LINE
P
G
.ON

VB of DIT

owe
123
SOB WELL 264

VB of GER
ONGC WELL

ASAN
Ex

N
r Lin
122

UDA
TP-1

r Line

MATCH
a

e
121

v
ocha

f DIT
Powe

f JAG
SOB WELL 249

Well
120

To K
119

11 Kv

VB o
TP-3

NGC
d
Fiel

VB o
118 To
SOB WELL 151

To O
SB#135
117
116
OFC

115

Ex
.O
Start 114

NG

To
113

SO
Pi p
112

B
eL

GG
111
VB of KOCHAV
A SOB WELL 10

in e

S-
110

II
109
11
K

108
vP
ow

107
er

106
Lin

CS-5/WBM ROAD CH.0.708 km CS-6/EXISTING LINE CH.0.95 km CS-9/EXISTING LINE CH.1.217 km


e

105 CS-1/CART TRACK CH.0.053 km CS-10/LT LINE CH.1.4 km


104 CS-7/BT ROAD CH.1.013 km
CS-2/CART TRACK CH.0.079 km CS-11/EXISTING LINE CH.1.412 km
103
CS-8/Electric line CH.1.024 km CS-12/EXISTING LINE CH.1.465 km
102
CS-3/LT LINE CH.0.09 km CS-13/OPTICAL FIBER CABLE CH.1.483 km
101
100 CS-4/CART TRACK CH.0.134 km CS-14/BT ROAD CH.1.498 km
99
98
97
96
95
94
93
92
91
90
90.741

90.411

92.991

93.361

92.721
GROUND LEVELS
90.936

90.638

90.410

90.297

90.600

91.483

91.720

91.720

92.288

92.952

93.284

93.843

93.286

92.778

93.097

93.882

93.613

94.044

92.709

92.792

92.469

92.490

92.728

93.460

92.869

92.828
90.985

92.695

93.605

93.405

92.695
90.935

90.945
90.935

90.697

90.754
90.759

93.396

94.026

93.911

92.451
90.62

92.59

93.39

92.69

93.99

92.49

92.49

93.59
(IN METRES)

DISTANCE BETWEEN LEVEL


49.727

13.246

14.721

13.345

12.701

44.669

23.363

26.637

38.694

11.306

31.709

18.291

36.086

13.914

30.538

22.056

27.944

37.248

12.752

38.357

11.643

44.255

42.218
0.273
8.689

31.56

5.739

5.331

6.901
12.56

5.745

7.782
50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50
0

POINTS (IN METRES)


Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+137.299

0+355.331

0+573.363

0+688.694

0+731.709

0+886.086

1+006.901
1+019.462

1+222.056

1+437.248

1+488.357

1+505.745

1+657.782
0+000.00

0+050.00

0+100.00

0+150.00

0+200.00

0+250.00

0+300.00

0+350.00

0+400.00

0+450.00

0+500.00

0+550.00

0+600.00

0+650.00

0+700.00

0+750.00

0+800.00

0+850.00

0+900.00

0+950.00
0+49.727

0+58.689
0+71.935

0+86.655

0+131.56

1+000.00

1+050.00

1+100.00

1+150.00

1+200.00

1+250.00

1+300.00

1+350.00

1+400.00

1+450.00

1+500.00

1+550.00

1+600.00

1+650.00

1+700.00

1+750.00
CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#135 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB GGS-II
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
MEHSANA ASSET
PARALLEL LINE SB#155
RIVER WBM ROAD CROSS SECTION NKBPL/ONGC/SB#135 TO SOB GGS-II/CS-5 MEHSANA
To SOB GGS-II

NALA
BT ROAD CROSS SECTION NKBPL/ONGC/SB#135 TO SOB GGS-II/CS-7 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
OTHER PROPOSED LINE
BT ROAD CROSS SECTION NKBPL/ONGC/SB#135 TO SOB GGS-II/CS-14 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
ONGC INSTALLATION CANAL CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
VILLAGE SITE FOREST BOUNDARY
ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.

VILLAGE BOUNDARY CART TRACK


4"Ø SB#135 TO SOB GGS-II WELL FLUID LINE
ALIGNMENT SHEET
EXISTING OTHER LINE / ROW TREE

TEMPLE / CHHATRI / MOSQUE


CHAINAGE : FROM 0.00 TO 1.75 KM
BITUMEN ROAD

W.B.M. ROAD BUILDING/ HUT N.K.BUILDCON (P) LTD.


RAILWAY LINE / PILLAR TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FIELD BUND WATER TANK MANHOLE Jaipur - 302015
X X FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE
LT POLE / LINE
DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SB#135
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB GGS-II/ ALN- 1
IP-3/4

IP-3/5

IP-4/1
IP-4/2

IP-5/1
142

TP-4

TP-5

TP-6

End
141
140
139 43°27'41'' 54°6'52'' 32°9'19''
138

145.982

203.808
16.536

76.424

60.401

10.892

63.431
9.061
137
136
135
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
134
133

To
Well No. Sob # 92

11
SB#135 132
ONGC WELL SOB

Jag

11 K
Kv
131 GGS-II

Po

uda
TP

v Po
we
130 -5

r Li

nR

wer
11
129 Kv

ne
Po

Line
Well No. Sob # 92
we
128 rL
ine
127 SOB GGS-II to SOB
126 CTF Oil Pipe Line
125
TP-4
124

To
SB#109 to SOB GGS-II
123

Koc
Well Fluid Line
122

hav
121 an

a
120 g ud WALL CROSSING
Ja ne
119 To r Li SB#193+225 to SOB
ad we GGS-II Well Fluid Line
118 in Ro Po
To Ma

ine
Kv
ell 117 GSPC Heramec 11

dL
TP-
E
LIN W
Off loading Facility

se
116

6
H GC

po
TC

a
ON 115

av

e
ro
MA

in
To

ch

rP
114

ipe L
Ko

he
an

To
113

Ot
Essar oil and Gas ud

GC P
112 Jag
Exploration production LtD. To
111
SOB GGS-II

End

N
OLD HEADER

O
110

Ex .
N
SA 109 E 11
T A LIN Kv
Pow
DI N 108 H
TC er L
of DA MA
ine
V B G U 107
JA 106
of
VB 105 CS-15/CART TRACK CH.1.816 km CS-20/BT ROAD CH.2.326 km
104 CS-16/LT LINE CH.1.95 km
103 CS-17/LT LINE CH.1.958 km
102
CS-18/BT ROAD CH.1.967 km
101
100 CS-19/LT LINE CH.1.985 km
99
98
97
96
95
94
93
92
91
90
89
92.931
92.828

92.183

92.102

92.126

92.450

91.430

90.367

90.138

91.724

92.540

92.794

93.087
90.855
GROUND LEVELS
92.216

92.127

93.051

92.926
92.19

93.09

89.99

92.89
(IN METRES)

DISTANCE BETWEEN LEVEL


16.536

26.094

10.732
10.892

28.376

17.605

32.395

21.413

19.525

43.906
49.67

9.061
7.37

0.33
50

50

50

50

50

50

50
POINTS (IN METRES)
Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
1+823.906

1+960.732
1+971.624

2+117.605

2+321.413
2+330.475

2+393.91
2+000.00

2+050.00

2+100.00

2+150.00

2+200.00

2+250.00

2+300.00

2+350.00
1+807.37

1+900.33
1+750.00

1+800.00

1+850.00

1+900.00

1+950.00

CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#135 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB GGS-II
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
BT ROAD CROSS SECTION NKBPL/ONGC/SB#135 TO SOB GGS-II/CS-18 MEHSANA ASSET
PARALLEL LINE SB#155
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/SB#135 TO SOB GGS-II/CS-20 MEHSANA
To SOB GGS-II

NALA
RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
OTHER PROPOSED LINE
SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
ONGC INSTALLATION CANAL CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
VILLAGE SITE FOREST BOUNDARY
ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.

VILLAGE BOUNDARY CART TRACK


4"Ø SB#135 TO SOB GGS-II WELL FLUID LINE
ALIGNMENT SHEET
EXISTING OTHER LINE / ROW TREE

TEMPLE / CHHATRI / MOSQUE


CHAINAGE : FROM 1.75 TO 2.39 KM
BITUMEN ROAD

W.B.M. ROAD BUILDING/ HUT N.K.BUILDCON (P) LTD.


RAILWAY LINE / PILLAR TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FIELD BUND WATER TANK MANHOLE Jaipur - 302015
X X FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE
LT POLE / LINE
DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SB#135
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB GGS-II/ ALN- 2
IP-0/1
IP-0/2

IP-0/3

IP-0/4
IP-0/5

IP-1/1

IP-1/2
IP-1/3

IP-2/1
IP-2/2

IP-2/3
IP-2/4

IP-2/5

IP-3/1
143

TP-1

TP-2

TP-3
Start
142
141
140 47°46'10'' 62°17'48'' 0°25'41''
139

121.243

202.688

202.688

144.534

170.215

134.773

132.927

219.112

219.112
12.548

13.714

10.142

11.831
14.794

27.179

91.094
5.911
138
137
136
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
135
134
SB#155 133 NE SOB
LI
132 GGS-II

MATCH LINE
CH

MATCH LINE
MATCH LINE
131 AT
M
130

Ex.
SSN
129

UR

TPUR
I YA

AN
128

ur
TP

NL
AD

tp
r

DITAS
11
127

pu

RA

ra
pu
i ne

Wa

GERA
AK
rat

Ge
Kv
rL
126

rat
SOB WELL 77

GE

ter
Ge

Po
we

To
BH

Ge
125

we
SB#155 Po

P
To

of

VB of
SB#135

To

r
ipel
of
Kv

Lin
124

VB of
VB
VB
11

e
VB

ine
123 of NE
G
VB ERA
122 LI
Start TP-3

- 1
TP CH

TP
121 of
KO UR AT
INE
TP-2
120 CH

VB of
M

11
AV HL
119
C

Kv
A AT
ld
To Fie
M

VB of
118

owe

GERA
ld
iya

Fie
117

r Li

To Kochava

11

MATCH LINE
ad

ne

MATCH LINE
To
116

11
K
KOCH

MATCH LINE
ak

v
TPUR
WELL 143

Po
e

Kv
Bh

115 Lin
wer

we
V Po

P ow
To

220

r
114 VB of KOCHAVA

Lin

er L
AVA

e
E
113 LIN

i ne
H
112 TC
MA
111
110
109
108
107
106
105 CS-3/CART TRACK CH.0.544 km CS-5/LT LINE CH.0.965 km
CS-1/LT LINE CH.0.08 km
104 CS-7/LT LINE CH.1.161 km
103 CS-4/LT LINE CH.0.572 km CS-6/BT ROAD CH.1.007 km
102 CS-2/BT ROAD CH.0.127 km
CS-8/CART TRACK CH.1.164 km
101
100
CS-9/CART TRACK CH.1.202 km
99
98
97
96
95
94
93
92
91
90

91.321

92.501

90.351

91.761

92.061

93.921
GROUND LEVELS
95.190

94.890

94.209

93.342

93.186

93.577

92.987

92.047

91.193

90.790

90.790

90.908

91.622

91.790

92.116

92.620

92.983

91.502

90.936

90.780

90.454

90.336

90.527

91.109

91.658

92.680
94.745

91.245

91.265

93.245
94.591

93.266

92.986
92.928

90.937

90.725

90.697

90.754

90.759

93.396
94.49

91.39
91.19

90.89

91.79

90.62

92.59
(IN METRES)

DISTANCE BETWEEN LEVEL


21.243

12.548

16.209

36.479

13.521

39.167

10.833

47.119

47.415

32.371

10.142

37.455

45.471

14.794

27.179

44.815

24.297

25.703

43.409

34.504

15.496
2.881

2.585

17.63

2.403

4.529
7.302

0.726
5.185

6.591
50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50
0

POINTS (IN METRES)


Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+121.243
0+133.791

0+336.479

0+539.167
0+552.881

0+697.415

1+002.403
1+012.545

1+145.471

1+157.302

1+172.095

1+199.274

1+205.185

1+424.297

1+643.409

1+734.504
0+000.00

0+050.00

0+100.00

0+150.00

0+200.00

0+250.00

0+300.00

0+350.00

0+400.00

0+450.00

0+500.00

0+550.00

0+600.00

0+650.00

0+700.00

0+750.00

0+800.00

0+850.00

0+900.00

0+950.00
0+867.63

1+000.00

1+050.00

1+100.00

1+150.00

1+200.00

1+250.00

1+300.00

1+350.00

1+400.00

1+450.00

1+500.00

1+550.00

1+600.00

1+650.00

1+700.00

1+750.00
CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#155 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB GGS-II
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
MEHSANA ASSET
PARALLEL LINE SB#135
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/SB#155 TO SOB GGS-II/CS-2 MEHSANA
To SOB GGS-II

NALA
BT ROAD CROSS SECTION NKBPL/ONGC/SB#155 TO SOB GGS-II/CS-6 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
OTHER PROPOSED LINE
SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
ONGC INSTALLATION CANAL CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
VILLAGE SITE FOREST BOUNDARY
ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.

VILLAGE BOUNDARY CART TRACK


4"Ø SB#155 TO SOB GGS-II WELL FLUID LINE
ALIGNMENT SHEET
EXISTING OTHER LINE / ROW TREE

TEMPLE / CHHATRI / MOSQUE


CHAINAGE : FROM 0.00 TO 1.75 KM
BITUMEN ROAD

W.B.M. ROAD BUILDING/ HUT N.K.BUILDCON (P) LTD.


RAILWAY LINE / PILLAR TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FIELD BUND WATER TANK MANHOLE Jaipur - 302015
X X FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE
LT POLE / LINE
DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SB#155
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB GGS-II/ ALN- 1
IP-3/2

IP-3/3

IP-3/4
IP-3/5

IP-5/1

IP-5/2

IP-5/3

IP-5/4
IP-5/5

IP-6/1
IP-6/2

IP-7/1
142

TP-4

TP-5

TP-6

TP-7

TP-8

End
141
140
139 40°37'40'' 24°8'22'' 43°27'41'' 54°6'52'' 32°17'29''
138

154.641

202.397

142.472

158.183

142.954

200.125
41.845

144.42

12.306

214.46

60.044

17.804

14.645

68.955

58.852

10.922

61.745
9.024
137
136
135
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
134
133 To
Ex.ON Di
SB#155 132 GC P OP ta
ipe Lin TI sa SOB
e
Well No. Sob # 92
C n
131
SOB WELL 173,293 AL
FI
BE
GGS-II

To
asan
130 R
TP

11
11
CA

Ja
129 BL -7

Kv

K
To Dit

gu
E

vP
SAN TP

Po
128
ONGC WELL

da
ITA -4

owe
VA
Well No. Sob # 92

LINE

we
D

nR
127 o f CHA

rL
VB

r
KO 11

L in
ine

S
126 of Kv

e
Pow
VB

e
Lin
H
er L

MATC
125 ine

r
we
ipe L ine

Po
GC P

MATCH LINE
124
Ex.ON

Kv
an e an
123 itas Lin

11
e ud WALL CROSSING
122 T oD Pip ONGC WELL Ja
g

er Line
e
C

To ONG
6
TP-

er Lin
G
To

To
121 . ON
SOB WELL 77 Ex

Ko
Pow

11 Kv Pow
120

e
ch

Lin
SOB WELL 249

av
220V
119
SOB WELL 264

ed
a
Well
chava
118

TP

os
TP-5 GSPC Heramec

rop
-8
117
Off loading Facility

a
To Ko

rP
av
TP-3 116 d
Roa

ch

he
LINE

Ex
ain
115
SOB WELL 151

Ko
To M

OFC
CH

Ot
.O
MAT

To
NG
114

SAN
DAN
ld
Fie

CP
113 OLD HEADER
To
LINE

To

En
ITA
AGU
To
ipe
112 ON

d
GC

SO
Lin

of D
111 W
H

ell LINE

of J
B
e
MATC

SOB GGS-II
110
CH
SOB WELL 10

GG
MAT

VB
S-

VB
109

II
108
107
GGS WELL 100
106
105
104 CS-10/WBM ROAD CH.1.753 km CS-11/EXISTING LINE CH.2.018 km CS-14/EXISTING LINE CH.2.265 km CS-20/CART TRACK CH.2.892 km CS-25/BT ROAD CH.3.384 km
CS-15/LT LINE CH.2.464 km CS-21/LT LINE CH.3.016 km
103 CS-16/EXISTING LINE CH.2.483 km
102 CS-22/LT LINE CH.3.023 km
CS-17/EXISTING LINE CH.2.542 km
101 CS-12/BT ROAD CH.2.081 km
CS-18/OPTICAL FIBER CABLE CH.2.559 km CS-23/BT ROAD CH.3.031 km
100
CS-13/Electric line CH.2.092 km CS-19/BT ROAD CH.2.574 km CS-24/LT LINE CH.3.05 km
99
98
97
96
95
94
93
92
91
90
89
93.921

93.881

92.291

92.181
GROUND LEVELS
93.108

92.813

92.690

92.974

93.590

93.294

93.463

93.927

93.724

92.796

92.700

92.792

92.513

92.453

92.490

92.614

93.163

93.172

92.906

92.062

92.668

92.786

91.723

90.647

90.073

91.578

92.403

92.844

93.083
93.335

90.665
94.026

93.908

92.451

92.216

92.127

93.051

92.926
93.39

92.69

93.99

92.49

92.49

93.59

92.19

93.09

89.99

92.89
(IN METRES)

DISTANCE BETWEEN LEVEL


26.349

23.651

20.769

29.231

25.409

12.306
12.285

40.112

45.428

14.616

17.804

24.892

25.108

33.076

14.645

16.676

33.324

25.529

10.922
13.549

29.405

20.595

11.446

50.299
9.888

4.572

17.58

2.279

29.53

9.024
50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
1+776.349

1+920.769

2+075.409
2+087.715

2+290.112

2+504.572

2+564.616

2+724.892

2+883.076
2+897.721

2+966.676

3+025.529
3+036.451

3+179.405

3+388.554
2+000.00

2+050.00

2+100.00

2+150.00

2+200.00

2+250.00

2+300.00

2+350.00

2+400.00

2+450.00

2+500.00

2+550.00

2+600.00

2+650.00

2+700.00

2+750.00

2+800.00

2+850.00

2+900.00

2+950.00

3+000.00

3+050.00

3+100.00

3+150.00

3+200.00

3+250.00

3+300.00

3+350.00

3+400.00

3+450.00
3+450.30
2+582.42

3+379.53
1+750.00

1+800.00

1+850.00

1+900.00

1+950.00

CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#155 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB GGS-II
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
WBM ROAD CROSS SECTION NKBPL/ONGC/SB#155 TO SOB GGS-II/CS-10 MEHSANA ASSET
PARALLEL LINE SB#135
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/SB#155 TO SOB GGS-II/CS-12 MEHSANA
To SOB GGS-II

NALA
BT ROAD CROSS SECTION NKBPL/ONGC/SB#155 TO SOB GGS-II/CS-19 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
OTHER PROPOSED LINE
BT ROAD CROSS SECTION NKBPL/ONGC/SB#155 TO SOB GGS-II/CS-23 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
ONGC INSTALLATION CANAL BT ROAD CROSS SECTION NKBPL/ONGC/SB#155 TO SOB GGS-II/CS-25 CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
VILLAGE SITE FOREST BOUNDARY
ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.

VILLAGE BOUNDARY CART TRACK


4"Ø SB#155 TO SOB GGS-II WELL FLUID LINE
ALIGNMENT SHEET
EXISTING OTHER LINE / ROW TREE

TEMPLE / CHHATRI / MOSQUE


CHAINAGE : FROM 1.75 TO 3.45 KM
BITUMEN ROAD

W.B.M. ROAD BUILDING/ HUT N.K.BUILDCON (P) LTD.


RAILWAY LINE / PILLAR TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FIELD BUND WATER TANK MANHOLE Jaipur - 302015
X X FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE
LT POLE / LINE
DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SB#155
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB GGS-II/ ALN- 2
IP-0/1

IP-1/1

IP-1/2
IP-1/3

IP-1/4

IP-2/1
IP-2/2

IP-2/3

IP-2/4
IP-2/5

IP-3/1
IP-3/2
142

TP-1

TP-2

TP-3

TP-4
Start
141
140
139 76°17'24'' 39°27'9'' 25°41'8'' 29°18'49''
138

193.737

193.737

153.597

143.456

152.766

155.613

126.255
181.07

16.723

13.965

77.856

196.97

15.132

49.032
8.468

8.014
137
136
135
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
134
133
SB#193+
225 132
ONGC well SOB#
SOB

MATCH LINE
131 GGS-II

To Kherva
159'266'238'180'267
E
130 H LIN
MATC

To Kochava
129

pur
128

gan
ONGC well

a
127

av

E
LIN
San

ch
126

Ko

H
125

To

To

TC
124 ONGC pump House
TP

MA
123 -2 TP-3

INE
122 TP

HL
-4

TP-1

N
121

LI

TC
Start

CH
120

MA
AT
119
ONGC well

ine

n
118

da
wer L
guda

gu
SB#193+225 117
an SBN#63'185"207

Ja
v Po
MATCH LINE
ud

11
116

To Ja
ag

To
J

Kv

11 K
Well
o Lemon Garden Lemon Garden
115 T

To Ja
Po
Lemon Garden
e
Well No. SOB 114/ 283

w
114 Lin 9 Lemon Garden

E
er

an
er -21

LIN
gudan
ow

Lin
113 SH

agud
vP
SOB#113 Well
11

e
1K Kv

H
112 1 Po

TC
we

To J
rL
111 ine

MA
110
SOB#113 Well

E
To

N
109 Kh

LI
erv

CH
108
a

AT
107

M
106
105
104 CS-1/LT LINE CH.0.629 km CS-4/BT ROAD CH.1.048 km CS-5/BT ROAD CH.1.343 km CS-6/BT ROAD CH.1.631 km
103 CS-2/BT ROAD CH.0.688 km
102
CS-3/LT LINE CH.0.696 km
101
100
99
98
97
96
95
94
93
92
91
90
89

89.861

91.311

91.741
GROUND LEVELS
90.089

90.087

90.094

90.102

90.109

90.106

90.110

89.804

90.382

91.003

91.077

91.127

91.629

91.844

91.927

92.118

92.257

91.922

91.856

91.790

91.790

92.544

93.280

93.580

93.387

93.122

92.569

93.393

93.388

92.892

93.230
90.085

92.815
90.101

91.294

91.948

91.598

91.633

93.554

93.491
89.79

90.99

91.39

91.89

91.79

93.69
93.59

93.29

93.09
(IN METRES)

DISTANCE BETWEEN LEVEL


43.737

37.474

12.526

34.527

45.761

16.723

48.434

42.821

33.435

13.965

25.255

24.745

22.225

15.132
12.643

36.389

13.611
6.263

41.07

8.468
7.006

4.239

26.83

6.447
1.566

7.179

2.601
8.93
50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50
0

POINTS (IN METRES)


Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+193.737

0+387.474

0+684.527
0+692.994

0+845.761

1+043.553

1+051.566

1+207.179

1+333.435
1+347.399

1+425.255

1+622.225

1+637.357

1+686.389
0+000.00

0+050.00

0+100.00

0+150.00

0+200.00

0+250.00

0+300.00

0+350.00

0+400.00

0+450.00

0+500.00

0+550.00

0+600.00

0+650.00

0+700.00

0+750.00

0+800.00

0+850.00

0+900.00

0+950.00
0+541.07

1+026.83
1+000.00

1+050.00

1+100.00

1+150.00

1+200.00

1+250.00

1+300.00

1+350.00

1+400.00

1+450.00

1+500.00

1+550.00

1+600.00

1+650.00

1+700.00

1+750.00
CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#193+225 ELECTRIC POLE / LINE CORPORATION LIMITED.
To SOB GGS-II LT POLE / LINE
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW TRANSFORMER LAMP POST
MEHSANA ASSET
PARALLEL LINE SOB GGS-II
ELECTRIC BOX TELEPHONE POLE BT ROAD CROSS SECTION NKBPL/ONGC/SB#193+225 TO SOB GGS-II/CS-2 MEHSANA
To SOB CTF
PARALLEL LINE SB#109
RIVER
BT ROAD CROSS SECTION NKBPL/ONGC/SB#193+225 TO SOB GGS-II/CS-4 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
To SOB GGS-II BT ROAD CROSS SECTION NKBPL/ONGC/SB#193+225 TO SOB GGS-II/CS-5 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE SB#134 To
SOB GGS-II
NALA BT ROAD CROSS SECTION NKBPL/ONGC/SB#193+225 TO SOB GGS-II/CS-6 CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
OTHER PROPOSED LINE CANAL
ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION FOREST BOUNDARY
4"Ø SB#193+225 TO SOB GGS-II WELL FLUID LINE
ALIGNMENT SHEET
VILLAGE SITE CART TRACK

VILLAGE BOUNDARY TREE


CHAINAGE : FROM 0.00 TO 1.75 KM

EXISTING OTHER LINE / ROW TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.
BITUMEN ROAD BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
W.B.M. ROAD WATER TANK MANHOLE Jaipur - 302015
RAILWAY LINE / PILLAR WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
Email : nkbpl.ongcwest@gmail.com
X X FIELD BUND / FENCING TP , IP

HIGH TENSION LINE / POLE DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SB#193+225
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB GGS-II/ ALN- 1
IP-4/1
IP-4/2

IP-4/3
145

TP-5

End
144
143
142 79°46'35''
141

199.078

150.321

139.244

117.797
12.813
140
139

E IN
138

CH L
ll
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
We
137 NG
C
O
136
To

MAT
SB#193+
va
225 ocha 135 SOB
134 GGS-II

To
133

Ko
To K

ch
tD
132 nL

av
ctio s
Chamunda Iron Private Limited

a
TP-4 131 d u a
pro d G Ma
To
130 tion oil an

d
SOB GGS-II
a in R

En
r
plo ar oad
129 OLD HEADER

Ex
Ex Ess

.ON
128

GC
127 cili
ty
Fa ec

a
126

Pip
g

v
di n am

ha
loa Her

a
e
125

av
Off SPC

Li n

Ko
n

LINE

ch
guda

124 G

e
11 Kv

To

o
Power
e
Oth

oK
Line in
123 er e L S-II
To Ja

T
CH

122 rop p
i G
ose dP G
dL ui SOB
MAT

an
121 ine
l

ud
F
ell to

g
120 W 155

Ja
ine

-5
er L
WALL CROSSING

To
#
119 Pow

TP
SB 11 K
v
ONGC WELL
118

e
ine
Well No. SOB 114/ 283

Lin
S
rL

R
ine
117

er
we

ow
an
rL
116

Po

vP
we

ud
an
Po

1K
g
v
115

ud

Ja
Kv

1
11
ag

To
11
114

J
Well No. Sob # 92

To
113
112
111
110
109
108
107 CS-8/WBM ROAD CH.1.891 km
CS-7/LT LINE CH.1.788 km CS-9/LT LINE CH.2.079 km
106
105
104 CS-10/EXISTING LINE CH.2.116 km
103
102
101
100
99
98
97
96
95
94
93
92
92.941

GROUND LEVELS
93.230

93.290

92.590

92.590

92.590

92.699

93.216

93.347

92.500

92.290

93.006
93.087
92.534
92.59

92.69

92.59
(IN METRES)

DISTANCE BETWEEN LEVEL


35.468

12.813

48.602

37.846

12.154
1.719

1.398

5.644
50

50

50

50

50

50

50

50
POINTS (IN METRES)
Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
1+885.467
1+898.281

2+048.602

2+187.846
2+000.00

2+050.00

2+100.00

2+150.00

2+200.00

2+250.00

2+300.00
2+305.64
1+750.00

1+800.00

1+850.00

1+900.00

1+950.00

CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#193+225 ELECTRIC POLE / LINE CORPORATION LIMITED.
To SOB GGS-II LT POLE / LINE
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW TRANSFORMER LAMP POST WBM ROAD CROSS SECTION NKBPL/ONGC/SB#193+225 TO SOB GGS-II/CS-8 MEHSANA ASSET
PARALLEL LINE SOB GGS-II
ELECTRIC BOX TELEPHONE POLE MEHSANA
To SOB CTF
PARALLEL LINE SB#109
RIVER
RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
To SOB GGS-II SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE SB#134 To
SOB GGS-II
NALA CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
OTHER PROPOSED LINE CANAL
ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION FOREST BOUNDARY
4"Ø SB#193+225 TO SOB GGS-II WELL FLUID LINE
ALIGNMENT SHEET
VILLAGE SITE CART TRACK

VILLAGE BOUNDARY TREE


CHAINAGE : FROM 1.75 TO 2.31 KM

EXISTING OTHER LINE / ROW TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.
BITUMEN ROAD BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
W.B.M. ROAD WATER TANK MANHOLE Jaipur - 302015
RAILWAY LINE / PILLAR WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
Email : nkbpl.ongcwest@gmail.com
X X FIELD BUND / FENCING TP , IP

HIGH TENSION LINE / POLE DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SB#193+225
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB GGS-II/ ALN- 2
IP-1/1

IP-1/2
IP-1/3

IP-2/1
IP-2/2

IP-3/1
IP-3/2

IP-3/3

IP-3/4
IP-3/5

IP-4/1

IP-4/2
IP-4/3
144

TP-1

TP-2

TP-3

TP-4
Start
143
142
141 79°46'35'' 29°18'49'' 25°41'8'' 39°27'9''
140

126.155

151.556

138.225

187.193

112.159

158.042

152.581

179.768

202.318
10.549

206.87

54.076

82.056

15.421

17.025
14.97

7.858

8.341
139
138
137
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
136

NE
SOB 135

LI
GGS-II 134

MATCH LINE
CH

MATCH LINE
133 SOB CTF

MAT
E

To Jagudan
E
132

LIN

To Ja
N
LI
131 Lemon Garden
ONGC well

11
CH

H
Lemon Garden

Kv
TC

gudan
130 n AT
da
SBN#63'185"207

Po
Line
M

an
MA
Well No. Sob # 92 129 gu

we
Ja
Well No. SOB 114/ 283

ine

agud

rL
wer
128 To

n
To
Well

L
Lemon Garden

da

ine
TP- Ja

er

v Po
2 g

gu
127

To J
ud

Po
an

Ja
SOB#113 Well

11 K
126

Kv

To
11

n
125 11 Kv Power Line

da
TP-1

-4
gu

TP
124 TP-4

Ja
123

To
WALL CROSSING
122 -2 a
TP av
n

NE ONGC pump House


da

ch LI

NE
121
Ko
gu

CH
Ja

LI
120 To AT

E va
TP-3
To

CH
119 Ex

To Kocha
M
.O

MATCH LINE
ONGC well

MATCH LINE
LIN
ONGC well

MAT

To
118 N
GC
O

S
th

117

CH
To

ang
er

Pi

To Kherva
Ko
SOB#
pe
Pr
va

116

AT

anp
ch
op
ha

Lin
av

M
os

115
SOB GGS-II a
159'266'238'180'267
oc

ur
e
ed
K

114
Li

a
To

ne

hav
Start

113
OLD HEADER

Koc
112

To
111
110
109
108
107
106 CS-1/LT LINE CH.0.247 km CS-3/LT LINE CH.0.55 km CS-5/BT ROAD CH.0.979 km CS-6/BT ROAD CH.1.261 km CS-7/LT LINE CH.1.61 km
CS-2/WBM ROAD CH.0.419 km CS-4/BT ROAD CH.0.694 km
105
104 CS-8/BT ROAD CH.1.619 km
103
102 CS-9/LT LINE CH.1.675 km
101
100
99
98
97
96
95
94
93
92
91
92.371

92.871

92.731

93.011

93.511

92.851

91.861

91.011
GROUND LEVELS
92.422

93.103

93.466

92.590

92.590

92.590

92.767

93.262

93.289

93.013

93.213

93.604

92.848

93.328

93.417

91.790

91.790

91.960

91.558

91.890

92.172

91.887

91.680

91.340

91.156

91.088
92.245
93.087

92.534

93.491

93.554

91.633
91.598

91.826

91.294
92.59

92.69

92.59

93.09

93.29

93.59

93.69

91.79

91.89

91.39
(IN METRES)

DISTANCE BETWEEN LEVEL


26.155

23.845

27.711

22.289

15.936
10.549

23.515

33.354

16.646

37.431

12.569

39.594

10.406

15.421

49.229

17.025

17.847

34.734

15.266

14.502

27.157
21.65

12.93

0.771

7.271
7.858

8.341
47.6
2.4
50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50
0

POINTS (IN METRES)


Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+126.155

0+277.711

0+415.936
0+426.485

0+633.354

0+687.431

0+889.594

0+987.071

1+099.229

1+257.271
1+265.128

1+282.153

1+434.734

1+614.502
1+622.843
0+000.00

0+050.00

0+100.00

0+150.00

0+200.00

0+250.00

0+300.00

0+350.00

0+400.00

0+450.00

0+500.00

0+550.00

0+600.00

0+650.00

0+700.00

0+750.00

0+800.00

0+850.00

0+900.00

0+950.00

0+971.65

1+000.00

1+050.00

1+100.00

1+150.00

1+200.00

1+250.00

1+300.00

1+350.00

1+400.00

1+450.00

1+500.00

1+550.00

1+600.00

1+650.00

1+700.00

1+750.00
CUMULATIVE CHAINAGE

0+702.4
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SOB GGS-II CART TRACK CORPORATION LIMITED.
To SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW FIELD BUND / FENCING
X X MEHSANA ASSET
PARALLEL LINE SB#109 To
HIGH TENSION LINE / POLE WBM ROAD CROSS SECTION NKBPL/ONGC/SOB GGS-II TO SOB CTF/CS-2 MEHSANA
SOB GGS-II
PARALLEL LINE SB#193+225 ELECTRIC POLE / LINE BT ROAD CROSS SECTION NKBPL/ONGC/SOB GGS-II TO SOB CTF/CS-4 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
To SOB GGS-II LT POLE / LINE BT ROAD CROSS SECTION NKBPL/ONGC/SOB GGS-II TO SOB CTF/CS-5 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE SB#134 To
To SOB GGS-II
TRANSFORMER LAMP POST BT ROAD CROSS SECTION NKBPL/ONGC/SOB GGS-II TO SOB CTF/CS-6 CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
PARALLEL LINE SB#17 To
ELECTRIC BOX TELEPHONE POLE
BT ROAD CROSS SECTION NKBPL/ONGC/SOB GGS-II TO SOB CTF/CS-8 ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
SOB CTF
PARALLEL LINE SB#125 To RIVER
8"Ø SOB GGS-II TO SOB CTF WELL FLUID LINE
SOB CTF
NALA
ALIGNMENT SHEET
OTHER PROPOSED LINE

ONGC INSTALLATION CANAL


CHAINAGE : FROM 0.00 TO 1.75 KM

VILLAGE SITE TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.


VILLAGE BOUNDARY BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
EXISTING OTHER LINE / ROW WATER TANK MANHOLE Jaipur - 302015
BITUMEN ROAD WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
Email : nkbpl.ongcwest@gmail.com
W.B.M. ROAD TP , IP

RAILWAY LINE / PILLAR DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SOB
/ GGS-IITo
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB CTF/ ALN-1
IP-4/10
IP-4/11

IP-4/12
IP-4/4

IP-4/5

IP-4/6

IP-4/7

IP-4/8

IP-4/9

IP-5/1
IP-5/2

IP-5/3
142

TP-5
141
140
139 47°30'9''
138

171.294

165.522

216.932

194.332

186.691

154.126

180.314

194.835

178.926
16.192

7.567

5.873
137
136
135
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
134
SOB 133
GGS-II

MATCH LINE
132
131 SOB CTF
MATCH LINE

MATCH LINE
130

To Main Road
129 ine
rL

To P
owe
128 K vP
11

unas
E
Lemon Garden
127

To
N
LI
SB#17

Ja
126 H

an
SB#17

gu

11
C
Lemon Garden 125 AT

da

Kv
n
M

Po
SH
124

w
-2

er
123

1
TP-5

Lin
122

e
121

TP
120

5 -

To K
119
118
ONGC Well

herv
11

VB
VB
117

Kv

MATCH LINE
E

ne
N

Po

a
LI

t Li

of P
116

of J
MATCH LINE

er

MATCH LINE
H
H

Li
C

Kv
115

ne

UNA
AT

AGU
To F
400
114
M

To

SAN
ie
113

Kh

DAN
ld
er
112

va
111
110
109
108
107
106
105
104 CS-10/LT LINE CH.1.965 km CS-12/HT LINE CH.2.266 km CS-14/CART TRACK CH.2.779 km CS-15/LT LINE CH.3.231 km
103
102
101 CS-11/SH CH.2.004 km CS-16/WBM ROAD CH.3.315 km
CS-13/LT LINE CH.2.356 km
100
99
98
97
96
95
94
93
92
91
90
89
91.011

90.461

91.711

89.961
GROUND LEVELS
89.802

90.954

92.184

91.602

91.800

91.834

91.437

91.159

91.003

90.933

90.278

90.742

90.790

90.790

90.790

90.416

89.954

89.368

89.372

89.777

90.132

90.293

89.864

89.799

89.750

89.627

89.609

89.982

90.314
89.865

90.385

89.795
91.891

91.799

91.091

90.234
90.193

89.595
89.595
90.09

91.79

90.79

89.69

89.89

90.39
(IN METRES)

DISTANCE BETWEEN LEVEL


25.161

24.839

46.454

12.646

37.354

28.169

21.831

45.101

39.433

10.567

26.124

16.309

37.816

12.184

12.966

31.161

47.764
3.546

4.899

7.567

18.13

31.87

5.873

2.236
50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50

50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
1+825.161

1+996.454

2+012.646

2+178.169

2+395.101

2+589.433

2+776.124
2+783.691

2+937.816

3+312.966
3+318.839

3+497.764
2+000.00

2+050.00

2+100.00

2+150.00

2+200.00

2+250.00

2+300.00

2+350.00

2+400.00

2+450.00

2+500.00

2+550.00

2+600.00

2+650.00

2+700.00

2+750.00

2+800.00

2+850.00

2+900.00

2+950.00

3+000.00

3+050.00

3+100.00

3+150.00

3+200.00

3+250.00

3+300.00

3+350.00

3+400.00

3+450.00

3+500.00
3+118.13
1+750.00

1+800.00

1+850.00

1+900.00

1+950.00

CUMULATIVE CHAINAGE
(METRES)

LOCATED WITHIN 15m, CH.

PUBLIC PLACES OF ASSEMBLY


(20 PEOPLE OR MORE), CH.

NO. OF DWELLINGS

CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)

SPECIAL PROVISIONS

PIPELINE COVER
MINIMUM (METRES)

SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS

CROSSINGS

COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH

SOIL STRATIFICATION

OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SOB GGS-II CART TRACK CORPORATION LIMITED.
To SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW FIELD BUND / FENCING
X X SH CROSS SECTION NKBPL/ONGC/SOB GGS-II TO SOB CTF/CS-11 MEHSANA ASSET
PARALLEL LINE SB#109 To
HIGH TENSION LINE / POLE WBM ROAD CROSS SECTION NKBPL/ONGC/SOB GGS-II TO SOB CTF/CS-16 MEHSANA
SOB GGS-II
PARALLEL LINE SB#193+225 ELECTRIC POLE / LINE RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
To SOB GGS-II LT POLE / LINE SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE SB#134 To
To SOB GGS-II
TRANSFORMER LAMP POST CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
PARALLEL LINE SB#17 To
ELECTRIC BOX TELEPHONE POLE
ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
SOB CTF
PARALLEL LINE SB#125 To RIVER
8"Ø SOB GGS-II TO SOB CTF WELL FLUID LINE
SOB CTF
NALA
ALIGNMENT SHEET
OTHER PROPOSED LINE

ONGC INSTALLATION CANAL


CHAINAGE : FROM 1.75 TO 3.50 KM

VILLAGE SITE TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.


VILLAGE BOUNDARY BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, Univers

You might also like