EARTHWORKS AT THE NTOTROSO RESETTLEMENT SITE.
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
(GHC) (GHC)
Earthworks
Remove topsoil and stockpile as directed 1413.13 m² 1.39 1,964.25
Preliminaries 3,953.62
CLAIMS 1 PROFCON LTD
CONSTRUCTION OF SHED AND SECURITY FENCE AT THE NTOTROSO RESETTLEMENT SITE.
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
(GHC) (GHC)
A TEMPORAL SHED
2
1 Trim and compact ground surface to receive concrete 20.35 m 4.87 99.10
3
2 Place concrete grade 25/20 (1:2:4) in ground slab 3.05 m 240.47 733.43
3 Formwork to edges of slab 1.84 m2 13.90 25.58
Sub-total 858.11
CONCRETE PEDESTAL
3
4 Excavate pit to receive plinth 1.2 m 6.26 7.51
3
5 Place concrete grade 25/20 (1:2:4) in plinth 2.03 m 240.47 488.15
6 Formwork to sides of plinth 8.1 m2 16.68 135.11
Sub-total 630.77
METALWORKS
75mm dia. Galvanized steel pipe post welded to 250 x
7 250 x 10mm thick base plate and 150 x 150 x 8mm thick 6 No 295.00 1,770.00
U-shape rafter cap
8 Supply and install M8 bolts 12 No 9.30 111.60
9 Supply and install HD-A-M16-400 anchor bolts 24 No 11.15 267.60
10 50 x 50 x 6mm thick angle cleats 18 No 24.39 439.02
Sub-total 2,588.22
ROOFING
0.35mm Corrugated aluminium roofing sheets fixed with
two corrugations side laps and 150mm end laps fixed to
11 29.8 m2 27.80 828.44
hardwood purlins (m/s) with aluminium drive screws
and washers
Sub-total 828.44
CARPENTRY
Sawn treated hardwood;
12 50 x 150mm rafters 14.7 m 10.50 154.35
13 50 x 100mm purlins 36.6 m 7.56 276.70
14 25 x 300 fascia 22 m 7.58 166.76
Sub-total 597.81
Summary for TEMPORAL SHED 5,503.35
SUMMARY
TEMPORAL SHED 5,503.35
Total 10,887.44
Preliminaries 2,721.86
CLAIMS 1 PROFCON LTD
CLAIMS ‐ REMEDIAL EARTHWORKS AT NTOTROSO RESETTLEMENT SITE
Total 13,530.79
Discount 2,265.00
PROFCON LTD 1