Pressure Adjustments Chapter 09 Mark 8
Pressure Adjustments Chapter 09 Mark 8
Pressure Adjustments Chapter 09 Mark 8
Kobelco Construction
Machinery America LLC
6. ADJUSTMENT 2nd STAGE MAIN RELIEF WITH “HEAVY LIFT SWITCH ON”............................ 7
A. Machine Preparation Procedures ................................................................................................. 7
B. 2nd Stage Main Relief Valve Adjustment ...................................................................................... 7
•
Note: To Change kg/cm2 to PSI multiply kg/cm2 PSV2 •
(PSV1)
pressure x 14.223 = Psi Dr3
B3
WARNING PILOT
CONTROL
• BE EXTREMELY CAUTIOUS WHILE RELEASING
FOR BUCKET
HYDRAULIC TANK PRESSURE OR REMOVING AND BOOM
LINES AND FITTINGS, VAPORS AND OIL MAY BE
EXTREMELY HOT.
• WEAR APPROVED SAFETY CLOTHES, SHOES, FIGURE 6.1
GLOVES AND HARD HAT WHEN PERFORMING
ANY MAINTENANCE OR TEST PROCEDURES. Note: To Change MPa to PSI multiply MPa
pressure x 145.0377 = Psi
1. Checking the Main Relief Value
Using Service Diagnostic Screens
a. With key in OFF position, gauge cluster
blank, press and hold buzzer stop
SCREEN CHANGE
switch.
SWITCH
b. Turn key switch to on position. Release
buzzer stop switch. See Figure 6.1.
c. Move key switch to start position, start
engine and release key switch.
d. Now by pressing the screen change
switch the service diagnostics is
advanced forward. See Figure 6.2.
e. By pressing the buzzer stop switch the
FIGURE6.2
screen is returned to the previous
screen.
f. Advance the service diagnostics to
screen No.7. See Figure 6.3.
g. Screen No.7 will display the voltage of No. 14 PRESSURE SENSOR
high pressure sensor, and the computer P-1 PUMP 07.V 0P
NOTE •
Turning Heavy lift Power Boost Adjusting Screw HEAVY LIFT
FIGURE 9.4
Mark 8 02/07 Rev. 02
Page 9-8
ADJUSTMENT MAIN RELIEF STANDARD PRESSURE
WARNING WORK
MODE
• MAKE CERTAIN THERE ARE NO OBJECTS “H”
FIGURE10.4
Mark 8 02/07 Rev. 02
Page 9-9
SWING CIRCUIT
7. SWING CIRCUIT
NOTE
The following procedures are provided for refer-
ence only. Attachment Port Relief Valves are fac-
tory preset and should not be field adjusted.
FIGURE 11.4
Mark 8 02/07 Rev. 02
Page 9-10
SWING CIRCUIT
WARNING
• PRECISE ADJUSTMENT OF THE MACHINE'S
ATTACHMENT PORT RELIEF VALVES IS
NOT POSSIBLE ON THE MACHINE.
• SHOULD A PROBLEM BE FOUND WITH THE
ATTACHMENT PORT RELIEF VALVES, IT IS
RECOMMENDED TO REPLACE FAULTY ATTACH-
MENT PORT RELIEF VALVES.
SUCH ADJUSTMENT COULD VOID WARRANTY.
FIGURE 12.1
C. Swing Over Load Relief Valve Pres-
sure Adjustment
Machine Preparation Procedures
1. Confirm that the following is proper be- LEFT
fore proceeding to step 2. SLEWING
a. KPSS is in “M” mode OR5
b. Heavy lift switch off.
c. Hydraulic oil is approximately OC
45~55 (OF113~145). •
d. Engine water temperature is •
RIGHT
a p p r o x i m a t e l y OC 4 0 ~ 1 0 0
SLEWING
(OF104~212). OR6
e. Maintenance connector is in the
release position.
f. High Idle RPM is proper per ma-
chine being tested.
g. Bucket teeth penetrate soil approxi-
mately 305mm (12"). Figure 12.1. FIGURE 12.2
2. Locate Swing Left overload relief OR5,
loosen 24mm locknut.See Figure12.2
3. Operate swing control to the left and
hold, stalling swing. Adjust pressure
to specific machine using 700kg/cm2
(10,000 psi) Pressure Gauge installed
to test port a2 on P2 Main Pump. See
Figure 12.3
4. After correct pressure is obtained
tighten adjusting screw locknut to ;
2.8 ~3.2 kgfm2 (20~30 ft.lb). Verify P1 Pump P2 Pump
pressure after tightening locknut. a1 PORT a2 PORT
5. Locate Swing Right overload relief
OR6, loosen 24mm locknut. Operate FIGURE 12.3
swing control to the right and hold, stall-
ing swing. Adjust pressure to specific
machine using 700kg/cm2 (10,000 psi) NOTE
Pressure Gauge installed to test port
Turning Normal Adjusting Screw Clockwise One
a2 on P2 Main Pump.
turn
6. After correct pressure is obtained
tighten adjusting screw locknut to ; Increases Pressure Approximately
2.8 ~3.2 kgfm2 (20~30 ft.lb). Verify 108 kgf/cm2 21 (300 psi)
pressure after tightening locknut.
Dr
PSV2
a3 A3
B3
a4
PSV1
PH1 PH2
PSV1 PSV2 PSV2
a3
(Top side) PH1 PH2 PH2 PH1
a4
(Bottom side)
a1 a1
a2
a2 B3
B3
B1
Dr B1
A3
Dr3 a5
A1 A2
A2
Dr3
Fig. 09-13
Connector
Low Idle 975~1025 RPM Throttle @ "LO"- Idle
Installed
Service
ENGINE
HEAVY LIFT a1
Main Pump 37.3~38.8 5400~5627 MR1 Boom Raise held over relief
MAIN a2
RELIEF a1
ATTACHMENT Main Pump 33.8~35 4900~5076 MR1 Boom Raise held over relief
a2
Port relief valves are set at a precise flow rate and cannot be adjusted on the machine. Port relief valves can be
NOTE: checked for excessive leakage by increasing the value of main relief valve. (turn main relief clockwise one complete
turn). Check at low idle, heavy lift on (if Applicable). Refer to chart below for port relief valve.
BOOM ROD a1 33.8~37.8 4902~5480 OR4 Boom Down
Main Pump
(DO NOT ADJUST) HEAD a2 33.8~39.7 4902~5760 OR3 Boom Up
ARM ROD a1 33.8~39.7 4902~5760 OR8 Arm Out (Cylinder In)
Main Pump
(DO NOT ADJUST) HEAD a2 33.8~37.8 4977~5474 OR7 Arm In (Cylinder Out)
BUCKET ROD a1 33.3~37.8 4829~5480 OR1 Bucket Out
Main Pump
PF 1/4
Power Shift:
*** ...All controls in neutral 0~10 mA
** ....Front attachment stalled 0~10 mA
P1 Pump *Auxiliary */** motors stalled
.....Both travel 10~30 mA
P2 Pump
a1 PORT a2 PORT
Connector
Low Idle 970~1030 RPM Throttle @ "LO"- Idle
Installed
Service
ENGINE
HEAVY LIFT a1
Main Pump 37.3~38.8 5400~5627 MR1 Boom Raise held over relief
MAIN a2
RELIEF a1
ATTACHMENT Main Pump 33.8~35 4900~5076 MR1 Boom Raise held over relief
a2
Port relief valves are set at a precise flow rate and cannot be adjusted on the machine. Port relief valves can be
NOTE: checked for excessive leakage by increasing the value of main relief valve. (turn main relief clockwise one complete
turn). Check at low idle, heavy lift on (if Applicable). Refer to chart below for port relief valve.
BOOM ROD a1 33.8~37.8 4902~5480 OR4 Boom Down
Main Pump
(DO NOT ADJUST) HEAD a2 33.8~39.7 4902~5760 OR3 Boom Up
ARM ROD Main Pump a1 33.8~39.7 4902~5760 OR8 Arm Out (Cylinder In)
(DO NOT ADJUST) HEAD a2 33.8~37.8 4977~5474 OR7 Arm In (Cylinder Out)
BUCKET ROD a1 33.3~37.8 4829~5480 OR1 Bucket Out
Main Pump
PF 1/4
AUXILIARY */ All Main Pump a1a2 27.5~32.5 3988~4713 Auxiliary Attachment Stalled
**
F a1 33.8~35.8 4902~5192 "H"-Mode, Engine at Hi Idle.
TRAVEL RH Simultaneous LH/RH Travel
R Main Pump a1 33.8~35.8 4902~5192 Engaged
(DO NOT ADJUST)
F a2 33.8~35.8 4902~5192 "H"-Mode, Engine at Hi Idle.
LH Simultaneous LH/RH Travel
R a2 33.8~35.8 4900~5192 Engaged
SYSTEM COMPONENT GAUGE @ SCREEN # MPa mA Adj point Measuring Condition
Service Diag.
Power Shift:
*** ...All controls in neutral 0~10 mA
** ....Front attachment stalled 0~10 mA
P1 Pump *Auxiliary */** motors stalled
.....Both travel 10~30 mA
P2 Pump
a1 PORT a2 PORT
Connector
Low Idle 975~1025 RPM Throttle @ "LO"- Idle
Installed
Service
ENGINE
HEAVY LIFT a1
Main Pump 37.3~38.8 5400~5627 MR1 Boom Raise held over relief
MAIN a2
RELIEF a1
ATTACHMENT Main Pump 33.8~35 4900~5076 MR1 Boom Raise held over relief
a2
Port relief valves are set at a precise flow rate and cannot be adjusted on the machine. Port relief valves can be
NOTE: checked for excessive leakage by increasing the value of main relief valve. (turn main relief clockwise one complete
turn). Check at low idle, heavy lift on (if Applicable). Refer to chart below for port relief valve.
BOOM ROD a1 33.8~37.8 4902~5480 OR4 Boom Down
Main Pump
(DO NOT ADJUST) HEAD a2 33.8~39.7 4902~5760 OR3 Boom Up
ARM ROD Main Pump a1 33.8~39.7 4902~5760 OR8 Arm Out (Cylinder In)
(DO NOT ADJUST) HEAD a2 33.8~37.8 4977~5474 OR7 Arm In (Cylinder Out)
BUCKET ROD a1 33.8~37.8 4902~5480 OR1 Bucket Out
Main Pump
PF 1/4
Power Shift:
*** ...All controls in neutral 0~10 mA
** ....Front attachment stalled 0~10 mA
P1 Pump *Auxiliary */** motors stalled
.....Both travel 10~30 mA
P2 Pump
a1 PORT a2 PORT