Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

PVsyst Report - 1

Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

Version 7.2.

21

PVsyst - Simulation report


Grid-Connected System

Project: Repowering Work - CHennai SIlks


Variant: New simulation variant
No 3D scene defined, no shadings
System power: 505 kWp
Mandrikavundanvalasu - India

Prepared By
Hebron Engineering Research and Technologies Services Private Limited (India
Daniel Gnanaselvam
No.41, Vakil Hosur Hills
Chennathur Post
Hosur / 635 109
India
Project: Repowering Work - CHennai SIlks
Variant: New simulation variant

PVsyst V7.2.21 Hebron Engineering Research and Technologies Services Private Limited (India)
VC0, Simulation date:
04/02/23 14:45
with v7.2.21

Project summary
Geographical Site Situation Project settings
Mandrikavundanvalasu Latitude 10.91 °N Albedo 0.20
India Longitude 77.64 °E
Altitude 229 m
Time zone UTC+5.5

Meteo data
Mandrikavundanvalasu
Meteonorm 8.0 (1991-2010), Sat=100% - Synthetic

System summary
Grid-Connected System No 3D scene defined, no shadings

PV Field Orientation Near Shadings User's needs


Fixed plane No Shadings Unlimited load (grid)
Tilt/Azimuth 12 / 0 °

System information
PV Array Inverters
Nb. of modules 936 units Nb. of units 4 units
Pnom total 505 kWp Pnom total 440 kWac
Pnom ratio 1.149

Results summary
Produced Energy 844323 kWh/year Specific production 1670 kWh/kWp/year Perf. Ratio PR 84.19 %

Table of contents
Project and results summary 2
General parameters, PV Array Characteristics, System losses 3
Main results 4
Loss diagram 5
Special graphs 6

04/02/23 PVsyst Licensed to Hebron Engineering Research and Technologies Services Private Limited (India) Page 2/6
Project: Repowering Work - CHennai SIlks
Variant: New simulation variant

PVsyst V7.2.21 Hebron Engineering Research and Technologies Services Private Limited (India)
VC0, Simulation date:
04/02/23 14:45
with v7.2.21

General parameters
Grid-Connected System No 3D scene defined, no shadings

PV Field Orientation
Orientation Sheds configuration Models used
Fixed plane No 3D scene defined Transposition Perez
Tilt/Azimuth 12 / 0 ° Diffuse Perez, Meteonorm
Circumsolar separate

Horizon Near Shadings User's needs


Free Horizon No Shadings Unlimited load (grid)

PV Array Characteristics
PV module Inverter
Manufacturer Emmvee photovoltaic Power Pvt Ltd Manufacturer Sungrow
Model E540HCB144 Model SG110-CX
(Custom parameters definition) (Original PVsyst database)
Unit Nom. Power 540 Wp Unit Nom. Power 110 kWac
Number of PV modules 936 units Number of inverters 4 units
Nominal (STC) 505 kWp Total power 440 kWac
Modules 52 Strings x 18 In series Operating voltage 200-850 V
At operating cond. (50°C) Pnom ratio (DC:AC) 1.15
Pmpp 461 kWp
U mpp 679 V
I mpp 679 A

Total PV power Total inverter power


Nominal (STC) 505 kWp Total power 440 kWac
Total 936 modules Number of inverters 4 units
Module area 2450 m² Pnom ratio 1.15
Cell area 2453 m²

Array losses
Thermal Loss factor DC wiring losses Module Quality Loss
Module temperature according to irradiance Global array res. 17 mΩ Loss Fraction -0.2 %
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s

Module mismatch losses Strings Mismatch loss


Loss Fraction 2.0 % at MPP Loss Fraction 0.1 %

IAM loss factor


Incidence effect (IAM): User defined profile

0° 40° 50° 60° 70° 75° 80° 85° 90°


1.000 1.000 1.000 1.000 1.000 0.970 0.900 0.760 0.000

04/02/23 PVsyst Licensed to Hebron Engineering Research and Technologies Services Private Limited (India) Page 3/6
Project: Repowering Work - CHennai SIlks
Variant: New simulation variant

PVsyst V7.2.21 Hebron Engineering Research and Technologies Services Private Limited (India)
VC0, Simulation date:
04/02/23 14:45
with v7.2.21

Main results
System Production
Produced Energy 844323 kWh/year Specific production 1670 kWh/kWp/year
Performance Ratio PR 84.19 %

Normalized productions (per installed kWp) Performance Ratio PR

Balances and main results

GlobHor DiffHor T_Amb GlobInc GlobEff EArray E_Grid PR E_Grid


kWh/m² kWh/m² °C kWh/m² kWh/m² kWh kWh ratio kWh
January 160.9 63.96 25.11 179.4 178.9 78333 77024 0.849 77024
February 161.1 66.39 26.75 173.2 172.8 74654 73438 0.839 73438
March 188.2 76.98 28.95 193.3 192.8 82130 80777 0.827 80777
April 185.8 78.31 29.72 182.7 182.2 77638 76288 0.826 76288
May 183.7 88.45 29.55 174.2 173.6 75260 73917 0.839 73917
June 170.8 79.77 27.74 159.7 159.0 69794 68486 0.849 68486
July 165.0 79.85 27.68 155.8 155.2 68149 66814 0.849 66814
August 161.6 81.29 27.22 156.9 156.4 68361 67050 0.845 67050
September 162.7 76.68 27.16 163.6 163.1 70419 69129 0.836 69129
October 150.7 77.11 26.90 157.2 156.8 68191 66917 0.842 66917
November 128.9 71.10 25.35 139.1 138.7 61399 60236 0.857 60236
December 134.8 62.73 24.86 149.0 148.7 65452 64247 0.853 64247
Year 1954.3 902.62 27.25 1984.1 1978.2 859780 844323 0.842 844323

Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane E_Grid Energy injected into grid
GlobEff Effective Global, corr. for IAM and shadings

04/02/23 PVsyst Licensed to Hebron Engineering Research and Technologies Services Private Limited (India) Page 4/6
Project: Repowering Work - CHennai SIlks
Variant: New simulation variant

PVsyst V7.2.21 Hebron Engineering Research and Technologies Services Private Limited (India)
VC0, Simulation date:
04/02/23 14:45
with v7.2.21

Loss diagram
1954 kWh/m² Global horizontal irradiation
+1.5% Global incident in coll. plane

-0.30% IAM factor on global

1978 kWh/m² * 2450 m² coll. Effective irradiation on collectors

efficiency at STC = 20.63% PV conversion

999876 kWh Array nominal energy (at STC effic.)


-0.66% PV loss due to irradiance level

-10.53% PV loss due to temperature

+0.23% Module quality loss

-2.10% Mismatch loss, modules and strings

-1.11% Ohmic wiring loss


862348 kWh Array virtual energy at MPP
-1.79% Inverter Loss during operation (efficiency)
-0.01% Inverter Loss over nominal inv. power
-0.29% Inverter Loss due to max. input current
0.00% Inverter Loss over nominal inv. voltage
0.00% Inverter Loss due to power threshold
0.00% Inverter Loss due to voltage threshold
844323 kWh Available Energy at Inverter Output
844323 kWh Energy injected into grid

04/02/23 PVsyst Licensed to Hebron Engineering Research and Technologies Services Private Limited (India) Page 5/6
Project: Repowering Work - CHennai SIlks
Variant: New simulation variant

PVsyst V7.2.21 Hebron Engineering Research and Technologies Services Private Limited (India)
VC0, Simulation date:
04/02/23 14:45
with v7.2.21

Special graphs
Daily Input/Output diagram

System Output Power Distribution

04/02/23 PVsyst Licensed to Hebron Engineering Research and Technologies Services Private Limited (India) Page 6/6

You might also like