Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

John Louie J. Ang: Front Elevation Right-Side Elevation

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

ROOF APEX LINE 1 ROOF APEX LINE 1

ROOF APEX LINE 2 ROOF APEX LINE 2


ROOF APEX LINE 3 ROOF APEX LINE 3

TOP OF BEAM LINE TOP OF BEAM LINE

CONCRETE SLAB
ROOFING
TEXTURED PAINT FIN.,(WITH
TEXTURED PAINT FIN.,(WITH
WATERPROOFING) FINAL COLOR
FIRE WALL WATERPROOFING) FINAL COLOR
AS PER OWNERS APPROVAL
AS PER OWNERS APPROVAL
SECOND FLR. FIN. LINE SECOND FLR. FIN. LINE
R.C CANOPY WITH R.C CANOPY WITH
WATERPROOFING WATERPROOFING
ROOF APEX LINE 1
ROOF APEX LINE 2
ROOF APEX LINE 3

SEE TRUSS DETAILS


PROPOSED TOP OF BEAM LINE
OUTDOOR PVC
PANEL ACCENT
GROUND FLR. LINE GROUND FLR. LINE
FINISH GRADE LINE FINISH GRADE LINE

T&B
SECOND FLR. FIN. LINE
CEILING LINE

1 FRONT ELEVATION 2 RIGHT-SIDE ELEVATION


A-3 SCALE 1 : 100 MTS. A-3 SCALE 1 : 100 MTS.

GROUND FLR. LINE


T&B DINING AREA
FINISH GRADE LINE

ROOF APEX LINE 1


ROOF APEX LINE 2
ROOF APEX LINE 1
ROOF APEX LINE 2 5 CROSS SECTION
ROOF APEX LINE 3 ROOF APEX LINE 3
A-3 SCALE 1 : 100 MTS.
TOP OF BEAM LINE TOP OF BEAM LINE

TEXTURED PAINT FIN.,(WITH


WATERPROOFING) FINAL COLOR
TEXTURED PAINT FIN.,(WITH AS PER OWNERS APPROVAL
WATERPROOFING) FINAL COLOR
AS PER OWNERS APPROVAL
SECOND FLR. FIN. LINE SECOND FLR. FIN. LINE
POLYCARBONATE ROOFING
SHEET ON TUBULAR STEEL BAR
FRAME

ROOF APEX LINE 1


ROOF APEX LINE 2
ROOF APEX LINE 3
GROUND FLR. LINE GROUND FLR. LINE
FINISH GRADE LINE FINISH GRADE LINE SEE TRUSS DETAILS

TOP OF BEAM LINE

3 REAR ELEVATION 4 LEFT-SIDE ELEVATION


A-3 SCALE 1 : 100 MTS. A-3 SCALE 1 : 100 MTS. SECOND FLR. FIN. LINE
BEDROOM 2 MASTER'S BEDROOM

CEILING LINE

GROUND FLR. LINE


DINING AREA LIVING AREA
FINISH GRADE LINE

9 LONGITUDINAL SECTION
A-3 SCALE 1 : 100 MTS.
LEGEND & SYMBOLS

DROPLIGHT

PINLIGHT

COVELIGHT

RECESSED PIN LIGHTS

7 GF REFLECTED CEILING PLAN 8 2F REFLECTED CEILING PLAN


A-3 SCALE 1 : 100 MTS. A-3 SCALE 1 : 100 MTS.

FRONT ELEVATION

JOHN LOUIE J. ANG PROPOSED GARAGE EXTENSION RIGHT-SIDE ELEVATION


Mr. & Mrs. Mark Dennis LEFT-SIDE ELEVATION
& RENOVATION WORKS
AVIDA WOODHILL SETTINGS NUVALI PHASE 2 BLOCK 16
LOT 38, BRGY. CANLUBANG, CALAMBA CITY, LAGUNA
& Karen Trinio
REAR ELEVATION
SECTIONS
GF REFLECTED CEILING PLAN
2F REFLECTED CEILING PLAN
A3

You might also like