Atlantic Bridge over the Panama Canal

Rafael Manzanarez
Octubre 18, 2017
Medellin, Colombia
Project Location

Panama Canal
3rd Crossing

2
Outline
77.5 [ft]

8.5 [ft]
• Project Background
• Objectives
• BIM Examples
• Closing Remarks & Lessons Learnt

~1200 [ft]

3
Project Background
Design-Bid -Build
Design-Build

Panama Canal Authority


(Owner & Administrator)

CCCC & Louis Berger


Vinci
Joint Venture
(Contractor)
(Contractor & Designer)
(Baseline Designer)
Litigation

Arup
(Reviewer of Baseline
Design)

4
Objectives: Identify Potential Design Issues
• Are the details buildable?
• Is there sufficient information in the drawings?
• Is the information consistent and correct?
• Is there sufficient space between the elements to prevent clashes?
• Are normal tolerances adequate?
• If detail is not buildable what can be done to solve the problem?

5
BIM Modeling

6
Identifying Errors in the Design

7
Proposing New Solutions

8
3D Models

9
Cross Section Modeling

10
2D vs. 3D drawings

11
Multiple Element Modeling

12
Can you identify conflicts/clashes?

13
Identifying Errors in Design

14
Identifying Errors in Design

15
Preparing Drawings

16
Intersecting Elements

17
Lessons Learnt
• Powerful display & modeling tools
• Future information integration: multidiscipline
• Prevent un-expected construction difficulties
• Training and staff development

18
Questions?

19