H20 Wall and Column Formwork
H20 Wall and Column Formwork
H20 Wall and Column Formwork
F o r m w o r k ■
German Formwork Technology
S u p p o r t S y s t e m s ■ S e r v i c e s
pb
G F T H20 Wall and Column Formwork HP System. Assembly and Application Guide 2
Product Overview
Corner Connector
TB-Walkway
Bracket
Waler Connector
Stopend
Sprag Brace Wall Strut
Outer Corner Bearing
G F T H20 Wall and Column Formwork - HP System. Assembly and Application Guide 3
Plan View
Stopend
T-wall intersection
Element connection
Length adjustment
Inner Corner
Outer Corner
TB Walkway Bracket
G F T H20 Wall and Column Formwork HP System. Assembly and Application Guide 4
Components
Weight
Art. No Kg/pc.
Walers
Waler 96 180011 22.5
Waler 121 180012 27.9
Waler 146 180013 33.4
Waler 171 180014 38.9
Waler 196 180015 44.3
Waler 221 180016 49.7
Waler 246 180017 55.0
Waler 271 180018 60.0
Waler 296 180019 66.2 Walers are connected by means of Waler
Connectors which provide a tension and
pressure resistant element connection. The
element connections are tight and precisely
aligned.
G F T H20 Wall and Column Formwork - HP System. Assembly and Application Guide 5
Components
Weight
Art. No Kg/pc.
G F T H20 Wall and Column Formwork HP System. Assembly and Application Guide 6
Components
Weight
Art. No Kg/pc.
G F T H20 Wall and Column Formwork - HP System. Assembly and Application Guide 7
Components
Weight
Art. No Kg/pc.
G F T H20 Wall and Column Formwork HP System. Assembly and Application Guide 8
Components
Weight
Art. No Kg/pc.
G F T H20 Wall and Column Formwork - HP System. Assembly and Application Guide 9
Components
Weight
Art. No Kg/pc.
G F T H20 Wall and Column Formwork HP System. Assembly and Application Guide 10
Pre-Assembly of Elements
A. Basic Assembly
For basic assembly of the H20 elements, an assembly floor
big enough for the largest wall formwork element has to be
prepared. To ensure the exact position of the H20 Walers and
Timber Beams, stop bars have to be fixed on the ground. The
position of the stop bars should correspond to the spacing of H20 Timber Beam Clamp
the Walers
G F T H20 Wall and Column Formwork - HP System. Assembly and Application Guide 11
T-Shaped Wall Arrangement
The arrangement of a T-shaped wall can be done with standard wall formwork elements and an additional infill panel which is
fixed by means of Waler Connector 165.
The inner corners are arranged with standard elements as shown and described on page 17.
Standard element
Joining Wedge
Waler
165
Standard element
Cor
ner
Con
Beam Fixing nec
tor
Device
Wedge
Infill
Panel
G F T H20 Wall and Column Formwork HP System. Assembly and Application Guide 12
Stopend Arrangement
Tension Strap
G F T H20 Wall and Column Formwork - HP System. Assembly and Application Guide 13
Corner Arrangement
Inner Corner
The erection of an inner corner is also possible by making Please take note that the corner connector’s
use of Corner Connector L24 / H20 in combination with shorter leg should be positioned towards the H20
Walers, H20 Timber Beams or Lattice Griders. The formwork’s inner corner.
Corner Connector L24 / H20 is fixed to the Waler by
means of Joining Wedges.
G F T H20 Wall and Column Formwork HP System. Assembly and Application Guide 14
Corner Arrangement
Outer Corner
The standard outer corner is comprised of H20 Tim-
ber Beams or Lattice Girders. The Outer Corner Bear-
ing is fixed to the Waler by means of a Joining Wedge
while the wood cleat is used to prevent the H20 Timber
Beams from being misaligned during tightening. Tighten-
ing the corner should be done at a 45° angle to the Waler.
G F T H20 Wall and Column Formwork - HP System. Assembly and Application Guide 15
Element Connection
Connection of the Wall Elements
Fixing of the wall elements by means of Waler Connector A. The center of the Waler Connector 100 has to be placed
100/165 and four Joining Wedges provides an aligned, ten- in between the two adjacent wall elements and secured with
sion and compression resistant wall element connection. Wedge 1.
For length adjustment, the Waler Connector 100, Beam Fixing D. Wedge 2 and Wedge 4 have to be tightened as well.
Device and corresponding Wedge are to be used and fixed to
the H20 Timber Beam
G F T H20 Wall and Column Formwork HP System. Assembly and Application Guide 16
Height Extension
The H20 Extension Piece is used to extend the height of The H20 Extension Piece is fastened to the H20 Timber
of the wall formwork’s standard elements. By fixing the H20 Beams using two H20 Extension Pieces and four Bolts M20
Extension Piece to the web of the individual H20 Timber x 80 with Nut.
Beams, an aligned and rigid connection which is compres-
sion and tension resistant is achieved.
G F T H20 Wall and Column Formwork - HP System. Assembly and Application Guide 17
Circular Formwork Arrangement
H20 Timber Beam elements arranged as circular wall shuttering can be connected by means of the Hinged Connector 65x65
secured by inserting the Joining Wedge in the Waler.
Hinged Connector
G F T H20 Wall and Column Formwork HP System. Assembly and Application Guide 18
Column Formwork Arrangement
G F T H20 Wall and Column Formwork - HP System. Assembly and Application Guide 19
Aligning the Wall Formwork Elements
Arrangement of Wall Struts with Sprag Braces
Using the Wall Strut and the Sprag Brace, the wall formwork
elements can be properly aligned and supported. During the
erection of the wall shuttering, arrangement of the Wall Struts
with Sprag Braces is necessary in order to take over the wind
loads. The compression and tension resistant connection to
the Waler is made by Strut Wedge Strap and Wedge. Please
note that the Wall Strut and Sprag Brace are to be ordered
separately.
G F T H20 Wall and Column Formwork HP System. Assembly and Application Guide 20
Supporting the Formwork
Special Aligning Strut Arrangement
For aligning extremely high wall elements, combinable Align-
ing Strut IBK sections can be arranged for a tension and com-
pression resistant bracing. The connection of the aligning
strut to the wall elements is done by means of the Connection
Beam CFB230.
1 each
G F T H20 Wall and Column Formwork - HP System. Assembly and Application Guide 21
TB Walkway Bracket Arrangement
G F T H20 Wall and Column Formwork HP System. Assembly and Application Guide 22
De-shuttering Wall Formwork
Step-1 Step-3
Fix the crane chain slings to H20 Panel (1-A) not attached Retract H20 panel (1-A) from the wall.
to the Wall Struts Side. Ensure slings angle does not
exceed 60o
Crane Chain Slings Crane Chain Slings
Panel (1-B)
Panel (1-B)
Step-2 Step-4
Remove tie rods from the H20 Panel that requires de- Lift and remove the retracted panel
shuttering
Ensure that all the accessories connected to the adjacent
H20 Panels are removed and separated from H20 Panel
(1-A)
Panel (1-A)
Panel (1-B)
G F T H20 Wall and Column Formwork - HP System. Assembly and Application Guide 23
De-shuttering Wall Formwork
Step-5 Step-7
Fix the crane chain sling to H20 Panel (1-B) attached to the Retract H20 panel (1-B) from wall.
Wall Strut. Ensure sling angle does not exceed 60o. Ensure
that all the accessories that connected to the adjacent H20
Panel are removed and separated from H20 Panel (1-B)
Crane Chain
Slings
Step-6 Step-8
Remove Wall Strut. Lift and remove the retracted panel
Panel (1-B)
Wall Strut
G F T H20 Wall and Column Formwork HP System. Assembly and Application Guide 24
Engineering, Design & Drawing
A. All the Shop drawing, Technical data & the Statical cal-
culation will be Suzitted by GFT in accordance with the
structural drawing project requirement
B. The site erection should be done as per GFT’s shop
drawing and shall be supervised and inspected by
GFT’s formwork specialist
C. The spacing and positioning of the Formwork material
are arranged based on the statical requirements and as
shown in the GFT’s execution drawing & Calculation
ogy
h nol s
Tec
e
i c
r v
rk e
wo
S
■
m
For
s
m
t e
n
rma
s
y
S
Ge r t
F T
o
p
ion
p
u
S
ulat
■
G o
r k
alc
w
r m
al c
o
F
tic
Sta
ubai)
C. (D
L.L.
logy
chno
rk Te
wo
Form
rman
l Are
Ge tria bai,
a4
U.A
.E. 0
32
F T Indus 5, Du – 34 04 425
■ GAl Quoz x: 3388 - (0)44 – 34 78
71
. Bo (0) e
P.O No.: +9 71 -
tech.a
Tel. No.: +9o@gf- ch.ae
Fax ail: Inf w.gf-te
E-M : ww
site
We
Typical Section
G F T H20 Wall and Column Formwork - HP System. Assembly and Application Guide 25
Engineering, Design & Drawing
G F T H20 Wall and Column Formwork HP System. Assembly and Application Guide 26
Engineering, Design & Drawing
G F T H20 Wall and Column Formwork - HP System. Assembly and Application Guide 27
■GF T German Formwork Technology L.L.C. (Dubai)
Al Quoz Industrial Area 4
P.O. Box : 33885, Dubai, U.A.E.
Tel. No. : +971 - (0)4 – 34 04 320
Fax No. : +971 - (0)4 – 34 78 425
E-Mail : Info@gf-tech.ae
Web : www.gf-tech.ae
■GF T (Qatar)
Aziziya Commercial Complex
Aziziya Commercial Street - 424
P.O. Box : 16502 Doha, Qatar
Tel. No. : +974 - 4465 9766
Fax. No. : +974 - 4456 7250
E-Mail : Info@gf-tech.ae
Web : www.gf-tech.ae
■ G F T (Syria)
Damascus, Syria, Mazah
P.O. Box : 9710
Tel. No. : +963 - 11 - 611 6601
Fax No. : +963 - 11 - 611 6605
E-Mail : Info@gf-tech.ae
Web : www.gf-tech.ae