1: PRELIMINARIES
Item No. Description Total Amount
UGX
BILL NO. 1
PRELIMINARIES
Preamble:
A Bidder
The to Visit
bidder shallthe
beSite
required to visit the site before bidding.
The Contractor shall visit the Site to acquaint himself with the
nature and position of the Works to be executed and no claim
for extras will be considered on account of lack of knowledge
in this respect.
Page 1 Preliminaries
A Measurements
Measurements used in preparing these Bills of Quantities
have been taken off from Architectural/Structural drawings of
these documents.
Any un authorised alteration or qualification made to the text
of these Bills of Quantities will be ignored.
B Drawings
C Samples
Page 2 Preliminaries
A Discrepancies in descriptions
B Pricing Preliminaries
The Contractor shall price out individually and in detail all the
items carrying a monetary value in this and any other section
of the Bills for Quantities as required and under no
circumstances will lump sums be allowed unless otherwise
stated to the contrary in the tender documents. Any item not
priced either in the Preliminaries Bill or elsewhere in the Bills
of Quantities, will be deemed to have been allowed for in the
prices inserted against other items in the Bills of Quantities.
B Import Licenses
Import Licenses
C Procedure
The Contractor shall proceed with the works in such a manner
as to qualify for payment at a particular stage as per the
Activity Payment Schedule.
Page 3 Preliminaries
D Preparation of Site, Works etc.
F Progress Photographs
G Blasting
Page 4 Preliminaries
A TESTING
(a) General
A GENERAL MATTERS
Tools and Plant
The contractor shall provide all necessary tools and
equipment and other requisites necessary for the proper
execution of the Works. 500,000
Page 5 Preliminaries
The Contractor shall allow for providing for the safety, health
and welfare of work people and for complying with any
relevant Ordinances, Regulations or Union Agreement and
the safety requirements for working on Construction sites in
accordance with the Conditions of Contract. 1,500,000
The Contractor shall allow for protection of his own and his
Sub-Contractor's work liable to damage, including provision of
temporary roof, gutters, drains etc., if necessary and shall
case-up, cover, or in other suitable ways protect all finished
work liable to injury, to the satisfaction of the Projec Manager
until completion of the Contract. 100,000
Page 6 Preliminaries
From the beginning to the completion of the Works, the same
shall be under the entire care and control of the Contractor,
who shall take all possible precautions to prevent any
nuisance, inconvenience or injury to the holders or occupiers
of surrounding properties and to the public generally and
shall at all times keep all paths and roads affected by the
works in safe and clear state, and shall use proper precautions
to ensure the safety of all wheeled traffic and pedestrians.
The Contractor shall allow for providing all watching, lighting,
barriers, covering open trenches and protection of the works
including sub-contract works, asmay be necessary for the
safety of the works and the existing buildings and for the
protection of the public and his own and Sub-Contractors'
employees. 1,500,000
A Police regulation
The Contractor shall allow for complying with any relevant
Police regulations including vehicular traffic management on
adjacent roads. 20,000
Page 7 Preliminaries
F Site Meetings
B Workmen's accomodation
NO site accomodation for workers shall be permitted. 0
D Scaffolding
E Setting out
The setting out for the buildings shall be done under the
supervision of the Clerk of Works/District Engineer. 0
Page 8 Preliminaries
A Existing Services
Page 9 Preliminaries
The Contractor must allow for removing and clearing away all
surplus excavated materials, rubbish, unused materials and
plant both during and at the completion of the Works and
shall leave the whole of the site and Works in a clean and tidy
state to the satisfaction of the Projec Manager including
clearing away and making good all traces of temporary acces
roads, offices, sheds, camps etc., if any. Particular care shall
be taken to leave clean all floors, windows and doors and to
remove all paint and cement stains, clean down external
faces, wash off stains to faced work, flush out plumbing
installations and drain runs. The Contractor is to find his own
tip/dump and shall pay all charges in connection therewith.
D Signboard
The Contractor shall make and erect a signboard in
accordance with the Architects detailed drawing. 1,000,000
C Occupation Certificate
D Contract Conditions
The Contractor shall provide and maintain the following
Insurance Policies and Performance Security in accordance
with the Contract:
(i) Insurance of the Works,Plant and Materials against loss or
damage.
Allow for any other item necessary for the proper execution
of the works and not listed in the items above ( Please
Provide a detailed List below) N/A
Page 10 Preliminaries
COLLECTION
A Page 1 of 12 400,000
B Page 2 of 12 100,000
C Page 3 of 12 100,000
D Page 4 of 12 10,000
E Page 5 of 12 6,770,000
F Page 6 of 12 9,010,000
G Page 7 of 12 6,600,000
H Page 8 of 12 2,540,000
J Page 9 of 12 700,000
K Page 10 of 12 1,000,000
L Page 11 of 12 500,000
TOTAL CARRIED TO GRAND SUMMARY 27,730,000
Page 11 Preliminaries
Office of the Prime Minister
Development Response to Displacement Impacts Project (DRDIP)
BILL NO. 2
ELEMENT A
Site Preparation
A Clear area of new construction of all undergrowth, small bushes, grub up all sm 750 400
trees, anti hills and remove any existing structures and obstructions as
directed. 300,000
-
B Excavate oversite to remove top soil average 150mm deep, deposit in sm 400 1,000
temporary spoil heaps average 50m from excavations and later spread and
level where directed on site. 400,000
-
C Excavate oversite to reduce levels not exceeding 1.50m deep commencing cm 340 4,000
from stripped level. 1,360,000
-
Excavations and Earthworks -
-
D Excavate foundation trench not exceeding 1.50m deep commencing from cm 65 4,000
reduced level, including planking and strutting and keeping foundation free
from water ( actual depth to be determined on site) 260,000
-
E Do but foundation pads cm 20 10,000 200,000
-
F Do. but for trench for storm water channel cm 15 10,000 150,000
-
G Do. but for slash apron cm 10 10,000 100,000
-
H Extra over excavation in hard material; (provisional) cm 1 50,000 50,000
-
I Return, fill in and ram selected excavated materials around foundations cm 75 5,000 375,000
-
Disposal of excavated material -
J Load and wheel surplus excavated material average 50m from excavations, sm 45 5,000
deposit in spoil heaps and later spread and level where directed on site. 225,000
-
K 150mm Thick bed of approved imported murram well spread levelled, sm 335 6,000
rammed and consolidated in layers not exceeding 100mm to receive
hardcore (measured separately). 2,010,000
-
L 150mm Thick bed of approved imported hardcore well spread, levelled, sm 335 6,000
rammed and consolidated in layers not exceeding 100mm, blinded with and
including 50mm thick layer of sand, well watered and rolled to received
concrete bed (measured separately). 2,010,000
-
Total to be carried to collection at end of element A >>>>>>>>>>>>>>>>>>> 7,440,000
2No. NEW DORMITORY BLOCKS
Substructure
ELEMENT B
A 250 x 100mm Cill, splay weathered, throated and finished fair on all m 38 8,000
exposed surfaces ( bedded and jointed in cement and sand (1:4) mortor (in
No. 9) 304,000
-
Vibrated Reinforced Insitu Concrete Grade 20 -
-
B Beams. cm 10 300,000 3,000,000
-
C Columns cm 4 300,000 1,200,000
-
D Lintels, 200x200mm reinforced with 12 mm mild steel bars complete with m 10 8,000
all necessary form work. 80,000
-
Mild Steel bar reinforcement to B.S 4449:1969 -
-
E 8mm Diameter rods kg 425 5,000 2,125,000
-
F 6mm Diameter rods kg 222 5,000 1,110,000
-
High Yield square twisted bar reinforcement to B.S 4449:1969 -
-
G 12mm Square bar. kg 1000 5,000 5,000,000
-
H Sawn formwork to sides and soffits of beam. sm 250 3,000 750,000
-
I Do but sides of of columns sm 96 3,000 288,000
-
Hard burnt brick walling load bearing (3.5N/sq.mm) to BS 6073 in
cement and sand (1:3) mortar all as described, laid in suitable
bond, with 6mm diameter mild steel strips, ( measured
separately), laid horizontally every alternate course. -
-
J 230 mm thick sm 420 30,000 12,600,000
-
K Labour and materials for beam filling, raking and cutting. m 100 3,000 300,000
-
-
-
-
-
-
-
-
-
-
-
Total to be carried to summary at end of Bill No.24>>>>>>>>>>>>>>>> 26,757,000
5No. NEW DORMITORY BLOCKS
Walling and Frame
ELEMENT C
A 50 x 50 x 4 x 217 long angle cleat with and including 2 no. bolts welded to No. 70 10,000
ends of trusses to hold fascia baord. 700,000
-
B Circular metallic vent size 600mm diameter with 2mm steel louvres. No 3 10,000 30,000
-
C Aluminium mosquito proof wire gauze fixed with hardwood timber beads or assm 1 10,000 10,000
-
D Painting to metallic circular vent sm 3 8,000 24,000
-
Painting to trusses type T1 -
-
E 50 x 50 x 4mm RHS Rafter m 145 15,000 2,175,000
-
F 50 x 50 x 4mm RHS Bottom tie m 116 15,000 1,740,000
-
G 50 x 50 x 3mm RHS Strut / Tie m 161 15,000 2,415,000
-
H 100 x 50 x 3mm thick RHS Zed purlins including 106 x 40 x 4mm MSA cleats m 452 15,000 6,780,000
-
-
Total 13,874,000
ELEMENT C
COLLECTION
ELEMENT D
WINDOWS
A Window size 1200mm x 1500mm high with steel louvered vent. No. 25 250,000 6,250,000
-
B Burglar proofing grille comprising 12mm square bars 150mm centres both No. 25 30,000
ways in cobweb pattern or other equal and approved pattern welded to 50
x 50 x 6mm angle the whole having one coat of red oxide primer to fit the
following window sizes; 1200mmx1500mm. 750,000
-
Supply and fix to windows the following ironmongery -
-
C 125mm approved stays. Prs 25 10,000 250,000
-
D Approved fasteners. Prs 25 10,000 250,000
-
E 4mm Ordinary quality clear sheet glass and glazing to window with putty in sm 38 60,000
panes over 0.10 - 0.50m². 2,280,000
-
F Prepare, prime and apply one undercoat and two finishing coats of gloss sm 63 6,000
paint on metal glazed windows including opening edges ( both sides
measured flat). 378,000
-
G Do but burglar proof sm 72 4,000 288,000
-
H Mosquito gauze to window louvred vents including coffee tray mesh No. 25 4,000 100,000
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Total to be carried to summary at end of Bill No.24>>>>>>>>>>>>>>>> 10,546,000
2No. NEW DORMITORY BLOCKS
Windows
ELEMENT E
DOORS
A Supply, assemble and fix casement metal door and frame total overall size No. 3 300,000
1200 x 2400 nn high with steel louvred vent. 900,000
-
150x45 door frames in mahogany wood or other approved kept
clean for stained finish -
-
B Frame size 900x2400mm high with 50x15mm door stop. No. 1 150,000 150,000
-
Flush door 45mm thick solid core, faced with MR quality plywood
for painting, hardwood lippings to edges. -
-
C 850x2050mm No. 1 300,000 300,000
-
D Prepare, prime and paint one undercoat and two gloss finishing coats of oil sm 17 8,000
paint on metal surfaces including opening edges ( both sides measured
flat). 136,000
-
E Ditto but matt stain finish on wood surfaces. sm 5 8,000 40,000
-
F Do but wood surfaces 200-300mm girth m 10 6,000 60,000
-
Supply and assemble the following iron mongery to timber
complete with all matching screws and keys: -
-
G 100 steel butt hinges Prs 2 30,000 60,000
-
H 3-lever mortice locks as "union" or any other equal and approved comp-lete No. 1 120,000
with furniture. 120,000
-
I Casement lock as M/s "Union" or any other equal and approved. No. 3 150,000 450,000
-
J Quadrants to door frames as specificed. m 6 10,000 60,000
-
K Architraves to door frames as specificed. m 6 5,000 30,000
-
L Metalic louvre vent 850 x 300mm to internal doors with mosquito gauze and No 1 50,000
coffee tray mesh 50,000
-
M 38mm Door stoppers No 7 20,000 140,000
-
N Mosquito gauze to external door louvred vents including coffee tray mesh. No 3 15,000
45,000
-
-
Total to be carried to summary at end of Bill No.24>>>>>>>>>>>>>>>> 2,541,000
2No. NEW DORMITORY BLOCKS
Doors
ELEMENT F
A 15mm wall rendering in two coats steel trowelled hard and smooth on sm 310 8,000
walls externally. 2,480,000
-
B Do but reveals. sm 20 10,000 200,000
-
C Two coat rough cast rendering to walls. sm 100 6,000 600,000
-
D Prepare and apply three coasts of exterior masonary paint on on rough cast sm 100 8,000
rendered walls. 800,000
-
E Do but reveals sm 20 6,000 120,000
-
F Weather guard paint to external walls sm 210 4,000 840,000
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Total to be carried to summary at end of Bill No.24>>>>>>>>>>>>>>>> 5,040,000
2No. NEW DORMITORY BLOCKS
External Wall Finishes
ELEMENT G
A 15mm Internal plaster in two coats to walls, trowelled hard and smooth sm 450 4,000
with steel float. 1,800,000
-
B Ditto but reveals sm 25 6,000 150,000
-
C Prepare and apply three coats of emulsion paint on plastered walls sm 450 4,000
internally. 1,800,000
-
D Ditto but reveals sm 25 4,000 100,000
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Total to be carried to summary at end of Bill No.24>>>>>>>>>>>>>>>> 3,850,000
2No. NEW DORMITORY BLOCKS
Internal Wall Finishes
ELEMENT H
FLOOR FINISHES
15mm Terrazzo paving in two coats with white cement and marble
aggregate mechanically polished to smooth finish with and
including 6x32mm plastic division strips (Floor Area, Apron,
Verandah and the ramps
A sm 360 6,000
30mm thick paving to receive Polished terrazzo finish (measured seperately) 2,160,000
-
B 15mm thick terrazzo finish sm 360 40,000 14,400,000
-
C 100 x 25mm Skirt : square top and coved junction at bottom m 140 8,000 1,120,000
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Total to be carried to summary at end of Bill No.24>>>>>>>>>>>>>>>> 17,680,000
2No. NEW DORMITORY BLOCKS
Internal Floor Finishes
ELEMENT I
CEILING
A Powder coated galvanized channels and angles with cross tees across the
runners to hold 9mm thick, 600x600mm gypsum panels/board and L-
shaped perimeter brackets to support the suspended ceiling at walls,
including all necessary fittings. sm 15 50,000 750,000
-
B Mosquito gauze in timber framed vents in walling above ceiling to matron's No. 1
room inclusive of coffee tray wire mesh , size 250x1200mm 20,000 20,000
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Total to be carried to summary at end of Bill No.24>>>>>>>>>>>>>>>> 770,000
2No. NEW DORMITORY BLOCKS
Ceiling
ELEMENT J
ELECTRICAL INSTALLATION
A: Solar array mounting rack/panel frame in galvanised steel supplied and 200,000 400,000
installed complete to specifications. No. 2
0
B: 2No. Solar arrays comprising solar modules of 80W, 16.9V, 4.76A, 300,000 2,400,000
configured at 24VDC all as SHELL POWERMAX ULTRA 85-P or approved
equivalent. No. 8
0
C: Charge contoller of maximum load current 30A as SOLARIX OMEGA or equal 300,000 600,000
and approved. No. 2
0
D: Power inverter pure sinewave, pulse width modulation, unity power factor 400,000 400,000
control, 1-phase, 1250W/240VAC as SOLARIX SINUS INVERTER or
approved equivalent. No. 1
0
E: Gel and deep cycle SLA solar battery 100Ah all as RITAR ULTRA POWER 400,000 1,600,000
RA12-100GD or approved equivalent. No. 4
0
F: 2.5mm sq. Ultra violet cabling between solar panels L/m 10 5,000 50,000
0
G: 4mm sq. Ultra violet cabling between solar panels/charge controller and 10,000 100,000
inverter L/m 10
0
H: 50mm sq. Single DC cabling between inverter and battery bank L/m 5 15,000 75,000
0
SWITCHGEAR: 0
0
I: Metalcased, hinged lockable door 6-Way SPN MCB-Type flush mounted 300,000 300,000
consumer Unit CU1, with 100A DP Intergral Isolator, busbars, neutral and
earth terminal blocks, complete ith miniature circuit breakers, all as to
CRABTREE manufacture or approved equivalen No. 1
0
J: 6mm sq. PVC twin-with earth Copper cable, connected from Inverter AC 20,000 300,000
side and terminated on to the incommer intergral Isolator of Consumer Unit
CU1 (Provisional Length) L/m 15
0
Total to be carried to collection at end of element J >>>>>>>>>>>>>>>>>>> 6,225,000
5No. NEW DORMITORY BLOCKS
Electrical Installation
LIGHTING FITTINGS:
B 1117mm 1x28W T4 surface mounted luminaire manufactured from rigid 50,000 850,000
rolled steel channel profile,with high quality,durable post coat powder paint
finish and secure,screw fixed cover plate as to ULTRA POWER Cat.No. T4
28W or equal and approved. No. 17
0
WIRING ACCESSORIES 0
0
C 6A SP 1-Gang 2-Way white moulded plate flush 0
wall-mounted switch c/w mounting box, as to 0
MK 4871 WHI or approved equivalent. No. 4 8,000 32,000
0
D 6A SP 2-Gang 2-Way white moulded plate flush 0
wall-mounted switch c/w mounting box, as to 0
MK 4872 WHI or approved equivalent. No. 2 8,000 16,000
0
WIRING: 0
0
Except for items separately covered under switchgear, fittings, appliances 0
and fixed accessories, all wiring items must include rates for all necessary
fixing/connecting accessories.
0
E Connect up complete and ready from 6A SP 0
MCB-ways of Consumer Unit CU1 in new 1.5 0
mm sq. single core PVC-Insulated copper cables 0
(with standard insulation colour coding), drawn in 0
new flush installed conduits, through wall switches 0
to all lighting points as per drawings. No. 17 300,000 5,100,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total to be carried to collection at end of element J >>>>>>>>>>>>>>>>>>> 5,998,000
2No. NEW DORMITORY BLOCKS
Electrical Installation
LIGHTENING PROTECTION
Element J
Electrical Installation
Collection
ELEMENT K
GENERAL ITEMS
A 65mm diameter x 2200mm long galvanized mild steel hollow stand pipes , No. 12 110,000
gauge 3mm with cleats welded to the lower and cast in concrete grade 15
including all necessary excavation 1,320,000
-
B 65mm diameter x 1200mm long galvanized mild steel hollow horizontal No. 12 110,000
member, gauge 3mm, welded on to stand pipes and 3 No drill holes made
for 6mm strand wires(measured separately) 1,320,000
-
C 6mm diameter stainless steel strand wire m 220 5,000 1,100,000
-
D Pin Board: 2400x1200 mm high comprising 12mm softboard 22x44mm No. 2 85,000
rebated and twice splayed hardwood timber beading all round screwed to
wall with 50mm brass screws and rawl plugs including applying three coats
dead matt vanish to timber surface. 170,000
-
E Renforced concrete benches; 2000x400x550mm high and 80mm thick. No. 2 200,000 400,000
-
F Provide and fix cloth hanging rails in 100x25mm hardwood complete with m 70 10,000
hooks at 400mm spacing. 700,000
-
G Waste pit, ( as per Engineer's drawing issued) Item 1 100,000
100,000
-
H Supply and install Rain Water harvesting tank in UV stabilised PVC as No. 2 2,500,000
CRESTANK CV-100C 5,000 Litres complete with punched inlet, overflow,
heavy duty lockable tap and washout, with all accessories and mounted on
approved concrete base . 5,000,000
-
I Supply and fix Unplasticed PVC 150mm Half round gutters and fittings as m 60 20,000
'Marley' or other approved with all necessary accessories. 1,200,000
-
J 125mm Diameter Unplasticed PVC Rain water down pipe fixed and clipped m 30 20,000
to walls with approved holderbats including outlets and bends . 600,000
-
K 2.5m diameter concrete base of 200mm thick grade 15 concrete No. 2 50,000
reinforced with mesh topping on hardcore, including 75mm concrete down
stand to edge of base and a concrete apron 350mm above ground level.
100,000
-
L Excavate percolation soak pit of diameter 2.0x3.0m deep starting from No. 2 50,000
ground level. Fill pit with hard boulders to a level 230mm from ground level
and lay 500 gauge polythene sheeting on top, then fill remaining pit with
vegetable soil, levelled and ramme 100,000
-
-
-
-
-
Total to be carried to summary at end of Element K >>>>>>>>>>>>>>>>> 12,110,000
2No. NEW DORMITORY BLOCKS
General Items
A Double decker beds: Fabricated out of 20mm diameter x2mm mild steel No. 68 150,000
pipes as end frames and 12mm diameter bars as infill and 40x40x3mm
angle as main frames for beds. Approved welded mesh to be welded onto
main bed steel frame and supported by 2No. flats of size 40x3 as antisag
members. Decker should be fabricated such that it can be dismantled and
re-assembled with ease for storage purposes but rigid enough when
assembled to resist any shear movements , sags or squeaks, all as per the
Engineer's drawing. 10,200,000
-
FIRE FIGHTING EQUIPMENT -
-
D 9 Kg Powder Type wall mounted fire extinguisher. No. 3 400,000 1,200,000
11,400,000
ELEMENT K
GENERAL ITEMS
COLLECTION
SUMMARY
RAIN WATER DRAINAGE WITH 10,000L STAINLESS STEEL HARVESTING WATER TANK
Proposed Construction in Schools -DRDIP
-
U 12mm Diameter bars(T12) KG 49 5,000 245,000
-
Mild steel bar reinforcement to BS 4461 -
-
V 8mm Diameter bars KG 24 5,000 120,000
-
Formwork -
W Sawn form work to : edges of bed : 75 - 150mm width LM 26 2,000 52,000
-
Mild steel reinforcement to BS 4483 -
X Steel fabric mesh reinforcement ref no. A142 weighing 1.58kg/m2: in floor bed: including tying SM 11 8,000 88,000
wire and distance blocks
-
Walling -
Hard burnt clay bricks to BS 712 & 6750 (3.5N/mm2 compressive strength) bedded and jointed -
in cement and sand (1:4) mortar in:-
Y 230mm wall SM 10 40,000 400,000
-
Finishes -
Z 15mm Cement and sand (1:4) render : steel trowelled smooth SM 11 8,000 88,000
-
Tank -
Y 10,000 Litre stainless steel water rain water harvesting tank manufactured in 2mm thick sheets NO 1 10,000,000 10,000,000
-
AA 12mm Diameter bip taps/draw off taps complete with a stop valve installed 3 meters away from NO 2 30,000 60,000
the tank; held in position by concrete stands.
-
BB 300mm x 12mm Diameter overflow pipe NO 1 20,000 20,000
CC 1700mm x 12mm Diameter pipe : Wash out complete with stop valves. NO 1 20,000 20,000
-
TOTAL FOR ROOF WATER DRAINAGE CARRIED TO GENERAL SUMMARY (2No.s) 13,173,000
Tanks
Office of the Prime Minister
Development Response to Displacement Impacts Project (DRDIP)
LAND SCAPING
Paspalm grass
A Imported vegetable soil deposited in spoil heaps, spread levelled on site including SM 225 5,000 1,125,000
raking to bring to fine tilth and plant grass ;Paspalm or any other equal and approved
grass plants at 150mm centres both ways well maintained until established.
-
Trees -
B Provide and plant 10No assorted fruit trees and 10No trees of any other type as Item 1 100,000 100,000
approved by the Project manager, including excavating pit, filling with selected earth
cart away surplus soil and replace dead plants with new ones;water and maintain
through out the contract period.
-
STORM WATER DRAINAGE -
Earth Drain. -
C Open storm water earth drain(side ditch):200mm wide bottom:500mm (average) LM 72 10,000 720,000
deep:all necessary excavations,spreading and levelling excavated material where
directed on site;cutting and trimming the sides to slope.Finished with plain in-situ
concrete class 10/14mm aggregate both side and bottom.(provisional route length
taken.)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
TOTAL BILL NO. 9: EXTERNAL WORKS CARRIED TO GENERAL SUMMARY 1,945,000
External Works
Office of the Prime Minister
Development Response to Displacement Impacts Project (DRDIP)
GENERAL SUMMARY
Item Description Qty Unit Rate (UGX) Total Amount UGX
General Summary