BILL NO.

1: PRELIMINARIES
TOTAL
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
BILL NO. 1 PRELIMINARIES

Preamble:
Each item in the Preliminaries and General Requirements, which the Contractor wishes to price,
shall be priced individually and the Contractor shall not enter any lump sum covering more than one
item or group of items. Items against which no price is indicated is deemed to have been included in
the rates.

A Bidder to Visit
The bidder shallthe
beSite
required to visit the site before bidding.

The Contractor is to satisfy himself as to any difficulties that the Site may present and make all
necessary inquiries to any point which in his opinion requires further elucidation as no claim for lack
of information on any of the above shall be entertained.

The Contractor shall therefore be deemed to have visited the site and satisfied himself as to: -

(i) The nature/terrain of the site.


(ii) The amount of bush,size of trees, structures,rubbish or debris to be cleared away before
commencement.
(iii) The nature of the soil to be excavated and location of the dumping site.
(iv) The nature, proximity of adjoining property, buildings and services to be protected and/or
diverted.
(v) The nature of existing buildings to be demolished if any, including cost of demolition.Allow for
demolitions of existing temporary structures.
(vi) The locations where all temporary structures,plant and materials necessary for executing the
works will be placed.
(vii) The existence and source of adequate supplies of labour, plant and local materials for the
works.
(viii) The requirements for addressing and protecting Enviromental issues.
(ix) The state and pattern of weather in the area.
(x) The source of clean water,electricity or any utility services for use during the construction of the
works.
The Contractor shall visit the Site to acquaint himself with the nature and position of the Works to
be executed and no claim for extras will be considered on account of lack of knowledge in this
respect.
A Measurements
Measurements used in preparing these Bills of Quantities have been taken off from
Architectural/Structural drawings of these documents.
Subtotal Page 1 Carried to Collection

Any un authorised alteration or qualification made to the text of these Bills of Quantities will be
ignored.
The Bills of Quantities shall under no circumstances be used for the purpose of ordering materials.
The Contractor shall make his own computations for purposes of ordering materials.

B Drawings

The Works are to be executed in accordance with the drawings referred to in these tender documents
together with any drawings which may be required in amplification or amendment thereof.

Therefore the Contractor shall be deemed to have examined the drawings before tendering and to
have satisfied himself regarding the nature and extent of the works and the method of construction
involved. No claim arising out of misinterpretation in any respects will be entertained.

C Samples

The Contractor shall furnish at the earliest possible opportunity before work commences and at his
own cost any samples of materials or workmanship that may be called for by the Project Manager
for his approval or rejection until such samples are approved by the Project Manager and such
samples when approved shall be the minimum standard for the work to which they apply.

The Contractor shall also provide Samples of finished work (mock-ups) which shall be deemed to
D include: -
(a) Making the samples with material identical to those to be used in the Works.
(b) Making samples under the same conditions as those likely to exist during the construction of
the Works.
(c) Maintaining and protecting approved samples
(d) Remove the samples when no longer required by the Project Manager.

E Rejected Workmanship or Materials


Any workmanship or materials not complying with specific requirements or approved samples or
which have been damaged, contaminated or have deteriorated, must be immediately removed from
the site and replaced at the Contractor's expense when required.
Subtotal Page 2 Carried to Collection
A Discrepancies in descriptions

The Bills of Quantities are to be priced according to the descriptions contained in the items and the
relevant drawings and notes thereon and Specifications. In the event of discrepancies appearing
between these descriptions or any drawing and specifications issued with tenders, the drawings and
notes thereon shall take precedence for the purpose of pricing.

B Pricing Preliminaries

The Contractor shall price out individually and in detail all the items carrying a monetary value in
this and any other section of the Bills for Quantities as required and under no circumstances will
lump sums be allowed unless otherwise stated to the contrary in the tender documents. Any item
not priced either in the Preliminaries Bill or elsewhere in the Bills of Quantities, will be deemed to
have been allowed for in the prices inserted against other items in the Bills of Quantities.

C Materials for the Works


The Contractor will be entirely responsible for obtaining all materials required for the Works,
whether local or imported and for, paying all costs and charges necessary, including all ordering,
shipping or air freight, clearance, transport to site, intermediate storage, and storage on site,
insurance, security, documentation, licenses, national and international taxes, etc.,
The Contractor must obtain the The Project Manager's approval and directions regarding the use of
any materials found on site.

D No exemption from duty and other tax payments

The prices tendered by the Contractor shall include all customs duties, import duties, business taxes,
income and other taxes that may be levied according to the laws and regulations in being in Uganda
as of the date 28 days prior to the closing date of submission of tenders on the Construction Plant,
materials and supplies (both permanent, temporary and consumable) acquired for the purpose of the
contract and on the services performed under the Contract. Nothing in the Contract shall relieve the
Contractor from his responsibility to pay any tax that may be levied in Uganda on profits made by
him in respect of the Contract.

E Legally demandable taxes


The Contractor shall allow for making any legally demandable payments due in respect of works
and hoardings, and of workpeople employed by him to Local or Central Government Authorities
and bodies.
Subtotal Page 3 Carried to Collection -

A Legally demandable taxes

The Contractor is to allow for Value Added Tax (VAT) at 18% of the Grand Summary at the end of
Bills of Quantities.

B Import Licenses

The Contractor will be entirely responsible for obtaining all import licenses and other documents
required by the regulations of the Government of Uganda.

C Procedure
The Contractor shall proceed with the works in such a manner as to qualify for payment at a
particular stage as per the Activity Payment Schedule.

D Preparation of Site, Works etc.

The Contractor shall allow for all necessary preparation of the Site, Works and materials prior to
commencement of construction. The Contractor shall allow for any necessary site clearing
including removal of rubbish and refuse and preparation of construction all in accordance with the
Project Manager's Instructions. No claims for extras in respect of expenses involved in opening up
and preparing the site and works for construction will be allowed and the Contractor must satisfy
himself as to the extent of the work involved. item 1,000,000 -

E Programme and Progress

The Contractor shall furnish to the Project Manager for approval and display in the site offices, a
Programme and Progress Chart devised in such a way that the lined programme is shown and
progress can be marked up as the work proceeds. The Contractor shall keep this chart up to date at
all times item 1,000,000 -

F Progress Photographs
The Contractor shall display at least (5) five progress photographs of appropriate sizes of the
completed works on a board fixed in the Site Meeting Room taken once every month by an
automatic Camera with time recording facility throughout the duration of the Contract.Including
other photos per site to be submitted as part of claim for payment for finished stage works. item 1120000 -
G Blasting

Blasting will only be allowed with the express permission of the Project Manager and in accordance
with any Government Regulations currently in force or other conditions set by the Project Manager.
Subtotal Page 4 Carried to Collection -
A TESTING
(a) General
Allow for expenses in connection with the testing of materials as required by the Project Manager
including the supply and preparation of materials to be tested, the cost of materials and their packing
and conveyance to the nearest approved testing laboratory. item 700000 -
(b) Concrete Tests
Allow for making all necessary concrete test cubes and testing at an approved laboratory. item 405000 -

One copy of the test cube report shall be forwarded direct to the Project Manager by the Laboratory
officials.
An accurate record of all test cubes taken and crushed must be kept on site.

B Payment for Materials on Site


There will be NO payment for materials on site.
Payment will be as per the Activity payment schedule for completed works at each stage.

C Priced Bills of Quantities


All items in these Bills of Quantities must be priced. No alterations of quantities or descriptions
made by the bidder will be allowed
Should the priced Bills of Quantities of the bidder show arithmetical errors in pricing (after a
complete technical and mathematical check) the difference between the bid figure and the correct
figure shall be computed so that the corrected figure shall be taken and maintained as the bid
amount.

D Working and Storage Space


The Contractor will be restricted to within the boundaries of the site for all operations.

The Contractor shall obtain the approval of the responsible Local authority for the siting of all
temporary buildings, access roads and paths, storage area for materials and spoil heaps. item 800000 -
E Visitors to the Site
The Contractor is required to control all visitors to the site and to keep out unauthorized persons and
shall provide a visitor's book where all authorised persons sign therein. item 50000 -
F Site Instruction book
The contractor shall provide a triplicate site instruction book per site. item 63000 -
Total Carried to Collection -

A GENERAL MATTERS
Tools and Plant
The contractor shall provide all necessary tools and equipment and other requisites necessary for the
proper execution of the Works. item 1000000 -

Allow for removing and reinstating, adapting from time to time as may be necessary and
maintaining all plant and equipment during the course of the Contract.

The Contractor is to provide everything necessary for the proper execution of the works according to
the true intent and meaning of Drawings, etc., whether the same may or may not be particularly
shown on the drawings or described in the Bills of Quantities provided that the same is reasonably to
be inferred there from.

B Safety, Health and Welfare of Work people

The Contractor shall allow for providing for the safety, health and welfare of work people and for
complying with any relevant Ordinances, Regulations or Union Agreement and the safety
requirements for working on Construction sites in accordance with the Conditions of Contract. LS 500000 -
C Occupational Health and safety, including Covid-19 prevention and response.

The contractor shall ensure so far as reasonably practicable,the health,safety and welfare at work for
his/her employees including those of his/her sub contractors and all other persons on site.
The contractor,among others,shall provide:-
(i) Protective clothing,equipment,etc for workers and visitors LS 1155000 -
(ii) Safe access to all places on site( Signage, Hoarding etc) LS 400000 -
(iii) Appropriate sanitation LS 420000 -
(iv) First Aid Kits. LS 336000 -
(v) Provisional sum of money for condoms for the whole period of contracts LS

The contractor shall report accidents,manage contagiuos diseases and reduce occupational health
hazards as required by the statutes and other regulations in place.
(v) Foot operated handwashing facility LS 500000 -
(vi) Provision of adeqaute and standard face masks as per MOH specifications, throughout contract
period (Workers & Visitors) LS 210000 -

(vii) Provision of temperature gun to regularly temperature of all person accessing the site
throughout the contract period. LS 420000 -

Provisional sum money for geotecnical design (Ugx 10,000,000 (Shillings Ten Million shillings
D only) LS 10000000 -
Subtotal Page 6 Carried to Collection -
A ENVIROMENTAL AND SOCIAL SAFEGUARDS COMPLIANCE
The Contractor MUST comply with the Enviromental and Social Safeguards issues as described in
the Enviromental social Management Plan as detailed in the attached Project briefs.
Stormwater management LS 2000000 -
Landscaping and Restoration of vegetation (grass planting and walk ways deign & construction) LS 800000 -
Control of dust and noise pollution LS 500000 -
Management of site waste (debris , spoil heap & collection bin construction for use by the
contractor, 2000mmx3000mmx1000mm high constructed in ordinary burnt clay brick and cement
sand mortar) LS 600000 -

In case of road works extra measures ( Restoration of burrow pits, establishment of access slabs and
culverts, Management of dust through water sprinkling, plus traffic management which includes;
diversions and safety signage).
Occupation certificate -

B Holidays and Transport for Work people


The Contractor shall allow for providing holidays and transport for work people and for complying
with any relevant Ordinances, Regulations or Union Agreement N/A
C Protection of Works and Persons

The Contractor shall allow for protection of his own and his Sub-Contractor's work liable to
damage, including provision of temporary roof, gutters, drains etc., if necessary and shall case-up,
cover, or in other suitable ways protect all finished work liable to injury, to the satisfaction of the
Projec Manager until completion of the Contract. -

From the beginning to the completion of the Works, the same shall be under the entire care and
control of the Contractor, who shall take all possible precautions to prevent any nuisance,
inconvenience or injury to the holders or occupiers of surrounding properties and to the public
generally and shall at all times keep all paths and roads affected by the works in safe and clear state,
and shall use proper precautions to ensure the safety of all wheeled traffic and pedestrians. The
Contractor shall allow for providing all watching, lighting, barriers, covering open trenches and
protection of the works including sub-contract works, asmay be necessary for the safety of the
works and the existing buildings and for the protection of the public and his own and Sub-
Contractors' employees. LS 1000000 -
Subtotal Page 7 Carried to Collection -
In the event of any damage or loss occurring to the works, or to materials or to any sewers, gullies,
drains, paths or other works on site in temporary possession of the Contractor for the purpose of this
Contract, either from the weather, want of proper protection, defects, theft, insufficiency of the
Works, or any other cause whatsoever during the progress of the Works, or for any accident or
damage to property or persons by reason of the said works, the Contractor alone shall be responsible
and shall without extra charge make good all damage and pay all costs incurred.

A Police regulation
The Contractor shall allow for complying with any relevant Police regulations including vehicular
traffic management on adjacent roads.

B Water for the Works

The Contractor shall allow for providing all temporary clear water supplies required for the Works
together with all necessary storage tanks and distribution systems for the same and must allow for
bearing all expenses incurred and paying for all water consumed. item 3500000 -

C Lighting and Power for the Works


The Contractor shall allow for providing all temporary lighting and power supplies required for the
Works together with all necessary distributions for the same and must allow for bearing all expenses
incurred and paying for all power consumed. item 3000000 -

D Crossing and Temporary Roads


The Contractor must allow for providing, forming and maintaining necessary crossings on to the site
and temporary roads as may be required by the Project Manager, removing same at completion and
making good damaged or disturbed surfaces as directed by and to the approval of the Project
Manager. N/A

E Contractor Site Offices


The Contractor shall allow for erecting and maintaining a site office for the use by his own site
staff.The office shall be sufficiently large enough with a sitting capacity of not less than 20No
people to enable holding of site meetings.The contractor must also allow for provision and
maintaining a lockable office complete with a desk,chair and cupboard for the sole use of a Clerk of
Works.At the end of the project,the contractor shall remove all and the used property shall be
handed over to the Employer. N/A

F Site Meetings
The Contractor shall provide the necessary logistical requirements for site meetings to review
progress and handle any matters arising from the construction works at a frequency not less than
once a month. Participants shall be relevant Contractors district officials, CPMCs and Sub County
Officials LS 2240000 -
G Stores for Materials etc.
The Contractor shall provide, erect and maintain on the site, in such positions as may be directed, item 3100000
ample temporary watertight lock-up sheds or buildings which are necessary for himself and his Sub-
Contractors for the proper storage and protection of materials liable to damage and shall remove the
same on completion and make good all surfaces disturbed.
-
Subtotal Page 8 Carried to Collection -
A Sanitation of the Works
The Contractor shall allow for providing the necessary latrines for the labour employed on the
Works, including labour employed by Sub-Contractors, to the satisfaction of the Health and Medical
Authorities and for maintaining the same in a thoroughly clean and sanitary condition and paying all
conservancy fees. item 4300000 -
The Contractor shall allow for removing the said latrines, filling pits with hardcore and murram and
leaving the ground clean, free from pollution upon completion of the Works to the satisfaction of the
Health and Medical Authorities.

B Workmen's accomodation
NO site accomodation for workers shall be permitted. -

C Hoarding and Screening


The Contractor shall allow for providing all necessary iron sheet hoarding, around the site with a
lockable gate for entrance/exit. item 8000000 -

The Contractor shall allow for thoroughly maintaining all such protective and other devices
throughout the contract and clearing away and handing over to the Employer including making good
disturbed ground on completion.

D Scaffolding
The Contractor shall allow for providing, erecting and dismantling all general scaffolding required
for the Works. The Contractor must allow here or in his rates for providing all special scaffolding
required by his Sub-Contractors carrying out works. item 2500000 -

E Setting out
The setting out for the buildings shall be done under the supervision of the Clerk of Works/District
Engineer. item 2208180 -
F Site Administration and Security

The Contractor shall provide and maintain an administrative personnel on site who shall provide and
maintain appropriate security for proper protection of the Works, materials and plant at the site. -
G Engraving/Labelling of the new buildings.
The Contractor shall allow for engraving of respective blocks in cement:sand mortar block size
500mm x 400mm x 15mm thick.To the Project Manager's approval. LS 1500000 -
Subtotal Page 9 Carried to Collection -

A Existing Services

The Contractor shall ascertain from the relevant authorities and by investigation, the exact location
of existing services including telephone, electricity, water supply, sewer line and storm water
drainage. The contractor shall make provision to the Authority concerned or as the Project Manager
may deem necessary for the proper protection of such services. Any damage or disturbance of such
services shall be reported to the relevant authority and to the Project Manager and shall be made
good to their satisfaction at the Contractor's expense. N/A

The Contractor shall allow for any expense involved in the diversion of electric cables, telephone
lines, water pipes, public sewer and storm water drainage etc., that may be required during the
execution of the Contract.

B Maintenance of Public and Private Roads

The Contractor is to allow for maintaining all public and private roads in the vicinity of the site and
to pay for or make good any damages caused to roads, kerbs, surface water drainage etc., occasioned
by heavy traffic, delivery of materials and building operations generally to the entire satisfaction of
the Projec Manager and the Local Authority and shall be responsible for observing any bye-law or
authority regarding keeping the road free from mud, filth etc., arising out of the execution of the
Works. N/A

C Removing Rubbish and Clearing


The Contractor must allow for removing and clearing away all surplus excavated materials, rubbish, item 615000
unused materials and plant both during and at the completion of the Works and shall leave the whole
of the site and Works in a clean and tidy state to the satisfaction of the Projec Manager including
clearing away and making good all traces of temporary acces roads, offices, sheds, camps etc., if
any. Particular care shall be taken to leave clean all floors, windows and doors and to remove all
paint and cement stains, clean down external faces, wash off stains to faced work, flush out
plumbing installations and drain runs. The Contractor is to find his own tip/dump and shall pay all
charges in connection therewith.
-
D Signboard

The Contractor shall make and erect a signboard in accordance with the Architects detailed drawing. LS 2000000 -

A Liability for Defects


Defects, shrinkage or other faults which are attributed by the Project Manager to work executed
under this Contract shall be made good by the Contractor at his own cost. N/A
Subtotal Page 10 Carried to Collection -
B Works to be delivered clean

On completion of the Contract, the site and the Works shall be cleared of all plant, scaffolding,
temporary structures, rubbish and unused materials and shall be delivered up clean and in perfect
condition in every respect to the satisfaction of the Project Manager. Particular attention is to be
paid to leave all windows, doors, floors, walls and fittings clean and removing all paint and cement
stains, including unblocking gutters, drains and channels. N/A

C Occupation Certificate
The Contractor shall apply for and obtain the Occupation Certificate from the Local Authority at the
completion of the Contract in accordance with the conditions laid down in the current bye-laws of
the Local Authority and shall pay all expenses connected thereof. LS 850000 -

D Contract Conditions
The Contractor shall provide and maintain the following Insurance Policies and Performance
Security in accordance with the Contract:
(i) Insurance of the Works,Plant and Materials against loss or damage.

(ii) Insurance of other property against loss or damage. -

(iii) Insurance against personal Injury or death of third parties and workmen in connection with the
Contract. -

(iv) Acceptable Performance Security. -

Allow for any other item necessary for the proper execution of the works and not listed in the items
above ( Please Provide a detailed List below)

Subtotal Page 11 Carried to Collection -

COLLECTION

A Page 1 of 12 -

B Page 2 of 12 -

C Page 3 of 12 -

D Page 4 of 12 -

E Page 5 of 12 -

F Page 6 of 12 -
G Page 7 of 12 -

H Page 8 of 12 -

J Page 9 of 12 -

K Page 10 of 12 -

L Page 11 of 12 -

TOTAL CARRIED TO GRAND SUMMARY -


Item Description UNIT QTY RATE AMOUNT

BILL NO. 2 : GENERAL WARD PALABEK KAL


HEALTH CENTRE III

SUMMARY

1.00 SUBSTRUCTURE -

2.00 ROOF STRUCTURES -

3.00 EXTERNAL WALLS -

4.00 WINDOWS & EXTERNAL DOORS -

5.00 INTERNAL WALLS & PARTITIONS -

6.00 INTERNAL DOORS -

7.00 INTERNAL FINISHINGS -

8.00 FITTINGS & FURNISHINGS -

9.00 MECHANICAL INSTALLATION -

10.00 ELECTRICAL INSTALLATION -

11.00 RAIN WATER HARVESTING TANK -

SUBTOTAL -
Item Description UNIT QTY RATE AMOUNT
TOTAL GENERAL WARD TO GENERAL
SUMMARY -
ELEMENT NO 1
SUBSTRUCTURE
(All Provisional)
Site Preparation

Excavate oversite to remove top soil average 150mm


1.01 thick and remove from site. m2 6,000 -

Treat surface of subsoil or fillings and surroundings with


approved chemical anti-termite solution: provide ten
1.02 year guarantee. m2 3,600 -

Excavation and Earthworks.


Note: Rates for excavation to include for keeping
excavations free from water and planking and strutting
to sides of excavations

1.03 Excavate to reduce levels and remove from site. m3 28,000 -

Excavate trenches for wall foundations and column


bases: commencing from reduced levels : not exceeding
1.04 1.5m deep . m3 25,000 -

1.05 Extra over excavation for excavating in rock m3 32,000 -

Disposal of excavated material


Selected excavated material in filling to foundation
trenches : around walling : placed in 200mm layers :
1.06 watered and compacted to 95% MDD m3 15,600 -

1.07 Remove surplus excavated material from site m3 15,000 -

125mm Murram filling : well watered and compacted to 95%


1.08 MDD 95% : to make up levels under floor bed m³ 30,000 -

Hardcore
150mm Filling : deposit, spread, level and compact :
1.09 25mm selected quarry dust blinding. m2 22,500 -

Insitu concrete class 15/ 20mm aggregate as described.


1.10 Foundations in trenches m3 458,000 -

100mm thick reinforced ground floor slab tamped to


1.11 fabric reinforcement. m2 45,800 -

Reinforcement
Mesh reinforcement Ref No. A98 size 200 x 200 mm
weighing 1.54 kg per square metre: in floor slab:
1.12 including all necessary supports m2 13,400 -
Item Description UNIT QTY RATE AMOUNT

Subtotal 1 Substructures carried to collection -


Sawn formwork as described to:
Vertical edges of surface bed : over 75mm but not
1.13 exceeding 150 mm high. m 4,500 -

Brickwork in burnt clay bricks with cement and sand


(1:3) mix, laid in suitable bond, with 25 x 3mm hoop
iron strips laid horizontally every alternate course.
1.14 230 mm thick walling. m2 96,000 -
Sundries

One layer 1000 gauge polythene sheet damp proof


1.15 membrane : Under bed : 300mm laps. m2 5,700 -

Damp proof courses : hessian based bituminous felt:


bedded in cement and sand (1:4) mortar : 300mm laps.

1.16 Horizontal : 230mm m 4,000 -


1.17 Ditto 150mm thick wall m 3,000 -
Plinth wall, ramp and splash apron
1.18 50mm Thick bed of sand on compacted ground. m2 6,800 -

15mm Thick cement and sand plaster to plinth walls


1.19 with wood float finish. m2 11,000 -

125mm (average) thick concrete class 15/20mm


aggregate ramp reinforced with and including formwork
and fabric mesh reinforcement ref A98 as before
1.20 described m2 75,000 -

1.21 Ditto but 75mm thick concrete splash apron ditto m2 53,000 -

Ditto concrete ramp beam size 60 x 80mm deep with and


including necessary excavations, formwork and disposal
1.22 of surplus soil. m 48,000 -
1.23 Ditto splash apron beam size 100 x 150mm deep ditto m 55,000 -

25mm thick cement and sand (1:3) paving on splash


1.24 apron wood float finish m2 16,500 -

Supply and fix the following terrazzo : mechanically


polished and finished smooth: including plastic division
strips at 2000mm centres. 15mm thick paving on splash
1.25 aprons m2 80,000 -
Item Description UNIT QTY RATE AMOUNT
Prepare and apply three coats of black bituminous paint
1.26 to plastered surfaces. m2 17,000 -

Subtotal 2 Substructures carried to collection -


Note: Rates for excavation to include for keeping
excavations free from water and planking and strutting
to sides of excavations
Excavate for column bases: commencing from reduced
1.27 levels : not exceeding 1.5m deep . m3 25,000 -

Selected excavated material in filling to foundation


1.28 trenches as before described. m3 15,600 -

1.29 Remove surplus excavated material from site m3 15,000 -

Blockwork built in cement and sand (1:3) mix, laid in


suitable bond, with 25 x 3mm hoop iron strips laid
horizontally every alternate course.
1.30 200 mm thick walling. m2 87,500 -

Insitu concrete class 20/ 20mm aggregate as described.

1.31 50mm thick blinding to foundations and column bases m2 27,500 -


Insitu concrete class 20/ 20mm : vibrated reinforced as
described.
1.32 Column Bases m3 550,000 -
1.33 Columns m3 550,000 -
1.34 Groundbeams m³ 550,000 -

1.35 Raft foundation m3 550,000 -


Mild steel rod reinforcement as described.
1.36 8 mm diameter bar kg 7,400 -

High yield tensile steel bar reinforcement to BS 4449


as described including cutting to lengths, bending,
hoisting and fixing including all necessary tying wire
and spacing blocks.
1.37 12 mm diameter bar kg 7,400 -
Sawn formwork as described to
1.38 Sides of Column bases m2 30,000 -

1.39 Sides of Columns m2 30,000 -

1.40 Sides of ground beams and raft foundation m2 30,000 -

Subtotal 3 substructures carried to collection -


COLLECTION

Subtotal 1 -
Item Description UNIT QTY RATE AMOUNT
Subtotal 2 -

Subtotal 3 -

TOTAL SUBSTRUCTURE TO SUMMARY -


ELEMENT NO. 2 ROOF

Insitu concrete class 20/16mm : vibrated, reinforced as


described

2.01 Ring beams m3 550,000 -

Mild steel reinforcement as described including cutting


to lengths, bending, hoisting and fixing including all
necessary tying wire and spacing blocks.

2.02 8 mm diameter bar kg 7,400 -

High yield tensile steel bar reinforcement to BS 4449


as described including cutting to lengths, bending,
hoisting and fixing including all necessary tying wire
and spacing blocks.
2.03 12 mm diameter bar kg 7,400 -
Sawn formwork as described to:

2.04 Sides and soffites of beams m2 30,000 -

Blockwork built in cement and sand (1:3) mix, laid in


suitable bond, with 25 x 3mm hoop iron strips laid
horizontally every alternate course.

2.05 230mm Thick gable walling m2 98,000 -

Finishes

Cement and sand (1:4) render on concrete or masonry

2.06 15mm to walls m2 11,000 -

Two coats tyrolene rendering on:

2.07 Concrete or masonry m2 4,000 -

Roof structure works

The following in roof construction including hoisting


and fixing approximately 3.0mm above ground level.
Item Description UNIT QTY RATE AMOUNT
Structural steel angle sections in trusses welded and
jointed with gusset plates and bolts

The following in 14No. Trusses of 9.80m span by


1.50m rise

Subtotal 1 Roof Carried to colllection -


Purlins
2.08 100 x 50 x 2mm zed purlins kg 12,000 -
The following in 12No. Trusses (T1) of 6.80m span by
1.403m Rise

2.09 50 x 50 x 6mm angle internal members kg 12,000 -

2.10 60 x 60 x 6mm angle tie beam kg 12,000 -

2.11 Ditto: rafters kg 12,000 -


The following in 2No. Trusses (T2) of 5.30m span by
1.403m Rise
2.12 50 x 50 x 6mm angle internal members kg 12,000 -
2.13 60 x 60 x 6mm angle tie beam kg 12,000 -
2.14 Ditto: rafters kg 12,000 -

The following in 1No. Trusses (T3) of 5.3m span by 1.43m


Rise

2.15 50 x 50 x 6mm angle internal members kg 12,000 -

2.16 60 x 60 x 6mm angle tie beam kg 12,000 -

2.17 Ditto: rafters kg 12,000 -

Purlins
2.18 16mm diameter 300mm long anchor bolts and nuts. No 25,000 -

2.19 220x120mm baseplates No 60,000 -

Roof Covering
IT4 sheets
Eaves

2.20 25 x 225mm Wrot Cypress fascia board m 30,000 -

Fascia &Barge board

225 x 1.5mm thick mild steel fascia boards welded to angle


2.21 cleats at rafter ends to detail m 12,000 -

2.22 Ditto barge board m 12,000 -

Knot prime stop and apply three coats of gloss oil paint
to timber surfaces.
Item Description UNIT QTY RATE AMOUNT
Knot, prime, stop and apply three coats of gloss oil paint
2.23 to wood fascia 200-300mm girth. m 4,000 -

Roof Vents.
Roof Vents size 230 x 460mm high filled with Kajjansi
ventilation bricks and bat proof netting complete with all
2.24 necessary timber framing. no 12,000 -

Subtotal 2 Roof Carried to colllection -

Roof coverings

26 Gauge pre-coated galvanised iron roofing sheets


in ordinary corrugations fixed: 1 1/2 corrugations
side laps: fixed to steel purlins (m/s) with galvanised
iron drive screws with washers.

2.25 Roof covering SM 52,000 -

2.26 Matching ridge caping LM 30,000 -

2.27 Matching valley gutters LM 45,000 -

Subtotal 3 Roof Carried to colllection -

COLLECTION

Subtotal 1 -

Subtotal 2 -

Subtotal 3 -
Item Description UNIT QTY RATE AMOUNT

TOTAL ROOF CARRIED TO SUMMARY -


ELEMENT NO. 3 EXTERNAL WALLS

Blockwork built in cement and sand (1:3) mix, laid in


suitable bond, with 25 x 3mm hoop iron strips laid
horizontally every alternate course.

3.01 200mm thick walling. m2 98,000 -


Precast concrete louvre block walling in cement sand
mortar (1:3) with pointed joints to approval.

3.02 200mm thick walling m2 87,500 -

Permanent Vents
Permanent Vent filled in with Kajjansi ventilation bricks and
bat proof gauze and coffee tray wire backing complete with
3.03 necessary timber framing and beading. m2 90,000 -

Metal work
100mm diameter x 3100mm galvanised iron class B pipe
support with bottom end welded to 110 x 110 x 6mm thick
plate set in and including concrete (1:3:6) base size 200 x 200
x 200mm deep and 100 x 80 x 6mm U-plate welded on top
3.04 end no 220,000 -

12mm diameter bolt with nut and washer including drilling 2


3.05 No. 14mm diameter holes no 25,000 -

Cement and sand ( 1:4) render trowelled smooth on


concrete or masonry
3.06 15mm to walls. m2 11,000 -

Two coats tyrolene rendering on:


3.07 Concrete or masonry m2 4,000 -
Painting : 'Sadolin Paints' or equal and approved.
Prepare and apply one undercoat and two finishing coats matt
3.08 vinyl paint on plastered surfaces generally m2 20,500 -

Prepare and apply three coats gloss oil paint on steel pipe
3.09 support 200-300mm girth m 4,000 -

Insitu concrete class 20/16mm : vibrated, reinforced as


described
3.10 Columns m3 550,000 -
Item Description UNIT QTY RATE AMOUNT
Mild steel rod reinforcement as described including cutting
to lengths, bending, hoisting and fixing including all
necessary tying wire and spacing blocks.

3.11 8 mm diameter bar kg 7,400 -


High yield tensile steel bar reinforcement to BS 4449 as
described including cutting to lengths, bending, hoisting
and fixing including all necessary tying wire and spacing
blocks.

3.12 12 mm diameter bar kg 7,400 -

Sawn formwork as described to


3.13 Sides of Column m2 30,000 -

TOTAL EXTERNAL WALLS TO SUMMARY -


ELEMENT NO. 4 WINDOWS & DOORS
Concrete Work
Precast concrete Class 25/12mm lintel reinforced with 4No.
12 mm high tensile steel bars and 8mm steel stirrups at 200
mm centres and including all necessary formwork and
hoisting and fixing in position.
4.01 150 x 230 mm high m 75,000 -
Precast concrete Grade '30' units reinforced as necessary
and finished fair face on all exposed sides.
4.02 75 x 285 mm sunk weathered and throated window cill m 36,500 -

Purpose made steel casement windows manufactured from


standard W30 sections: manufacture, assemble and deliver
to site : Supply and fix ironmongery comprising approved
hinges, pivoting mechanisms, stays, fasteners to opening
lights: plugged and screwed or built into walling : one coat
red oxide primer before delivery.

Window type W1 : Size 1500 x 1200mm overall height: 2No.


side hung opening lights size 500 x 1200mm high : 1 No.
fixed middle light size 500 x 1200mm high complete with
burglar proofing grille compromising of 12mm bars 150mm
4.03 centres to centres. no 468,000 -
4.04 Window type W6 : Size 1500 x 900mm overall height. no 351,000 -
4.05 Window type W2 : Size 1500 x 600mm overall height. no 234,000 -
4.06 Window type W3 : Size 600 x 600mm overall height. no 93,600 -
4.07 Window type W5 : Size 1200 x 900mm overall height. no 280,800 -
4.08 Window type W4 : Size 600 x 750mm overall height. no 117,000 -

Burglar proofing made of standard and straight square


bars, 12mm welded to form webb, placed 150mm c/c both
ways, welded and primed before delivery to site.
Item Description UNIT QTY RATE AMOUNT

Window type W1 : Size 1500 x 1200mm overall height: 2No.


side hung opening lights size 500 x 1200mm high : 1 No.
fixed middle light size 500 x 1200mm high complete with
burglar proofing grille compromising of 12mm bars 150mm
4.09 centres to centres. no 291,600 -
4.10 Window type W6 : Size 1500 x 900mm overall height. no 218,700 -
4.11 Window type W2 : Size 1500 x 600mm overall height. no 145,800 -
4.12 Window type W3 : Size 600 x 600mm overall height. no 58,320 -
4.13 Window type W5 : Size 1200 x 900mm overall height. no 174,960 -
4.14 Window type W4 : Size 600 x 750mm overall height. no 72,900 -

Purpose made steel casement doors manufactured from


Standard W20 Sections: manufacture, assemble and deliver
to Site: Supply and fix approved hinges: plugged and
screwed or built into walling: one coat red oxide primer
before delivery.
Door size 1500 x 2400mm high overall; 300mm high louvred
vents: 2100 mm high door in two opening leaves one 900mm
4.07 and other 600mm wide (D1). no 1,519,200 -
Door size 900 x 2100mm high overall; 2100 mm high door
in two opening leaves one 900mm and other 600mm wide
4.08 (D4). no 797,580 -

Internal Semi solid core flush doors complete frames all


in wooden door frames (220x40mm) complete with
approved door locks

Door size 1500 x 2650mm high overall; 300mm high louvred


vents: 2100 mm high door in two opening leaves one 900mm
and other 600mm wide with vision pannel (D3), double
4.09 swing doors no 2,036,970 -

Subtotal 1 Windows and Doors -


Door size 1500 x 2650mm high overall; 300mm high louvred
vents: 2100 mm high door in two opening equal opening
4.10 leaves (D2) double swing door no 2,036,970 -

Door size 900 x 2650mm high overall; 300mm high louvred


4.11 vents: 2100 mm high single leaf door (D5). no 1,337,934 -

Ironmongery

Supply and fix the following ironmongery of "UNION"


Manufacture and to Architects approval complete with
matching fixings to hardwood or steel

4.12 25mm Rubber door stop plugged to wall or floor. no 22,000 -

4.13 3 Lever Steel door lock complete with lever furniture no 134,000 -

Glass and Glazing

4.14 5mm thick clear sheet glass to metal with putty m2 140,000 -

Painting
Item Description UNIT QTY RATE AMOUNT
Prepare touch up primer and apply one undercoat and two
finishing coats of gloss oil paint : on metalwork.

4.15 Glazed metal surfaces m2 13,500 -

4.16 Burglar proofing grilles m2 13,500 -

Subtotal 2 Windows and Doors -

COLLECTION

Subtotal 1 -

Subtotal 2 -

TOTAL WINDOWS AND DOORS TO SUMMARY -


ELEMENT NO. 5
INTERNAL WALLS & PARTITIONS

Brickwork in burnt clay bricks with cement and sand


(1:3) mix, laid in suitable bond, with 25 x 3mm hoop
iron strips laid horizontally every alternate course.

5.01 200mm Thick walling. m2 75,500 -

5.02 150mm thick walling m² 59,100 -

Insitu concrete class 25/20mm : vibrated, reinforced as


described

5.03 Columns m3 634,000 -

Mild steel rod reinforcement as described including


cutting to lengths, bending, hoisting and fixing
including all necessary tying wire and spacing blocks.

5.04 8 mm diameter bar kg 7,400 -


Item Description UNIT QTY RATE AMOUNT

High yield tensile steel bar reinforcement to BS 4449


as described including cutting to lengths, bending,
hoisting and fixing including all necessary tying wire
and spacing blocks.

5.05 12 mm diameter bar kg 7,400 -

Sawn formwork as described to

5.06 Sides of Column m2 30,000 -

TOTAL INTERNAL WALLS & PARTITIONS TO


SUMMARY -
ELEMENT NO. 6 INTERNAL DOORS

Concrete Work

Precast concrete Class 25/12mm lintel reinforced with 4No.


12 mm high tensile steel bars and 8mm steel stirrups at 200
mm centres and including all necessary formwork and
hoisting and fixing in position.

6.01 200 x 200 mm high m 78,000 -

Solid core flush doors: 6mm thick internal quality plywood


facing both sides: hardwood lipping to all edges.

Door size 900x2650mm high overal; Solid core mahogany


6.02 veneered flush door on Steel frames frames (D5) no 954,954 -

Door size 800x2650mm high overal; Solid core mahogany


6.03 veneered flush door on Steel frames frames (D6) no 848,848 -

Door size 800x2100mm high overal; Solid core mahogany


6.04 veneered flush door on Steel frames frames (D7) no 672,672 -

Wrot Mahogany : Selected and kept Clean

6.05 25 x 50mm Architrave: two labours m 5,200 -

6.06 50 x 230mm Door frame: two labours m 50,000 -

6.07 50 x 230mm Transome: Ditto m 50,000 -


Item Description UNIT QTY RATE AMOUNT

12mm thick x 100 x 825mm long louvres set and including


6.08 forming 36 No. 12 x 100mm wide grooves m 60,000 -

Ironmongery
Supply and fix the following ironmongery of "UNION"
Manufacture as described.

6.09 Butt Hinges, 75 x 100mm : finished stainless steel. prs 58,500 -

6.10 25mm Rubber door stop plugged to wall or floor. no 22,000 -

6.11 Double barrel, double action spring hinge : frame mounted prs 215,000 -

6.12 3 Lever rebated Dead lock ditto no 75,000 -

6.13 Briton 3000 series' Overhead' door closers no 325,000 -

6.14 3 Lever Mortice Lock complete with lever furniture no 134,000 -

6.15 3 Lever rebated Mortice lock ditto no 120,000 -


6.16 150 x 300mm Aluminuim push plate no 134,000 -
Glass and Glazing
6mm Thick x 200 x 300mm high clear sheet glass vision
6.17 panel fixed with and including 19 x 25mm timber beading. no 3,000 -

Subtotal 1 Internal Doors Carried to Collection -

Prepare Knot, Prime, stop and apply three coats of


gloss oil paint : on woodwork

6.18 General Surfaces : doors m2 13,500 -

6.19 Ditto: over 200 but not exceeding 300mm girth m 4,200 -

Ditto not exceeding 100mm girth (Architraves and


6.20 Louvres). m 2,000 -

6.21 Prime back of frame before fixing m 3,100 -

Subtotal 2 Internal Doors Carried to Collection -

COLLECTION
Item Description UNIT QTY RATE AMOUNT
Subtotal 1 -

Subtotal 2 -

TOTAL INTERNAL DOORS TO SUMMARY -


ELEMENT NO. 7 INTERNAL FINISHES
Floor Finishes

Supply and fix the following terrazzo : mechanically


polished to finished smooth : including plastic division
strips at 2000mm centres.

25mm thick cement sand screed cast and ready to receive


7.01 terrazzo measurely seperately. m2 16,500 -
7.02 15mm Thick terrazzo m2 80,000 -

Provide for screed in cement sand mortar (1:3) finished rough


7.03 and ready to receive terrazzo. m² 16,500 -
25 x 100mm skirting with square top edge and coved junction
7.04 at bottom. m 2,000 -
Wall Finishes
7.05 15mm thick to Lime plaster, steel trowell finish to walls. m2 16,000 -

150 x 150 x 6mm thick glazed wall tiles: bedded on and


including cement and sand (1:4) backing: grouted, jointed
and pointed in white cement.
7.06 Tiling to walls m2 125,000 -

Painting : 'Sadolin Paints' or equal and approved.


Item Description UNIT QTY RATE AMOUNT
Prepare and apply one undercoat and two finishings coats of
7.07 matt vinyl paint to plastered surfaces. m2 20,500 -
Ceiling Finishes
9 x 24 SWG galvanized expanded metal lathing U-nailed to
7.08 timber branderings m2 50,000 -
7.09 Cement and sand (1:4) pricking course to metal lathing m 2
16,000 -

Ceiling board
Supply and fix gypsum plaster board ceiling 12mm thick on
ceiling 50 x 75mm timber branderings and 50 x 100 mm
7.10 joists all at 600mm centres m2 132,000 -

75mm wide concave gypsum cornice: over 100 but not


7.11 exceeding 200mm girth. lm 26,400 -

7.12 Extra for 15 x 150mm thick cement and sand (1:3) cornice m 4,000 -

Pressure impregnated sawn Cypress


7.13 50 x 50mm branderings m 27,000 -

7.14 50 x 100mm joists m 30,000 -


Painting
Prepare and apply three coats of first grade emulsion paint
on:.
7.15 Plastered/softboard ceiling m2 14,000 -
7.16 Cornice : Over 100 but not exceeding 200mm girth. m 3,000 -

TOTAL INTERNAL FINISHES TO SUMMARY. -


ELEMENT NO. 8 FITTINGS AND FIXTURES
Curtain Boxes

Provide aluminum rails all windows complete with fixing


8.01 accessories m 83,385 -

Prepare and apply three coats of polyurethane lacquer: on


woodwork
8.02 General surfaces of pelmet boxes m2 13,500 -

Concrete Bench Seats

75mm Thick reinforced concrete (1:2:4) slab finished smooth


on exposed surfaces with 12mm cement and sand (1:3)
8.03 screed; topped with polished terazzo finished to 13mm thick m2 273,485 -

Concrete (1:2:4) beam size 200 x 185mm deep reinforced


with and including 4 No. Y12 steel bars, R8 links at 200mm
8.04 centres and formwork. m 78,995 -
8.05 Fabric mesh reinforcement ref. A98 laid in slab m 2
13,400 -
8.06 Sawn formwork to soffite of slab m 2
30,000 -
8.07 Ditto edge of slab 75mm high m 2,250 -
Item Description UNIT QTY RATE AMOUNT
25 x 200mm deep hardwood bench back screwed to wall with
8.08 and including three coats clear varnish m 35,400 -

Concrete wall shelving (store)


75mm Thick reinforced concrete (1:2:4) slab finished smooth
on exposed surfaces with 12mm cement and sand (1:3)
8.09 screed. m2 104,485 -

Concrete (1:2:4) beam size 200 x 185mm deep reinforced


with and including 4 No. Y12 steel bars, R8 links at 200mm
8.10 centres and formwork. m 78,995 -

8.11 Fabric mesh reinforcement ref. A98 laid in slab m2 13,400 -

8.12 Sawn formwork to soffite of slab m2 30,000 -

8.13 Ditto edge of slab 75mm high m 2,250 -

Concrete Work top

8.14 100mm thick reinforced concrete (1:2:4) on plinth walls m2 55,000 -

Concrete (1:2:4) beam size 200 x 185mm deep reinforced


with and including 4 No. Y12 steel bars, R8 links at 200mm
8.15 centres and formwork. m 78,995 -

75mm Thick reinforced concrete (1:2:4) slab finished with


8.16 15mm terrazzo finish on exposed surfaces. m2 273,485 -

8.17 Fabric mesh reinforcement ref. A98 laid in slab m2 13,400 -

8.18 Wrot formwork to soffite of slab m2 30,000 -

Subtotal 1 Fittings and Fixtures carried to collection -

8.19 Ditto edge of slab / plinth 75 - 150mm high m 4,500 -


25mm thick blockboard door, shelf, back and base with
8.20 hardwood lipping to exposed edges m2 79,261 -

8.21 25 x 25mm softwood bearer m 3,500 -

8.22 50 x 50mm ditto m 5,000 -

8.23 Approved cupboard lock no 14,000 -

8.24 75mm steel butt hinges prs 14,000 -

8.25 Approved ball catch no 28,491 -

8.26 Ditto pull handles no 21,000 -


Item Description UNIT QTY RATE AMOUNT
Prepare and apply three coats gloss oil paint on wood
8.27 surfaces. m2 13,500 -

8.28 Ditto to frame not exceeding 100mm girth. m 1,350 -

Total Carried to Collection -

COLLECTION

Page 2/17 -

Page 2/18 -

TOTAL FITTINGS & FIXTURES TO SUMMARY. -


ELEMENT NO. 9

MECHANICAL INSTALLATION

Supply, install, connect and set to work the following,


all as described in the Specifications and Drawings.

Sanitary Appliances

White Vitreous China Wash hand basin with 2 tapholes


as ARMITAGE SHANKS, LICHFIELD 46, S2755
(122703S) complete with 12mm pillar taps S7100
(6973400), 38mm plastic domed strainer waste S885067
(90568NOSC), 38mm plastic bottle trap S891567
9.01 (70238Q4SC) or equal approved. no 910,000 -
Item Description UNIT QTY RATE AMOUNT

Supply and install medical sluice sink and install


9.02 complete with waste traps and tap ready to use. no 4,350,000 -
Supply and install 'COTTO' dhobi sink
9.03 (480x620x235mm) (Sterilisation and Delivery room) no 700,727 -

Close coupled washdown WC suite, with P trap, 6litre


cistern, seat and cover and all accessories as Armitage
9.04 Shanks htm64 Wentworth 2 S3161 or equal approved. no 1,050,000 -

Supply and fit overhead shower (LD-1714) system


9.05 complete to clincal bath, gents and ladies rooms no 405,000 -

Water Supply to Appliances

12 mm class B cold water pipe, burried in wall,


clipped to wall, or in duct, complete with all fittings and
9.06 accessories. m 10,000 -

12mm gate valves as Peglar heavy duty or equal


9.07 approved. no 25,000 -

25mm gate valves as Peglar heavy duty or equal


9.08 approved. no 45,000 -

Flexible tubes (stainless steel braid on PVC) for


9.09 connection of appliances, complete. no 13,500 -

Water Supply

38mm PVC heavy gauge pipes complete with bends and


all accessories for WHBs, sinks, in floor, walls, up to
9.10 manholes/Gully Trap . m 10,500 -

External Drainage

110mm PVC heavy gauge pipework burried in the


ground to a fall of 1:60 complete with excavations,
9.11 bedding, backfilling and all accessories. m 29,000 -

Gully Trap (GT) complete with PVC trap, masonry


construction 300x300mm, with steel cover and all
9.12 accessories. no 180,000 -

Supply and install overhead water storage tank of 2000


litres capacity (PVC) supported on a steel tank stand
9.13 raised to 3500mm high minimum above the ground. no 9,400,000 -
Item Description UNIT QTY RATE AMOUNT

Supply and install rain water harvesting PVC tank of


10,000 litres capacity supported on a concrete base
9.14 raised to 500mm high minimum above the ground. no 7,000,000 -

Provisional sum of money for all the pipping work for


both tanks, gutters, downpipes amd other acessories
9.15 measured flat. Ls 13,000,000 -

Subtotal 1 Mechanical Installation -

Manhole 450 x 600 x 900mm deep to invert in masonry


brickwork, rendered smooth inside complete with
benching, heavy duty manhole cover made out of
9.16 concrete and angles and all accessories. no 330,000 -

Septic Tank for 30 people size approx. 3200 x 1250 x


1450mm in masonry brickwork, rendered smooth inside
complete with inlet and outlet manholes benching, heavy
duty manhole cover made out of concrete and angles and
9.17 all accessories. no 2,500,000 -

Soak Pit Size approx. 2500mm on top tappering to


1500mm and depth of 1500mm complete with hardcore
9.18 and all accessories. no 872,000 -

Electric Water heater

Vertical type Electric Water heater 100 litres with glass lined
inner cylinder, 3KW electric heater element, thermostat and
9.19 all accessories as ARISTON or equal approved. No 2,100,000 -

Subtotal 2 Mechanical Installation -

Collection

Subotal 1 -

Subotal 1 -
Item Description UNIT QTY RATE AMOUNT
TOTAL MECHANICAL INSTALLATION TO
SUMMARY. -
ELEMENT NO. 10
ELECTRICAL INSTALLATION

Supply, install, connect and set to work the following,


all as described in the Specifications and Drawings.

Power Supply

100A 9-Way SPN MCB Consumer Unit flush mounting


complete with integral isolator, MCBs and all
10.01 accessories as MEM, CRABTREE or equal approved. no 490,000 -

Supply Cable 25mm2 x 3core PVC/SWA/PVC Copper


cables in 25mm PVC concealed conduits complete with
terminations clipping and all accessories from meter to
10.02 the consumer Unit above. m 129,000 -

10.03 Meter box to contain meter and cutouts. no 70,000 -

Main Earth at adaptable box by 25mm2 PVC copper


cables to copper electrode in manhole complete with all
10.04 accessories. item 883,000 -

Supply and installation of a change-over switch,


complete with all associated accessories: to enable a
convinient shift from generator power supply to the
10.05 installed solar power supply and vice-versa item 1,330,000 -

Lighting
Lighting points wired by 1.5mm2 twin with earth PVC-I
10.06 copper cables in 20mm pvc conduits. no 98,000 -

1 x 36W 1200mm single bare batten fluorescent fitting


complete with daylight tube switch start and all
10.07 accessories as Thorn or equal approved.(F1) no 63,000 -

1 x 18W 600mm single bare batten fluorescent fitting


complete with daylight tube switch start and all
10.08 accessories as Thorn or equal approved(F2). no 14,000 -

Cast Aluminium Bulkhead, for 100W BC GLS lamps,


with glass bowl retained by tamper resistant fixings,
IP65 protection, as Thorn OLG Cat. No. OLG 1100BC
or equal approved (Source: Comprehensinve product
10.09 catalogue 1999, Page 406) (Light S). No 327,600 -
Item Description UNIT QTY RATE AMOUNT
6A 1 gang 1 way moulded switch as MK or approved
10.10 equal. no 11,200 -

6A 2 gang 1 way moulded switch as MK or approved


10.11 equal. no 11,200 -

Sockets

Socket outlet point wired by 2.5mm2 twin with earth


PVC-I copper cables in 20mm pvc conduits and all
10.12 accessories. no 90,000 -

13A 2gang switched socket outlet as MK, in MK boxes


10.13 complete with all accessories. no 63,000 -

10.14 Provisional sum for change over switch item 1,330,000 -

Subtotal 1 Electricals carried to Collection -


Solar Power
Solar Power Supply and Lighting

Solar Panel, with Peak power of 120W, Max.Current of


4.5A, Max. Voltage of 17V DC, Short circuit current of
4.8A, Open circuit voltage of 21.4V DC, as SIEMENS
10.14 SP75, BP SOLAR BP 275 or equal approved. no 336,000 -

Galvanised steel supporting structure mounted above


ground at an Optimum tilt angle to be determined by site
10.15 location, complete with brackets and all accessories. no 1,500,000 -

Charge Regulator with System voltage 12V / 24V DC,


Max Module and Load Current of 12A, Article No.
B01.548 as by Steca GmbH Memmingen (Germany) or
10.17 equal approved. no 952,000 -

Inverter of Max. DC Power of 1960W, Max. Current of


14A DC / AC, Max Voltage at no load of 175V DC, as
10.18 GRUDFOS (Germany) SA 1500 v03 or equal approved. no 4,350,000 -

Deep Cycle Maintenance Free Solar Batteries, of


200AH, 12V / 24V, as DELCO 2000 by Steca GmbH
10.19 Memmingen (Germany) or equal approved. no 1,190,000 -

Battery cable with fuse and interconnecting cables to


10.20 Consumer unit. item 1,290,000 -
Item Description UNIT QTY RATE AMOUNT
Earth installation by 25mm2 PVC copper cables to
copper electrode in manhole complete with all
10.21 accessories. item 883,000 -

Supply Cable 10mm2 x 3core PVC/SWA/PVC Copper


cables in 25mm PVC concealed conduits complete with
terminations clipping and all accessories from battery
10.22 battery bank to Solar Power Consumer Unit CU2. m 56,560 -
Lighting points wired by 2.5mm2 twin with earth PVC-I
copper cables in 20mm pvc conduits complete with all
10.23 accessories. no 98,000 -
1 x 18W 600mm single bare batten fluorescent fitting
complete with daylight tube switch start and all
10.24 accessories as Thorn or equal approved(F2). no 14,000 -

1 gang 1 way 6A moulded switch as MK or approved


10.25 equal. no 11,200 -

Lightning Protection

Copper tape of Hard Drawn High conductivity copper


plate 3mm x 25mm cross section for Down
Conductors,bonded to the iron sheet roof complete with
10.26 fixing clips and all accessories as by FURSE or equal. m 27,500 -

Air terminals complete with Tape Adapter and all


10.27 accessories as by FURSE or equal. no 275,000 -

10.28 Test Blocks complete as by FURSE or equal. no 49,500 -


Earth electrodes made from Hard drawn copper or
copper weld 20mm diameter by 1200mm in two length
screwed together complete with cap, earth clamp,
10.29 manhole and all accessories. no 539,169 -
Fire Fighting
9kg powder type wall mounted fire extinguisher as
10.30 ANGUS or equal approved. no 290,000 -
Subtotal 3 Electricals carried to collection -
COLLECTION

Page 2/20 -
Page 2/22 -

TOTAL ELECTRICAL INSTALLATION TO


SUMMARY. -

ELEMENT NO. 11 RAIN WATER HARVESTING


TANK
Item Description UNIT QTY RATE AMOUNT
Supply and fix : rainwater disposal system
UPVC Gutter to BS 4576

110mm Streamline gutter complete with gutter unions


A fascia clips for fixing to fascia m 14,900 -

Extra over gutter for :


B 110mm Gutter angles nr 14,000 -
C 110mm Stop ends nr 7,000 -
D 110 x 75mm Gutter outlets nr 15,000 -

uPVC Down pipe to BS 4576

100mm Diameter rain water down pipe : clipped to


E walls withapproved holder bats nr 147,600 -

Extra over down pipe for :


F Bend : 100mm x 90o. nr 14,000 -

G 100mm Shoe nr 14,000 -

The following in 1No 10,000L rainwater storage tank


Tank base
Excavate top vegetable soil average 150mm deep and
H cart to spoil m2 6,000 -

Anti-termite treatment to : sides and bottoms of


I foundations m2 3,600 -

J Ditto : blinded surfaces of hardcore m2 3,600 -

Excavate foundation trenches: not exceeding 1.5m deep:


K commencing from stripped level m3 25,000 -
Return, fill and ram : selected excavated materials
around foundations: in 200mm layers compacted to 95%
L MDD. m3 15,600 -

Surplus excavated material : Load up, cart, deposit,


M spread and level on site where directed. m3 15,000 -

Subtotal 1 RWT carried to collection -

125mm Murram filling : well watered and compacted to


N 95% MDD 95% : to make up levels under floor bed m2 30,000 -
Item Description UNIT QTY RATE AMOUNT
150mm Hardcore bed : in broken stone blinded with and
including 20mm layer of approved blinding ; under floor
O bed m2 22,500 -

Plain concrete class 15/20mm aggregate, (mix 1:3:6) in :


P foundation in trenches m3 458,000 -

Q Ditto : 100mm Floor bed m2 45,800 -

R Sawn form work to : edges of bed : 75 - 150mm width m 4,500 -

230mm Wall : built to a radius of 1.07m : in hard burnt


clay bricks bedded and jointed in cement and sand (1:4)
S mortar m2 98,000 -

15mm Cement and sand (1:4) render : steel trowelled


T smooth m2 11,000 -

10,000 Litre Cylindical PVC water tank approved by the


U supervising Engineer before supply. nr 5,460,000 -

V 12mm Diameter Bip tap : complete with a stop valve sum 42,000 -

W 300mm x 12mm Diameter overflow pipe nr 12,000 -

X
500mm x 50mm Diameter pipe : Wash out complete
Y with stop valves nr 15,000 -

Subtotal 2 RWT Carried to collection -

Collection

Subtotal 1 -

Subtotal 2 -

TOTAL ELEMENT NO.11 RAIN WATER


HARVESTING TANK CARRIED TO BILL
SUMMARY -
CONSTRUCTION OF GENERAL WARD,PALABEK KAL HEALTH CENTRE III

GENERAL SUMMARY Nos. Cost of Each Unit Amount


Ushs Ushs

BILL NO.1 PRELIMINARIES ITEM - -


-
-
BILL NO: 2 GENERAL WARD 1 - -

-
-
SUBTOTAL -
-
-
-
-
-
Add 5% Contigency -
-
-
-
-
-
-
-
-
-
-
-
-
-
SUB-TOTAL 1A -