Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Material Number Material Description Plantmrp Controller Purchasing Group Material Group M3062973 Stiffener Board 930X1050Mm 20P 6172P04 B1E 35170

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 180

Material number

Material description
PlantMRP controller
Purchasing group
Material group
M3062973 STIFFENER BOARD 930X1050MM
6172P04
20P
B1E
35170

Plant-Specific Material Status


Issue Storage Location
Default storage location for external
Goods
pr receipt processing time in days
05
RC01
1

Planned delivery time in days


In-house production time
Material type
Procurement Type
Auto PO order allowed
Indicator: bulk material
43
0 HALB
F

ABC indicator
External Material Group
Price Control Indicator
Unit Standard Cost
Moving Average Price
2011/072011/062011/05
A
S
13.94
0
0
0
0

2011/042011/032011/022011/012010/122010/112010/102010/092010/082010/072010/062010/052010/042010/03 2010/02
0
0
0
0
0
0
0
0
0
0
0
0
0
###
0

2010/012009/122009/112009/102009/092009/082009/072009/062009/052009/042009/032009/02 2009/012008/12
787.4
###
0
0
0
###
0
0
0
0
0
###
###
###

2008/112008/102008/092008/082008/072008/062008/052008/042008/032008/022008/012007/122007/112007/10
###
###
0
0
0
0
0
0
0
0
0
0
0
###

2007/092007/082007/072007/062007/052007/04Average Weekly Consumption (4 weeks)


Lot size (materials planning)
0 30.57 67.64
0 48.92
0
0 EX

Fixed lot size


Minimum lot size
Maximum lot size
Maximum stock level
Total Stock
Unrestricted stock
Safety stock
0
4,000.00
0
0
0
0
0

Base unit of measure


Total stock Value
Safety Stock Value
Weeks Inventory On Hand
Vendor Name
Product hierarchy
Valuation type
KG
0
0
0
X

Valuation type

Date Run
Userid Run By

###
###

Material number
Material description
PlantMRP controller
Purchasing group
Material group
M3062973 STIFFENER BOARD 930X1050MM
6172P04
20P
B1E
35170

Plant-Specific Material Status


Issue Storage Location
Default storage location for external
Goods
pr receipt processing time in days
05
RC01
1

Planned delivery time in days


In-house production time
Material type
Procurement Type
Auto PO order allowed
Indicator: bulk material
43
0 HALB
F

ABC indicator
External Material Group
Price Control Indicator
Unit Standard Cost
Moving Average Price
2011/072011/062011/05
A
S
13.94
0
0
0
0

2011/042011/032011/022011/012010/122010/112010/102010/092010/082010/072010/062010/052010/042010/03 2010/02
0
0
0
0
0
0
0
0
0
0
0
0
0
###
0

2010/012009/122009/112009/102009/092009/082009/072009/062009/052009/042009/032009/02 2009/012008/12
787.4
###
0
0
0
###
0
0
0
0
0
###
###
###

2008/112008/102008/092008/082008/072008/062008/052008/042008/032008/022008/012007/122007/112007/10
###
###
0
0
0
0
0
0
0
0
0
0
0
###

2007/092007/082007/072007/062007/052007/04Average Weekly Consumption (4 weeks)


Lot size (materials planning)
0 30.57 67.64
0 48.92
0
0 EX

Fixed lot size


Minimum lot size
Maximum lot size
Maximum stock level
Total Stock
Unrestricted stock
Safety stock
0
4,000.00
0
0
0
0
0

Base unit of measure


Total stock Value
Safety Stock Value
Weeks Inventory On Hand
Vendor Name
Product hierarchy
Valuation type
KG
0
0
0
X

Valuation type

Material number Material description Plant

MRP controller Purchasing group Material group

Plant-Specific Material Status Issue Storage Location Default storage location for external pr

Goods receipt processing time in days Planned delivery time in days In-house production time Material type

Procurement Type Auto PO order allowed Indicator: bulk material ABC indicator External Material Group

Price Control Indicator Unit Standard Cost Moving Average Price 2011/07

2011/06

2011/05

2011/04

2011/03

2011/02

2011/01

2010/12

2010/11

2010/10

2010/09

2010/08

2010/07

2010/06

2010/05

2010/04

2010/03

2010/02

2010/01

2009/12

2009/11

2009/10

2009/09

2009/08

2009/07

2009/06

2009/05

2009/04

2009/03

2009/02

2009/01

2008/12

2008/11

2008/10

2008/09

2008/08

2008/07

2008/06

2008/05

2008/04

2008/03

2008/02

2008/01

2007/12

2007/11

2007/10

2007/09

2007/08

2007/07

2007/06

2007/05

2007/04

Average Weekly Consumption (4 weeks)Lot size (materials planning) Fixed lot size

Minimum lot size

Maximum lot size Maximum stock level Total Stock

Unrestricted stock Safety stock

Base unit of measure Total stock Value Safety Stock Value Weeks Inventory On Hand Vendor Name

Product hierarchy Valuation type

Material number
Material description
Plant

MRP controller Purchasing group


Material group Plant-Specific Material Status

Issue Storage Location


Default storageGoods
location
receipt
for external
processing
Planned
pr delivery
timeIn-house
intime
daysin production
days Material
timetype

Procurement Type

Auto PO order allowed


Indicator: bulk material
ABC indicator External Material
Price
Group
Control Indicator
Unit Standard Cost
Moving Average Price

2011/07

2011/06

2011/05

2011/04

2011/03

2011/02

2011/01

2010/12

2010/11

2010/10

2010/09

2010/08

2010/07

2010/06

2010/05

2010/04

2010/03

2010/02

2010/01

2009/12

2009/11

2009/10

2009/09

2009/08

2009/07

2009/06

2009/05

2009/04

2009/03

2009/02

2009/01

2008/12

2008/11

2008/10

2008/09

2008/08

2008/07

2008/06

2008/05

2008/04

2008/03

2008/02

2008/01

2007/12

2007/11

2007/10

2007/09

2007/08

2007/07

2007/06

2007/05

2007/04

Average Weekly
Lot
Consumption
size (materials
Fixed
(4 weeks)
planning)
lot size Minimum lot size

Maximum lot size


Maximum stockTotal
levelStock

Unrestricted stock
Safety stock

Base unit of measure


Total stock Value

Safety Stock Value


Weeks Inventory
Vendor
On Hand
Name Product hierarchy
Valuation type

Material number
Material description
Plant

MRP controller Purchasing group


Material group Plant-Specific Material Status

Issue Storage Location


Default storageGoods
location
receipt
for external
processing
Planned
pr delivery
timeIn-house
intime
daysin production
days Material
timetype

Procurement Type

Auto PO order allowed


Indicator: bulk material
ABC indicator External Material
Price
Group
Control Indicator
Unit Standard Cost
Moving Average Price

2011/07

2011/06

2011/05

2011/04

2011/03

2011/02

2011/01

2010/12

2010/11

2010/10

2010/09

2010/08

2010/07

2010/06

2010/05

2010/04

2010/03

2010/02

2010/01

2009/12

2009/11

2009/10

2009/09

2009/08

2009/07

2009/06

2009/05

2009/04

2009/03

2009/02

2009/01

2008/12

2008/11

2008/10

2008/09

2008/08

2008/07

2008/06

2008/05

2008/04

2008/03

2008/02

2008/01

2007/12

2007/11

2007/10

2007/09

2007/08

2007/07

2007/06

2007/05

2007/04

Average Weekly
Lot
Consumption
size (materials
Fixed
(4 weeks)
planning)
lot size Minimum lot size

Maximum lot size


Maximum stockTotal
levelStock

Unrestricted stock
Safety stock

Base unit of measure


Total stock Value

Safety Stock Value


Weeks Inventory
Vendor
On Hand
Name Product hierarchy
Valuation type

Material number
Material description
Plant

MRP controller Purchasing group


Material group Plant-Specific Material Status

Issue Storage Location


Default storageGoods
location
receipt
for external
processing
Planned
pr delivery
timeIn-house
intime
daysin production
days Material
timetype

Procurement Type

Auto PO order allowed


Indicator: bulk material
ABC indicator External Material
Price
Group
Control Indicator
Unit Standard Cost
Moving Average Price

2011/07

2011/06

2011/05

2011/04

2011/03

2011/02

2011/01

2010/12

2010/11

2010/10

2010/09

2010/08

2010/07

2010/06

2010/05

2010/04

2010/03

2010/02

2010/01

2009/12

2009/11

2009/10

2009/09

2009/08

2009/07

2009/06

2009/05

2009/04

2009/03

2009/02

2009/01

2008/12

2008/11

2008/10

2008/09

2008/08

2008/07

2008/06

2008/05

2008/04

2008/03

2008/02

2008/01

2007/12

2007/11

2007/10

2007/09

2007/08

2007/07

2007/06

2007/05

2007/04

Average Weekly
Lot
Consumption
size (materials
Fixed
(4 weeks)
planning)
lot size Minimum lot size

Maximum lot size


Maximum stockTotal
levelStock

Unrestricted stock
Safety stock

Base unit of measure


Total stock Value

Safety Stock Value


Weeks Inventory
Vendor
On Hand
Name Product hierarchy
Valuation type

Material number
Material description
Plant

MRP controller Purchasing group


Material group Plant-Specific Material Status

Issue Storage Location


Default storageGoods
location
receipt
for external
processing
Planned
pr delivery
timeIn-house
intime
daysin production
days Material
timetype

Procurement Type

Auto PO order allowed


Indicator: bulk material
ABC indicator External Material
Price
Group
Control Indicator
Unit Standard Cost
Moving Average Price

2011/07

2011/06

2011/05

2011/04

2011/03

2011/02

2011/01

2010/12

2010/11

2010/10

2010/09

2010/08

2010/07

2010/06

2010/05

2010/04

2010/03

2010/02

2010/01

2009/12

2009/11

2009/10

2009/09

2009/08

2009/07

2009/06

2009/05

2009/04

2009/03

2009/02

2009/01

2008/12

2008/11

2008/10

2008/09

2008/08

2008/07

2008/06

2008/05

2008/04

2008/03

2008/02

2008/01

2007/12

2007/11

2007/10

2007/09

2007/08

2007/07

2007/06

2007/05

2007/04

Average Weekly
Lot
Consumption
size (materials
Fixed
(4 weeks)
planning)
lot size Minimum lot size

Maximum lot size


Maximum stockTotal
levelStock

Unrestricted stock
Safety stock

Base unit of measure


Total stock Value

Safety Stock Value


Weeks Inventory
Vendor
On Hand
Name Product hierarchy
Valuation type

Material number
Material description
Plant

MRP controller Purchasing group


Material group Plant-Specific Material Status

Issue Storage Location


Default storageGoods
location
receipt
for external
processing
Planned
pr delivery
timeIn-house
intime
daysin production
days Material
timetype

Procurement Type

Auto PO order allowed


Indicator: bulk material
ABC indicator External Material
Price
Group
Control Indicator
Unit Standard Cost
Moving Average Price

2011/07

2011/06

2011/05

2011/04

2011/03

2011/02

2011/01

2010/12

2010/11

2010/10

2010/09

2010/08

2010/07

2010/06

2010/05

2010/04

2010/03

2010/02

2010/01

2009/12

2009/11

2009/10

2009/09

2009/08

2009/07

2009/06

2009/05

2009/04

2009/03

2009/02

2009/01

2008/12

2008/11

2008/10

2008/09

2008/08

2008/07

2008/06

2008/05

2008/04

2008/03

2008/02

2008/01

2007/12

2007/11

2007/10

2007/09

2007/08

2007/07

2007/06

2007/05

2007/04

Average Weekly
Lot
Consumption
size (materials
Fixed
(4 weeks)
planning)
lot size Minimum lot size

Maximum lot size


Maximum stockTotal
levelStock

Unrestricted stock
Safety stock

Base unit of measure


Total stock Value

Safety Stock Value


Weeks Inventory
Vendor
On Hand
Name Product hierarchy
Valuation type

Material number
Material description
Plant

MRP controller Purchasing group


Material group Plant-Specific Material Status

Issue Storage Location


Default storageGoods
location
receipt
for external
processing
Planned
pr delivery
timeIn-house
intime
daysin production
days Material
timetype

Procurement Type

Auto PO order allowed


Indicator: bulk material
ABC indicator External Material
Price
Group
Control Indicator
Unit Standard Cost
Moving Average Price

2011/07

2011/06

2011/05

2011/04

2011/03

2011/02

2011/01

2010/12

2010/11

2010/10

2010/09

2010/08

2010/07

2010/06

2010/05

2010/04

2010/03

2010/02

2010/01

2009/12

2009/11

2009/10

2009/09

2009/08

2009/07

2009/06

2009/05

2009/04

2009/03

2009/02

2009/01

2008/12

2008/11

2008/10

2008/09

2008/08

2008/07

2008/06

2008/05

2008/04

2008/03

2008/02

2008/01

2007/12

2007/11

2007/10

2007/09

2007/08

2007/07

2007/06

2007/05

2007/04

Average Weekly
Lot
Consumption
size (materials
Fixed
(4 weeks)
planning)
lot size Minimum lot size

Maximum lot size


Maximum stockTotal
levelStock

Unrestricted stock
Safety stock

Base unit of measure


Total stock Value

Safety Stock Value


Weeks Inventory
Vendor
On Hand
Name Product hierarchy
Valuation type

Material number
Material description
Plant

MRP controller Purchasing group


Material group Plant-Specific Material Status

Issue Storage Location


Default storageGoods
location
receipt
for external
processing
Planned
pr delivery
timeIn-house
intime
daysin production
days Material
timetype

Procurement Type

Auto PO order allowed


Indicator: bulk material
ABC indicator External Material
Price
Group
Control Indicator
Unit Standard Cost
Moving Average Price

2011/07

2011/06

2011/05

2011/04

2011/03

2011/02

2011/01

2010/12

2010/11

2010/10

2010/09

2010/08

2010/07

2010/06

2010/05

2010/04

2010/03

2010/02

2010/01

2009/12

2009/11

2009/10

2009/09

2009/08

2009/07

2009/06

2009/05

2009/04

2009/03

2009/02

2009/01

2008/12

2008/11

2008/10

2008/09

2008/08

2008/07

2008/06

2008/05

2008/04

2008/03

2008/02

2008/01

2007/12

2007/11

2007/10

2007/09

2007/08

2007/07

2007/06

2007/05

2007/04

Average Weekly
Lot
Consumption
size (materials
Fixed
(4 weeks)
planning)
lot size Minimum lot size

Maximum lot size


Maximum stockTotal
levelStock

Unrestricted stock
Safety stock

Base unit of measure


Total stock Value

Safety Stock Value


Weeks Inventory
Vendor
On Hand
Name Product hierarchy
Valuation type

Material number
Material description
Plant

MRP controller Purchasing group


Material group Plant-Specific Material Status

Issue Storage Location


Default storageGoods
location
receipt
for external
processing
Planned
pr delivery
timeIn-house
intime
daysin production
days Material
timetype

Procurement Type

Auto PO order allowed


Indicator: bulk material
ABC indicator External Material
Price
Group
Control Indicator
Unit Standard Cost
Moving Average Price

2011/07

2011/06

2011/05

2011/04

2011/03

2011/02

2011/01

2010/12

2010/11

2010/10

2010/09

2010/08

2010/07

2010/06

2010/05

2010/04

2010/03

2010/02

2010/01

2009/12

2009/11

2009/10

2009/09

2009/08

2009/07

2009/06

2009/05

2009/04

2009/03

2009/02

2009/01

2008/12

2008/11

2008/10

2008/09

2008/08

2008/07

2008/06

2008/05

2008/04

2008/03

2008/02

2008/01

2007/12

2007/11

2007/10

2007/09

2007/08

2007/07

2007/06

2007/05

2007/04

Average Weekly
Lot
Consumption
size (materials
Fixed
(4 weeks)
planning)
lot size Minimum lot size

Maximum lot size


Maximum stockTotal
levelStock

Unrestricted stock
Safety stock

Base unit of measure


Total stock Value

Safety Stock Value


Weeks Inventory
Vendor
On Hand
Name Product hierarchy
Valuation type

Material number
Material description
Plant

MRP controller Purchasing group


Material group Plant-Specific Material Status

Issue Storage Location


Default storageGoods
location
receipt
for external
processing
Planned
pr delivery
timeIn-house
intime
daysin production
days Material
timetype

Procurement Type

Auto PO order allowed


Indicator: bulk material
ABC indicator External Material
Price
Group
Control Indicator
Unit Standard Cost
Moving Average Price

2011/07

2011/06

2011/05

2011/04

2011/03

2011/02

2011/01

2010/12

2010/11

2010/10

2010/09

2010/08

2010/07

2010/06

2010/05

2010/04

2010/03

2010/02

2010/01

2009/12

2009/11

2009/10

2009/09

2009/08

2009/07

2009/06

2009/05

2009/04

2009/03

2009/02

2009/01

2008/12

2008/11

2008/10

2008/09

2008/08

2008/07

2008/06

2008/05

2008/04

2008/03

2008/02

2008/01

2007/12

2007/11

2007/10

2007/09

2007/08

2007/07

2007/06

2007/05

2007/04

Average Weekly
Lot
Consumption
size (materials
Fixed
(4 weeks)
planning)
lot size Minimum lot size

Maximum lot size


Maximum stockTotal
levelStock

Unrestricted stock
Safety stock

Base unit of measure


Total stock Value

Safety Stock Value


Weeks Inventory
Vendor
On Hand
Name Product hierarchy
Valuation type

Material number
Material description
Plant

MRP controller Purchasing group


Material group Plant-Specific Material Status

Issue Storage Location


Default storageGoods
location
receipt
for external
processing
Planned
pr delivery
timeIn-house
intime
daysin production
days Material
timetype

Procurement Type

Auto PO order allowed


Indicator: bulk material
ABC indicator External Material
Price
Group
Control Indicator
Unit Standard Cost
Moving Average Price

2011/07

2011/06

2011/05

2011/04

2011/03

2011/02

2011/01

2010/12

2010/11

2010/10

2010/09

2010/08

2010/07

2010/06

2010/05

2010/04

2010/03

2010/02

2010/01

2009/12

2009/11

2009/10

2009/09

2009/08

2009/07

2009/06

2009/05

2009/04

2009/03

2009/02

2009/01

2008/12

2008/11

2008/10

2008/09

2008/08

2008/07

2008/06

2008/05

2008/04

2008/03

2008/02

2008/01

2007/12

2007/11

2007/10

2007/09

2007/08

2007/07

2007/06

2007/05

2007/04

Average Weekly
Lot
Consumption
size (materials
Fixed
(4 weeks)
planning)
lot size Minimum lot size

Maximum lot size


Maximum stockTotal
levelStock

Unrestricted stock
Safety stock

Base unit of measure


Total stock Value

Safety Stock Value


Weeks Inventory
Vendor
On Hand
Name Product hierarchy
Valuation type

Material number
Material description
Plant
MRP controller Purchasing group
Material group Plant-Specific Material Status
M3062973
STIFFENER BOARD
6172 930X1050MM
P04 20P
B1E
35170
05

Issue Storage Location


Default storageGoods
location
receipt
for external
processing
Planned
pr delivery
timeIn-house
intime
daysin production
days Material
timetype
RC01
1
43
0 HALB

Procurement Type
F

Auto PO order allowed


Indicator: bulk material
ABC indicator External Material
Price
Group
Control Indicator
Unit Standard Cost
Moving Average Price
A
S
13.94
0

2011/07

2011/06
0

2011/05
0

2011/04
0

2011/03
0

2011/02
0

2011/01
0

2010/12

2010/11
0

2010/10
0

2010/09
0

2010/08
0

2010/07
0

2010/06
0

2010/05

2010/04
0

2010/03
2010/02
1,054.00

2010/01
0

787.4

2009/12
2009/11
3,379.43

2009/10

2009/09
0

2009/08
2009/07
765.14

2009/06
0

2009/05
0

2009/04
0

2009/03
0

2009/02
2009/01
2008/12
2008/11
2008/10
2008/09
4,402.52
806.15
552.34
2,284.67
1,476.75

2008/08

2008/07
0

2008/06
0

2008/05
0

2008/04
0

2008/03
0

2008/02
0

2008/01

2007/12
0

2007/11
0

2007/10
2007/09
1,143.83

2007/08
0

2007/07
30.57

67.64

2007/06

2007/05
0

2007/04
48.92

Average Weekly
Lot
Consumption
size (materials
Fixed
(4 weeks)
planning)
lot size Minimum lot size
0 EX
0
4,000.00

Maximum lot size


Maximum stockTotal
levelStock
Unrestricted stock
Safety stock Base unit of measure
Total stock Value
0
0
0
0
0 KG
0

Safety Stock Value


Weeks Inventory
Vendor
On Hand
Name Product hierarchy
Valuation type
0
0
X

S
S
#N/A
#N/A

Date Run
7/18/2011
Userid Run By
81002428
#N/A
#N/A
#N/A
#N/A

You might also like