Whex Garage Council Presentation

Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

OUR MISSION

1
Convention Center District Plan
Development Plan
• Approximately $200 million renovation of the Duke Energy
Convention Center including new public plaza on the former
Millennium Hotel site

• New Convention Headquarters Hotel on the parking lot at 5th


and Plum

• Redevelopment of other publicly controlled assets in the


surrounding area
o Purchase Whex Parking Garage and position for
redevelopment in conjunction with the hotel
o Demolish 435 Elm and prep site for future mixed-use
development
2
Whex Garage
Overview
• Whex Garage
 780-space parking garage
 Adjacent to new Convention
Headquarters Hotel site
 3CDC has purchase option:
$11.9MM
 Port Authority would hold the
property, similar to other
Convention District assets
 3CDC will lease/operate garage
and create redevelopment plan

3
Whex Garage

Financing Overview

Total Uses 12,242,424 ODOD – 166 Loan


Amount $ 7,000,000
Sources Interest Rate (Yr 1-5) 0%
ODOD 7,000,000 Interest Rate (Yr 6-7) 1%
CEFIII 4,018,182 Amortization Interest Only
Equity 1,224,242 Term 7 years
Total Sources 12,242,424 Annual Fees 0.250%

CEFII Loan
Amount $ 4,018,182
Interest Rate 2%
Amortization 30 years
Term 7 years

4
4
Whex Garage

• Whex Garage acquisition is critical to the Convention District


Plan

o The garage will provide required parking for Convention


Headquarter Hotel
This will result in major savings by eliminating the need
to build parking within the hotel development itself,
lowering the subsidy required by the hotel

o Garage will also provide public parking for Convention


Center and support additional development on surrounding
publicly owed sites

5
Whex Garage

• City Request:
o $275,000 annual appropriation from Downtown/Riverfront
TIF District to support State of Ohio loan, which will finance
acquisition
Matched by $275,00 annual appropriation from
Hamilton County
Funds will be held in escrow to backstop loan and are
not anticipated to be needed to fund annual debt
service
7-year maximum term

o 3CDC will create a redevelopment plan for the garage in


conjunction with the construction of the new headquarter
hotel and Convention Center