07 Vol III Section 6 4 RAD Group A Part 1
07 Vol III Section 6 4 RAD Group A Part 1
07 Vol III Section 6 4 RAD Group A Part 1
LW#70
e
GS-1 Pipelin
EP S to Lanwa G
North Lanwa
-1 Pipeline
North Lanwa EPS to Lanwa GGS
TM
AS SHOWN 0
SECON/ONGC/LW #70 TO INSIDE GGS HEADER FLOW LINES PIPELINE/ALN-01
GUJARAT STATE, PATAN DISTRICT AND CHANASMA TALUK.
TERMINAL POINT OF
8 Ø LW#70 TO INSIDE
GGS HEADER
AT CH : 2/046.63 KM
Lanwa GGS-1
Nor
th L
anw
a EP
S to
Lan
wa
GGS
-1 P
ipel
ine
TM
AS SHOWN 0
SECON/ONGC/LW #70 TO INSIDE GGS HEADER FLOW LINES PIPELINE/ALN-02
IP-0/1
IP-0/2
IP-0/3
IP-0/4
IP-0/5
IP-0/6
IP-0/7
IP-2/1
IP-2/2
TP-1
TP-2
Start
End
32°39'2'' 58°38'29''
159.687
162.298
136.856
223.515
156.776
18.216
63.805
67.896
11.562
12.042
7.644
9.973
110
109
ONG
108
CW
107
ELL
106
SN#23 105
SSCTF
SN#
104
35
103
102
101
VB OF JOTANA
VB OF KASALPUR
100
ONG
He Line
99
GGS
t
CTF
igh
ONGC WELL SN#69
r
IP
To SS
6.5 Powe
CW
98 -
2 2/1
ine
-
TP e
rL
m
97
ELL
Kv
IP-
hal
we
2
Lin /2
m H ine
t
11
96
igh
Po
t
ant
eigh
ed
tL
He
s
SN#
Kv
95 po
S
Kv H
m
o
11
-1 Pr
To
6.5
94 TP ther
62
220
15.4
IP-0/6 IP-0/7
93 O
SN#23 IP-0/4 IP-0/5
92 IP-0/2 IP-0/3
91 IP-0/1
Start ONGC WELL SN #14,199 End
90
89
88
9
87 #6
N
S SANTHAL
m H ine
oS
t
86
eigh
T
tL
m H r Line
He Line
Kv H
ONG
85
To J
t
ONGC WELL SN#69
eigh
t
ana
er
igh
we
84
6.5 Pow
220
15.4
otan
v Po
CW
Jot
83
m
Kv
11 K
6.5
To
a
ELL
11
82
81
SN#
80
CS-1/BT ROAD CH.0.331 km
298
79 CS-5/LT LINE CH.0.633 km
CS-7/CART TRACK CH.0.867 km
CS-2/LT LINE CH.0.352 km
78
CS-6/CART TRACK CH.0.712 km
77 CS-3/LT LINE CH.0.413 km
76 CS-4/CART TRACK CH.0.481 km
75
74
73
72
71
70
69
68
67
66
65
64
63
62
69.221
70.791
71.481
GROUND LEVELS
70.962
71.234
70.484
69.677
69.267
68.965
69.808
71.094
70.100
71.218
70.953
70.700
71.919
70.835
70.118
71.499
71.140
71.297
71.745
71.984
72.133
70.853
70.767
69.244
69.174
69.198
70.7
71.5
71.4
71.2
(IN METRES)
21.985
18.216
27.057
15.299
31.811
31.994
18.006
11.451
12.042
26.507
30.269
9.687
9.799
7.644
8.216
9.973
49.89
0.111
50
50
50
50
50
50
50
50
50
50
50
50
50
0
SURFACE/TERRAIN DETAILS
0+159.687
0+321.985
0+340.201
0+477.057
0+484.701
0+708.216
0+718.189
0+781.994
0+849.889
0+861.451
0+873.493
0+000.00
0+050.00
0+100.00
0+150.00
0+200.00
0+250.00
0+300.00
0+350.00
0+400.00
0+450.00
0+500.00
0+550.00
0+600.00
0+650.00
0+700.00
0+750.00
0+800.00
0+850.00
0+900.00
0+950.00
1+000.00
1+030.27
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE TRANSFORMER LAMP POST CORPORATION LIMITED.
ENGINEERING SERVICES (C & M) DIVISION
ELECTRIC BOX TELEPHONE POLE
PROPOSED ROW BT ROAD CROSS SECTION NKBPL/ONGC/SN#23 To SSCTF/CS-1 MEHSANA ASSET
OTHER PROPOSED LINE RIVER MEHSANA
ONGC INSTALLATION
NALA
RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
ONGC WELL SITE SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
VILLAGE BOUNDARY
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
EXISTING LINE CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
EXISTING OTHER ROW CART TRACK
4"Ø SN#23 To SSCTF WELL FLUID LINE
ALIGNMENT SHEET
BITUMEN ROAD POND
IP-1/1
IP-1/2
IP-1/3
IP-2/1
IP-2/2
IP-2/3
IP-2/4
IP-2/5
IP-2/6
IP-2/7
IP-3/1
IP-3/2
IP-3/3
IP-3/4
IP-3/5
119
TP-1
TP-2
TP-3
Start
118
117
116 82°54'20'' 71°50'16'' 17°11'44''
115
173.329
124.086
168.841
168.841
169.216
138.205
138.205
177.396
177.396
11.762
57.674
22.108
66.569
75.535
10.296
34.13
8.929
7.651
8.542
114
113
112
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
111
BL#0293 &2
110
BL#144 109 Balol
eld
108 GGS-III
e
lIn
i
To F
107
pe
Pi
LINE
106
To ONGC Well
11 K
ine
11
r v Po
te
MATCH LIN
rL
wer
Kv
105 a Line
we
H LINE
22 W
MATCH
Po
ine
Po
104 INE
MATCH L 0K /G rL
w
vP U e
Kv
11 Kv Power Line
BL# 245 & 246& 235
er L
oj
103 ow ow
in
vP
11
To Field
er
ine
0K TP-3
Dh
Lin
M ATC
102
BL#192
INE
e MATCH L e 22
Lin
TP
To
101 w er
BL#15
-2
Po
100 Kv
r Line
0
22
Rupen
99
TP-1
11 Kv Powe
Start 98
97
Nadi
BL#144 96 BL#168 lIn
e er
L ine
cut
To K
TP-1 ow
95 i pe v P Any
To Field
rP 0K
anod
e 22
94
BL#168 at
lIne
W
93
BL#276BL#276
a
/G To
U LINE
pe
92 Ka
H
r Pi
n
TC od
E
91 MA
ne e
ate
a
TCH LIN
r Li 22 in
E
BL#238&213
e 0K rL
da
ow
MATCH LIN
vP 90 vP
we
W
BL#236
no
0K
LINE
a
ow
22 Po
od
e
U/G
Ka
To K
89 rL
ine Kv
an
11
To
88 To
K
MA
H
anod
Ka
To
MATC
BL#150
87 no
da
a
86
85
84
BL#238&213
83
82 CS-2/Water Pipe Line CH.0.339 km CS-4/BT ROAD CH.0.64 km CS-7/LT LINE CH.0.857 km CS-9/LT LINE CH.1.089 km CS-12/CART TRACK CH.1.369 km CS-13/CART TRACK CH.1.734 km
81 CS-1/HT LINE CH.0.196 km CS-5/Water Pipe Line CH.0.74 km
CS-11/RIVER CH.1.247 km
80 CS-3/HT LINE CH.0.383 km
CS-8/BT ROAD CH.0.935 km CS-10/HT LINE CH.1.119 km
79
78 CS-6/BT ROAD CH.0.75 km
77
76
75
74
73
72
71
70
69
68
67
66
68.421
69.381
68.821
GROUND LEVELS
68.716
68.873
69.026
69.193
69.057
68.666
68.239
68.128
68.427
68.559
68.639
68.640
68.697
68.392
68.119
67.522
68.058
69.766
69.894
69.609
68.936
68.820
68.893
66.487
68.279
68.749
69.190
69.070
68.749
68.855
68.550
68.518
68.348
68.254
68.416
68.709
68.709
68.245
68.215
69.925
69.945
68.945
68.225
68.848
68.985
69.114
68.748
68.445
68.436
69.19
68.58
69.48
(IN METRES)
26.671
47.415
16.256
33.744
35.097
11.762
30.989
19.011
38.663
11.337
10.772
39.228
29.987
11.084
27.121
22.879
15.326
34.674
31.894
18.106
26.377
48.981
28.415
10.296
11.289
2.585
3.141
8.929
7.651
8.542
1.019
7.43
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
0
0+297.415
0+466.256
0+635.097
0+646.859
0+680.989
0+738.663
0+760.772
0+929.987
0+938.916
1+077.121
1+215.326
1+281.894
1+365.081
1+373.623
1+551.019
1+728.415
1+738.711
0+000.00
0+050.00
0+100.00
0+150.00
0+200.00
0+250.00
0+300.00
0+350.00
0+400.00
0+450.00
0+500.00
0+550.00
0+600.00
0+650.00
0+700.00
0+750.00
0+800.00
0+850.00
0+900.00
0+950.00
1+357.43
1+000.00
1+050.00
1+100.00
1+150.00
1+200.00
1+250.00
1+300.00
1+350.00
1+400.00
1+450.00
1+500.00
1+550.00
1+600.00
1+650.00
1+700.00
1+750.00
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE BL#144 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
Balol GGS-III
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
MEHSANA ASSET
PARALLEL LINE BL#168 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/BL#144 TO BALOL GGS-III/CS-4 MEHSANA
Balol GGS-III
PARALLEL LINE BL#183 To
NALA
BT ROAD CROSS SECTION NKBPL/ONGC/BL#144 TO BALOL GGS-III/CS-6 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
Balol GGS-III BT ROAD CROSS SECTION NKBPL/ONGC/BL#144 TO BALOL GGS-III/CS-8 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE BL#190 To
Balol GGS-III
ROAD SIDE DRAIN
RIVER CROSS SECTION NKBPL/ONGC/BL#144 TO BALOL GGS-III/CS-11 CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION
TREE
CHAINAGE : FROM 0.00 TO 1.75 KM
BITUMEN ROAD
IP-4/3
IP-5/1
IP-5/2
121
TP-4
TP-5
TP-6
End
120
119
118 21°43'48'' 86°3'6'' 96°31'49''
117
135.502
149.315
109.367
99.003
34.943
12.652
29.524
15.982
93.871
116
115
114
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
113
112
ine
BL#144 111
rL
Balol
we
110 GGS-III
ap
Po
ine
wer L
Kv
Mot
Kv Po 109
11
11
End
108
To
107
106 TP-6
To K
105
NE
104
BALOL GGS-III
anod
LI
103 TP-
CH
4
a
102
BL#150
AT
M
101
100
11
99 Kv
Pow
er L
98 ine
97
96
da
no
95
94 Ka
To
93
-5
92 To
TP
Mo
91 dhe
ra R
90 oad
89
88 BL#134
87
86
85
84 CS-16/LT LINE CH.2.202 km
83 CS-14/LT LINE CH.1.763 km
CS-15/BT ROAD CH.1.879 km
82
81 CS-17/BT ROAD CH.2.207 km
80
79
78
77
76
75
74
73
72
71
70
69
68
69.911
GROUND LEVELS
68.348
68.489
68.596
69.529
71.274
69.452
70.819
71.045
70.397
70.746
70.846
70.619
70.033
68.631
68.554
69.458
71.236
70.336
70.746
70.785
70.425
69.312
(IN METRES)
12.286
22.656
12.652
14.692
20.125
29.524
24.997
25.003
18.868
20.81
29.19
0.352
15.63
34.37
50
50
50
50
50
50
50
POINTS (IN METRES)
Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
1+837.714
1+872.656
1+885.308
2+170.125
2+199.648
2+324.997
2+000.00
2+050.00
2+100.00
2+150.00
2+200.00
2+250.00
2+300.00
2+350.00
2+400.00
2+418.87
2+020.81
2+215.63
1+750.00
1+800.00
1+850.00
1+900.00
1+950.00
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE BL#144 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
Balol GGS-III
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
BT ROAD CROSS SECTION NKBPL/ONGC/BL#144 TO BALOL GGS-III/CS-15 MEHSANA ASSET
PARALLEL LINE BL#168 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/BL#144 TO BALOL GGS-III/CS-17 MEHSANA
Balol GGS-III
PARALLEL LINE BL#183 To
NALA
RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
Balol GGS-III SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE BL#190 To
Balol GGS-III
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION
TREE
CHAINAGE : FROM 1.75 TO 2.419 KM
BITUMEN ROAD
IP-0/2
IP-0/3
IP-1/1
IP-1/2
IP-1/3
IP-1/4
IP-1/5
IP-1/6
IP-1/7
IP-2/1
IP-2/2
IP-2/3
IP-2/4
IP-2/5
IP-3/1
IP-3/2
IP-3/3
119
TP-1
TP-2
TP-3
Start
118
117
116 71°50'16'' 17°11'44'' 21°43'48''
115
169.114
169.114
166.217
177.129
177.129
135.195
11.706
31.895
57.662
22.169
138.75
138.75
67.417
74.024
10.525
99.253
35.689
12.456
8.825
7.292
9.078
114
113
112 e
G U J A R A T S T A T E / M A H E S A N Aer Lin D I S T R I C T
111
110 0K
v Po
w
BL#0293 & 244
22
BL#168 109
ield
Balol
108 GGS-III
To F
INE
H LINE
22 107 ine
To ONGC Well
el
11
0
CH L
Kv
106 Pip
Kv
Po r
ate
MATC
w
Po
er
W105
MAT
w
Li G
U/
11 Kv Power Line
er
ne
To Field
104
ine
Lin
rL
103 TP-2
To M
e
BL#192
r Line
we
11
BL# 245 & BL#15
Po
102 Kv
To
Po
otap
Kv
we
11 Kv Powe
101 rL
Dh
wer Line
11
ine o
246& 235 11 Kv P
in
To
100
oj
Ru
Dh
99
pe
E
ino
LIN
nN
Start 98
j
H e
TP-
TC Lin
adi
97 MA er
w cut
1
96 Kv
Po Any
To Field
BL#168 22
0
Kv
95
TP-1
22
0
BL#276 Po
we
94 To
Ka
TP-3
NE
rL 93
da
U/G
INE
in no
no
e da
H LI
92
BL#236 Li
ne
Ka
HL
Wa
INE er
To r Pipe
91
C
ow
BL#134
To
L
te
MATC
Ka
U/ CH P
MAT
90 Kv
G
BL#238&213
AT
no
BL# 245 &
W
11
BL#150
at M
To Kanoda
89
da
To K
To er P da o
lIne
88 Ka ipe n
246& 235
no lIne Ka
anod
87 da To
86
a
85
84
83
82 CS-3/BT ROAD CH.0.343 km CS-6/LT LINE CH.0.556 km CS-8/LT LINE CH.0.789 km CS-11/CART TRACK CH.1.067 km CS-12/CART TRACK CH.1.432 km
81 CS-1/Water Pipe Line CH.0.037 km CS-4/Water Pipe Line CH.0.44 km
CS-2/HT LINE CH.0.089 km CS-9/HT LINE CH.0.812 km CS-10/RIVER CH.0.946 km CS-13/LT LINE CH.1.461 km CS-14/BT ROAD CH.1.578 km
80
79 CS-5/BT ROAD CH.0.451 km CS-7/BT ROAD CH.0.633 km
78
77
76
75
74
73
72
71
70
69
68
67
66
68.121
GROUND LEVELS
68.254
68.100
68.414
68.429
68.546
68.643
68.634
68.709
68.426
67.533
68.099
69.774
69.885
69.596
69.399
68.906
68.819
68.897
66.469
68.282
68.772
69.205
69.057
68.818
68.750
68.837
68.550
68.512
68.332
68.498
68.595
69.534
69.928
70.844
71.276
68.416
68.709
68.709
68.245
68.215
69.925
69.945
68.945
68.225
68.848
68.985
69.114
68.748
68.445
68.436
68.631
68.554
69.458
71.236
68.58
69.48
(IN METRES)
30.886
38.227
11.706
31.828
18.172
39.491
10.509
27.877
13.298
25.452
24.548
14.202
35.798
31.619
18.381
27.987
49.142
26.271
10.525
13.204
36.049
13.951
21.738
12.456
15.806
19.389
30.611
0.067
11.66
38.34
8.825
5.642
7.292
9.078
0.858
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
0
0+338.227
0+349.933
0+381.828
0+439.491
0+627.877
0+636.702
0+775.452
0+914.202
0+981.619
1+055.642
1+062.934
1+072.013
1+249.142
1+426.271
1+436.796
1+536.049
1+571.738
1+584.194
1+719.389
0+000.00
0+050.00
0+100.00
0+150.00
0+200.00
0+250.00
0+300.00
0+350.00
0+400.00
0+450.00
0+500.00
0+550.00
0+600.00
0+650.00
0+700.00
0+750.00
0+800.00
0+850.00
0+900.00
0+950.00
0+461.66
1+000.00
1+050.00
1+100.00
1+150.00
1+200.00
1+250.00
1+300.00
1+350.00
1+400.00
1+450.00
1+500.00
1+550.00
1+600.00
1+650.00
1+700.00
1+750.00
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE BL#168 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
Balol GGS-III
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
MEHSANA ASSET
PARALLEL LINE BL#144 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/BL#168 TO BALOL GGS-III/CS-3 MEHSANA
Balol GGS-III
PARALLEL LINE BL#183 To
NALA
BT ROAD CROSS SECTION NKBPL/ONGC/BL#168 TO BALOL GGS-III/CS-5 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
Balol GGS-III BT ROAD CROSS SECTION NKBPL/ONGC/BL#168 TO BALOL GGS-III/CS-7 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE BL#190 To
Balol GGS-III
ROAD SIDE DRAIN
RIVER CROSS SECTION NKBPL/ONGC/BL#168 TO BALOL GGS-III/CS-10 CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL BT ROAD CROSS SECTION NKBPL/ONGC/BL#168 TO BALOL GGS-III/CS-14 ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION
TREE
CHAINAGE : FROM 0.00 TO 1.75 KM
BITUMEN ROAD
IP-4/2
122
TP-4
TP-5
End
121
120
119 86°3'6'' 96°31'49''
118
152.447
112.804
15.982
97.234
32.25
117
116
115
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
114
113
11 Kv
BL#168 112 Balol
111
BALOL GGS-III GGS-III
Power
110
109 E
H LIN
Line
108 MATC
End
107
106
E
H LIN
MATC 105
104
103
BL#134
102
101
100
99
TP-5
98
97
96
95 TP-4
94
93
92
To Mod
91
90
89
hera Ro
88
87
a
86
d
GROUND LEVELS
70.394
70.694
69.536
69.312
71.276
71.028
70.838
70.667
70.173
70.336
70.746
70.785
70.425
(IN METRES)
28.165
15.982
29.933
32.871
17.129
30.105
4.085
50
50
50
50
1+904.085
1+920.067
2+032.871
2+000.00
2+050.00
2+100.00
2+130.10
1+750.00
1+800.00
1+850.00
1+900.00
1+950.00
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE BL#168 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
Balol GGS-III
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
BT ROAD CROSS SECTION NKBPL/ONGC/BL#168 TO BALOL GGS-III/CS-16 MEHSANA ASSET
PARALLEL LINE BL#144 To
RIVER MEHSANA
Balol GGS-III
PARALLEL LINE BL#183 To
NALA
RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
Balol GGS-III SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE BL#190 To
Balol GGS-III
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION
TREE
CHAINAGE : FROM 1.75 TO 2.13 KM
BITUMEN ROAD
IP-4/1
IP-4/2
IP-4/3
IP-4/4
IP-4/5
IP-4/6
IP-4/7
IP-5/1
IP-5/2
IP-5/3
IP-5/4
IP-5/5
IP-6/1
IP-6/2
119
TP-1
TP-2
TP-3
TP-4
TP-5
TP-6
Start
118
117
116 18°58'47'' 48°52'25'' 42°41'56'' 30°0'49'' 17°11'44'' 21°43'48''
115
105.485
131.516
143.034
172.214
137.659
137.659
177.663
177.663
135.809
12.757
50.746
54.709
22.048
65.721
77.047
10.067
98.753
34.196
12.847
9.033
7.944
8.072
114
113
112
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
111
e
110 er Lin
v Pow
To Field
11 K
To Field
11 Kv Power Line
To
BL#183 109 Balol
M
108 GGS-III
BL#15
ot a
StartT107
Rupe
P-1
p
106
TP
n
105 TP-5
Nadi
To ONG
-2
BL#183 BL#190
11
104
KvP
103
ow
6
TP-
BL#134
C Well
102
er
Lin
101
e
To
100 Dh
11 Kv Power Line
in
99 oj
U/G
98
To Field
Wa
t
BL#150
To Kan
97 TP-3 ycu
BL#192
ine
ter
An
rL
96
we
ne
To
i
Po
ipe
L
e
95 er
oda
Lin
Kv
Kan
ow
lIn
P
er
11
94
Kv
e
ow
oda
0
vP
93 22
BL#236
K
92
11
91 To
U/G
Ka
90 11 no
Kv da
TP-4
Wa
89 Po
we To
ter
rL
88 ine Ka
Pip
n od
87 a
BL#238&213
el
Ine
86
85
84 CS-2/LT LINE CH.0.392 km CS-5/LT LINE CH.0.62 km CS-7/LT LINE CH.0.85 km CS-10/CART TRACK CH.1.131 km CS-11/CART TRACK CH.1.496 km
CS-1/Water Pipe Line CH.0.185 km CS-3/Water Pipe Line CH.0.501 km CS-6/BT ROAD CH.0.698 km CS-8/HT LINE CH.0.886 km CS-12/LT LINE CH.1.525 km
83 CS-4/BT ROAD CH.0.509 km CS-9/RIVER CH.1.008 km CS-13/BT ROAD CH.1.64 km
82
81
80
79
78
77
76
75
74
73
72
71
70
69
68
67
66
69.711
68.411
GROUND LEVELS
69.052
68.865
68.810
68.905
69.113
69.134
68.918
68.407
68.059
68.504
68.198
67.700
67.806
69.553
70.114
69.227
69.478
68.825
68.854
66.729
68.247
68.589
69.155
69.077
68.848
68.767
68.839
68.592
68.550
68.475
68.630
69.473
69.718
70.587
68.815
69.102
68.915
68.245
68.215
69.925
69.945
68.554
68.945
68.225
68.848
68.985
69.114
68.748
68.445
68.436
68.631
68.554
69.458
68.58
69
(IN METRES)
37.243
13.502
36.498
18.987
31.013
49.497
43.537
48.246
20.293
29.707
42.508
26.859
23.141
19.627
14.358
13.305
36.695
40.968
48.965
49.789
33.985
12.847
0.503
6.463
1.754
7.492
48.46
42.58
7.944
8.072
9.032
1.035
0.211
3.168
1.54
39.2
10.8
7.42
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+168.987
0+300.503
0+443.537
0+498.246
0+520.293
0+692.508
0+976.859
1+119.627
1+127.571
1+135.642
1+313.305
1+490.968
1+501.035
1+599.789
1+633.985
1+646.832
0+000.00
0+050.00
0+100.00
0+150.00
0+200.00
0+250.00
0+300.00
0+350.00
0+400.00
0+450.00
0+500.00
0+550.00
0+600.00
0+650.00
0+700.00
0+750.00
0+800.00
0+850.00
0+900.00
0+950.00
0+12.757
0+63.502
0+701.54
1+042.58
1+000.00
1+050.00
1+100.00
1+150.00
1+200.00
1+250.00
1+300.00
1+350.00
1+400.00
1+450.00
1+500.00
1+550.00
1+600.00
1+650.00
1+700.00
1+750.00
CUMULATIVE CHAINAGE
0+839.2
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE BL#183 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
Balol GGS-III
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
BT ROAD CROSS SECTION NKBPL/ONGC/BL#183 TO BALOL GGS-III/CS-4 MEHSANA ASSET
PARALLEL LINE BL#144 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/BL#183 TO BALOL GGS-III/CS-6 MEHSANA
Balol GGS-III
PARALLEL LINE BL#168 To
NALA
RIVER CROSS SECTION NKBPL/ONGC/BL#183 TO BALOL GGS-III/CS-9 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
Balol GGS-III BT ROAD CROSS SECTION NKBPL/ONGC/BL#183 TO BALOL GGS-III/CS-13 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE BL#190 To
Balol GGS-III
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION
TREE
CHAINAGE : FROM 0.00 TO 1.75 KM
BITUMEN ROAD
IP-7/1
IP-7/2
122
TP-7
TP-8
End
121
120
119 86°3'6'' 96°31'49''
118
146.183
26.798
15.982
105.93
90.508
117
116
115
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
114
113
BL#183 112 Balol
111 BALOL GGS-III GGS-III
110
To
11
109
d
K
Kv
En
ano
108
Po
we
d
107
a
rL
ine
106
105
104
103
102
8 -
TP
101
100
99 BL#134
98
97
96
95
94 - 7
TP
To
93
M od
92
he
91
ra
90
Ro
a
89
d
88
87 CS-14/LT LINE CH.1.958 km
CS-15/BT ROAD CH.1.963 km
86
85
84
83
82
81
80
79
78
77
76
75
74
73
72
71
70
69
GROUND LEVELS
70.652
69.446
69.312
70.587
71.259
71.217
70.496
70.660
70.835
70.047
71.236
70.336
70.746
70.785
70.425
(IN METRES)
17.359
28.824
21.176
15.982
28.397
27.533
22.467
18.041
5.621
50
50
50
50
POINTS (IN METRES)
Normal soil Normal soil
SURFACE/TERRAIN DETAILS
1+782.641
1+928.824
1+955.621
1+971.603
2+077.533
2+000.00
2+050.00
2+100.00
2+150.00
2+168.04
1+750.00
1+800.00
1+850.00
1+900.00
1+950.00
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE BL#183 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
Balol GGS-III
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
BT ROAD CROSS SECTION NKBPL/ONGC/BL#183 TO BALOL GGS-III/CS-15 MEHSANA ASSET
PARALLEL LINE BL#144 To
RIVER MEHSANA
Balol GGS-III
PARALLEL LINE BL#168 To
NALA
RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
Balol GGS-III SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE BL#190 To
Balol GGS-III
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION
TREE
CHAINAGE : FROM 1.75 TO 2.17 KM
BITUMEN ROAD
IP-3/1
IP-3/2
IP-3/3
IP-3/4
IP-3/5
IP-3/6
IP-3/7
IP-4/1
IP-4/2
IP-4/3
IP-4/4
IP-5/1
IP-5/2
119
TP-1
TP-2
TP-3
TP-4
TP-5
Start
118
117
116 48°52'25'' 42°41'56'' 30°0'49'' 17°11'44'' 21°43'48''
115
105.675
129.447
143.126
175.213
155.216
119.012
182.849
182.849
136.116
52.109
51.703
22.027
64.872
78.559
98.504
13.043
9.137
7.612
8.226
33.45
114
113
112
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
111
110 da Line
ld
ano wer
To Field
v Po
To Fie
BL#190 109 K 11 K
To
11 Kv Power Line
Balol
To
108 GGS-III
M
BL#15
ot a
Start107
Rupe
p
106
TP
105 TP-4
n Na
-1
To ONG
BL#183
104
BL#190
11
di
K
103
vP
TP-5
ow
102
C Well
BL#134
er
101
Lin
To
e
100 Dh
in
11 Kv Power Line
99 oj
U/G
98
Wa
To Field
97 TP-2 t
BL#192 ycu BL#150
To Kan
e
Lin
ter
96 An
r
we
ne
Pip
To
95 Li
Po
e
er
Lin
el
oda
Kv
Kan
94 w
Po
Ine
er
11
Kv
ow
93
oda
0
vP
22
BL#236
K
92
11
91 To
U/G
90 Ka
11 no
Kv TP-3 d
Wa
89 Po a
we To
ter
88 r Lin
e Ka
Pip
87 no
d a
BL#238&213
el
86
Ine
85
84
83
82
CS-2/LT LINE CH.0.381 km CS-5/LT LINE CH.0.606 km CS-7/LT LINE CH.0.835 km CS-10/CART TRACK CH.1.118 km CS-11/CART TRACK CH.1.483 km
81 CS-1/Water Pipe Line CH.0.17 km CS-3/Water Pipe Line CH.0.486 km CS-6/BT ROAD CH.0.685 km CS-8/HT LINE CH.0.878 km CS-12/LT LINE CH.1.512 km
80 CS-4/BT ROAD CH.0.493 km CS-9/RIVER CH.0.994 km CS-13/BT ROAD CH.1.626 km
79
78
77
76
75
74
73
72
71
70
69
68
67
66
69.131
68.341
68.591
GROUND LEVELS
69.000
68.822
68.812
69.017
69.114
68.784
68.324
68.215
68.190
68.183
67.538
68.078
69.776
69.890
69.592
69.387
68.925
68.817
68.902
66.454
68.288
68.769
69.193
69.067
68.820
68.754
68.852
68.550
68.516
68.503
69.542
69.958
70.866
68.815
69.102
68.915
68.245
68.215
69.925
69.945
68.954
68.945
68.225
68.848
68.985
69.114
68.748
68.436
68.631
68.554
69.458
68.58
(IN METRES)
42.216
30.357
19.643
45.913
11.563
43.653
12.665
37.335
27.538
22.462
28.066
45.217
37.632
12.368
36.136
13.864
19.586
13.043
17.372
2.109
7.784
37.23
12.77
32.06
17.94
4.087
9.137
6.347
6.096
7.612
8.226
4.783
29.3
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+157.784
0+430.357
0+504.087
0+688.437
0+843.653
0+962.665
1+027.538
1+106.096
1+113.708
1+121.934
1+304.783
1+487.632
1+586.136
1+619.586
1+632.628
0+000.00
0+050.00
0+100.00
0+150.00
0+200.00
0+250.00
0+300.00
0+350.00
0+400.00
0+450.00
0+500.00
0+550.00
0+600.00
0+650.00
0+700.00
0+750.00
0+800.00
0+850.00
0+900.00
0+950.00
0+52.109
0+287.23
0+482.06
1+000.00
1+050.00
1+100.00
1+150.00
1+200.00
1+250.00
1+300.00
1+350.00
1+400.00
1+450.00
1+500.00
1+550.00
1+600.00
1+650.00
1+700.00
1+750.00
CUMULATIVE CHAINAGE
0+679.3
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE BL#190 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
Balol GGS-III
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
MEHSANA ASSET
PARALLEL LINE BL#144 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/BL#190 TO BALOL GGS-III/CS-4 MEHSANA
Balol GGS-III
PARALLEL LINE BL#168 To
NALA
BT ROAD CROSS SECTION NKBPL/ONGC/BL#190 TO BALOL GGS-III/CS-6 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
Balol GGS-III RIVER CROSS SECTION NKBPL/ONGC/BL#190 TO BALOL GGS-III/CS-9 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE BL#183 To
Balol GGS-III
ROAD SIDE DRAIN
BT ROAD CROSS SECTION NKBPL/ONGC/BL#190 TO BALOL GGS-III/CS-13 CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION
TREE
CHAINAGE : FROM 0.00 TO 1.75 KM
BITUMEN ROAD
IP-6/1
IP-6/2
122
TP-6
TP-7
End
121
120
119 86°3'6'' 96°31'49''
118
143.051
102.493
24.072
15.982
87.145
117
116
115
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
114
113
To
BL#190 112
K
Balol
an
111 GGS-III
od
a
110
BALOL GGS-III
11
109
Kv
d
P
108
En
ow
er
107
Lin
e
106
105
104
103
102
-7
101
TP
100 BL#134
99
98
97
96
95
-6
94 TP
To
93
M
92
od
he
91
ra
90
Ro
89
ad
88
87
86
85
CS-14/LT LINE CH.1.938 km
84 CS-15/BT ROAD CH.1.943 km
83
82
81
80
79
78
77
76
75
74
73
72
71
70
69
70.871
GROUND LEVELS
70.832
69.620
69.312
70.866
71.277
71.003
70.385
70.463
71.236
70.336
70.746
70.785
70.425
(IN METRES)
31.256
11.795
24.072
14.133
48.151
45.659
41.486
1.849
4.341
50
50
50
1+911.795
1+935.867
1+951.849
2+054.341
2+000.00
2+050.00
2+100.00
2+141.49
1+750.00
1+800.00
1+850.00
1+900.00
1+950.00
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM) 0
0
@ 1.0m DEPTH 0
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE BL#190 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
Balol GGS-III
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
BT ROAD CROSS SECTION NKBPL/ONGC/BL#190 TO BALOL GGS-III/CS-15 MEHSANA ASSET
PARALLEL LINE BL#144 To
RIVER MEHSANA
Balol GGS-III
PARALLEL LINE BL#168 To
NALA
RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
Balol GGS-III SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE BL#183 To
Balol GGS-III
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION
TREE
CHAINAGE : FROM 1.75 TO 2.14 KM
BITUMEN ROAD
IP-2/2
IP-2/3
IP-3/1
IP-3/2
IP-3/3
IP-3/4
IP-3/5
IP-3/6
IP-3/7
IP-3/8
IP-3/9
140
TP-1
TP-2
TP-3
TP-4
Start
139
138
137 52°9'9'' 27°54'50'' 11°5'55'' 46°3'17''
136
129.424
146.212
217.518
144.412
140.097
140.205
125.819
125.819
103.968
149.93
71.338
21.527
175.55
13.833
8.953
9.241
5.857
9.273
135
134
133
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
132
131 To
Fie
SB#176 130 ld
To
129 SOB CTF
To
K
To
SOB CTF # 268/ 216
he
128
Fie
Fie
rv
127
ld
ld
Existing
126 Goga Ji Maharaj Temple
125
ON
124
GC
O
123 Ongc well NE
NGC Lin
LI
Ro
122
CH
ad
AT
e
121 in
rL M
e
120 we
Po
kv
119 66
To
118
e
220 v Power Lin
O
117
NG
116
To
We
115 Goga Ji Maharaj Temple
To Hebu
ll
eb
114
SB#176
uv
ra va
113 bu NE
a
pu e LI
am oH
ne
112 H
va
R T
Li
To TC
er
111
Sobhasan ETP A
w
Po
M
110
Kv
11
109
108
107
106
105
104
103
102 CS-1/BT ROAD CH.0.363 km CS-3/HT LINE CH.0.74 km CS-5/Electric line CH.1.19 km CS-8/BT ROAD CH.1.63 km
CS-2/CART TRACK CH.0.379 km CS-4/BT ROAD CH.0.924 km CS-6/CART TRACK CH.1.217 km
101 CS-7/CART TRACK CH.1.366 km
100
99
98
97
96
95
94
93
92
91
90
89
88
87
91.901
GROUND LEVELS
91.636
91.543
91.554
91.252
91.215
89.443
88.543
89.513
89.486
90.042
89.143
89.126
89.715
89.543
87.314
87.743
87.943
88.465
91.754
91.788
91.743
91.984
91.763
91.658
90.117
89.629
89.406
89.368
89.000
88.380
88.576
89.300
89.402
89.307
89.704
89.907
89.464
89.768
89.208
88.563
87.314
87.330
87.453
88.038
88.316
88.850
91.555
90.915
88.895
88.905
89.355
89.085
89.895
(IN METRES)
20.576
29.354
20.646
21.527
18.828
27.384
22.616
44.902
20.452
20.307
24.105
25.895
14.202
29.941
10.264
13.833
25.903
49.916
25.736
14.991
38.977
11.023
0.692
8.953
5.098
9.241
5.857
0.084
9.273
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+129.424
0+279.354
0+350.692
0+372.219
0+381.172
0+527.384
0+744.902
0+920.452
0+929.693
1+074.105
1+214.202
1+220.059
1+360.264
1+374.097
1+499.916
1+625.736
1+635.009
1+738.977
0+000.00
0+050.00
0+100.00
0+150.00
0+200.00
0+250.00
0+300.00
0+350.00
0+400.00
0+450.00
0+500.00
0+550.00
0+600.00
0+650.00
0+700.00
0+750.00
0+800.00
0+850.00
0+900.00
0+950.00
1+000.00
1+050.00
1+100.00
1+150.00
1+200.00
1+250.00
1+300.00
1+350.00
1+400.00
1+450.00
1+500.00
1+550.00
1+600.00
1+650.00
1+700.00
1+750.00
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#176 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
MEHSANA ASSET
PARALLEL LINE SB#194 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/SB#176 TO SOB CTF/CS-1 MEHSANA
SOB CTF
PARALLEL LINE SB#97 To
NALA
BT ROAD CROSS SECTION NKBPL/ONGC/SB#176 TO SOB CTF/CS-4 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB CTF BT ROAD CROSS SECTION NKBPL/ONGC/SB#176 TO SOB CTF/CS-8 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
OTHER PROPOSED LINE
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION
TREE
CHAINAGE : FROM 0.00 TO 1.75 KM
BITUMEN ROAD
IP-5/1
IP-5/2
139
TP-5
End
138
137
136 82°13'49''
135
202.621
100.632
12.566
61.209
202.8
6.119
134
133
132
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
131
130
Ex
SB#176 129
ist
ing
ine
ON
n
126
sa
L
GC
Lin
er
na
Ro 125
w
e
Pu
Po
ad 124
Kv
To
123
11
NEW HEADER
122
121 Ramdev Seva camp WA SOB CTF
LL
E
120 CR
LIN
OS
119 SIN
G
TCH
118
117
MA
116
1 9
-2
115
Sobhasan ETP ON
ne
SH
Li
114 G C
r
we
Ro
Po
113 a d
Kv
Sobhasan ETP
va
112
11
bu
111
He
ine
110
To
CL
109
NG
To F
108 ield
gO
107
stin
106
Ex i
105
104
103
102
101 CS-9/LT LINE CH.1.911 km CS-13/BT ROAD CH.2.221 km
CS-10/LT LINE CH.1.94 km
100 CS-11/BT ROAD CH.1.949 km
99 CS-12/LT LINE CH.1.978 km
98
97
96
95
94
93
92
91
90
89
88
87
86
86.781
GROUND LEVELS
87.302
87.119
86.343
86.618
86.623
88.850
89.328
88.833
88.026
87.530
86.993
86.436
86.318
86.209
86.446
86.524
86.465
(IN METRES)
45.836
43.036
18.173
25.709
24.923
8.402
4.164
6.964
6.119
50
50
50
50
50
50
50
POINTS (IN METRES)
Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
1+941.598
1+954.164
2+156.964
2+218.173
2+224.291
2+324.92
2+000.00
2+050.00
2+100.00
2+150.00
2+200.00
2+250.00
2+300.00
1+750.00
1+800.00
1+850.00
1+900.00
1+950.00
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#176 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
BT ROAD CROSS SECTION NKBPL/ONGC/SB#176 TO SOB CTF/CS-11 MEHSANA ASSET
PARALLEL LINE SB#194 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/SB#176 TO SOB CTF/CS-13 MEHSANA
SOB CTF
PARALLEL LINE SB#97 To
NALA
RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB CTF SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
OTHER PROPOSED LINE
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION
TREE
CHAINAGE : FROM 1.75 TO 2.325 KM
BITUMEN ROAD
IP-1/1
IP-1/2
IP-1/3
IP-1/4
IP-2/1
IP-2/2
IP-2/3
IP-2/4
IP-2/5
142
TP-1
TP-2
TP-3
Start
141
140
139 15°24'58'' 62°11'7'' 14°18'8''
138
171.998
238.164
239.642
174.421
175.558
229.357
229.357
126.978
19.391
32.001
88.714
10.228
22.761
31.144
6.318
137
136
135
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
134
133
INE
SB#194 132
HL
131 SOB CTF
MATCH LINE
To Gandhinagar
To
MATC
130
To Himatnagar
Kad
129
vas
128
an
127
e
ura
er Lin
126
SOB CTF WELL
am p
v Pow
125
-4
To R
124
TP
11 K
123
122 TP-2
121 TP-1 TP-3
120 E
LIN
119
SB#194
H
TC
SB#176
118 MA
E
H LIN
117 11 Kv Powe
11 Kv Power Line
r Line
Start
SH-55
116
MATCH LINE
To Mehsana
MATC
115
To Mehsana
To R
114
SH 73
113
amp
112 E
ura
LIN
111 Teja Dhari hotel CH T
110 MA
109
108
107
106
105 CS-3/SH CH.0.686 km CS-5/BT ROAD CH.1.151 km
104 CS-1/LT LINE CH.0.173 km CS-4/LT LINE CH.0.702 km CS-6/SH CH.1.189 km
CS-2/BT ROAD CH.0.175 km
103
102
101
100
99
98
97
96
95
94
93
92
91
90
89
90.271
91.151
91.881
GROUND LEVELS
91.110
91.203
91.916
92.453
92.984
92.939
92.348
90.328
89.704
90.853
90.760
90.640
91.006
90.518
90.809
91.018
90.890
90.723
90.654
91.024
91.793
91.497
91.386
91.290
91.356
91.363
90.992
91.577
91.798
91.858
91.205
90.415
91.835
92.915
93.212
92.985
90.713
90.624
90.951
90.662
91.543
91.613
91.766
91.676
91.454
91.754
89.8
(IN METRES)
19.391
35.871
14.129
25.513
24.487
42.486
31.935
18.065
42.507
46.207
22.761
20.804
39.698
10.302
19.055
30.945
6.318
2.293
7.514
7.493
3.793
6.435
10.34
39.66
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+171.998
0+178.316
0+197.707
0+435.871
0+675.513
0+707.514
0+881.935
1+057.493
1+146.207
1+156.435
1+179.196
1+439.698
1+669.055
0+000.00
0+050.00
0+100.00
0+150.00
0+200.00
0+250.00
0+300.00
0+350.00
0+400.00
0+450.00
0+500.00
0+550.00
0+600.00
0+650.00
0+700.00
0+750.00
0+800.00
0+850.00
0+900.00
0+950.00
1+210.34
1+000.00
1+050.00
1+100.00
1+150.00
1+200.00
1+250.00
1+300.00
1+350.00
1+400.00
1+450.00
1+500.00
1+550.00
1+600.00
1+650.00
1+700.00
1+750.00
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#194 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
MEHSANA ASSET
PARALLEL LINE SB#176 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/ SB#194 TO SOB CTF WELL/CS-2 MEHSANA
SOB CTF
PARALLEL LINE SB#97 To
NALA
SH CROSS SECTION NKBPL/ONGC/ SB#194 TO SOB CTF WELL/CS-3 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB CTF BT ROAD CROSS SECTION NKBPL/ONGC/ SB#194 TO SOB CTF WELL/CS-5 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
OTHER PROPOSED LINE
ROAD SIDE DRAIN
SH CROSS SECTION NKBPL/ONGC/ SB#194 TO SOB CTF WELL/CS-6 CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION
TREE
CHAINAGE : FROM 0.00 TO 1.75 KM
BITUMEN ROAD
IP-5/2
IP-6/1
IP-6/2
IP-6/3
IP-6/4
IP-6/5
IP-6/6
IP-6/7
IP-6/8
IP-6/9
140
TP-4
TP-5
TP-6
TP-7
139
138
137 52°9'8'' 27°55'19'' 11°5'27'' 46°3'17''
136
148.725
165.803
224.064
155.573
130.495
245.277
108.736
19.723
148.55
13.683
81.66
8.813
146.4
9.28
135
5.9
134
133
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
132
131 To
To
Fie
To
To
SB#194 130 ld
F
K
iel
Fie
129 SOB CTF
he
Existing
d
rv a
ld
128
127 SOB CTF # 268/ 216 Goga Ji Maharaj Temple
ON
126
GC
ONGC
TP-6
125 Ongc well
Ro
ad
124
Line
INE
123
CH L
122
TP-5 ine
121 er
L
NE
M AT
ow
120 LI
TP
v P
k
-7
CH
r Line
119 66
118 AT
To
220 v Powe
M
ON
117
To
Goga Ji Maharaj Temple
GC
To Heb
TP-3 116
Heb
115 a
We
uv
uv
b
He
ll
114
uva
4 To
113 TP-
a Sobhasan ETP
SB#176 112
am
p ur
rL
ine
e
we
in
111 R rL Po
To E Kv
we
110 N an
11
LI
Po
nas
Kv
Pu
CH
109
INE
To
11
108 AT
M
CH L
107
106
Sobhasan ETP
MAT
105
104
103 CS-7/BT ROAD CH.2.04 km CS-9/HT LINE CH.2.413 km CS-11/Electric line CH.2.855 km CS-14/BT ROAD CH.3.295 km
102 CS-8/CART TRACK CH.2.044 km CS-10/BT ROAD CH.2.588 km CS-12/CART TRACK CH.2.882 km
CS-13/CART TRACK CH.3.038 km
101
100
99
98
97
96
95
94
93
92
91
90
89
88
87
91.161
89.381
89.041
89.481
GROUND LEVELS
91.858
91.658
91.920
91.853
91.569
89.843
89.443
89.327
88.507
88.417
89.077
89.460
89.587
89.494
89.089
89.857
89.819
88.803
88.028
87.317
87.337
87.943
88.280
88.433
89.528
91.605
90.455
88.805
89.265
89.295
89.115
91.636
91.543
91.554
91.215
89.464
88.342
89.513
89.486
90.042
89.143
89.126
89.715
89.543
87.743
87.943
88.465
(IN METRES)
44.758
26.418
19.723
44.691
10.495
39.505
34.559
48.945
13.683
41.284
3.967
5.242
3.859
5.309
8.813
6.628
1.055
29.44
14.66
31.74
4.577
8.716
40.7
9.28
0.02
5.9
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
1+796.033
1+944.758
2+026.418
2+046.141
2+194.691
2+360.495
2+584.559
2+593.372
2+748.945
3+045.423
3+408.716
2+000.00
2+050.00
2+100.00
2+150.00
2+200.00
2+250.00
2+300.00
2+350.00
2+400.00
2+450.00
2+500.00
2+550.00
2+600.00
2+650.00
2+700.00
2+750.00
2+800.00
2+850.00
2+900.00
2+950.00
3+000.00
3+050.00
3+100.00
3+150.00
3+200.00
3+250.00
3+300.00
3+350.00
3+400.00
3+450.00
3+500.00
2+879.44
2+885.34
3+031.74
3+299.98
1+750.00
1+800.00
1+850.00
1+900.00
1+950.00
CUMULATIVE CHAINAGE
3+290.7
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#194 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
BT ROAD CROSS SECTION NKBPL/ONGC/ SB#194 TO SOB CTF WELL/CS-7 MEHSANA ASSET
PARALLEL LINE SB#176 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/ SB#194 TO SOB CTF WELL/CS-10 MEHSANA
SOB CTF
PARALLEL LINE SB#97 To
NALA
BT ROAD CROSS SECTION NKBPL/ONGC/ SB#194 TO SOB CTF WELL/CS-14 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB CTF SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
OTHER PROPOSED LINE
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION
TREE
CHAINAGE : FROM 1.75 TO 3.50 KM
BITUMEN ROAD
IP-8/1
IP-8/2
139
TP-8
End
138
137
136 82°13'49''
135
TC 205.863
197.509
100.806
12.376
56.952
5.837
134
INE
133
Ex
HL
132
is t
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
ing
131
MA
ON
130
GC
SB#194 TP 129
Lin
-7
128 SOB CTF
e
in e
127
n
rL
sa
OLD HEADER
we
na
126
Po
Pu
d
125
En
Kv
To
11
124
123
122 Ramdev Seva camp NEW HEADER
121
120
WA
LL
CR
SOB CTF
E
OS
LIN
119 SIN
G
H
118
TC
117
19
Sobhasan ETP
MA
-2
116 ne
SH
Li
Sobhasan ETP 115
Po
we
r
ON
114 Kv
11 GC
va
113 bu Ro
ad
He
112
-8
To
TP
111
e
Lin
110
GC
109
To F
ON
108 ield
ng
107
isti
106
Ex
105
104
103
102 CS-15/LT LINE CH.3.583 km CS-19/BT ROAD CH.3.884 km
101 CS-16/LT LINE CH.3.613 km
CS-17/BT ROAD CH.3.622 km
100 CS-18/LT LINE CH.3.651 km
99
98
97
96
95
94
93
92
91
90
89
88
87
86
88.451
86.181
GROUND LEVELS
87.537
87.036
86.897
86.607
86.564
89.115
86.245
86.405
87.302
87.119
86.343
86.618
86.623
86.524
(IN METRES)
23.045
24.465
25.535
31.417
12.746
5.837
38.06
50
50
50
50
50
50
POINTS (IN METRES)
Normal soil Normal soil
SURFACE/TERRAIN DETAILS
3+614.579
3+626.955
3+824.465
3+881.417
3+887.254
3+500.00
3+550.00
3+600.00
3+650.00
3+700.00
3+750.00
3+800.00
3+850.00
3+900.00
3+950.00
3+988.06
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#194 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
BT ROAD CROSS SECTION NKBPL/ONGC/ SB#194 TO SOB CTF WELL/CS-17 MEHSANA ASSET
PARALLEL LINE SB#176 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/ SB#194 TO SOB CTF WELL/CS-19 MEHSANA
SOB CTF
PARALLEL LINE SB#97 To
NALA
RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB CTF SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
OTHER PROPOSED LINE
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION
TREE
CHAINAGE : FROM 3.50 TO 3.988 KM
BITUMEN ROAD
IP-1/1
IP-1/2
IP-1/3
IP-3/1
IP-3/2
IP-3/3
IP-4/1
IP-4/2
IP-4/3
IP-4/4
141
TP-1
TP-2
TP-3
TP-4
Start
140
139
138 12°35'30'' 79°35'6'' 27°54'21'' 11°6'24''
137
118.905
180.329
134.622
242.663
142.984
209.041
187.487
133.251
148.743
128.46
48.941
61.011
20.717
21.414
9.624
9.409
9.68
136
135
134
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
133
132 To
SB#97 131 Fie
ld
130
129
SOB CTF # 268/ 216 SOB CTF
To Ra
To
E
128
MATCH LIN
Kh
127
To Rampura
mpura
erv
To F
126
a
125 TP-4
ield
124
123 TP-3
Goga Ji Maharaj Temple
122
TP-1
E
121 ine
LIN
erL
120 ow
To
P
CH
Start
119
SB#176 66
kv
ON
T
MA
118
GC
SB#97 117
TP-2
We
To ONG
116
a
ll
r
pu
To
r
C
E To we
MATCH LIN SB#176 Po
Well
He
113
E
Goga Ji Maharaj Temple
Kv
MATCH LIN
b
112 11
uv
E
MATCH LIN
a
111
-2
110 TP
109
E
LIN
108
107
H
TC
106
MA
105
104 CS-2/BT ROAD CH.0.577 km CS-4/BT ROAD CH.0.945 km CS-6/HT LINE CH.1.326 km
103 CS-1/CART TRACK CH.0.133 km CS-3/LT LINE CH.0.583 km CS-5/CART TRACK CH.0.974 km CS-7/BT ROAD CH.1.52 km
102
101
100
99
98
97
96
95
94
93
92
91
90
89
88
90.431
GROUND LEVELS
91.115
91.108
90.805
90.168
89.782
89.629
90.574
91.543
91.554
91.252
91.215
89.443
88.543
89.513
89.486
90.042
92.014
91.592
91.134
91.028
91.084
90.657
90.282
90.203
89.833
90.168
90.853
91.359
92.007
91.723
91.630
89.942
89.552
89.402
89.364
88.697
88.366
88.647
88.928
89.357
89.367
89.416
89.880
89.827
89.290
90.975
90.265
91.645
91.585
90.775
88.865
(IN METRES)
37.374
12.626
21.996
18.381
30.561
19.439
23.224
26.776
34.235
15.765
21.414
23.634
28.391
21.609
15.878
24.713
41.463
28.46
11.86
7.045
9.624
4.952
19.35
30.65
9.409
8.537
9.68
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+257.045
0+437.374
0+571.996
0+581.619
0+630.561
0+873.224
0+934.235
0+954.952
0+976.366
1+328.391
1+515.878
1+525.287
1+658.537
0+000.00
0+050.00
0+100.00
0+150.00
0+200.00
0+250.00
0+300.00
0+350.00
0+400.00
0+450.00
0+500.00
0+550.00
0+600.00
0+650.00
0+700.00
0+750.00
0+800.00
0+850.00
0+900.00
0+950.00
0+128.46
0+138.14
1+119.35
1+000.00
1+050.00
1+100.00
1+150.00
1+200.00
1+250.00
1+300.00
1+350.00
1+400.00
1+450.00
1+500.00
1+550.00
1+600.00
1+650.00
1+700.00
1+750.00
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#97 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
MEHSANA ASSET
PARALLEL LINE SB#194 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/SB#97 TO SOB CTF/CS-2 MEHSANA
SOB CTF
PARALLEL LINE SB#176 To
NALA
BT ROAD CROSS SECTION NKBPL/ONGC/SB#97 TO SOB CTF/CS-4 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB CTF BT ROAD CROSS SECTION NKBPL/ONGC/SB#97 TO SOB CTF/CS-7 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
OTHER PROPOSED LINE
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION
TREE
CHAINAGE : FROM 0.00 TO 1.75 KM
BITUMEN ROAD
IP-4/7
IP-4/8
IP-4/9
IP-5/1
IP-5/2
IP-6/1
IP-6/2
139
TP-5
TP-6
End
138
137
136 46°3'17'' 82°13'49''
135
129.542
129.542
199.379
100.458
134.85
12.899
99.199
12.757
208.09
65.465
5.932
9.266
134
6.4
133
132
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
131
130 OLD HEADER
End
SB#97 129
MATCH LINE
MATCH LINE
Existi
To
127
SOB # 12
To
F
126
SOB CTF
iel
Fie
ng ON
ON
d
125
Ongc well
san
ld
r Line
G
124 NEW HEADER
CR
una
GC L
Powe
123
oa
To P
WAL
d
Goga Ji Maharaj Temple 122 L CR
ine
OSS
v
11 K
121 Ex IN G
ist
120 in Ramdev Seva camp
g TP-5
O
NG
E
119
LIN
C ONG
118 Li
ne CR
CH
ON oad
117 G CR
T
oad
MA
116
e
ower Lin
115
9
114
-21
ine
MATCH LINE
TP-6
220 v P
113
MATCH LINE
L
SH
To He
er
Goga Ji Maharaj Temple
ow
ine
112 va
u
Sobhasan ETP Sobhasan ETP
vP
eb
GC L
H111
buva
K
o
Ongc well
11
va
T 110
ng ON
bu
109
He
108
To
Existi
107
E
To Field
LIN
106
SB#02
CH
105
Sobhasan ETP
T
104
MA
103
102 CS-8/Electric line CH.1.783 km CS-11/BT ROAD CH.2.225 km CS-12/LT LINE CH.2.497 km CS-16/BT ROAD CH.2.817 km
101 CS-9/CART TRACK CH.1.81 km CS-13/LT LINE CH.2.526 km
CS-10/CART TRACK CH.1.954 km CS-14/BT ROAD CH.2.535 km
100 CS-15/LT LINE CH.2.563 km
99
98
97
96
95
94
93
92
91
90
89
88
87
86
88.121
GROUND LEVELS
89.143
89.126
89.715
89.543
87.314
87.743
87.943
88.465
87.302
87.119
86.343
86.618
86.623
86.524
89.290
89.113
89.553
89.872
89.672
89.068
88.366
87.317
87.334
87.559
89.308
89.236
88.663
87.774
87.084
86.962
86.716
86.329
86.297
86.458
88.335
86.335
86.435
(IN METRES)
48.062
10.961
39.039
40.503
20.046
20.688
28.511
21.489
12.757
48.737
14.202
29.398
5.932
1.938
9.497
9.266
27.89
9.354
1.263
21.06
7.28
6.4
50
50
50
50
50
50
50
50
50
50
50
50
50
50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
1+813.212
1+948.062
1+960.961
2+090.503
2+220.046
2+229.312
2+328.511
2+540.646
2+748.737
2+814.202
2+820.602
2+000.00
2+050.00
2+100.00
2+150.00
2+200.00
2+250.00
2+300.00
2+350.00
2+400.00
2+450.00
2+500.00
2+550.00
2+600.00
2+650.00
2+700.00
2+750.00
2+800.00
2+850.00
2+900.00
1+807.28
2+527.89
2+921.06
1+750.00
1+800.00
1+850.00
1+900.00
1+950.00
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#97 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
BT ROAD CROSS SECTION NKBPL/ONGC/SB#97 TO SOB CTF/CS-11 MEHSANA ASSET
PARALLEL LINE SB#194 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/SB#97 TO SOB CTF/CS-14 MEHSANA
SOB CTF
PARALLEL LINE SB#176 To
NALA
BT ROAD CROSS SECTION NKBPL/ONGC/SB#97 TO SOB CTF/CS-16 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB CTF SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
OTHER PROPOSED LINE
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION
TREE
CHAINAGE : FROM 1.75 TO 2.921 KM
BITUMEN ROAD
IP-0/3
IP-1/1
IP-1/2
IP-3/1
IP-3/2
IP-3/3
IP-3/4
IP-4/1
IP-4/2
IP-5/1
IP-5/2
139
TP-1
TP-2
TP-3
TP-4
TP-5
Start
138
137
49°44'2'' 40°21'53'' 20°23'26'' 37°1'46'' 93°11'1''
136
135
208.036
185.616
204.153
135.951
211.623
104.007
75.406
127.98
49.727
152.65
10.594
90.148
66.084
14.416
5.876
8.059
7.388
8.029
134
133
NE
LI
132 CH
AT G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
131 M
130
To
SB#17 129 E
Pu
LIN
e
SOB CTF
s an
Lin
128
na
CH
sa
T
ed
127
una
MA
n
n
nasa
os
LINE
126
rop
To
To Pu
125
rP
-21
ine
CH
he
124 rL
To P
SH
we NE To
Ot
o
To
MAT
123 vP LI Pu
To
K
11
unas
P
122 22 CH na
una
0V AT sa
121 Po TP n
an
E
san
M
we - LIN
SB#17 rL 4
120
H
To
ine TC
TP-3
Kh
119 MA
er
Ramdev Seva camp
-
TP
va
Start 118
117
116 ONGC Well
an
11
Kv
115
vas
Po
To
2
To
we
11
114 TP-
Kad
rL
To
Kv
Ka
ine
Khe
113
Po
d
To F
To
Khe
va
To
220V
ield
we
rva
sa
He 9
112
rL
SH
rva
n
LINE
bu
ine
e
-2
Pow
111
Lin
va
1
-5
er Lin
110
ed
TP
CH
os
109
ro p
MAT
108
rP
Sobhasan ETP
he
107
Ot
106
105
104
103
102
101 CS-3/BT ROAD Ch.0.683 km CS-5/WBM ROAD Ch.1.006 km CS-7/CART TRACK Ch.1.491 km
CS-1/LT LINE Ch.0.124 km CS-6/WBM ROAD Ch.1.165 km
100 CS-8/LT LINE Ch.1.497 km
CS-4/Electric line Ch.0.69 km
99 CS-12/LT LINE Ch.1.691 km
CS-2/WBM ROAD Ch.0.21 km
98
CS-11/SH Ch.1.659 km
97
96 CS-10/LT LINE Ch.1.651 km
95 CS-9/LT LINE Ch.1.619 km
94
93
92
91
90
89
88
87
86
89.741
89.621
88.681
90.361
88.711
89.311
87.301
GROUND LEVELS
89.890
89.863
89.807
89.994
90.373
88.559
87.859
87.890
90.339
90.689
90.748
89.533
88.990
89.083
88.894
88.790
88.790
88.139
87.288
87.044
87.878
88.623
89.588
88.387
87.723
86.980
86.747
89.795
89.615
89.595
89.595
90.731
90.737
88.891
88.625
89.705
88.165
90.39
88.79
90.09
89.09
88.88
88.69
88.39
89.69
87.29
87.09
(IN METRES)
49.528
46.318
29.088
12.853
15.127
34.873
48.922
41.807
10.843
10.594
28.563
33.059
16.941
37.066
35.243
14.757
14.416
34.257
8.036
5.876
0.472
3.682
8.059
1.078
0.804
7.388
8.029
4.905
1.328
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
0
0+399.528
0+603.682
0+679.088
0+687.147
0+815.127
0+951.078
1+000.804
1+008.193
1+160.843
1+171.437
1+383.059
1+487.066
1+495.095
1+585.243
1+651.328
1+665.743
0+000.00
0+050.00
0+100.00
0+150.00
0+200.00
0+250.00
0+300.00
0+350.00
0+400.00
0+450.00
0+500.00
0+550.00
0+600.00
0+650.00
0+700.00
0+750.00
0+800.00
0+850.00
0+900.00
0+950.00
1+000.00
1+050.00
1+100.00
1+150.00
1+200.00
1+250.00
1+300.00
1+350.00
1+400.00
1+450.00
1+500.00
1+550.00
1+600.00
1+650.00
1+700.00
1+750.00
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#17 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
MEHSANA ASSET
PARALLEL LINE SOB GGS-II
RIVER WBM ROAD CROSS SECTION NKBPL/ONGC/SB#17 To SOB CTF/CS-2 MEHSANA
To SOB CTF
PARALLEL LINE SB#125 To
NALA
BT ROAD CROSS SECTION NKBPL/ONGC/SB#17 To SOB CTF/CS-3 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB CTF WBM ROAD CROSS SECTION NKBPL/ONGC/SB#17 To SOB CTF/CS-5 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
OTHER PROPOSED LINE CANAL WBM ROAD CROSS SECTION NKBPL/ONGC/SB#17 To SOB CTF/CS-6 CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
FOREST BOUNDARY
CART TRACK CROSS SECTION NKBPL/ONGC/SB#17 To SOB CTF/CS-7 ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION
NKBPL/ONGC/SB#17 To SOB CTF/CS-11
VILLAGE SITE CART TRACK
SH CROSS SECTION
4"Ø SB#17 TO SOB CTF WELL FLUID LINE
ALIGNMENT SHEET
VILLAGE BOUNDARY POND
TREE
CHAINAGE : FROM 0.00 TO 1.75 KM
EXISTING OTHER LINE / ROW
TP-6
End
138
137
82°13'49''
136
135
101.327
180.71
43.439
5.737
134
133
132
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
131
130
Ramdev Seva camp
SB#17 129
128 SOB CTF
NE
127 LI
To
CH
SH
-21
SH
126 AT
9
To
M
-2
Heb
125
19
uva
wer
v Po
11 K 124
123
Line
OLDd HEADER
122 En
121
120 SOB CTF
Ot
119 NEW HEADER
NE he
L I 118 rPr WALL CROSSING
CH 117 op
AT
os
M 116 ed
Lin
115 e
-6
114 TP
113
112
F
111
CT
110
B
SO
109
To
108
107
106
105
104
103
102
101 CS-13/BT ROAD Ch.1.893 km
100
99
98
97
96
95
94
93
92
91
90
89
88
87
86
86.191
GROUND LEVELS
86.747
86.373
86.599
86.409
86.575
86.625
86.19
86.62
(IN METRES)
39.893
46.956
3.546
5.737
4.371
50
50
1+889.893
1+895.629
1+750.00
1+800.00
1+850.00
1+900.00
1+950.00
1+996.96
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#17 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
BT ROAD CROSS SECTION NKBPL/ONGC/SB#17 To SOB CTF/CS-13 MEHSANA ASSET
PARALLEL LINE SOB GGS-II
RIVER MEHSANA
To SOB CTF
PARALLEL LINE SB#125 To
NALA
RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB CTF SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
OTHER PROPOSED LINE CANAL CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
FOREST BOUNDARY
ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION
TREE
CHAINAGE : FROM 1.75 TO 1.997 KM
EXISTING OTHER LINE / ROW
IP-0/2
IP-0/3
IP-0/4
IP-1/1
IP-2/1
IP-2/2
IP-2/3
IP-3/1
IP-3/2
IP-3/3
139
TP-1
TP-2
TP-3
TP-4
TP-5
Start
End
138
137
136 43°9'28'' 6°23'54'' 4°16'26'' 44°40'43'' 85°23'41''
135
174.286
205.547
184.478
141.948
118.317
132.619
166.284
15.359
10.412
147.86
15.777
86.065
85.498
6.773
146.1
95.82
8.921
134
133
132
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
131 NE
130 LI
11 Kv Power Line
C H
SB# 86 129 AT WALL CROSSING
To
a
M SOB CTF
ebuv
128
Sh
MATCH LINE
127
-2
NEW HEADER
To H
19
ONGC Well
SB C
To PT
11 Kv Power Line
11
126
_ NG
DS o O
125
ine
SB#35
a
TP
YS Off
T
uv
er L
124 SB#47 - 5
b
He
e
Pow
123
in
e
Lin
rL
OLD HEADER
e
ine
ce ON
in
To
we
122
rL
v
r
rL
we
11 K
11 Kv ONGC WELL
Po
we
Power
we
Po
121
Po
L ine
Kv
E
Po
Kv
G
Kv
N
11
120 LI SOB CTF
11
Kv
C
11
H 4
11
119 TP-1 TP-3 -
C TP En
118 AT d
Start M
117 TP-2
SB#86
ana
116
115
has
SB#02
er Line
114
hob
11 Kv
W ell
113
To S
To ONG
11 Kv Pow
ngc
SB#313
Power
MATCH LINE
112
Su To
To O
111 b s On
tat gc
Line
C Well
110 ion
109
108
107
106
105
104
103
102
101 CS-1/LT LINE CH.0.341 km CS-6/WBM ROAD CH.0.976 km CS-8/BT ROAD CH.1.55 km
CS-2/LT LINE CH.0.492 km CS-7/LT LINE CH.1.156 km
100
99
CS-3/BT ROAD CH.0.567 km
98
97
CS-4/LT LINE CH.0.579 km
96
95 CS-5/LT LINE CH.0.594 km
94
93
92
91
90
89
88
87
86
88.521
86.701
86.731
87.521
87.971
87.021
GROUND LEVELS
87.144
87.308
87.576
87.936
88.043
88.066
88.682
88.890
88.073
87.722
87.159
87.392
87.448
87.500
87.663
86.796
87.110
87.377
87.653
87.969
87.896
87.897
87.898
87.526
87.083
86.962
87.415
88.405
87.275
87.945
87.715
88.582
88.165
88.171
87.118
87.422
87.521
87.585
87.671
87.265
87.896
87.812
87.792
87.787
87.025
87.95
(IN METRES)
24.28572
25.71428
29.83239
20.16761
15.35916
13.55797
28.39037
21.60963
20.31051
10.41155
19.27794
31.65755
18.34245
29.51716
20.48284
15.77711
29.50054
42.06215
DISTANCE BETWEEN LEVEL
14.3101
6.77277
24.4908
25.5092
49.0388
45.8015
4.72235
43.4357
0.9612
4.1985
6.5643
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
0
0+379.832
0+571.083
0+586.442
0+874.491
0+970.311
0+980.722
1+099.039
1+231.658
1+379.517
1+545.802
1+554.722
1+570.499
1+656.564
0+000.00
0+050.00
0+100.00
0+150.00
0+200.00
0+250.00
0+300.00
0+350.00
0+400.00
0+450.00
0+500.00
0+550.00
0+600.00
0+650.00
0+700.00
0+750.00
0+800.00
0+850.00
0+900.00
0+950.00
0+564.31
0+728.39
1+000.00
1+050.00
1+100.00
1+150.00
1+200.00
1+250.00
1+300.00
1+350.00
1+400.00
1+450.00
1+500.00
1+550.00
1+600.00
1+650.00
1+700.00
1+742.06
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB# 86 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
MEHSANA ASSET
PARALLEL LINE SB# 29 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/SB# 86TO SOB CTF WELL/CS-3 MEHSANA
SOB CTF
NALA
WBM ROAD CROSS SECTION NKBPL/ONGC/SB# 86TO SOB CTF WELL/CS-6 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
OTHER PROPOSED LINE
BT ROAD CROSS SECTION NKBPL/ONGC/SB# 86TO SOB CTF WELL/CS-8 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
ONGC INSTALLATION
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
VILLAGE BOUNDARY CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
EXISTING OTHER LINE / ROW CART TRACK
4"Ø SB# 86 TO SOB CTF WELL FLUID LINE
BITUMEN ROAD
ALIGNMENT SHEET
POND
W.B.M. ROAD TREE
CHAINAGE : FROM 0.00 TO 1.742 KM
RAILWAY LINE / PILLAR TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.
FOREST BOUNDARY BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FIELD BUND WATER TANK MANHOLE Jaipur - 302015
X
FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE
LT POLE / LINE
DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SB#
/ 86To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB CTF/ ALN-1
IP-0/1
IP-0/2
IP-1/1
IP-1/2
IP-2/1
IP-2/2
IP-2/3
IP-2/4
IP-3/1
IP-4/1
IP-4/2
137
TP-1
TP-2
TP-3
TP-4
Start
136
135
134 12°21'8'' 52°40'44'' 43°10'14'' 6°23'8''
133
223.216
209.992
206.523
173.759
205.832
143.037
142.687
25.223
182.96
15.503
98.645
8.383
18.13
6.68
10.1
132
131
NE
130 LI E
129 CH G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
LI
N
AT
128 M CH
SB# 29 127
11 Kv Power Line AT
M
MATCH LINE
MATCH LINE
LINE
ebuv
126 SOB CTF
125
To
To P
To H
H
X
124
To ONGC Well
S
11 Kv Power Line
MATC
h-2
a
S
T
123 h-21
uv
SB#35
YS O
19
eb
9
e in
122
ine
er L
SB#47
rL
To
ff
121 E
we
ce O
Pow
N
LI
Po
ne
120
Li
To Sh-219
v
Kv
CH NE
NGC
11 K
r
11 Kv
we
LI
119 Power
11
AT
Po
Line
M H
Kv
ine
118
TC
SB#29
11
rL
117 A TP-3
we
M
Po
116
Kv
Start TP-4
11
115
114 TP-1 TP-2
ana
113
SB#86
has
112
11 Kv
hob
MATCH LINE
H LINE
MATCH LINE
111
To S
ower Lin
Powe
110 SB#313
Su To
To ON
r Line
109
MATC
b s On
11 Kv P
108 To tat gc
Wo ion
od
GC W
107 Fa
106 cto
ry
ell
105
104
103
102
101
100
99 CS-1/BT ROAD CH.0.228 km CS-2/BT ROAD CH.0.658 km CS-3/LT LINE CH.1.032 km CS-8/WBM ROAD CH.1.666 km
CS-4/LT LINE CH.1.18 km
98
97
CS-5/BT ROAD CH.1.257 km
96
95 CS-6/LT LINE CH.1.268 km
94
93 CS-7/LT LINE CH.1.287 km
92
91
90
89
88
87
86
85
84
89.131
87.301
GROUND LEVELS
89.259
89.397
90.032
90.826
89.410
86.760
87.650
89.084
88.992
88.450
87.796
87.340
88.174
87.180
87.330
87.627
87.993
88.066
88.454
88.726
88.923
88.450
87.509
86.644
86.876
87.187
87.416
87.460
87.510
87.588
87.898
87.435
88.055
88.135
91.466
91.584
89.581
88.194
88.043
87.144
87.715
88.582
88.165
88.171
87.118
87.422
87.521
87.585
87.95
(IN METRES)
50
50
50
23
18
50
50
50
42
50
50
50
48
16
25
50
50
50
15
35
50
50
50
21
29
50
50
50
16
24
50
50
19
31
50
50
12
38
50
11
10
29
50
0
4
7
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+223.216
0+441.592
0+648.114
0+666.244
0+691.467
0+865.227
1+071.059
1+254.019
1+260.699
1+276.202
1+419.239
1+561.926
1+660.571
1+670.671
0+000.00
0+050.00
0+100.00
0+150.00
0+200.00
0+250.00
0+300.00
0+350.00
0+400.00
0+450.00
0+500.00
0+550.00
0+600.00
0+650.00
0+700.00
0+750.00
0+800.00
0+850.00
0+900.00
0+950.00
1+000.00
1+050.00
1+100.00
1+150.00
1+200.00
1+250.00
1+300.00
1+350.00
1+400.00
1+450.00
1+500.00
1+550.00
1+600.00
1+650.00
1+700.00
1+750.00
CUMULATIVE CHAINAGE
0+231.6
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB# 29 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
MEHSANA ASSET
PARALLEL LINE SB# 86 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/SB# 29 TO SOB CTF/CS-1 MEHSANA
SOB CTF
NALA
BT ROAD CROSS SECTION NKBPL/ONGC/SB# 29 TO SOB CTF/CS-2 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
OTHER PROPOSED LINE
BT ROAD CROSS SECTION NKBPL/ONGC/SB# 29 TO SOB CTF/CS-5 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
ONGC INSTALLATION
ROAD SIDE DRAIN
WBM ROAD CROSS SECTION NKBPL/ONGC/SB# 29 TO SOB CTF/CS-8 CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
VILLAGE BOUNDARY CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
EXISTING OTHER LINE / ROW CART TRACK
4"Ø SB# 29 TO SOB CTF WELL FLUID LINE
BITUMEN ROAD
ALIGNMENT SHEET
POND
W.B.M. ROAD TREE
CHAINAGE : FROM 0.00 TO 1.75 KM
RAILWAY LINE / PILLAR TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.
FOREST BOUNDARY BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FIELD BUND WATER TANK MANHOLE Jaipur - 302015
X
FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE
LT POLE / LINE
DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SB#
/ 29To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB CTF/ ALN-1
IP-5/1
IP-5/2
IP-5/3
139
TP-5
TP-6
TP-7
End
138
137
136 4°17'48'' 44°42'5'' 85°23'41''
135
137.166
181.895
248.33
88.815
90.111
8.917
8.858
134
133
132
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
131
SB#11
130
an
SB# 29 129
s
na
128 SOB CTF
Pu
To
127
126 WALL CROSSING
125
MATCH LINE
ONGC FIRE STATION
124
X
123
NEW HEADER
SB C
11 Kv Power Line
11
_ NG
122
X
DS o O
121 TP
-
T
7
120
119
OLD HEADER
X
11 Kv
Power
118 ONGC WELL
Line
117
116
115
TP-5
TP
-6 SOB CTF En
d
114
113
112
111 SB#02 To Puna
110 san
ell
MATCH LINE
W
109
X
ngc
Su To 108
X
b s On
To O
tat gc 107
ion 106
105
X
104
103
102
101 CS-10/BT ROAD CH.2.243 km
CS-9/LT LINE CH.1.836 km
100
99
98
97
96
95
94
93
92
91
90
89
88
87
86
87.501
GROUND LEVELS
87.898
87.529
86.086
87.156
87.784
87.897
87.898
87.899
87.809
87.408
87.010
86.972
87.905
87.265
87.896
87.812
87.792
87.787
87.025
87.021
(IN METRES)
50
50
19
31
50
50
44
50
50
38
44
45
50
35
6
9
3
6
5
POINTS (IN METRES)
Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
1+919.001
2+056.167
2+238.062
2+246.979
2+255.838
2+344.653
2+000.00
2+050.00
2+100.00
2+150.00
2+200.00
2+250.00
2+300.00
2+350.00
2+400.00
2+434.76
1+750.00
1+800.00
1+850.00
1+900.00
1+950.00
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB# 29 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
BT ROAD CROSS SECTION NKBPL/ONGC/SB# 29 TO SOB CTF/CS-10 MEHSANA ASSET
PARALLEL LINE SB# 86 To
RIVER MEHSANA
SOB CTF
NALA
RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
OTHER PROPOSED LINE
SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
ONGC INSTALLATION
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
VILLAGE BOUNDARY CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
EXISTING OTHER LINE / ROW CART TRACK
4"Ø SB# 29 TO SOB CTF WELL FLUID LINE
BITUMEN ROAD
ALIGNMENT SHEET
POND
W.B.M. ROAD TREE
CHAINAGE : FROM 1.75 TO 2.435 KM
RAILWAY LINE / PILLAR TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.
FOREST BOUNDARY BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
FIELD BUND WATER TANK MANHOLE Jaipur - 302015
X
FENCING WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
Email : nkbpl.ongcwest@gmail.com
HIGH TENSION LINE / POLE TP , IP
ELECTRIC POLE / LINE
LT POLE / LINE
DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SB#
/ 29To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB CTF/ ALN-2
IP-2/1
IP-2/2
IP-2/3
IP-3/1
IP-3/2
IP-5/1
IP-5/2
IP-5/3
IP-5/4
139
TP-1
TP-2
TP-3
TP-4
TP-5
TP-6
Start
138
137
19°50'36'' 10°17'20'' 49°44'2'' 40°21'53'' 20°23'12'' 37°1'60''
136
135
166.139
116.245
192.307
196.868
125.526
135.042
152.472
105.352
206.76
51.649
10.383
212.43
5.879
73.76
8.005
7.542
134
133
132
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
131
INE
130 ONGC FIRE STATION
HL
TP-4
san
SB#125 129
E N
T
LI
TC
na
oP
128 SOB CTF
Pu
H
san
MA
u
C
127
na
AT
To
a
s
Pun
M
126
an
125
To
To
124
Pu
na
123 ine
sa
er L TP-5
n
122 ow
To P
K vP
11
SB#125 121
NE
u
nasa
120
220
LI
TP
CH
n
V
119
sa
NE -6
Start
SB#17
Pow
TP-4
na
AT
LI
118
u
22
ONGC Well
P
er L
CH
n
0V
asa
To
117 Po AT
INE
TP-2
ne
we
adv
M
116 rL
in
HL
e
TP-1
To
K
115
To
TC
Ka
114
- 3
TP
dva
MA
11
113 Kv
To
sa
Po
112
Kh
n
we
er
rL
To K
111
va
To in
e
Fie
110 ld
herv
NE
109
LI
108
C H
107
AT
M
106
105
104
103
102
101 CS-1/LT LINE CH.0.403 km CS-3/BT ROAD CH.0.962 km CS-5/WBM ROAD CH.1.283 km
CS-6/WBM ROAD CH.1.442 km
100
99 CS-4/Electric line CH.0.968 km
98 CS-2/WBM ROAD CH.0.492 km
97
96
95
94
93
92
91
90
89
88
87
86
89.871
89.911
88.841
88.601
87.741
89.531
GROUND LEVELS
89.390
89.333
89.352
89.608
90.330
89.986
89.890
89.840
89.790
89.696
89.594
90.119
89.896
87.947
87.890
87.939
89.447
90.680
90.752
90.688
89.146
88.990
89.000
88.790
88.764
86.990
87.417
88.372
88.914
89.685
89.595
89.595
90.731
90.737
88.891
88.625
89.39
89.69
89.89
90.39
88.79
90.09
89.09
88.88
88.69
88.39
(IN METRES)
33.861
32.384
17.616
39.144
34.198
15.802
34.037
41.488
28.179
14.279
38.193
10.383
11.005
38.995
5.879
4.977
37.33
12.67
7.958
8.005
8.512
26.53
23.47
7.542
1.425
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
0
0+282.384
0+489.144
0+495.023
0+884.198
0+957.958
0+965.963
1+091.488
1+278.179
1+285.721
1+438.193
1+448.575
1+661.005
0+000.00
0+050.00
0+100.00
0+150.00
0+200.00
0+250.00
0+300.00
0+350.00
0+400.00
0+450.00
0+500.00
0+550.00
0+600.00
0+650.00
0+700.00
0+750.00
0+800.00
0+850.00
0+900.00
0+950.00
0+687.33
1+226.53
1+000.00
1+050.00
1+100.00
1+150.00
1+200.00
1+250.00
1+300.00
1+350.00
1+400.00
1+450.00
1+500.00
1+550.00
1+600.00
1+650.00
1+700.00
1+750.00
CUMULATIVE CHAINAGE
0+0
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#125 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
MEHSANA ASSET
PARALLEL LINE SOB GGS-II
RIVER WBM ROAD CROSS SECTION NKBPL/ONGC/SB#125 To SOB CTF/CS-2 MEHSANA
To SOB CTF
PARALLEL LINE SB#17 To
NALA
BT ROAD CROSS SECTION NKBPL/ONGC/SB#125 To SOB CTF/CS-3 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB CTF WBM ROAD CROSS SECTION NKBPL/ONGC/SB#125 To SOB CTF/CS-5 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
OTHER PROPOSED LINE CANAL WBM ROAD CROSS SECTION NKBPL/ONGC/SB#125 To SOB CTF/CS-6 CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
FOREST BOUNDARY
ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION
TREE
CHAINAGE : FROM 0.00 TO 1.75 KM
EXISTING OTHER LINE / ROW
IP-7/1
IP-7/2
IP-8/1
IP-8/2
139
TP-7
TP-8
End
138
137
93°11'1'' 82°13'49''
136
135
175.295
101.501
85.465
61.765
38.855
7.821
5.783
14.5
134
133
132
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
131
130
SB#125 129
SOB CTF
To Field
128 SOB CTF
127
MATC
126 H LINE
En d
125 OLD HEADER
124 MATC
123 H LINE
122
n a
1 1 Kv
121
unas
120
Powe
To P
119 NEW HEADER
r
118 To SH-219
Line
117
WALL CROSSING
116
115 Ramdev Seva camp
114
TP-7
113
112 To SO
TP-8
B CT
F
111
Other Pro
110 posed Lin
e
109
ine
Heb -219
rL
108
we
uva
SH
Sobhasan ETP
Po
107
Kv
106
11
To
105
104
103
102
101 CS-7/CART TRACK CH.1.771 km CS-13/BT ROAD CH.2.153 km
100 CS-9/LT LINE CH.1.889 km
CS-8/LT LINE CH.1.777 km
99
CS-10/LT LINE CH.1.922 km
98
97
CS-11/SH CH.1.929 km
96
95 CS-12/LT LINE CH.1.961 km
94
93
92
91
90
89
88
87
86
89.531
GROUND LEVELS
89.058
87.463
86.866
86.539
86.190
86.619
86.372
86.549
88.235
87.035
86.575
89.705
88.165
86.625
89.69
87.29
87.09
86.19
86.62
(IN METRES)
25.822
40.357
21.408
14.092
11.203
38.797
44.159
7.821
9.643
0.058
5.783
7.342
14.5
50
50
50
50
50
POINTS (IN METRES)
Normal soil Normal soil
SURFACE/TERRAIN DETAILS
1+766.357
1+774.178
1+859.643
1+921.408
1+935.908
2+111.203
2+150.058
2+155.841
2+000.00
2+050.00
2+100.00
2+150.00
2+200.00
2+250.00
2+257.34
1+750.00
1+800.00
1+850.00
1+900.00
1+950.00
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#125 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
SH CROSS SECTION NKBPL/ONGC/SB#125 To SOB CTF/CS-11 MEHSANA ASSET
PARALLEL LINE SOB GGS-II
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/SB#125 To SOB CTF/CS-13 MEHSANA
To SOB CTF
PARALLEL LINE SB#17 To
NALA
RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB CTF SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
OTHER PROPOSED LINE CANAL CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
FOREST BOUNDARY
ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION
TREE
CHAINAGE : FROM 1.75 TO 2.26 KM
EXISTING OTHER LINE / ROW
IP-0/3
IP-0/4
IP-0/5
IP-1/1
IP-1/2
IP-1/3
IP-1/4
IP-1/5
IP-1/6
136
TP-1
TP-2
Start
End
135
134
133 8°20'42'' 2°47'31''
132
123.889
188.813
227.133
102.985
135.341
135.342
206.636
122.608
239.21
17.908
14.783
29.401
8.844
9.339
131
130
129
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
128
va 127
u
WSB#22 H ed 126 SOB GGS-I
To
To Heduva
125 WSB#8+15 To SOB GGS-I
To
r
ine
a
Well Fluid Pipe Line
He
rL
ag
we
124
wy
du
ti N
o
H vP 123
v
K
55
ak
- 11
n
SH 122
Sh
io
WSB#18+22+23 SOB#22
at
To
St
To
121
ay
120 WSB#18+
SOB GGS-I
ilw
23 To SOB
Ra
119 Well Fluid GGS-I
Pipe Line
e
an
in
118 Start
rL
End
es
TP-2
we
117
ah
Po
M
Kv
116
To
25
115
114 GGS-I
17 To SOB
WSB#12+
113
WSB#6
KU H-2 T
220 v Power Line Pipe Line
A
TP-1
To
Well Fluid
Hwy
KA 19
M
112
Ku
NU
ka
111
EXI
H-55
S
HA
s
110
STIN
A
To S
tio
V
109 y
ta
DU
of
Hw
S
108
ay
VB
HE
55
GAI
WSB#22 T -
o SOB GG
ilw
107 Well Fluid S-I SH
of
Ra
L
Pipe Line
To
To
106
VB
ROW
n
da
Fi
105
el
gu
d
Ja
104
To
103
102
101
CS-4/RAILWAY CH.0.829 km
100 CS-2/EXISTING LINE CH.0.366 km CS-6/SH CH.1.181 km CS-7/BT ROAD CH.1.402 km
99 CS-1/CART TRACK CH.0.128 km CS-5/LT LINE CH.0.837 km
98 CS-3/CART TRACK CH.0.376 km
97
96
95
94
93
92
91
90
89
88
87
86
85
84
83
85.361
87.151
GROUND LEVELS
84.144
85.019
85.568
85.329
86.670
88.140
89.016
89.574
89.992
89.712
90.007
90.688
90.824
91.264
91.340
90.960
90.202
88.626
87.000
87.074
87.370
87.806
87.832
87.867
87.930
88.373
88.264
88.103
87.977
87.900
83.765
88.777
85.5
85.6
88.7
89.6
91.3
90.2
87.7
87.8
88.1
88.3
87
88
(IN METRES)
17.267
21.943
18.718
20.095
29.905
47.228
49.787
35.554
14.446
20.896
17.908
11.196
10.223
29.401
10.376
12.232
8.844
9.339
2.772
0.213
45.44
4.56
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+123.889
0+132.733
0+371.943
0+381.282
0+570.095
0+797.228
0+900.213
1+035.554
1+170.896
1+188.804
1+410.223
1+439.624
0+000.00
0+050.00
0+100.00
0+150.00
0+200.00
0+250.00
0+300.00
0+350.00
0+400.00
0+450.00
0+500.00
0+550.00
0+600.00
0+650.00
0+700.00
0+750.00
0+800.00
0+850.00
0+900.00
0+950.00
1+395.44
1+000.00
1+050.00
1+100.00
1+150.00
1+200.00
1+250.00
1+300.00
1+350.00
1+400.00
1+450.00
1+500.00
1+550.00
1+562.23
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE WSB#22 TO
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB GGS-I
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
RAILWAY CROSS SECTION NKBPL/ONGC/WSB#22 TO SOB GGS-I/CS-4 MEHSANA ASSET
PARALLEL LINE WSB#8+15 To
RIVER SH CROSS SECTION NKBPL/ONGC/WSB#22 TO SOB GGS-I/CS-6 MEHSANA
SOB GGS-I
PARALLEL LINE WSB#12+17 To
NALA
BT ROAD CROSS SECTION NKBPL/ONGC/WSB#22 TO SOB GGS-I/CS-7 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB GGS-I SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE WSB#18+23 To
SOB GGS-I
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION
TREE
CHAINAGE : FROM 0.00 TO 1.56 KM
BITUMEN ROAD
IP-1/1
IP-1/2
IP-1/3
IP-1/4
IP-1/5
IP-1/6
IP-2/1
IP-3/1
IP-3/2
133
TP-1
TP-2
TP-3
Start
132
131
130 54°27'25'' 2°11'22'' 14°15'46''
129
138.145
190.769
212.084
172.799
119.299
162.032
197.429
192.548
11.439
156.97
87.907
51.447
58.52
13.14
128
127
126
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
125
124
WSB#12+17 123 SOB GGS-I
tion
Railw esana
122
ay Sta
EXISTING GAIL ROW
121
agar
WSB#8+15
AT
To Ma
120
S
N
WSB#7
KUKA
UM
Line
119 WSB#8+15 To
hakti
SOB GGS-I
Well Fluid Pipe
HAN
118
SOB#26
ower
Line Residential Area
To Ma Station
To S
Railw
117
VB of
P
TP
UVA
25 Kv
116
25 Kv Pow
-1
ay
hesan
SH-219
115
HED
114
er Line
WSB#12+17
f
113
VB o
112 er Line
11 Kv Pow
111
110 Start
Pond
109 TP-2
a
tion
an n WSB#12+17
108
h es tatio To SOB GGS-
Well Fluid Pipe I TP-3
riyavi
ay Sta
e
a
M ay S Line
Lin
107
Railway Station
To Jagudan
To ilw
er
106
Ra
ow
To Bo
Railw
SOB#22
vP
105 Sukheshwar Mahadev Temple
y
K
To SH-55 Hw
11
104
a
e
Lin
v
du
103 er
ow va
He
P
102 Kv To S
H-21 e du
To
25
101
9 Hw
y T oH
100
99
98
CS-6/RAILWAY CH.1.33km
97 CS-2/RAILWAY CH.0.561km CS-4/BT ROAD CH.0.897km CS-9/SH CH.1.566km
96 CS-1/EXISTING LINE CH.0.11km CS-7/LT LINE CH.1.344km
95 CS-8/BT ROAD CH.1.356km
CS-3/LT LINE CH.0.567km CS-5/LT LINE CH.0.901km
94
93
92
91
90
89
88
87
86
85
84
83
82
81
80
85.001
85.341
86.381
86.211
GROUND LEVELS
81.100
81.380
82.174
82.138
81.377
80.810
81.302
81.777
82.433
83.356
83.867
84.442
84.100
84.530
85.469
85.778
86.169
86.236
86.849
87.498
88.553
88.912
87.880
87.930
87.472
87.730
88.087
88.243
88.300
88.300
84.395
88.125
82.7
81.6
84.5
84.4
85.2
85.4
85.3
86.2
87.8
88.7
88.5
87.8
88
(IN METRES)
11.855
28.914
21.086
40.998
49.518
22.317
27.683
41.615
46.946
10.025
39.975
22.057
27.943
40.036
11.411
38.589
9.002
0.482
8.385
3.054
9.964
13.14
28.02
8.84
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+138.145
0+328.914
0+540.998
0+599.518
0+772.317
0+891.615
0+903.054
1+060.025
1+222.057
1+309.964
1+361.411
0+000.00
0+050.00
0+100.00
0+150.00
0+200.00
0+250.00
0+300.00
0+350.00
0+400.00
0+450.00
0+500.00
0+550.00
0+600.00
0+650.00
0+700.00
0+750.00
0+800.00
0+850.00
0+900.00
0+950.00
1+558.84
1+571.98
1+000.00
1+050.00
1+100.00
1+150.00
1+200.00
1+250.00
1+300.00
1+350.00
1+400.00
1+450.00
1+500.00
1+550.00
1+600.00
1+650.00
1+700.00
1+750.00
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE WSB#12+17 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB GGS-I
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
RAILWAY CROSS SECTION NKBPL/ONGC/WSB#12+17 TO SOB GGS-I /CS-2 MEHSANA ASSET
PARALLEL LINE WSB#8+15 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/WSB#12+17 TO SOB GGS-I /CS-4 MEHSANA
SOB GGS-I
PARALLEL LINE WSB#18+23 To
NALA
RAILWAY CROSS SECTION NKBPL/ONGC/WSB#12+17 TO SOB GGS-I /CS-6 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB GGS-I BT ROAD CROSS SECTION NKBPL/ONGC/WSB#12+17 TO SOB GGS-I /CS-8 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE WSB#22 To
SOB GGS-I
ROAD SIDE DRAIN
SH CROSS SECTION NKBPL/ONGC/WSB#12+17 TO SOB GGS-I /CS-9 CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION
TREE
CHAINAGE : FROM 0.00 TO 1.75 KM
BITUMEN ROAD
TP-4
End
139
138
137 33°12'37''
AT 136
M
112.287
ANU 135
H S ar
VA
U KA Nag 134
DU f K kt
i 133
HE o Sha G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
of 9
VB To
132
-21
VB 131
SH
E
LIN
127
CH
126
GGS-I
WSB#18+23 To SOB
T
125
MA
124 Well Fluid Pipe Line
123
122 SOB GGS-I
SOB#22 121
120
End
119 TP-4
118
117
11
116
Kv
Po
115
E
w
S-I
WSB#22 To SOB GG
er
LIN
114
Lin
Well Fluid Pipe Line
e
Line 113
H
220 v Power
To
TC
Ku
112
MA
ka
111
s
110
109
108
107
106
105
104
103
102
101
100
99
98
97
96
95
94
93
92
91
90
89
88
87
GROUND LEVELS
88.300
88.100
88.100
88.3
87.9
(IN METRES)
35.473
26.814
50
1+876.81
1+750.00
1+800.00
1+850.00
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE WSB#12+17 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB GGS-I
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
MEHSANA ASSET
PARALLEL LINE WSB#8+15 To
RIVER MEHSANA
SOB GGS-I
PARALLEL LINE WSB#18+23 To
NALA
RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB GGS-I SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE WSB#22 To
SOB GGS-I
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION
TREE
CHAINAGE : FROM 1.75 TO 1.88 KM
BITUMEN ROAD
IP-0/2
IP-0/3
IP-0/4
IP-0/5
IP-0/6
IP-1/1
IP-2/1
IP-2/2
134
TP-1
TP-2
TP-3
Start
End
133
132
131 2°11'23'' 14°15'47'' 33°12'37''
130
215.477
171.398
122.766
152.777
163.172
196.886
190.751
105.631
58.206
12.015
87.045
51.777
13.365
129
128
127
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
126
125 I
S-
WSB#8+15 124 GG SOB GGS-I
B
tation
123 SO e
SOB GGS-I
Railw hesana
o
T L i n
122
23 e
ine
ay S
121 WSB#8+ 8+ Pip
wer L
15 1
a
Well Fluid To SOB GGS-I # id
WSB#8+15
To M
SB lu
WSB#7
120 Pipe Line
W ell F
SOB#26
v Po
119 d
W En
T
Start
25 K
gar
UMA
118
To S KAS
i Na
117
To Mah tation
Railwa
Residential Area
HAN
hakt
I
f KU
116
S-
25 Kv Powe
115 GG
A
yS
esana
B e
VB o
DUV
114 SO Lin
SH-219
T o e
113 2 Pip
f HE
-3 #2 uid
r Line
112 TP SB l
W ell F
VB o
tation
111 11 Kv Powe
r Line W
WSB#12
Railw riyavi
110 +17 To S
Well Fluid OB GGS
ay S
Pipe Line -I TP-1
109
o
EX
e
To B
Lin
108 To Kuk
I
TP-2 as
ST
r
we
107
I
Po
NG
Railway Station
To Jagudan
Kv
106
GA
Pond
11
v
IL
105
du
To SH-55 Hwy
RO
He
104
W
e
SOB#22
To
To S a in
103 H-21 v rL
9 Hw du ow
e
102 y He P
To 0
v
101 22
100
99
98 CS-5/RAILWAY CH.1.003 km
CS-1/RAILWAY CH.0.235 km CS-3/BT ROAD CH.0.574 km CS-8/SH CH.1.239 km
97
CS-6/LT LINE CH.1.017 km
96 CS-4/LT LINE CH.0.578 km
CS-2/LT LINE CH.0.241 km CS-7/BT ROAD CH.1.029 km
95
94
93
92
91
90
89
88
87
86
85
84
83
82
81
88.991
GROUND LEVELS
81.600
82.057
82.962
84.162
84.138
84.226
84.798
85.478
85.428
85.708
86.392
86.316
86.148
87.174
87.849
88.277
88.173
87.863
87.714
87.552
88.016
88.170
88.300
88.300
88.227
88.100
87.900
83.645
84.475
85.225
86.585
85.395
84.29
84.4
85.2
85.4
86.2
87.8
88.7
88.5
87.8
88.3
88
(IN METRES)
34.523
23.683
26.317
45.081
17.847
12.015
20.138
32.639
17.361
45.811
32.857
17.143
34.633
15.367
13.365
35.635
14.365
41.266
4.919
4.189
31.52
5.116
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+215.477
0+273.683
0+445.081
0+567.847
0+579.862
0+732.639
0+895.811
0+982.857
1+034.633
1+244.884
1+435.635
0+000.00
0+050.00
0+100.00
0+150.00
0+200.00
0+250.00
0+300.00
0+350.00
0+400.00
0+450.00
0+500.00
0+550.00
0+600.00
0+650.00
0+700.00
0+750.00
0+800.00
0+850.00
0+900.00
0+950.00
1+231.52
1+000.00
1+050.00
1+100.00
1+150.00
1+200.00
1+250.00
1+300.00
1+350.00
1+400.00
1+450.00
1+500.00
1+541.27
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE WSB#8+15 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB GGS-I
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
RAILWAY CROSS SECTION NKBPL/ONGC/WSB#8+15 TO SOB GGS-I/CS-1 MEHSANA ASSET
PARALLEL LINE WSB#12+17 To
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/WSB#8+15 TO SOB GGS-I/CS-3 MEHSANA
SOB GGS-I
PARALLEL LINE WSB#18+23 To
NALA
RAILWAY CROSS SECTION NKBPL/ONGC/WSB#8+15 TO SOB GGS-I/CS-5 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB GGS-I BT ROAD CROSS SECTION NKBPL/ONGC/WSB#8+15 TO SOB GGS-I/CS-7 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE WSB#22 To
SOB GGS-I
ROAD SIDE DRAIN
SH CROSS SECTION NKBPL/ONGC/WSB#8+15 TO SOB GGS-I/CS-8 CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION
TREE
CHAINAGE : FROM 0.00 TO 1.54 KM
BITUMEN ROAD
IP-0/3
IP-0/4
IP-0/5
IP-1/1
IP-1/2
IP-1/3
IP-1/4
IP-1/5
IP-1/6
136
TP-1
TP-2
Start
End
135
134
133 8°20'43'' 2°47'30''
132
183.819
232.533
196.236
225.236
134.456
134.456
199.338
108.26
17.906
14.736
32.993
117.57
9.049
9.295
131
130
129
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
128
127
va
WSB#18+23 e du 126 SOB GGS-I
T oH
125
To Heduva
WSB#8+15 To SOB GGS-I
To
r
124
a
e Well Fluid Pipe Line
ag
in
He
rL 123
we
ti N
wy
du
H v Po
va
ak
55 1K 122
n
H- 1
Sh
io
S 121
SOB#22
at
To
WSB#18+22+23
To
St
120
SOB GGS-I
ay
WSB#18+
ilw
119 23 To SOB
Ra
Well Fluid GGS-I
118 Start Pipe Line
a
End
e
an
in
TP-2
L
117
es
er
w
ah
Po
116
Kv
To
115
25
114
B GGS-I
113 17 To SO
WSB#12+
KU H-2 T
TP-1
WSB#6 220 v Power Line Pipe L in e
112
To
Well Fluid
9
wy
M
1
Ku
NU
111
-55 H
ka
S
EXI
S
KA
HA
s
110
STIN
To SH
VA
109
io
at
y
DU
of
108
Hw
St
GG
VB
HE
55
y
107 WSB#22 T
wa
o SOB GG -
SH
AIL
il
S-I
of
106 Well Fluid
Ra
Pipe Line To
To
VB
ROW
an
105
Fi
d
el
gu
104
Ja
103
To
102
101
100 CS-2/EXISTING LINE CH.0.424 km CS-4/RAILWAY CH.0.893 km CS-6/SH CH.1.243 km CS-7/BT ROAD CH.1.458 km
99 CS-1/CART TRACK CH.0.189 km
98 CS-3/CART TRACK CH.0.43 km CS-5/LT LINE CH.0.901 km
97
96
95
94
93
92
91
90
89
88
87
86
85
84
83
83.991
86.381
88.941
90.551
91.181
GROUND LEVELS
83.500
84.799
85.587
85.464
85.227
87.956
89.464
89.908
89.863
90.819
91.300
91.219
88.993
87.502
87.000
87.000
87.930
87.829
87.859
87.913
87.999
88.294
88.103
88.042
87.900
83.745
89.775
90.335
87.355
85.5
85.6
88.7
88.8
89.6
91.3
90.2
87.7
87.8
88.1
88.3
87
88
(IN METRES)
25.402
15.303
30.933
19.067
43.831
14.429
35.571
48.885
33.341
16.659
48.753
14.736
32.993
15.885
9.049
7.132
9.295
6.169
1.115
1.247
0.585
1.686
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
0+183.819
0+192.868
0+425.402
0+434.697
0+630.933
0+856.169
0+964.429
1+098.885
1+233.341
1+251.247
1+450.585
1+465.321
1+498.314
0+000.00
0+050.00
0+100.00
0+150.00
0+200.00
0+250.00
0+300.00
0+350.00
0+400.00
0+450.00
0+500.00
0+550.00
0+600.00
0+650.00
0+700.00
0+750.00
0+800.00
0+850.00
0+900.00
0+950.00
1+000.00
1+050.00
1+100.00
1+150.00
1+200.00
1+250.00
1+300.00
1+350.00
1+400.00
1+450.00
1+500.00
1+550.00
1+600.00
1+615.88
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE WSB#18+23 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB GGS-I
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
RAILWAY CROSS SECTION NKBPL/ONGC/WSB#18+23 TO SOB GGS-I/CS-4 MEHSANA ASSET
PARALLEL LINE WSB#8+15 To
RIVER SH CROSS SECTION NKBPL/ONGC/WSB#18+23 TO SOB GGS-I/CS-6 MEHSANA
SOB GGS-I
PARALLEL LINE WSB#12+17 To
NALA
BT ROAD CROSS SECTION NKBPL/ONGC/WSB#18+23 TO SOB GGS-I/CS-7 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
SOB GGS-I SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE WSB#22 To
SOB GGS-I
ROAD SIDE DRAIN
CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION
TREE
CHAINAGE : FROM 0.00 TO 1.62 KM
BITUMEN ROAD
IP-1/1
IP-1/2
IP-1/3
IP-1/4
IP-1/5
IP-1/6
IP-1/7
IP-2/1
IP-2/2
IP-2/3
IP-2/4
142
TP-1
TP-2
Start
141
140
139 93°8'37'' 39°27'9''
138
114.678
139.083
241.171
174.625
166.267
166.825
156.827
119.207
214.48
16.185
204.51
16.874
8.405
7.936
137
136
135
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
134
133
MATCH LINE
SB#109 132 SOB
MATCH LINE
MATCH LINE
131 MATCH LINE GGS-II
ONGC well SOB#
MATCH LINE
130
To
To
129
To San
159'266'238'180'267
K
Kh
NE
och
128
erv
LI
ONGC well
ava
To Kherva
CH
127
ganpu
11
AT
Kv
126
ne
Po
M
t Li
125
r
er
vH
Li
124
ne
K
400
123 ONGC pump House
122
TP-1
TP TP-2
Start 121 -2
120
SB#109
119
118
SOB#113 Well
e
SH
11
in
n
an
er L
a
-2
ONGC well
117
Kv
MATCH LINE
ud
NE
19
agud
To
g
11
Pow
Po
MATCH LINE
Ja
116
MATCH LINE
LI
Ja
Lemon Garden Lemon Garden
To
w
Kv
To
SBN#63'185"207
CH
gu
er
Lemon Garden
To J
v
115
Ja
Po
Lemon Garden
11 K
da
Lin
AT
gu
n
w
114
To Jag
er
da
Well
M
Lin
n
113
e
112
udan
111 Lemon Garden
110
109
108
107
106
105
104 CS-2/LT LINE CH.0.367 km CS-4/SH CH.0.718 km CS-6/LT LINE CH.1.051 km CS-9/BT ROAD CH.1.467 km
CS-1/LT LINE CH.0.169 km CS-3/HT LINE CH.0.463 km
103
CS-7/BT ROAD CH.1.109 km
102
CS-5/LT LINE CH.0.756 km
101 CS-8/LT LINE CH.1.117 km
100
99
98
97
96
95
94
93
92
91
90
89
89.831
91.271
92.191
GROUND LEVELS
90.089
90.106
90.107
90.110
90.092
90.628
91.052
91.056
91.259
91.609
91.792
91.870
91.649
91.744
91.493
90.244
90.079
90.809
91.457
91.779
91.976
91.990
91.712
91.880
91.790
92.114
93.089
93.740
90.085
91.045
91.155
92.305
91.825
91.799
91.891
91.294
91.826
91.598
91.633
90.11
90.09
91.59
90.09
91.39
91.89
91.79
93.69
(IN METRES)
35.322
46.239
44.932
16.185
24.403
49.778
36.863
29.404
20.596
46.229
13.103
28.962
27.866
22.134
47.073
3.761
5.068
9.412
0.222
4.732
8.405
3.771
7.936
2.927
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
0
0+253.761
0+494.932
0+709.412
0+725.597
0+900.222
1+104.732
1+113.137
1+279.404
1+446.229
1+463.103
1+471.038
1+627.866
1+747.073
0+000.00
0+050.00
0+100.00
0+150.00
0+200.00
0+250.00
0+300.00
0+350.00
0+400.00
0+450.00
0+500.00
0+550.00
0+600.00
0+650.00
0+700.00
0+750.00
0+800.00
0+850.00
0+900.00
0+950.00
1+000.00
1+050.00
1+100.00
1+150.00
1+200.00
1+250.00
1+300.00
1+350.00
1+400.00
1+450.00
1+500.00
1+550.00
1+600.00
1+650.00
1+700.00
1+750.00
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#109 To ELECTRIC POLE / LINE CORPORATION LIMITED.
SOB GGS-II LT POLE / LINE
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW TRANSFORMER LAMP POST
MEHSANA ASSET
PARALLEL LINE SOB GGS-II ELECTRIC BOX TELEPHONE POLE SH CROSS SECTION NKBPL/ONGC/SB#109 TO SOB GGS-II/CS-4 MEHSANA
To SOB CTF
PARALLEL LINE SB#193+225 RIVER
BT ROAD CROSS SECTION NKBPL/ONGC/SB#109 TO SOB GGS-II/CS-7 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
To SOB GGS-II BT ROAD CROSS SECTION NKBPL/ONGC/SB#109 TO SOB GGS-II/CS-9 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE SB#134 To
SOB GGS-II
NALA CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
OTHER PROPOSED LINE
TREE
CHAINAGE : FROM 0.00 TO 1.75 KM
VILLAGE BOUNDARY
EXISTING OTHER LINE / ROW TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.
BITUMEN ROAD
BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
W.B.M. ROAD WATER TANK MANHOLE Jaipur - 302015
RAILWAY LINE / PILLAR WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
Email : nkbpl.ongcwest@gmail.com
FIELD BUND / FENCING TP , IP
X X
HIGH TENSION LINE / POLE DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SB#109
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB GGS-II/ ALN- 1
IP-2/5
IP-3/1
IP-3/2
IP-4/1
IP-4/2
IP-4/3
145
TP-3
TP-4
TP-5
End
144
143
142 25°41'8'' 29°18'49'' 79°46'35''
141
192.082
204.477
121.976
14.693
79.956
15.051
51.554
12.812
141.64
145.4
N
140 A
139 UD
AG
138 J
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T of
137 VB
136
e in
rL
To Koc
we
SB#109 135
To
Po v SOB
Ko
134 1K 1 GGS-II
TP-
ch
GGS WELL 100
hava
133 4
LIN
av
a
132
CH
131
T
SOB GGS-II
MA
130 TP-3
129
n
uda
128
Ja g
127 ll
We
126
To
C
NG
d
11 K
En
O
125
Ex.O
v Po
wer OLD HEADER To
124 Line
Well No. SOB 114/ 283 Chamunda Iron Private Limited
NGC
123
122 an
Pipe
ud
ag
To M
121 E J ain R
To
Line
LIN Ot
oad
120 he
udan
CH rP
119 rop
os
To Jag
T
118 edL
MA
117 ine
ava
116 ne
Li
och
WALL CROSSING
5
115 er
-
TP
w
K
114 Po
SOB#113 Well
To
Kv
113 11
112
111
110
109
108
107 CS-10/BT ROAD CH.1.756 km CS-11/BT ROAD CH.2.042 km CS-13/WBM ROAD CH.2.31 km CS-15/EXISTING LINE CH.2.533 km
CS-12/LT LINE CH.2.193 km CS-14/LT LINE CH.2.49 km
106
105
104
103
102
101
100
99
98
97
96
95
94
93
92
93.031
93.411
GROUND LEVELS
93.740
93.447
93.233
92.890
92.644
93.139
93.482
93.093
93.143
93.290
93.106
92.590
92.590
92.707
92.278
93.087
92.585
92.645
92.705
93.554
93.491
92.534
93.59
93.29
93.09
92.59
92.69
92.59
(IN METRES)
38.235
41.721
33.803
15.051
49.592
12.812
32.304
40.664
45.264
26.712
8.279
1.146
0.408
4.885
9.336
4.736
50
50
50
50
50
50
50
50
50
50
50
50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
1+761.765
1+841.721
2+033.803
2+048.854
2+100.408
2+304.885
2+317.696
2+459.336
2+604.736
2+726.71
2+000.00
2+050.00
2+100.00
2+150.00
2+200.00
2+250.00
2+300.00
2+350.00
2+400.00
2+450.00
2+500.00
2+550.00
2+600.00
2+650.00
2+700.00
1+750.00
1+800.00
1+850.00
1+900.00
1+950.00
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#109 To ELECTRIC POLE / LINE CORPORATION LIMITED.
SOB GGS-II LT POLE / LINE
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW TRANSFORMER LAMP POST
BT ROAD CROSS SECTION NKBPL/ONGC/SB#109 TO SOB GGS-II/CS-10 MEHSANA ASSET
PARALLEL LINE SOB GGS-II ELECTRIC BOX TELEPHONE POLE BT ROAD CROSS SECTION NKBPL/ONGC/SB#109 TO SOB GGS-II/CS-11 MEHSANA
To SOB CTF
PARALLEL LINE SB#193+225 RIVER
WBM ROAD CROSS SECTION NKBPL/ONGC/SB#109 TO SOB GGS-II/CS-13 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
To SOB GGS-II SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE SB#134 To
SOB GGS-II
NALA CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
OTHER PROPOSED LINE
TREE
CHAINAGE : FROM 1.75 TO 2.73 KM
VILLAGE BOUNDARY
EXISTING OTHER LINE / ROW TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.
BITUMEN ROAD
BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
W.B.M. ROAD WATER TANK MANHOLE Jaipur - 302015
RAILWAY LINE / PILLAR WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
Email : nkbpl.ongcwest@gmail.com
FIELD BUND / FENCING TP , IP
X X
HIGH TENSION LINE / POLE DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SB#109
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB GGS-II/ ALN- 2
IP-1/1
IP-1/2
IP-1/3
IP-1/4
IP-1/5
IP-2/1
IP-2/2
IP-3/1
IP-3/2
IP-3/3
142
TP-1
TP-2
TP-3
TP-4
Start
End
141
140
139 56°8'4'' 25°41'8'' 29°18'49'' 79°46'35''
138
199.479
154.398
133.304
201.859
159.003
133.088
113.619
16.572
13.237
75.755
15.213
193.68
12.815
8.092
46.51
137
136
135
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
MATCH LINE
134
133
SB#134 132 SOB
va
131 S GGS-II
ocha
ta To
130 rt Ko
a
chav
To K
129 ch
av
SB#134
End
a
SOB GGS-II
o
128
To K
LIN
OLD HEADER
127 TP-3
H
TC
126
TP-2
MA
125
Ex
124
.O
NG
123
To
C
122
S
Oth
Pip
ang
er P
121 rop
eL
ose
anp
120 dL
ine
ine
ur
n
119
MATCH LINE
P-2 11 Kv Pow
da
T er Line
udan
gu
To
118
4
TP-
Ja
Ja
WALL CROSSING
117 TP-1
Well No. SOB 114/ 283
gu
g
To
To Ja
da
116
SOB#113 Well
n
n
a
E
ud
da
115
LIN
g
ONGC well
gu
Ja
114
ine
Ja
To
To
rL
Jag
TC
113
To
we
ud
an
Well No. Sob # 92
MA
Po
112
Kv
Well No. SOB 114/ 283
111
11
110
109 Lemon Garden
108
107
Well No. Sob # 92
106
105
104 CS-1/BT ROAD CH.0.22 km CS-2/BT ROAD CH.0.521 km CS-3/BT ROAD CH.0.811 km
CS-4/LT LINE CH.0.978 km CS-6/LT LINE CH.1.261 km
103
102 CS-7/EXISTING LINE CH.1.291 km
CS-5/WBM ROAD CH.1.064 km
101
100
99
98
97
96
95
94
93
92
91
90
89
93.491
GROUND LEVELS
90.089
90.090
90.108
90.107
89.847
91.927
91.790
93.014
93.560
93.293
92.963
92.700
92.950
93.548
93.214
93.030
93.370
93.276
92.637
92.590
92.590
92.590
92.820
92.293
92.706
93.087
91.655
91.975
93.455
93.045
91.598
91.633
93.554
93.491
92.534
89.79
91.79
93.69
93.59
93.29
93.09
92.59
92.69
92.59
(IN METRES)
25.858
11.844
13.237
24.919
49.164
15.213
32.092
14.418
35.582
12.815
29.087
29.916
20.084
13.004
36.996
26.622
0.521
16.05
8.092
28.54
21.46
0.836
2.695
8.098
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
0
0+224.142
0+511.844
0+525.081
0+600.836
0+802.695
0+817.908
0+864.418
1+058.098
1+070.913
1+229.916
1+363.004
0+000.00
0+050.00
0+100.00
0+150.00
0+200.00
0+250.00
0+300.00
0+350.00
0+400.00
0+450.00
0+500.00
0+550.00
0+600.00
0+650.00
0+700.00
0+750.00
0+800.00
0+850.00
0+900.00
0+950.00
0+216.05
0+378.54
1+476.62
1+000.00
1+050.00
1+100.00
1+150.00
1+200.00
1+250.00
1+300.00
1+350.00
1+400.00
1+450.00
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#134 To ELECTRIC POLE / LINE CORPORATION LIMITED.
SOB GGS-II LT POLE / LINE
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW TRANSFORMER LAMP POST
MEHSANA ASSET
PARALLEL LINE SOB GGS-II ELECTRIC BOX TELEPHONE POLE BT ROAD CROSS SECTION NKBPL/ONGC/SB#109 TO SOB GGS-II/CS-1 MEHSANA
To SOB CTF
PARALLEL LINE SB#193+225 RIVER
BT ROAD CROSS SECTION NKBPL/ONGC/SB#109 TO SOB GGS-II/CS-2 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
To SOB GGS-II BT ROAD CROSS SECTION NKBPL/ONGC/SB#109 TO SOB GGS-II/CS-3 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE SB#109 To
SOB GGS-II
NALA WBM ROAD CROSS SECTION NKBPL/ONGC/SB#109 TO SOB GGS-II/CS-5 CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
CANAL ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
OTHER PROPOSED LINE
FOREST BOUNDARY
4"Ø SB#134 TO SOB GGS-II WELL FLUID LINE
ONGC INSTALLATION
ALIGNMENT SHEET
VILLAGE SITE CART TRACK
HIGH TENSION LINE / POLE DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SB#134
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB GGS-II/ ALN- 1
IP-0/1
IP-0/2
IP-0/3
IP-0/4
IP-0/5
IP-0/6
IP-0/7
IP-1/1
IP-1/2
IP-1/3
IP-1/4
IP-1/5
IP-3/1
IP-3/2
IP-3/3
143
TP-1
TP-2
TP-3
Start
142
141
140 0°25'41'' 40°38'1'' 24°8'43''
139
218.032
218.032
115.331
154.377
120.815
202.594
215.192
152.037
149.588
49.727
13.246
14.721
44.904
43.015
51.109
17.389
8.962
5.739
12.56
138
137
136
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
135
134 Ex.O
SB#135 133 SOB WELL 173,293 NGC
Pipe
To
SOB
n
Line
itasa
D
132 AN GGS-II
ita
TAS
sa
131 I AVA
To D
of D
n
130 VB f KOCH TP
-2
o
129 VB
128
127 san
Dita C Pipe L
ine
ne
To Ex.ONG
Li
126
r
ATPUR
we
SOB WELL 77
ASAN
Po
125 ine
220V
eL
Kv
124 ip
11
CP
LINE
P
G
.ON
VB of DIT
owe
123
SOB WELL 264
VB of GER
ONGC WELL
ASAN
Ex
N
r Lin
122
UDA
TP-1
r Line
MATCH
a
e
121
v
ocha
f DIT
Powe
f JAG
SOB WELL 249
Well
120
To K
119
11 Kv
VB o
TP-3
NGC
d
Fiel
VB o
118 To
SOB WELL 151
To O
SB#135
117
116
OFC
115
Ex
.O
Start 114
NG
To
113
SO
Pi p
112
B
eL
GG
111
VB of KOCHAV
A SOB WELL 10
in e
S-
110
II
109
11
K
108
vP
ow
107
er
106
Lin
90.411
92.991
93.361
92.721
GROUND LEVELS
90.936
90.638
90.410
90.297
90.600
91.483
91.720
91.720
92.288
92.952
93.284
93.843
93.286
92.778
93.097
93.882
93.613
94.044
92.709
92.792
92.469
92.490
92.728
93.460
92.869
92.828
90.985
92.695
93.605
93.405
92.695
90.935
90.945
90.935
90.697
90.754
90.759
93.396
94.026
93.911
92.451
90.62
92.59
93.39
92.69
93.99
92.49
92.49
93.59
(IN METRES)
13.246
14.721
13.345
12.701
44.669
23.363
26.637
38.694
11.306
31.709
18.291
36.086
13.914
30.538
22.056
27.944
37.248
12.752
38.357
11.643
44.255
42.218
0.273
8.689
31.56
5.739
5.331
6.901
12.56
5.745
7.782
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
0
0+355.331
0+573.363
0+688.694
0+731.709
0+886.086
1+006.901
1+019.462
1+222.056
1+437.248
1+488.357
1+505.745
1+657.782
0+000.00
0+050.00
0+100.00
0+150.00
0+200.00
0+250.00
0+300.00
0+350.00
0+400.00
0+450.00
0+500.00
0+550.00
0+600.00
0+650.00
0+700.00
0+750.00
0+800.00
0+850.00
0+900.00
0+950.00
0+49.727
0+58.689
0+71.935
0+86.655
0+131.56
1+000.00
1+050.00
1+100.00
1+150.00
1+200.00
1+250.00
1+300.00
1+350.00
1+400.00
1+450.00
1+500.00
1+550.00
1+600.00
1+650.00
1+700.00
1+750.00
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#135 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB GGS-II
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
MEHSANA ASSET
PARALLEL LINE SB#155
RIVER WBM ROAD CROSS SECTION NKBPL/ONGC/SB#135 TO SOB GGS-II/CS-5 MEHSANA
To SOB GGS-II
NALA
BT ROAD CROSS SECTION NKBPL/ONGC/SB#135 TO SOB GGS-II/CS-7 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
OTHER PROPOSED LINE
BT ROAD CROSS SECTION NKBPL/ONGC/SB#135 TO SOB GGS-II/CS-14 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
ONGC INSTALLATION CANAL CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
VILLAGE SITE FOREST BOUNDARY
ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
IP-3/5
IP-4/1
IP-4/2
IP-5/1
142
TP-4
TP-5
TP-6
End
141
140
139 43°27'41'' 54°6'52'' 32°9'19''
138
145.982
203.808
16.536
76.424
60.401
10.892
63.431
9.061
137
136
135
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
134
133
To
Well No. Sob # 92
11
SB#135 132
ONGC WELL SOB
Jag
11 K
Kv
131 GGS-II
Po
uda
TP
v Po
we
130 -5
r Li
nR
wer
11
129 Kv
ne
Po
Line
Well No. Sob # 92
we
128 rL
ine
127 SOB GGS-II to SOB
126 CTF Oil Pipe Line
125
TP-4
124
To
SB#109 to SOB GGS-II
123
Koc
Well Fluid Line
122
hav
121 an
a
120 g ud WALL CROSSING
Ja ne
119 To r Li SB#193+225 to SOB
ad we GGS-II Well Fluid Line
118 in Ro Po
To Ma
ine
Kv
ell 117 GSPC Heramec 11
dL
TP-
E
LIN W
Off loading Facility
se
116
6
H GC
po
TC
a
ON 115
av
e
ro
MA
in
To
ch
rP
114
ipe L
Ko
he
an
To
113
Ot
Essar oil and Gas ud
GC P
112 Jag
Exploration production LtD. To
111
SOB GGS-II
End
N
OLD HEADER
O
110
Ex .
N
SA 109 E 11
T A LIN Kv
Pow
DI N 108 H
TC er L
of DA MA
ine
V B G U 107
JA 106
of
VB 105 CS-15/CART TRACK CH.1.816 km CS-20/BT ROAD CH.2.326 km
104 CS-16/LT LINE CH.1.95 km
103 CS-17/LT LINE CH.1.958 km
102
CS-18/BT ROAD CH.1.967 km
101
100 CS-19/LT LINE CH.1.985 km
99
98
97
96
95
94
93
92
91
90
89
92.931
92.828
92.183
92.102
92.126
92.450
91.430
90.367
90.138
91.724
92.540
92.794
93.087
90.855
GROUND LEVELS
92.216
92.127
93.051
92.926
92.19
93.09
89.99
92.89
(IN METRES)
26.094
10.732
10.892
28.376
17.605
32.395
21.413
19.525
43.906
49.67
9.061
7.37
0.33
50
50
50
50
50
50
50
POINTS (IN METRES)
Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
1+823.906
1+960.732
1+971.624
2+117.605
2+321.413
2+330.475
2+393.91
2+000.00
2+050.00
2+100.00
2+150.00
2+200.00
2+250.00
2+300.00
2+350.00
1+807.37
1+900.33
1+750.00
1+800.00
1+850.00
1+900.00
1+950.00
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#135 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB GGS-II
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
BT ROAD CROSS SECTION NKBPL/ONGC/SB#135 TO SOB GGS-II/CS-18 MEHSANA ASSET
PARALLEL LINE SB#155
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/SB#135 TO SOB GGS-II/CS-20 MEHSANA
To SOB GGS-II
NALA
RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
OTHER PROPOSED LINE
SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
ONGC INSTALLATION CANAL CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
VILLAGE SITE FOREST BOUNDARY
ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
IP-0/3
IP-0/4
IP-0/5
IP-1/1
IP-1/2
IP-1/3
IP-2/1
IP-2/2
IP-2/3
IP-2/4
IP-2/5
IP-3/1
143
TP-1
TP-2
TP-3
Start
142
141
140 47°46'10'' 62°17'48'' 0°25'41''
139
121.243
202.688
202.688
144.534
170.215
134.773
132.927
219.112
219.112
12.548
13.714
10.142
11.831
14.794
27.179
91.094
5.911
138
137
136
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
135
134
SB#155 133 NE SOB
LI
132 GGS-II
MATCH LINE
CH
MATCH LINE
MATCH LINE
131 AT
M
130
Ex.
SSN
129
UR
TPUR
I YA
AN
128
ur
TP
NL
AD
tp
r
DITAS
11
127
pu
RA
ra
pu
i ne
Wa
GERA
AK
rat
Ge
Kv
rL
126
rat
SOB WELL 77
GE
ter
Ge
Po
we
To
BH
Ge
125
we
SB#155 Po
P
To
of
VB of
SB#135
To
r
ipel
of
Kv
Lin
124
VB of
VB
VB
11
e
VB
ine
123 of NE
G
VB ERA
122 LI
Start TP-3
- 1
TP CH
TP
121 of
KO UR AT
INE
TP-2
120 CH
VB of
M
11
AV HL
119
C
Kv
A AT
ld
To Fie
M
VB of
118
owe
GERA
ld
iya
Fie
117
r Li
To Kochava
11
MATCH LINE
ad
ne
MATCH LINE
To
116
11
K
KOCH
MATCH LINE
ak
v
TPUR
WELL 143
Po
e
Kv
Bh
115 Lin
wer
we
V Po
P ow
To
220
r
114 VB of KOCHAVA
Lin
er L
AVA
e
E
113 LIN
i ne
H
112 TC
MA
111
110
109
108
107
106
105 CS-3/CART TRACK CH.0.544 km CS-5/LT LINE CH.0.965 km
CS-1/LT LINE CH.0.08 km
104 CS-7/LT LINE CH.1.161 km
103 CS-4/LT LINE CH.0.572 km CS-6/BT ROAD CH.1.007 km
102 CS-2/BT ROAD CH.0.127 km
CS-8/CART TRACK CH.1.164 km
101
100
CS-9/CART TRACK CH.1.202 km
99
98
97
96
95
94
93
92
91
90
91.321
92.501
90.351
91.761
92.061
93.921
GROUND LEVELS
95.190
94.890
94.209
93.342
93.186
93.577
92.987
92.047
91.193
90.790
90.790
90.908
91.622
91.790
92.116
92.620
92.983
91.502
90.936
90.780
90.454
90.336
90.527
91.109
91.658
92.680
94.745
91.245
91.265
93.245
94.591
93.266
92.986
92.928
90.937
90.725
90.697
90.754
90.759
93.396
94.49
91.39
91.19
90.89
91.79
90.62
92.59
(IN METRES)
12.548
16.209
36.479
13.521
39.167
10.833
47.119
47.415
32.371
10.142
37.455
45.471
14.794
27.179
44.815
24.297
25.703
43.409
34.504
15.496
2.881
2.585
17.63
2.403
4.529
7.302
0.726
5.185
6.591
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
0
0+336.479
0+539.167
0+552.881
0+697.415
1+002.403
1+012.545
1+145.471
1+157.302
1+172.095
1+199.274
1+205.185
1+424.297
1+643.409
1+734.504
0+000.00
0+050.00
0+100.00
0+150.00
0+200.00
0+250.00
0+300.00
0+350.00
0+400.00
0+450.00
0+500.00
0+550.00
0+600.00
0+650.00
0+700.00
0+750.00
0+800.00
0+850.00
0+900.00
0+950.00
0+867.63
1+000.00
1+050.00
1+100.00
1+150.00
1+200.00
1+250.00
1+300.00
1+350.00
1+400.00
1+450.00
1+500.00
1+550.00
1+600.00
1+650.00
1+700.00
1+750.00
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#155 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB GGS-II
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
MEHSANA ASSET
PARALLEL LINE SB#135
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/SB#155 TO SOB GGS-II/CS-2 MEHSANA
To SOB GGS-II
NALA
BT ROAD CROSS SECTION NKBPL/ONGC/SB#155 TO SOB GGS-II/CS-6 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
OTHER PROPOSED LINE
SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
ONGC INSTALLATION CANAL CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
VILLAGE SITE FOREST BOUNDARY
ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
IP-3/3
IP-3/4
IP-3/5
IP-5/1
IP-5/2
IP-5/3
IP-5/4
IP-5/5
IP-6/1
IP-6/2
IP-7/1
142
TP-4
TP-5
TP-6
TP-7
TP-8
End
141
140
139 40°37'40'' 24°8'22'' 43°27'41'' 54°6'52'' 32°17'29''
138
154.641
202.397
142.472
158.183
142.954
200.125
41.845
144.42
12.306
214.46
60.044
17.804
14.645
68.955
58.852
10.922
61.745
9.024
137
136
135
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
134
133 To
Ex.ON Di
SB#155 132 GC P OP ta
ipe Lin TI sa SOB
e
Well No. Sob # 92
C n
131
SOB WELL 173,293 AL
FI
BE
GGS-II
To
asan
130 R
TP
11
11
CA
Ja
129 BL -7
Kv
K
To Dit
gu
E
vP
SAN TP
Po
128
ONGC WELL
da
ITA -4
owe
VA
Well No. Sob # 92
LINE
we
D
nR
127 o f CHA
rL
VB
r
KO 11
L in
ine
S
126 of Kv
e
Pow
VB
e
Lin
H
er L
MATC
125 ine
r
we
ipe L ine
Po
GC P
MATCH LINE
124
Ex.ON
Kv
an e an
123 itas Lin
11
e ud WALL CROSSING
122 T oD Pip ONGC WELL Ja
g
er Line
e
C
To ONG
6
TP-
er Lin
G
To
To
121 . ON
SOB WELL 77 Ex
Ko
Pow
11 Kv Pow
120
e
ch
Lin
SOB WELL 249
av
220V
119
SOB WELL 264
ed
a
Well
chava
118
TP
os
TP-5 GSPC Heramec
rop
-8
117
Off loading Facility
a
To Ko
rP
av
TP-3 116 d
Roa
ch
he
LINE
Ex
ain
115
SOB WELL 151
Ko
To M
OFC
CH
Ot
.O
MAT
To
NG
114
SAN
DAN
ld
Fie
CP
113 OLD HEADER
To
LINE
To
En
ITA
AGU
To
ipe
112 ON
d
GC
SO
Lin
of D
111 W
H
ell LINE
of J
B
e
MATC
SOB GGS-II
110
CH
SOB WELL 10
GG
MAT
VB
S-
VB
109
II
108
107
GGS WELL 100
106
105
104 CS-10/WBM ROAD CH.1.753 km CS-11/EXISTING LINE CH.2.018 km CS-14/EXISTING LINE CH.2.265 km CS-20/CART TRACK CH.2.892 km CS-25/BT ROAD CH.3.384 km
CS-15/LT LINE CH.2.464 km CS-21/LT LINE CH.3.016 km
103 CS-16/EXISTING LINE CH.2.483 km
102 CS-22/LT LINE CH.3.023 km
CS-17/EXISTING LINE CH.2.542 km
101 CS-12/BT ROAD CH.2.081 km
CS-18/OPTICAL FIBER CABLE CH.2.559 km CS-23/BT ROAD CH.3.031 km
100
CS-13/Electric line CH.2.092 km CS-19/BT ROAD CH.2.574 km CS-24/LT LINE CH.3.05 km
99
98
97
96
95
94
93
92
91
90
89
93.921
93.881
92.291
92.181
GROUND LEVELS
93.108
92.813
92.690
92.974
93.590
93.294
93.463
93.927
93.724
92.796
92.700
92.792
92.513
92.453
92.490
92.614
93.163
93.172
92.906
92.062
92.668
92.786
91.723
90.647
90.073
91.578
92.403
92.844
93.083
93.335
90.665
94.026
93.908
92.451
92.216
92.127
93.051
92.926
93.39
92.69
93.99
92.49
92.49
93.59
92.19
93.09
89.99
92.89
(IN METRES)
23.651
20.769
29.231
25.409
12.306
12.285
40.112
45.428
14.616
17.804
24.892
25.108
33.076
14.645
16.676
33.324
25.529
10.922
13.549
29.405
20.595
11.446
50.299
9.888
4.572
17.58
2.279
29.53
9.024
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
1+776.349
1+920.769
2+075.409
2+087.715
2+290.112
2+504.572
2+564.616
2+724.892
2+883.076
2+897.721
2+966.676
3+025.529
3+036.451
3+179.405
3+388.554
2+000.00
2+050.00
2+100.00
2+150.00
2+200.00
2+250.00
2+300.00
2+350.00
2+400.00
2+450.00
2+500.00
2+550.00
2+600.00
2+650.00
2+700.00
2+750.00
2+800.00
2+850.00
2+900.00
2+950.00
3+000.00
3+050.00
3+100.00
3+150.00
3+200.00
3+250.00
3+300.00
3+350.00
3+400.00
3+450.00
3+450.30
2+582.42
3+379.53
1+750.00
1+800.00
1+850.00
1+900.00
1+950.00
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#155 To
TRANSFORMER LAMP POST
CORPORATION LIMITED.
SOB GGS-II
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW ELECTRIC BOX TELEPHONE POLE
WBM ROAD CROSS SECTION NKBPL/ONGC/SB#155 TO SOB GGS-II/CS-10 MEHSANA ASSET
PARALLEL LINE SB#135
RIVER BT ROAD CROSS SECTION NKBPL/ONGC/SB#155 TO SOB GGS-II/CS-12 MEHSANA
To SOB GGS-II
NALA
BT ROAD CROSS SECTION NKBPL/ONGC/SB#155 TO SOB GGS-II/CS-19 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
OTHER PROPOSED LINE
BT ROAD CROSS SECTION NKBPL/ONGC/SB#155 TO SOB GGS-II/CS-23 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
ONGC INSTALLATION CANAL BT ROAD CROSS SECTION NKBPL/ONGC/SB#155 TO SOB GGS-II/CS-25 CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
VILLAGE SITE FOREST BOUNDARY
ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
IP-1/1
IP-1/2
IP-1/3
IP-1/4
IP-2/1
IP-2/2
IP-2/3
IP-2/4
IP-2/5
IP-3/1
IP-3/2
142
TP-1
TP-2
TP-3
TP-4
Start
141
140
139 76°17'24'' 39°27'9'' 25°41'8'' 29°18'49''
138
193.737
193.737
153.597
143.456
152.766
155.613
126.255
181.07
16.723
13.965
77.856
196.97
15.132
49.032
8.468
8.014
137
136
135
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
134
133
SB#193+
225 132
ONGC well SOB#
SOB
MATCH LINE
131 GGS-II
To Kherva
159'266'238'180'267
E
130 H LIN
MATC
To Kochava
129
pur
128
gan
ONGC well
a
127
av
E
LIN
San
ch
126
Ko
H
125
To
To
TC
124 ONGC pump House
TP
MA
123 -2 TP-3
INE
122 TP
HL
-4
TP-1
N
121
LI
TC
Start
CH
120
MA
AT
119
ONGC well
ine
n
118
da
wer L
guda
gu
SB#193+225 117
an SBN#63'185"207
Ja
v Po
MATCH LINE
ud
11
116
To Ja
ag
To
J
Kv
11 K
Well
o Lemon Garden Lemon Garden
115 T
To Ja
Po
Lemon Garden
e
Well No. SOB 114/ 283
w
114 Lin 9 Lemon Garden
E
er
an
er -21
LIN
gudan
ow
Lin
113 SH
agud
vP
SOB#113 Well
11
e
1K Kv
H
112 1 Po
TC
we
To J
rL
111 ine
MA
110
SOB#113 Well
E
To
N
109 Kh
LI
erv
CH
108
a
AT
107
M
106
105
104 CS-1/LT LINE CH.0.629 km CS-4/BT ROAD CH.1.048 km CS-5/BT ROAD CH.1.343 km CS-6/BT ROAD CH.1.631 km
103 CS-2/BT ROAD CH.0.688 km
102
CS-3/LT LINE CH.0.696 km
101
100
99
98
97
96
95
94
93
92
91
90
89
89.861
91.311
91.741
GROUND LEVELS
90.089
90.087
90.094
90.102
90.109
90.106
90.110
89.804
90.382
91.003
91.077
91.127
91.629
91.844
91.927
92.118
92.257
91.922
91.856
91.790
91.790
92.544
93.280
93.580
93.387
93.122
92.569
93.393
93.388
92.892
93.230
90.085
92.815
90.101
91.294
91.948
91.598
91.633
93.554
93.491
89.79
90.99
91.39
91.89
91.79
93.69
93.59
93.29
93.09
(IN METRES)
37.474
12.526
34.527
45.761
16.723
48.434
42.821
33.435
13.965
25.255
24.745
22.225
15.132
12.643
36.389
13.611
6.263
41.07
8.468
7.006
4.239
26.83
6.447
1.566
7.179
2.601
8.93
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
0
0+387.474
0+684.527
0+692.994
0+845.761
1+043.553
1+051.566
1+207.179
1+333.435
1+347.399
1+425.255
1+622.225
1+637.357
1+686.389
0+000.00
0+050.00
0+100.00
0+150.00
0+200.00
0+250.00
0+300.00
0+350.00
0+400.00
0+450.00
0+500.00
0+550.00
0+600.00
0+650.00
0+700.00
0+750.00
0+800.00
0+850.00
0+900.00
0+950.00
0+541.07
1+026.83
1+000.00
1+050.00
1+100.00
1+150.00
1+200.00
1+250.00
1+300.00
1+350.00
1+400.00
1+450.00
1+500.00
1+550.00
1+600.00
1+650.00
1+700.00
1+750.00
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#193+225 ELECTRIC POLE / LINE CORPORATION LIMITED.
To SOB GGS-II LT POLE / LINE
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW TRANSFORMER LAMP POST
MEHSANA ASSET
PARALLEL LINE SOB GGS-II
ELECTRIC BOX TELEPHONE POLE BT ROAD CROSS SECTION NKBPL/ONGC/SB#193+225 TO SOB GGS-II/CS-2 MEHSANA
To SOB CTF
PARALLEL LINE SB#109
RIVER
BT ROAD CROSS SECTION NKBPL/ONGC/SB#193+225 TO SOB GGS-II/CS-4 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
To SOB GGS-II BT ROAD CROSS SECTION NKBPL/ONGC/SB#193+225 TO SOB GGS-II/CS-5 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE SB#134 To
SOB GGS-II
NALA BT ROAD CROSS SECTION NKBPL/ONGC/SB#193+225 TO SOB GGS-II/CS-6 CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
OTHER PROPOSED LINE CANAL
ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION FOREST BOUNDARY
4"Ø SB#193+225 TO SOB GGS-II WELL FLUID LINE
ALIGNMENT SHEET
VILLAGE SITE CART TRACK
EXISTING OTHER LINE / ROW TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.
BITUMEN ROAD BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
W.B.M. ROAD WATER TANK MANHOLE Jaipur - 302015
RAILWAY LINE / PILLAR WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
Email : nkbpl.ongcwest@gmail.com
X X FIELD BUND / FENCING TP , IP
HIGH TENSION LINE / POLE DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SB#193+225
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB GGS-II/ ALN- 1
IP-4/1
IP-4/2
IP-4/3
145
TP-5
End
144
143
142 79°46'35''
141
199.078
150.321
139.244
117.797
12.813
140
139
E IN
138
CH L
ll
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
We
137 NG
C
O
136
To
MAT
SB#193+
va
225 ocha 135 SOB
134 GGS-II
To
133
Ko
To K
ch
tD
132 nL
av
ctio s
Chamunda Iron Private Limited
a
TP-4 131 d u a
pro d G Ma
To
130 tion oil an
d
SOB GGS-II
a in R
En
r
plo ar oad
129 OLD HEADER
Ex
Ex Ess
.ON
128
GC
127 cili
ty
Fa ec
a
126
Pip
g
v
di n am
ha
loa Her
a
e
125
av
Off SPC
Li n
Ko
n
LINE
ch
guda
124 G
e
11 Kv
To
o
Power
e
Oth
oK
Line in
123 er e L S-II
To Ja
T
CH
122 rop p
i G
ose dP G
dL ui SOB
MAT
an
121 ine
l
ud
F
ell to
g
120 W 155
Ja
ine
-5
er L
WALL CROSSING
To
#
119 Pow
TP
SB 11 K
v
ONGC WELL
118
e
ine
Well No. SOB 114/ 283
Lin
S
rL
R
ine
117
er
we
ow
an
rL
116
Po
vP
we
ud
an
Po
1K
g
v
115
ud
Ja
Kv
1
11
ag
To
11
114
J
Well No. Sob # 92
To
113
112
111
110
109
108
107 CS-8/WBM ROAD CH.1.891 km
CS-7/LT LINE CH.1.788 km CS-9/LT LINE CH.2.079 km
106
105
104 CS-10/EXISTING LINE CH.2.116 km
103
102
101
100
99
98
97
96
95
94
93
92
92.941
GROUND LEVELS
93.230
93.290
92.590
92.590
92.590
92.699
93.216
93.347
92.500
92.290
93.006
93.087
92.534
92.59
92.69
92.59
(IN METRES)
12.813
48.602
37.846
12.154
1.719
1.398
5.644
50
50
50
50
50
50
50
50
POINTS (IN METRES)
Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
1+885.467
1+898.281
2+048.602
2+187.846
2+000.00
2+050.00
2+100.00
2+150.00
2+200.00
2+250.00
2+300.00
2+305.64
1+750.00
1+800.00
1+850.00
1+900.00
1+950.00
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SB#193+225 ELECTRIC POLE / LINE CORPORATION LIMITED.
To SOB GGS-II LT POLE / LINE
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW TRANSFORMER LAMP POST WBM ROAD CROSS SECTION NKBPL/ONGC/SB#193+225 TO SOB GGS-II/CS-8 MEHSANA ASSET
PARALLEL LINE SOB GGS-II
ELECTRIC BOX TELEPHONE POLE MEHSANA
To SOB CTF
PARALLEL LINE SB#109
RIVER
RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
To SOB GGS-II SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE SB#134 To
SOB GGS-II
NALA CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
OTHER PROPOSED LINE CANAL
ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
ONGC INSTALLATION FOREST BOUNDARY
4"Ø SB#193+225 TO SOB GGS-II WELL FLUID LINE
ALIGNMENT SHEET
VILLAGE SITE CART TRACK
EXISTING OTHER LINE / ROW TEMPLE / CHHATRI / MOSQUE N.K.BUILDCON (P) LTD.
BITUMEN ROAD BUILDING/ HUT/TEMP.STRUCTURE (AN ISO 9001 CERTIFIED COMPANY)
COMPOUND WALL
B-62, University Marg, Bapu Nagar,
W.B.M. ROAD WATER TANK MANHOLE Jaipur - 302015
RAILWAY LINE / PILLAR WELL TUBE WELL HAND PUMP Tel. : 91-141-2710841, 42, 43
Email : nkbpl.ongcwest@gmail.com
X X FIELD BUND / FENCING TP , IP
HIGH TENSION LINE / POLE DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SB#193+225
/ To
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB GGS-II/ ALN- 2
IP-1/1
IP-1/2
IP-1/3
IP-2/1
IP-2/2
IP-3/1
IP-3/2
IP-3/3
IP-3/4
IP-3/5
IP-4/1
IP-4/2
IP-4/3
144
TP-1
TP-2
TP-3
TP-4
Start
143
142
141 79°46'35'' 29°18'49'' 25°41'8'' 39°27'9''
140
126.155
151.556
138.225
187.193
112.159
158.042
152.581
179.768
202.318
10.549
206.87
54.076
82.056
15.421
17.025
14.97
7.858
8.341
139
138
137
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
136
NE
SOB 135
LI
GGS-II 134
MATCH LINE
CH
MATCH LINE
133 SOB CTF
MAT
E
To Jagudan
E
132
LIN
To Ja
N
LI
131 Lemon Garden
ONGC well
11
CH
H
Lemon Garden
Kv
TC
gudan
130 n AT
da
SBN#63'185"207
Po
Line
M
an
MA
Well No. Sob # 92 129 gu
we
Ja
Well No. SOB 114/ 283
ine
agud
rL
wer
128 To
n
To
Well
L
Lemon Garden
da
ine
TP- Ja
er
v Po
2 g
gu
127
To J
ud
Po
an
Ja
SOB#113 Well
11 K
126
Kv
To
11
n
125 11 Kv Power Line
da
TP-1
-4
gu
TP
124 TP-4
Ja
123
To
WALL CROSSING
122 -2 a
TP av
n
ch LI
NE
121
Ko
gu
CH
Ja
LI
120 To AT
E va
TP-3
To
CH
119 Ex
To Kocha
M
.O
MATCH LINE
ONGC well
MATCH LINE
LIN
ONGC well
MAT
To
118 N
GC
O
S
th
117
CH
To
ang
er
Pi
To Kherva
Ko
SOB#
pe
Pr
va
116
AT
anp
ch
op
ha
Lin
av
M
os
115
SOB GGS-II a
159'266'238'180'267
oc
ur
e
ed
K
114
Li
a
To
ne
hav
Start
113
OLD HEADER
Koc
112
To
111
110
109
108
107
106 CS-1/LT LINE CH.0.247 km CS-3/LT LINE CH.0.55 km CS-5/BT ROAD CH.0.979 km CS-6/BT ROAD CH.1.261 km CS-7/LT LINE CH.1.61 km
CS-2/WBM ROAD CH.0.419 km CS-4/BT ROAD CH.0.694 km
105
104 CS-8/BT ROAD CH.1.619 km
103
102 CS-9/LT LINE CH.1.675 km
101
100
99
98
97
96
95
94
93
92
91
92.371
92.871
92.731
93.011
93.511
92.851
91.861
91.011
GROUND LEVELS
92.422
93.103
93.466
92.590
92.590
92.590
92.767
93.262
93.289
93.013
93.213
93.604
92.848
93.328
93.417
91.790
91.790
91.960
91.558
91.890
92.172
91.887
91.680
91.340
91.156
91.088
92.245
93.087
92.534
93.491
93.554
91.633
91.598
91.826
91.294
92.59
92.69
92.59
93.09
93.29
93.59
93.69
91.79
91.89
91.39
(IN METRES)
23.845
27.711
22.289
15.936
10.549
23.515
33.354
16.646
37.431
12.569
39.594
10.406
15.421
49.229
17.025
17.847
34.734
15.266
14.502
27.157
21.65
12.93
0.771
7.271
7.858
8.341
47.6
2.4
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
0
0+277.711
0+415.936
0+426.485
0+633.354
0+687.431
0+889.594
0+987.071
1+099.229
1+257.271
1+265.128
1+282.153
1+434.734
1+614.502
1+622.843
0+000.00
0+050.00
0+100.00
0+150.00
0+200.00
0+250.00
0+300.00
0+350.00
0+400.00
0+450.00
0+500.00
0+550.00
0+600.00
0+650.00
0+700.00
0+750.00
0+800.00
0+850.00
0+900.00
0+950.00
0+971.65
1+000.00
1+050.00
1+100.00
1+150.00
1+200.00
1+250.00
1+300.00
1+350.00
1+400.00
1+450.00
1+500.00
1+550.00
1+600.00
1+650.00
1+700.00
1+750.00
CUMULATIVE CHAINAGE
0+702.4
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SOB GGS-II CART TRACK CORPORATION LIMITED.
To SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW FIELD BUND / FENCING
X X MEHSANA ASSET
PARALLEL LINE SB#109 To
HIGH TENSION LINE / POLE WBM ROAD CROSS SECTION NKBPL/ONGC/SOB GGS-II TO SOB CTF/CS-2 MEHSANA
SOB GGS-II
PARALLEL LINE SB#193+225 ELECTRIC POLE / LINE BT ROAD CROSS SECTION NKBPL/ONGC/SOB GGS-II TO SOB CTF/CS-4 RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
To SOB GGS-II LT POLE / LINE BT ROAD CROSS SECTION NKBPL/ONGC/SOB GGS-II TO SOB CTF/CS-5 SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE SB#134 To
To SOB GGS-II
TRANSFORMER LAMP POST BT ROAD CROSS SECTION NKBPL/ONGC/SOB GGS-II TO SOB CTF/CS-6 CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
PARALLEL LINE SB#17 To
ELECTRIC BOX TELEPHONE POLE
BT ROAD CROSS SECTION NKBPL/ONGC/SOB GGS-II TO SOB CTF/CS-8 ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
SOB CTF
PARALLEL LINE SB#125 To RIVER
8"Ø SOB GGS-II TO SOB CTF WELL FLUID LINE
SOB CTF
NALA
ALIGNMENT SHEET
OTHER PROPOSED LINE
RAILWAY LINE / PILLAR DGPS POINT, TBM DLH/OES/MM/RC/ NKB / ONGC SOB
/ GGS-IITo
1 : 2500 SUR_ROU_PERM/X11NC19001 RO
/2019/9010030850 SOB CTF/ ALN-1
IP-4/10
IP-4/11
IP-4/12
IP-4/4
IP-4/5
IP-4/6
IP-4/7
IP-4/8
IP-4/9
IP-5/1
IP-5/2
IP-5/3
142
TP-5
141
140
139 47°30'9''
138
171.294
165.522
216.932
194.332
186.691
154.126
180.314
194.835
178.926
16.192
7.567
5.873
137
136
135
G U J A R A T S T A T E / M A H E S A N A D I S T R I C T
134
SOB 133
GGS-II
MATCH LINE
132
131 SOB CTF
MATCH LINE
MATCH LINE
130
To Main Road
129 ine
rL
To P
owe
128 K vP
11
unas
E
Lemon Garden
127
To
N
LI
SB#17
Ja
126 H
an
SB#17
gu
11
C
Lemon Garden 125 AT
da
Kv
n
M
Po
SH
124
w
-2
er
123
1
TP-5
Lin
122
e
121
TP
120
5 -
To K
119
118
ONGC Well
herv
11
VB
VB
117
Kv
MATCH LINE
E
ne
N
Po
a
LI
t Li
of P
116
of J
MATCH LINE
er
MATCH LINE
H
H
Li
C
Kv
115
ne
UNA
AT
AGU
To F
400
114
M
To
SAN
ie
113
Kh
DAN
ld
er
112
va
111
110
109
108
107
106
105
104 CS-10/LT LINE CH.1.965 km CS-12/HT LINE CH.2.266 km CS-14/CART TRACK CH.2.779 km CS-15/LT LINE CH.3.231 km
103
102
101 CS-11/SH CH.2.004 km CS-16/WBM ROAD CH.3.315 km
CS-13/LT LINE CH.2.356 km
100
99
98
97
96
95
94
93
92
91
90
89
91.011
90.461
91.711
89.961
GROUND LEVELS
89.802
90.954
92.184
91.602
91.800
91.834
91.437
91.159
91.003
90.933
90.278
90.742
90.790
90.790
90.790
90.416
89.954
89.368
89.372
89.777
90.132
90.293
89.864
89.799
89.750
89.627
89.609
89.982
90.314
89.865
90.385
89.795
91.891
91.799
91.091
90.234
90.193
89.595
89.595
90.09
91.79
90.79
89.69
89.89
90.39
(IN METRES)
24.839
46.454
12.646
37.354
28.169
21.831
45.101
39.433
10.567
26.124
16.309
37.816
12.184
12.966
31.161
47.764
3.546
4.899
7.567
18.13
31.87
5.873
2.236
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
POINTS (IN METRES)
Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil Normal soil
SURFACE/TERRAIN DETAILS
1+825.161
1+996.454
2+012.646
2+178.169
2+395.101
2+589.433
2+776.124
2+783.691
2+937.816
3+312.966
3+318.839
3+497.764
2+000.00
2+050.00
2+100.00
2+150.00
2+200.00
2+250.00
2+300.00
2+350.00
2+400.00
2+450.00
2+500.00
2+550.00
2+600.00
2+650.00
2+700.00
2+750.00
2+800.00
2+850.00
2+900.00
2+950.00
3+000.00
3+050.00
3+100.00
3+150.00
3+200.00
3+250.00
3+300.00
3+350.00
3+400.00
3+450.00
3+500.00
3+118.13
1+750.00
1+800.00
1+850.00
1+900.00
1+950.00
CUMULATIVE CHAINAGE
(METRES)
NO. OF DWELLINGS
CLASS / ZONE
DESIGN FACTOR
WALL THICKNESS (MM)
MATERIAL AND GRADE
DESIGN CUMULATIVE CHAINAGE
(KM METRES)
(000 + 000)
SPECIAL PROVISIONS
PIPELINE COVER
MINIMUM (METRES)
SPECIAL INSTALLATIONS/
FITTINGS/ MARKERS
CROSSINGS
COATING
CATHODIC PROTECTION
INSTALLATIONS
SOIL RESISTIVITY (OHM - CM)
@ 1.0m DEPTH
SOIL STRATIFICATION
OWNER :
OIL AND NATURAL GAS
PROPOSED LINE SOB GGS-II CART TRACK CORPORATION LIMITED.
To SOB CTF
ENGINEERING SERVICES (C & M) DIVISION
PROPOSED ROW FIELD BUND / FENCING
X X SH CROSS SECTION NKBPL/ONGC/SOB GGS-II TO SOB CTF/CS-11 MEHSANA ASSET
PARALLEL LINE SB#109 To
HIGH TENSION LINE / POLE WBM ROAD CROSS SECTION NKBPL/ONGC/SOB GGS-II TO SOB CTF/CS-16 MEHSANA
SOB GGS-II
PARALLEL LINE SB#193+225 ELECTRIC POLE / LINE RATE CONTRACT FOR CARRYING OUT PRE-ENGG.
To SOB GGS-II LT POLE / LINE SURVEY, ROU ACQUISITION & OBTAINING STATUTORY
PARALLEL LINE SB#134 To
To SOB GGS-II
TRANSFORMER LAMP POST CLEARANCE /PERMISSION FOR PROJECTS IN WESTERN
PARALLEL LINE SB#17 To
ELECTRIC BOX TELEPHONE POLE
ON SHORE ASSETS FOR A PERIOD OF 3 YEARS.
SOB CTF
PARALLEL LINE SB#125 To RIVER
8"Ø SOB GGS-II TO SOB CTF WELL FLUID LINE
SOB CTF
NALA
ALIGNMENT SHEET
OTHER PROPOSED LINE