On A/C MSN All: ATR-A-00-65-XX-10000-021A-D
On A/C MSN All: ATR-A-00-65-XX-10000-021A-D
On A/C MSN All: ATR-A-00-65-XX-10000-021A-D
DM status information
DM Code : ATR-A-12-22-32-00001-240A-A
Airline : 0713
Issue Number : 001
Issue Date : Jan 01/23
Breakdown Title : LANDING GEAR
DM Title : Lubrication of the MLG and the MLG Doors
Applicability : ON A/C MSN ALL
Aircraft Type : ATR72
DM Producer : FB429
Language : Simplified English
Copyright : ATR-A-00-65-XX-10000-021A-D
WARNING: MOST MATERIALS ARE DANGEROUS FOR YOUR HEALTH AND THE ENVIRONMENT
(TOXIC, FLAMMABLE, EXPLOSIVE, IRRITANT...):
- OBEY THE MATERIAL MANUFACTURER INSTRUCTIONS AND THE LOCAL
REGULATIONS.
- USE PROTECTIVE CLOTHING, GOGGLES AND GLOVES.
- ENSURE CORRECT AIRFLOW THROUGH THE WORK AREA.
- DO NOT BREATHE THE FUMES.
- DO NOT USE THESE MATERIALS NEAR SPARKS OR SOURCES OF HEAT.
- DO NOT APPLY MATERIALS OUTSIDE OF SPECIFIED AREAS.
- PREPARE AND USE ONLY THE NECESSARY MATERIAL QUANTITY, USE THE
APPLICABLE PROCEDURE TO DISCARD THE REMAINING MATERIAL.
1. General
A. Reason for the Job
Ref. MPD ATR72_122232-LUB-10000-1
Ref. MPD ATR72_122232-LUB-10005-1
Ref. MPD ATR72_122232-LUB-10030-1
B. Additional information
NOTE: In some cases, the removal of the MLG wheels from the wheel axle will possibly
not be easy if A/C operations lead to:
- High number of cycles between tires changes
- Long lead time between tires changes.
about:blank 1/9
1/18/23, 4:31 PM 0713 - ATR72 - Line Maintenance - MSN: 00713 - 01-Jan-2023 - ATR-A-12-22-32-00001-240A-A - Lubrication of the MLG an…
A. Work Zones.
SPATULA
No Specific 1
C. Consumable Materials.
D. Referenced Information.
REFERENCE DESIGNATION
ATR-A-12-37-32-00ZZZ- MP - Removal of the Main Landing Gear (MLG) Wheel/Tire
520Z-A Assembly
ATR-A-12-37-32-00ZZZ- MP - Installation of the Main Landing Gear (MLG)
720Z-A Wheel/Tire Assembly
3. Job Set-Up
SUBTASK 122232-10100100001
A. On the center instrument panels, on the LDG GEAR section on the panel 404VU/VM, put a
WARNING NOTICE to prevent landing gear operation.
4. Procedure
SUBTASK 122232-30000130001
A. General Lubrication Procedure
(1) Make sure that the grease nipples are in good condition.
NOTE: You can identify the grease nipple with a red mark around it.
about:blank 2/9
1/18/23, 4:31 PM 0713 - ATR72 - Line Maintenance - MSN: 00713 - 01-Jan-2023 - ATR-A-12-22-32-00001-240A-A - Lubrication of the MLG an…
(2) If the lubrication operation has removal and installation of a component, for the
repair or replacement, you must do the lubrication procedure as follows:
(a) Make sure that you clean the hinge points with 11024 (Degreasing Solvent) and
lubricate them before the MLG is operated.
(b) If there is high resistance on the PUMP - HAND GREASE during the lubrication
procedure:
1 Examine the lubricating fittings and the related hinge points.
2 If you cannot find the cause of this resistance, remove and examine the
hinge points.
(c) Put a sufficient quantity of grease into each lubrication fitting to fully remove all
the used grease.
(d) Where possible, move the hinge in one direction and then back again during
lubrication to fill the grease easily.
(e) Clean the lubrication fittings and the hinge points with a Cotton Rag to remove
the unwanted grease.
SUBTASK 122232-30000050004
Ref. Fig. Lubrication of the MLG Points
NOTE: For this specific step, you can use the following material(s) as an alternative:
- 04004C(Synthetic grease high pressure).
(2) Lubricate the MLG/aircraft attachment points at the two grease lubrication fittings on
the truss shear for MLG support bearings.
(3) Lubricate the MLG leg as follows:
(a) Lubricate the two grease lubrication fittings on the leg structure/trailing-arm
attachment-pin.
(b) Lubricate the two grease lubrication fittings on the trailing arm, at the universal
joint/trailing-arm attachment-pin.
(c) Lubricate the two grease nipples on the trailing arm, at the leg/trailing arm
attachment-pin.
about:blank 3/9
1/18/23, 4:31 PM 0713 - ATR72 - Line Maintenance - MSN: 00713 - 01-Jan-2023 - ATR-A-12-22-32-00001-240A-A - Lubrication of the MLG an…
SUBTASK 122232-30000060001
Ref. Fig. Lubrication of the MLG Door Points
(5) Lubricate the MLG-door-rod attachment link (3) and (4) with 04004B (Synthetic
grease high pressure).
SUBTASK 122232-30000070001
Ref. Fig. Sealing Compound General-Visual-Inspection for Integrity
D. General Visual Inspection of U-Joint
(1) Make sure that the 09002D (Polysulfide sealant fast curing) bead around the two
bushes are not removed. The possible conditions are as follows:
(a) The 09002D (Polysulfide sealant fast curing) is removed but the bushes are in
their initial positions.
about:blank 4/9
1/18/23, 4:31 PM 0713 - ATR72 - Line Maintenance - MSN: 00713 - 01-Jan-2023 - ATR-A-12-22-32-00001-240A-A - Lubrication of the MLG an…
(b) The 09002D (Polysulfide sealant fast curing) is removed and the bushes are not
in their initial positions.
(c) The 09002D (Polysulfide sealant fast curing) is not removed.
NOTE: Although the sealing compound bead has a crack, the positions of the bushes
do not change. If there is a crack in the sealing compound bead, the sealing
compound bead will not show that the bushes are moved. The sealing can
show signs of crack because of its usual aging process. Thus, it is not
necessary to replace the sealing bead that shows this specified sign given
that the bushes are in their initial positions. If you are not sure, remove the
sealing bead (refer the procedure below mentioned) for a better inspection or
speak to messier-dowty or AI(R) product support.
NOTE: In this condition, the aircraft is airworthy. Thus, it can fly while you wait
for next instructions from messier-dowty or AI(R) product support.
5. Close-Up
SUBTASK 122232-10200020001
A. Close Up
(1) Remove all the fixtures, tools, test and support equipment used during this
procedure.
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Remove the warning notice(s) used during this procedure.
about:blank 5/9
1/18/23, 4:31 PM 0713 - ATR72 - Line Maintenance - MSN: 00713 - 01-Jan-2023 - ATR-A-12-22-32-00001-240A-A - Lubrication of the MLG an…
Z193
FR27
Z194
A FR25
Z730
Z740
B
01
01
A
LH SHOWN
RH SYMMETRICAL
6509GM
(6514GM) 01
01
01
01
01
B
MLG
LH SHOWN
RH SYMMETRICAL
NOTE:
01 APPLY 04004B ON THE MLG LUBRICATION POINTS.
LUBRICATION POINT ICN-ATR-A-122232-A-FB429-00TXS-A-002-01
about:blank 6/9
1/18/23, 4:31 PM 0713 - ATR72 - Line Maintenance - MSN: 00713 - 01-Jan-2023 - ATR-A-12-22-32-00001-240A-A - Lubrication of the MLG an…
Z730
A
A
B
Z740
01
01
01
01
01
01
A
SIDE-BRACE MAIN ALIGNMENT
LH SHOWN
RH SYMMETRICAL
01
01
B
SIDE-BRACE SECONDARY ALIGNMENT
NOTE:
01 APPLY 04004B ON THE MLG-SIDE-BRACE LUBRICATION POINTS.
LUBRICATION POINT ICN-ATR-A-122232-A-FB429-00TXU-A-002-01
about:blank 7/9
1/18/23, 4:31 PM 0713 - ATR72 - Line Maintenance - MSN: 00713 - 01-Jan-2023 - ATR-A-12-22-32-00001-240A-A - Lubrication of the MLG an…
Z730
A
A Z740
5 01
01
2
01
02
4
6509GM
(6514GM) 02
A
LH SHOWN
RH SYMMETRICAL
NOTE:
01 APPLY 04004B MIXED WITH 5% OF 04007A ON THE MLG-DOOR LUBRICATION POINTS.
02 APPLY 04004B ON THE MLG-DOOR LUBRICATION POINTS.
LUBRICATION POINT ICN-ATR-A-122232-A-FB429-00TXX-A-002-01
about:blank 8/9
1/18/23, 4:31 PM 0713 - ATR72 - Line Maintenance - MSN: 00713 - 01-Jan-2023 - ATR-A-12-22-32-00001-240A-A - Lubrication of the MLG an…
6509GM
(6514GM)
Z730
A A
Z740
A
MLG
LH SHOWN
RH SYMMETRICAL
A
B SEALING COMPOUND C
A A
SEALING COMPOUND
C
ICN-ATR-A-122232-A-FB429-00TXY-A-002-01
about:blank 9/9