HYDRAULIC MODEL INVENTORY (Pipe) OF DMA-1 (Rairangpur)
HYDRAULIC MODEL INVENTORY (Pipe) OF DMA-1 (Rairangpur)
HYDRAULIC MODEL INVENTORY (Pipe) OF DMA-1 (Rairangpur)
Hydraulic
Length Hazen- Headloss Pressure Pressure Hydraulic
Elevation Stop Elevation Diameter Velocity Flow Headloss Grade
ID Label Start Node (Scaled) Material Williams Gradient (Start) (m (Stop) (m Grade Remarks
Start Node Stop (mm) (m/s) (MLD) (m) (Start)
(m) C (m/km) H2O) H2O) (Stop) (m)
(m)
120 P-229 J-61 265.5 J-62 265.4 5 150 DI 130 0.72 1.094 4.094 0.02 26 26 291.6 291.5 Existing DI to be retained
2073 P-932 R-1 (ZONE-1) 275 J-61 265.5 838 150 DI 130 0.72 1.094 4.095 3.43 0 26 295 291.6 Existing DI to be retained
1739 P-800 J-62 265.4 J-807 265.1 109 150 DI 130 0.71 1.082 4.008 0.44 26 26 291.5 291.1 Existing DI to be retained
1472 P-687 J-807 265.1 J-94 265.9 72 150 DI 130 0.7 1.072 3.945 0.29 26 25 291.1 290.8 Existing DI to be retained
530 P-343 J-94 265.9 J-161 265.3 28 150 DI 130 0.51 0.786 2.218 0.06 25 25 290.8 290.8 Existing DI to be retained
1768 P-816 J-161 265.3 J-7 265 127 100 DI 140 1.01 0.688 10.899 1.39 25 24 290.8 289.4 Existing DI to be Replaced
39 P-216 J-7 265 J-8 265 1 100 DI 140 0.98 0.667 10.289 0.01 24 24 289.4 289.4 Existing DI to be Replaced
1691 P-137 J-628 259.5 J-249 258.2 98 100 DI 140 0.6 0.407 4.115 0.4 28 29 288 287.6 Existing UPVC to be Replaced
412 P-27 J-249 258.2 J-250 258 21 100 DI 140 0.59 0.4 3.994 0.09 29 29 287.6 287.5 Existing UPVC to be Replaced
578 P-41 J-250 258 J-347 258 29 100 DI 140 0.54 0.367 3.397 0.1 29 29 287.5 287.4 Existing UPVC to be Replaced
1855 P-162 J-347 258 J-953 256.7 142 100 DI 140 0.54 0.364 3.349 0.47 29 30 287.4 286.9 Existing UPVC to be Replaced
1785 P-825 J-8 265 J-305 264.7 119 100 DI 130 0.51 0.346 3.497 0.42 24 24 289.4 289 Existing DI to be retained
505 P-335 J-305 264.7 J-306 264.4 26 100 DI 130 0.47 0.321 3.045 0.08 24 24 289 288.9 Existing DI to be retained
824 P-445 J-306 264.4 J-487 263.9 39 100 DI 130 0.46 0.315 2.932 0.12 24 25 288.9 288.8 Existing DI to be retained
2004 P-906 J-8 265 J-119 262.5 306 100 DI 130 0.46 0.314 2.917 0.89 24 26 289.4 288.5 Existing DI to be retained
2077 P-1057 J-162 265.2 J-641 256.2 1,150 100 DI 140 0.46 0.309 2.48 2.85 25 32 290.8 287.9 Existing CI to be Replaced
209 P-15 J-119 262.5 J-120 262.4 10 100 DI 140 0.46 0.309 2.474 0.02 26 26 288.5 288.5 Existing UPVC to be Replaced
1103 P-73 J-487 263.9 J-130 263.3 50 100 DI 140 0.46 0.309 2.474 0.12 25 25 288.8 288.6 Existing UPVC to be Replaced
926 P-60 J-120 262.4 J-381 261.9 43 100 DI 140 0.45 0.303 2.379 0.1 26 26 288.5 288.3 Existing UPVC to be Replaced
226 P-16 J-130 263.3 J-131 263.1 11 100 DI 140 0.44 0.302 2.365 0.03 25 25 288.6 288.6 Existing UPVC to be Replaced
908 P-57 J-131 263.1 J-535 262.7 42 100 DI 140 0.43 0.293 2.246 0.09 25 26 288.6 288.5 Existing UPVC to be Replaced
1919 P-180 J-381 261.9 J-628 259.5 172 100 DI 140 0.42 0.287 2.155 0.37 26 28 288.3 288 Existing UPVC to be Replaced
934 P-61 J-535 262.7 J-35 261.6 43 100 DI 140 0.42 0.285 2.129 0.09 26 27 288.5 288.4 Existing UPVC to be Replaced
81 P-7 J-35 261.6 J-36 261.6 3 100 DI 140 0.4 0.269 1.913 0.01 27 27 288.4 288.4 Existing UPVC to be Replaced
1654 P-133 J-36 261.6 J-319 260.2 92 100 DI 140 0.36 0.242 1.579 0.15 27 28 288.4 288.3 Existing UPVC to be Replaced
1914 P-178 J-412 252 J-215 252 163 100 DI 140 0.34 0.233 1.461 0.24 34 34 286.3 286.1 Existing UPVC to be Replaced
531 P-36 J-319 260.2 J-259 260.1 28 100 DI 140 0.34 0.231 1.447 0.04 28 28 288.3 288.2 Existing UPVC to be Replaced
428 P-30 J-259 260.1 J-5 259.2 22 100 DI 140 0.33 0.227 1.394 0.03 28 29 288.2 288.2 Existing UPVC to be Replaced
666 P-389 J-93 265.7 J-162 265.2 33 100 DI 130 0.31 0.212 1.41 0.05 25 25 290.8 290.8 Existing DI to be retained
2092 P-1064 J-641 256.2 J-688 255.3 62 100 DI 140 0.31 0.211 1.223 0.08 32 32 287.9 287.8 Existing CI to be Replaced
360 P-25 J-215 252 J-216 252 18 100 DI 140 0.31 0.21 1.206 0.02 34 34 286.1 286.1 Existing UPVC to be Replaced
2093 P-1065 J-688 255.3 J-755 255.3 2 100 DI 140 0.31 0.208 1.192 0 32 33 287.8 287.8 Existing CI to be Replaced
2090 P-1062 J-755 255.3 J-462 251.9 482 100 DI 140 0.3 0.202 1.124 0.54 33 35 287.8 287.3 Existing CI to be Replaced
780 P-430 J-462 251.9 J-245 251 37 100 DI 130 0.3 0.201 1.278 0.05 35 36 287.3 287.2 Existing DI to be retained
1118 P-74 J-216 252 J-644 251.6 51 100 DI 140 0.28 0.189 0.998 0.05 34 34 286.1 286 Existing UPVC to be Replaced
1490 P-695 J-245 251 J-85 250.9 73 100 DI 130 0.27 0.183 1.078 0.08 36 36 287.2 287.2 Existing DI to be retained
1708 P-140 J-644 251.6 J-847 252 102 100 DI 140 0.24 0.162 0.752 0.08 34 34 286 286 Existing UPVC to be Replaced
2051 P-197 J-953 256.7 J-3 251.7 459 100 DI 140 0.21 0.143 0.597 0.27 30 35 286.9 286.6 Existing UPVC to be Replaced
2052 P-198 J-953 256.7 J-4 251.7 459 100 DI 140 0.21 0.143 0.596 0.27 30 35 286.9 286.6 Existing UPVC to be Replaced
158 P-238 J-85 250.9 J-86 250.9 7 100 DI 130 0.2 0.134 0.607 0 36 36 287.2 287.2 Existing DI to be retained
1606 P-127 J-847 252 J-571 252 86 100 DI 140 0.16 0.11 0.364 0.03 34 34 286 285.9 Existing UPVC to be Replaced
275 P-269 J-161 265.3 J-162 265.2 13 100 DI 130 0.14 0.098 0.336 0 25 25 290.8 290.8 Existing DI to be retained
559 P-352 J-336 249.6 J-337 249.6 29 100 DI 130 0.14 0.096 0.328 0.01 37 37 287.1 287.1 Existing DI to be retained
1927 P-181 J-337 249.6 J-955 249 198 100 DI 140 0.12 0.081 0.206 0.04 37 38 287.1 287.1 Existing UPVC to be Replaced
499 P-332 J-86 250.9 J-302 250.7 26 100 DI 130 0.12 0.08 0.233 0.01 36 36 287.2 287.2 Existing DI to be retained
976 P-63 J-571 252 J-57 252 45 100 DI 140 0.12 0.08 0.204 0.01 34 34 285.9 285.9 Existing UPVC to be Replaced
1866 P-856 J-955 249 J-522 248.5 142 100 DI 140 0.11 0.077 0.189 0.03 38 38 287.1 287.1 Proposed New DI Pipeline
1679 P-781 J-302 250.7 J-336 249.6 97 100 DI 130 0.08 0.052 0.103 0.01 36 37 287.2 287.1 Existing DI to be retained
114 P-9 J-57 252 J-58 251.9 5 100 DI 140 0.08 0.051 0.089 0 34 34 285.9 285.9 Existing UPVC to be Replaced
1774 P-820 J-86 250.9 J-336 249.6 195 100 DI 140 0.07 0.049 0.082 0.02 36 37 287.2 287.1 Proposed New DI Pipeline
1214 P-586 J-522 248.5 J-690 248.4 57 100 DI 140 0.05 0.037 0.049 0 38 39 287.1 287.1 Proposed New DI Pipeline
1075 P-531 J-625 251.3 J-324 251.8 49 100 DI 140 0.05 0.037 0.048 0 35 34 286.3 286.3 Proposed New DI Pipeline
1468 P-111 J-58 251.9 J-615 252 72 100 DI 140 0.05 0.037 0.048 0 34 34 285.9 285.9 Existing UPVC to be Replaced
886 P-471 J-522 248.5 J-523 248.2 42 100 DI 140 0.05 0.036 0.046 0 38 39 287.1 287.1 Proposed New DI Pipeline
1270 P-605 J-85 250.9 J-403 251.3 59 100 DI 130 0.05 0.033 0.046 0 36 36 287.2 287.2 Existing DI to be retained
972 P-498 J-559 264.8 J-569 264.2 46 100 DI 140 0.05 0.032 0.038 0 26 26 290.8 290.8 Proposed New DI Pipeline
1957 P-886 J-523 248.2 J-873 249.6 281 100 DI 140 0.05 0.031 0.036 0.01 39 37 287.1 287.1 Proposed New DI Pipeline
677 P-393 J-403 251.3 J-404 251.3 33 100 DI 130 0.04 0.028 0.033 0 36 36 287.2 287.2 Existing DI to be retained
1055 P-523 J-615 252 J-616 252 47 100 DI 130 0.04 0.028 0.032 0 34 34 285.9 285.9 Existing DI to be retained
1643 P-767 J-873 249.6 J-513 250.9 118 100 DI 140 0.03 0.022 0.019 0 37 36 287.1 287 Proposed New DI Pipeline
1519 P-708 J-324 251.8 J-826 251.5 91 100 DI 140 0.03 0.022 0.018 0 34 35 286.3 286.3 Proposed New DI Pipeline
1996 P-902 J-690 248.4 J-989 250.9 273 100 DI 140 0.03 0.022 0.018 0 39 36 287.1 287.1 Proposed New DI Pipeline
2027 P-917 J-995 252 J-996 251.1 346 100 DI 130 0.03 0.02 0.017 0.01 34 35 285.9 285.9 Existing DI to be retained
1238 P-593 J-569 264.2 J-702 263.7 68 100 DI 140 0.03 0.019 0.015 0 26 27 290.8 290.8 Proposed New DI Pipeline
1729 P-144 J-36 261.6 J-258 261.7 105 100 DI 140 0.03 0.018 0.014 0 27 27 288.4 288.4 Existing UPVC to be Replaced
784 P-432 J-215 252 J-357 251.8 37 100 DI 140 0.02 0.016 0.011 0 34 34 286.1 286.1 Proposed New DI Pipeline
2265 P-215 J-996 251.1 J-96 251 1 100 DI 140 0.02 0.016 0.015 0 35 35 285.9 285.9 Proposed New DI Pipeline
1640 P-765 J-7 265 J-872 263.7 90 100 DI 130 0.02 0.016 0.011 0 24 26 289.4 289.4 Existing DI to be retained
1624 P-130 J-317 250.7 J-341 249 88 100 DI 140 0.02 0.014 0.008 0 37 39 287.9 287.9 Existing UPVC to be Replaced
1492 P-112 J-305 264.7 J-605 263.6 73 100 DI 140 0.02 0.014 0.008 0 24 25 289 289 Existing UPVC to be Replaced
1871 P-166 J-957 259.5 J-958 258 146 100 DI 140 0.02 0.014 0.008 0 28 30 288 288 Existing UPVC to be Replaced
1694 P-785 J-404 251.3 J-895 251.2 99 100 DI 140 0.02 0.014 0.008 0 36 36 287.2 287.2 Proposed New DI Pipeline
595 P-363 J-357 251.8 J-183 250.7 41 100 DI 140 0.02 0.013 0.007 0 34 35 286.1 286.1 Proposed New DI Pipeline
1970 P-188 J-96 251 J-977 249.9 263 100 DI 140 0.02 0.013 0.007 0 35 36 285.9 285.9 Existing UPVC to be Replaced
1233 P-591 J-352 259 J-700 259.3 80 100 DI 140 0.02 0.012 0.006 0 29 29 288 288 Proposed New DI Pipeline
2045 P-921 J-872 263.7 J-147 268 477 100 DI 130 0.02 0.012 0.007 0 26 21 289.4 289.4 Existing DI to be retained
1942 P-880 J-977 249.9 J-941 253.4 191 100 DI 130 0.01 0.01 0.005 0 36 32 285.9 285.9 Existing DI to be retained
406 P-306 J-245 251 J-246 250.9 20 100 DI 140 0.01 0.008 0.003 0 36 36 287.2 287.2 Proposed New DI Pipeline
1599 P-746 J-807 265.1 J-860 264.7 98 100 DI 140 0.01 0.008 0.003 0 26 26 291.1 291.1 Proposed New DI Pipeline
690 P-396 J-379 260.4 J-411 258.9 34 100 DI 140 0.01 0.007 0.002 0 28 29 288.1 288.1 Proposed New DI Pipeline
1962 P-889 J-616 252 J-95 251.1 214 100 DI 130 0.01 0.007 0.003 0 34 35 285.9 285.9 Existing DI to be retained
947 P-487 J-202 258.9 J-556 258.4 44 100 DI 140 0.01 0.006 0.002 0 29 29 288 288 Proposed New DI Pipeline
1159 P-564 J-319 260.2 J-275 259.5 54 100 DI 140 0.01 0.006 0.002 0 28 29 288.3 288.3 Proposed New DI Pipeline
1921 P-871 J-523 248.2 J-971 248.5 182 100 DI 140 0.01 0.005 0.001 0 39 38 287.1 287.1 Proposed New DI Pipeline
1758 P-809 J-513 250.9 J-919 250.8 152 100 DI 140 0.01 0.005 0.001 0 36 36 287 287 Proposed New DI Pipeline
1982 P-896 J-96 251 J-986 250.6 243 100 DI 140 0.01 0.005 0.001 0 35 35 285.9 285.9 Proposed New DI Pipeline
996 P-503 J-569 264.2 J-582 264.8 50 100 DI 140 0.01 0.005 0.001 0 26 26 290.8 290.8 Proposed New DI Pipeline
1959 P-888 J-616 252 J-982 251 210 100 DI 140 0.01 0.005 0.001 0 34 35 285.9 285.9 Proposed New DI Pipeline
1579 P-738 J-605 263.6 J-852 262.3 101 100 DI 140 0.01 0.004 0.001 0 25 27 289 289 Proposed New DI Pipeline
252 P-264 J-147 268 J-148 268 12 100 DI 140 0.01 0.004 0 0 21 21 289.4 289.4 Proposed New DI Pipeline
582 P-359 J-306 264.4 J-349 264.1 29 100 DI 140 0.01 0.004 0.001 0 24 25 288.9 288.9 Proposed New DI Pipeline
762 P-423 J-394 260 J-452 259.5 46 100 DI 140 0.01 0.004 0 0 28 29 288 288 Proposed New DI Pipeline
1257 P-601 J-535 262.7 J-711 263.7 66 100 DI 140 0.01 0.004 0.001 0 26 25 288.5 288.5 Proposed New DI Pipeline
1531 P-715 J-58 251.9 J-830 249.4 77 100 DI 140 0.01 0.004 0.001 0 34 36 285.9 285.9 Proposed New DI Pipeline
899 P-475 J-530 253.8 J-531 253.4 42 100 DI 140 0 0.003 0 0 34 34 287.9 287.9 Proposed New DI Pipeline
1026 P-513 J-599 252 J-600 251.3 47 100 DI 140 0 0.003 0 0 35 36 287.2 287.2 Proposed New DI Pipeline
1727 P-797 J-347 258 J-908 256.4 132 100 DI 140 0 0.003 0 0 29 31 287.4 287.4 Proposed New DI Pipeline
1761 P-811 J-872 263.7 J-920 262.2 122 100 DI 140 0 0.003 0 0 26 27 289.4 289.4 Proposed New DI Pipeline
309 P-278 J-183 250.7 J-184 250.5 16 100 DI 140 0 0.003 0.001 0 35 36 286.1 286.1 Proposed New DI Pipeline
1692 P-138 J-258 261.7 J-894 259.6 98 100 DI 140 0 0.003 0 0 27 29 288.4 288.4 Existing UPVC to be Replaced
1827 P-841 J-941 253.4 J-942 255.8 131 100 DI 130 0 0.003 0 0 32 30 285.9 285.9 Existing DI to be retained
173 P-14 J-95 251.1 J-96 251 8 100 DI 140 0 0.003 0.002 0 35 35 285.9 285.9 Existing UPVC to be Replaced
970 P-497 J-317 250.7 J-568 251.7 46 100 DI 140 0 0.002 0 0 37 36 287.9 287.9 Proposed New DI Pipeline
486 P-326 J-262 260.2 J-295 259.2 25 100 DI 140 0 0.002 0 0 28 29 288.1 288.1 Proposed New DI Pipeline
846 P-454 J-261 260 J-500 259 40 100 DI 140 0 0.002 0 0 28 29 288.1 288.1 Proposed New DI Pipeline
1211 P-585 J-688 255.3 J-689 255.3 65 100 DI 140 0 0.002 0 0 32 33 287.8 287.8 Proposed New DI Pipeline
1505 P-703 J-120 262.4 J-819 262.6 75 100 DI 140 0 0.002 0 0 26 26 288.5 288.5 Proposed New DI Pipeline
Hydraulic
Length Hazen- Headloss Pressure Pressure Hydraulic
Elevation Stop Elevation Diameter Velocity Flow Headloss Grade
ID Label Start Node (Scaled) Material Williams Gradient (Start) (m (Stop) (m Grade Remarks
Start Node Stop (mm) (m/s) (MLD) (m) (Start)
(m) C (m/km) H2O) H2O) (Stop) (m)
(m)
1568 P-734 J-130 263.3 J-846 264 81 100 DI 140 0 0.002 0 0 25 25 288.6 288.6 Proposed New DI Pipeline
1036 P-517 J-605 263.6 J-606 263.8 47 100 DI 140 0 0.001 0 0 25 25 289 289 Proposed New DI Pipeline
1687 P-783 J-873 249.6 J-892 250 96 100 DI 140 0 0.001 0 0 37 37 287.1 287.1 Proposed New DI Pipeline
36 P-2 J-5 259.2 J-6 259.2 1 100 DI 140 0 0 0 0 29 29 288.2 288.2 Existing UPVC to be Replaced
538 P-346 J-323 251.8 J-324 251.8 28 100 DI 140 0 0 0 0 34 34 286.3 286.3 Proposed New DI Pipeline
2263 P-977 J-991 251 J-995 252 322 100 DI 140 0 0 0 0 35 34 285.9 285.9 Proposed New DI Pipeline
2049 P-924 J-941 253.4 J-1002 255.4 466 100 DI 130 0 0 0 0 32 30 285.9 285.9 Existing DI to be retained
454 P-317 J-275 259.5 J-276 259.4 23 100 DI 140 0 0 0 0 29 29 288.3 288.3 Proposed New DI Pipeline
2078 P-201 J-1012 270 J-953 256.7 1,011 100 DI 140 0 0 0 0 17 30 286.9 286.9 Existing UPVC to be Replaced
2164 P-966 J-1024 251.4 J-62 265.4 1,578 100 DI 130 0 0 0 0 40 26 291.5 291.5 Existing DI to be retained
1820 P-838 J-937 251.9 J-938 251.3 127 100 DI 140 0 0 0 0 35 36 287.3 287.3 Proposed New DI Pipeline
1244 P-596 J-704 255 J-594 254.3 57 100 DI 140 0 0 0 0 33 33 287.9 287.9 Proposed New DI Pipeline
2167 P-967 J-1025 251.4 J-625 251.3 31 100 DI 130 0 0 0 0 35 35 286.3 286.3 Existing DI to be retained
2091 P-1063 J-462 251.9 J-937 251.9 3 100 DI 140 0 0 0 0 35 35 287.3 287.3 Existing CI to be Replaced
1188 P-576 J-677 251.3 J-357 251.8 66 100 DI 140 0 -0.002 0 0 35 34 286.1 286.1 Proposed New DI Pipeline
959 P-492 J-562 258 J-249 258.2 45 100 DI 140 0 -0.002 0 0 30 29 287.6 287.6 Proposed New DI Pipeline
1088 P-537 J-631 250.9 J-28 251.9 67 100 DI 140 0 -0.002 0 0 35 34 286 286 Proposed New DI Pipeline
1093 P-540 J-633 260.7 J-200 261.5 73 100 DI 140 0 -0.002 0 0 28 27 288.3 288.3 Proposed New DI Pipeline
1280 P-610 J-721 258.6 J-275 259.5 90 100 DI 140 0 -0.002 0 0 30 29 288.3 288.3 Proposed New DI Pipeline
334 P-284 J-199 261.4 J-200 261.5 17 100 DI 140 0 -0.003 0 0 27 27 288.3 288.3 Proposed New DI Pipeline
488 P-327 J-296 261 J-259 260.1 25 100 DI 140 0.01 -0.004 0.001 0 27 28 288.2 288.2 Proposed New DI Pipeline
620 P-372 J-372 252 J-183 250.7 31 100 DI 140 0.01 -0.004 0.001 0 34 35 286.1 286.1 Proposed New DI Pipeline
1442 P-108 J-795 252 J-644 251.6 70 100 DI 140 0.01 -0.004 0.001 0 34 34 286 286 Existing UPVC to be Replaced
567 P-356 J-340 249.1 J-341 249 30 100 DI 140 0.01 -0.004 0.001 0 39 39 287.9 287.9 Proposed New DI Pipeline
727 P-409 J-432 263 J-131 263.1 35 100 DI 140 0.01 -0.004 0.001 0 26 25 288.6 288.6 Proposed New DI Pipeline
1563 P-731 J-844 249.8 J-644 251.6 80 100 DI 140 0.01 -0.004 0.001 0 36 34 286 286 Proposed New DI Pipeline
1709 P-791 J-901 262 J-902 262.7 131 100 DI 140 0.01 -0.004 0.001 0 26 26 288.4 288.4 Proposed New DI Pipeline
1557 P-728 J-842 248 J-27 251.9 79 100 DI 140 0.01 -0.004 0.001 0 38 34 286 286 Proposed New DI Pipeline
1105 P-545 J-638 250.6 J-571 252 50 100 DI 140 0.01 -0.005 0.001 0 35 34 285.9 285.9 Proposed New DI Pipeline
69 P-221 J-27 251.9 J-28 251.9 3 100 DI 130 0.01 -0.005 0 0 34 34 286 286 Existing DI to be retained
868 P-464 J-512 251 J-513 250.9 41 100 DI 140 0.01 -0.005 0.001 0 36 36 287 287 Proposed New DI Pipeline
1205 P-582 J-685 250.8 J-163 251 58 100 DI 140 0.01 -0.005 0.002 0 37 37 287.9 287.9 Proposed New DI Pipeline
1724 P-143 J-902 262.7 J-232 262.5 122 100 DI 140 0.01 -0.006 0.001 0 26 26 288.4 288.4 Existing UPVC to be Replaced
1107 P-546 J-599 252 J-403 251.3 50 100 DI 140 0.01 -0.006 0.001 0 35 36 287.2 287.2 Proposed New DI Pipeline
1546 P-722 J-837 251.7 J-216 252 79 100 DI 140 0.01 -0.006 0.002 0 34 34 286.1 286.1 Proposed New DI Pipeline
1928 P-875 J-973 250 J-690 248.4 185 100 DI 140 0.01 -0.006 0.002 0 37 39 287.1 287.1 Proposed New DI Pipeline
470 P-321 J-285 263.3 J-141 263.3 24 100 DI 140 0.01 -0.007 0.002 0 27 27 290.8 290.8 Proposed New DI Pipeline
1178 P-571 J-672 253.3 J-594 254.3 78 100 DI 140 0.01 -0.007 0.002 0 35 33 287.9 287.9 Proposed New DI Pipeline
386 P-301 J-232 262.5 J-233 262.5 19 100 DI 130 0.01 -0.008 0.004 0 26 26 288.4 288.4 Existing DI to be retained
338 P-24 J-201 258.8 J-202 258.9 17 100 DI 140 0.01 -0.008 0.002 0 29 29 288 288 Existing UPVC to be Replaced
1875 P-167 J-959 264.1 J-140 263.4 151 100 DI 140 0.02 -0.012 0.006 0 27 27 290.8 290.8 Existing UPVC to be Replaced
1125 P-551 J-233 262.5 J-257 261.9 51 100 DI 130 0.02 -0.012 0.007 0 26 26 288.4 288.4 Existing DI to be retained
1851 P-161 J-951 261 J-35 261.6 136 100 DI 140 0.02 -0.012 0.006 0 27 27 288.4 288.4 Existing UPVC to be Replaced
425 P-29 J-257 261.9 J-258 261.7 23 100 DI 140 0.02 -0.013 0.006 0 26 27 288.4 288.4 Existing UPVC to be Replaced
636 P-378 J-200 261.5 J-381 261.9 31 100 DI 140 0.02 -0.013 0.007 0 27 26 288.3 288.3 Proposed New DI Pipeline
241 P-261 J-140 263.4 J-141 263.3 12 100 DI 130 0.03 -0.018 0.013 0 27 27 290.8 290.8 Existing DI to be retained
2262 P-214 J-957 259.5 J-1042 259.5 5 100 DI 140 0.03 -0.018 0.014 0 28 28 288 288 Proposed New DI Pipeline
1570 P-735 J-28 251.9 J-847 252 82 100 DI 130 0.03 -0.018 0.015 0 34 34 286 286 Existing DI to be retained
1156 P-562 J-664 250.1 J-302 250.7 52 100 DI 140 0.03 -0.02 0.016 0 37 36 287.1 287.2 Proposed New DI Pipeline
741 P-415 J-439 251.7 J-159 251.3 36 100 DI 140 0.03 -0.022 0.018 0 36 36 287.9 287.9 Proposed New DI Pipeline
525 P-35 J-317 250.7 J-163 251 27 100 DI 140 0.03 -0.022 0.019 0 37 37 287.9 287.9 Existing UPVC to be Replaced
1018 P-511 J-594 254.3 J-595 254.7 46 100 DI 140 0.04 -0.024 0.022 0 33 33 287.9 287.9 Proposed New DI Pipeline
587 P-42 J-202 258.9 J-352 259 30 100 DI 140 0.04 -0.026 0.024 0 29 29 288 288 Existing UPVC to be Replaced
2264 P-978 J-995 252 J-57 252 1 100 DI 140 0.04 -0.026 0.028 0 34 34 285.9 285.9 Proposed New DI Pipeline
949 P-488 J-557 258 J-250 258 45 100 DI 140 0.04 -0.029 0.031 0 29 29 287.5 287.5 Proposed New DI Pipeline
1491 P-696 J-141 263.3 J-559 264.8 87 100 DI 130 0.05 -0.032 0.042 0 27 26 290.8 290.8 Existing DI to be retained
278 P-20 J-163 251 J-159 251.3 14 100 DI 140 0.05 -0.034 0.042 0 37 36 287.9 287.9 Existing UPVC to be Replaced
1649 P-770 J-625 251.3 J-412 252 91 100 DI 130 0.06 -0.039 0.06 0.01 35 34 286.3 286.3 Existing DI to be retained
2260 P-204 J-352 259 J-1042 259.5 49 100 DI 140 0.06 -0.04 0.057 0 29 28 288 288 Existing UPVC to be Replaced
2037 P-194 J-998 260.1 J-953 256.7 376 100 DI 140 0.07 -0.051 0.087 0.03 27 30 286.9 286.9 Existing UPVC to be Replaced
272 P-19 J-159 251.3 J-160 251.6 13 100 DI 140 0.08 -0.056 0.103 0 36 36 287.9 287.9 Existing UPVC to be Replaced
1662 P-775 J-160 251.6 J-530 253.8 93 100 DI 130 0.09 -0.059 0.13 0.01 36 34 287.9 287.9 Existing DI to be retained
2261 P-205 J-1042 259.5 J-628 259.5 1 100 DI 140 0.09 -0.059 0.114 0 28 28 288 288 Existing UPVC to be Replaced
1072 P-529 J-530 253.8 J-595 254.7 49 100 DI 130 0.1 -0.067 0.166 0.01 34 33 287.9 287.9 Existing DI to be retained
954 P-490 J-559 264.8 J-93 265.7 45 100 DI 130 0.11 -0.072 0.191 0.01 26 25 290.8 290.8 Existing DI to be retained
1111 P-547 J-595 254.7 J-641 256.2 52 100 DI 130 0.14 -0.093 0.305 0.02 33 32 287.9 287.9 Existing DI to be retained
33 P-1 J-3 251.7 J-4 251.7 1 100 DI 140 0.21 -0.143 0.605 0 35 35 286.6 286.6 Existing UPVC to be Replaced
1341 P-100 J-628 259.5 J-394 260 63 100 DI 140 0.27 -0.182 0.932 0.06 28 28 288 288 Existing UPVC to be Replaced
659 P-46 J-394 260 J-261 260 33 100 DI 140 0.28 -0.193 1.03 0.03 28 28 288 288.1 Existing UPVC to be Replaced
432 P-31 J-261 260 J-262 260.2 22 100 DI 140 0.3 -0.203 1.133 0.02 28 28 288.1 288.1 Existing UPVC to be Replaced
632 P-44 J-262 260.2 J-379 260.4 31 100 DI 140 0.31 -0.208 1.191 0.04 28 28 288.1 288.1 Existing UPVC to be Replaced
1153 P-78 J-379 260.4 J-5 259.2 52 100 DI 140 0.32 -0.217 1.291 0.07 28 29 288.1 288.2 Existing UPVC to be Replaced
692 P-397 J-412 252 J-413 251.9 34 100 DI 130 0.41 -0.278 2.338 0.08 34 34 286.3 286.4 Existing DI to be retained
1714 P-1027 J-413 251.9 J-3 251.7 102 100 DI 140 0.42 -0.283 2.101 0.21 34 35 286.4 286.6 Existing CI to be Replaced
170 P-241 J-93 265.7 J-94 265.9 8 100 DI 130 0.42 -0.286 2.465 0.02 25 25 290.8 290.8 Existing DI to be retained
HYDRAULIC MODEL INVENTORY (Junction) OF DMA-1 (Rairangpur)