It Vizion Introduction: Daniel Daia, Business Development Executive, 4.08.2022
It Vizion Introduction: Daniel Daia, Business Development Executive, 4.08.2022
It Vizion Introduction: Daniel Daia, Business Development Executive, 4.08.2022
1. Introduction
2. Data Infrastructure
3. Near Real-Time Decision
Support Systems
4. Advanced Data Analytics
5. Next Steps
1
INTRODUCTION
About IT Vizion
Connecting Integrating
Stranded Data Cloud Silos
1&2 MIT Technology Review, May 2013; 3 McKinsey, “The Internet of Things” 2015
“...A data integration workspace to enable automated data
utilization and exploitation of analytics and information
toolsets…”
Our main partners for Digital Innovations
MICROSOFT AZURE & BI
Power BI Solutions: Architect, Deploy Support
Azure Data Integration
Dashboarding
8
Data Infrastructure context joins Enterprise data
AI ready
User Interfaces
User Interfaces
HMI Esri
Operational Data
Business
Intelligence Infrastructure Intelligence
OT IT
Data / Asset
Data / Asset
PI Data Big
Arch. Data
SCADA Relat. Unstr.
LIMS
PLC DB DB
Managing operations data is complex
Operations data sources Complexity Data consumers
SCADA
Planning &
Data Historian scheduling
DCS
PLC OPC
Controllers ERP
Excel
Asset reliability
Databases Text files
LIMS CMMS
IIoT Gateways
EMS BI tool
Cloud system
Analytics
Data lake platform
THE SOLUTION
SCADA
DCS
IIoT
Gateways
Cloud
systems
WHAT IS THE CANARY SYSTEM?
Pass-through
EC
Flag
COMOS
Flag
Poll
SAP Poll
Event based
XHQ is enabling near real-time data drive decisions across
all company operations, assets and locations
CEO / Management Dashboard
TOP FLOOR
Corporate
• Utilization & Efficiency
• Paper Loss & Waste
• Commercials
• Safety & Energy Indicators
• Incidents
Site Production
Plant
• • Plan vs actual
CO2 Emissions
2, 3, 4
• Raw material vs production Finance Supply Chain
• Paper Loss Performance
Sales &
R &D
Marketing
Production Batch Quality Maintenance 360°Critical Inventory Energy
Operations Process Management Performance Management Asset Monitoring Performance
• Capacity Utilization • Rejects • Losses • Equipment Utilization • Inventory cost • Facility Utilization
SHOP FLOOR
• Production Cycle • Batch: • On spec • PM order status Plan vs Actual • Energy Cost
Plan vs Actuals • Process Quality • PM order cost tracking • Stock levels by Product
Customer/Suppliers
Asset 01 Asset 02 • Flaring Human
Customer/Suppliers Resources
30
What Seeq does
Data Alignment
▪ Connect to many data sources
▪ Match time stamps
▪ Index data
Investigate Optimize
Predict
Report
• Asset failure
• Batch outcome • Dashboard/KPI
• Plant margins • Shift/batch
• Regulatory
Process Data Reality
Data Tools ROI
Process
Collect Contextualize
Process Data
Collect Contextualize
Sunk Costs
Timing
Business Manufacturing
Systems Systems
Cleanse Calculate
Contextual Data
Interpolation Display downsampling Dropouts and flyers Time-weighted statistics Context within signals
Time zones and UDT Pan & zoom across time Noisy signals Area under a curve Context from SQL sources
Units of measure Axis and trend line options Gaps in data Derivatives EAM, MES, Batch systems
Seeq Brings Innovation to Process Engineers
Data Cleansing
Diagnostic Analytics
Process models
User defined boundaries
• 2 sigma
• Average
• Min/max
Seeq Advanced Analytics
NOW
Predictions
NOW
Predictive analytics
• Regression algorithms
• Integrate with notifications
Seeq Advanced Analytics
Batch Analytics
sensor 1
sensor 2
• Journal (capture)
Seeq Advanced Analytics
Analytics Workflow
Sharing workbooks Real-time
collaboration
43
Knowledge capture
Journals
• Knowledge capture
• Step through analyses
• Collaboration
• Searchable
Seeq Advanced Analytics
Publishing
• Read-only
• Time- relative
>Last shift
>Last hour
>Prior to alarm
Time Series Data
Time
Temperature
Asset Operation
Define by
Limit
Define by
Pattern
Using Conditions
50
Seeq Extended Architecture
Seeq Workbench Seeq Organizer Seeq Data Lab Enterprise Apps
Visualization & BI Tools
MS
Time Series MS IOT Hub
Insights
The Data Lab for much more
Batch Genealogy Identify Failure Modes with Causal Maps
Root Cause Analysis with
Clustering
Max COT –
Multi-Dimensional Batch Evolution Max COT – East
West Furnaces
Furnaces 511 F
527 F
Furnac
Furnace e4
1 Furnace 2 511 F
527 F 497 F
Furnace Furnace
3 5
501 F 502 F
Optimizing logistics and maximizing revenue Tracking and categorizing performance Lost yield due to unplanned
losses to identify bad actors, justify downtime
Calculating the number of shutdowns that improvement projects, and do historical
minimizes the total time required to produce and global benchmarking Optimizing planned
a given order size maintenance
Maintaining specific boundary conditions
Viewing the relationship between the within a process
production settings and key process KPIs, like
quality or production rate
Data Scientists
Integrated
Innovation
Engineers Executives
Control Room &
Advanced Business Strategy
Operators
Analytics Monitoring
Plant Managers
Publish Insights
Managers
Teams Maintenance Data-based
Collaboration Predictive Decisions
Analytics
Financial Benefits Financial Benefits Financial Benefits
• Productivity: Analyses that took • Cost avoidance: Device failure predicted to • Capital allocation: $23M capital saved
weeks/months now take minutes/hours. avoid unplanned plant shutdown and several • Capacity improvement: 5% increased production
• Rapid payback: Customer estimates of $100k. across all plants through benchmarking
Seeq software payback is under 3 weeks. • Asset utilization: Increased by 10%. • Cost avoidance: $1M/month of fines avoided per site
• Optimization. Reduction of additives saving 56
Accelerating Digital Transformation
At the corporate level use Seeq’s • Contextualized process data with • $23M capital saved
access to process data to exploit embedded SME expertise is ‘First Class • 5% capacity increase
interdependencies for augmented Citizen’ with other business data • $1M/mo. of fines avoided per site
performance, capital deployment • Allows corporate analysts and operational • Network blockage predicted 6 hours sooner
Improved Capital efficiency, greater visibility into units to collaborate to make process data • Under performing plant identified and
Deployment operations metrics, and faster driven decisions. quality issue corrected
Benefits start in 6 - 18 mos response to market. • Note: Centralized data lakes are optional.
Accelerating Digital Transformation
• Identify shut-in stages across multiple • Major Safety Issue Averted: Network
Augment performance, safety, wells on same completion system. Scale blockage predicted 6 hours sooner.
reliability, quality, compliance, and analysis to 1000s of wells. • Revenue: Customer estimated benefits
uptime at the plant level. Examples: • Provide report for operators to guide >$2M/year. Payback time in weeks.
• Well Completion, Containment, drillers where majority of the issues Supplier savings estimated at $1M/mo.
Shutdown
occur and how to proceed • Robust Operation: Customer detected
Plant Level • Detect Drilling Oscillations
• Fractional Distillation
• Managing reactor feed rate to maximize evidence of pending failure. Past failures
Optimization • Supplier Optimization capacity. led to well shutdown at an est. cost of
Benefits start in 2 - 6 mos $30M.
Empower alignment with Corporate • Empowers corporate analysts and • Fines Avoided. $1M/mo. of fines avoided
values and strategy: operational units to collaborate to make per incident.
• Capital deployment efficiency process data driven decisions. (e.g., • Decreased Significant Losses: 80%
• Greater metrics visibility Consistency of KPI Implementation) reduction in steam losses.
Improved Capital • Faster response to market. • Support Environmental Responsibility • Capital Saved: $23M investment avoided
Deployment • IT/OT Strategy (e.g., Cloud Roadmap, • Capacity Increase: 5%
Benefits start in 6 - 18 mos SaaS)
Accelerating Digital Transformation
• Identify load change events and quantify • Revenue: More accurate lost energy
Augment performance, safety, event magnitude based on price changes. production results in +$40k-100k/yr in rev
reliability, quality, compliance, and Provide load forecast model to operators. Robust Operation: Device failure predicted
uptime at the plant level. Examples: • Compare potential verses actual power to days in advance avoiding unplanned plant
• Power Grid Load Shedding
ID ramp up period and quantify losses. shutdown and hundreds of thousands of $.
Plant Level • Wind Turbine Ramp Up/ Ramp Down
• Create profiles for normal pump station • Safety Issue Averted. Savings of ~$100k/yr
• Water Treatment Reporting/
Optimization Wastewater Pump Station Monitoring behavior. Monitor pump stations for by optimizing additives; < corrosion reduces
Benefits start in 2 - 6 mos deviation from normal profile. unplanned outages & extends asset life.
Empower alignment with Corporate • Empowers corporate analysts and • Fines Avoided. Non-compliance time of
values and strategy: operational units to collaborate to make ~4h/month/turbine was eliminated.
• Capital deployment efficiency process data driven decisions. (e.g., • Grid Reliability: Under-performing plant
• Greater metrics visibility Consistency of KPI Implementation) identified and quality issue corrected.
Improved Capital • Faster response to market. • Support Environmental Responsibility • Capital Saved: $15M investment avoided
Deployment • IT/OT Strategy (e.g., Cloud Roadmap,
Benefits start in 6 - 18 mos SaaS)
Enabling Seeq Advanced Analytics in XHQ
Seeq and XHQ Reliability
5
NEXT STEPS
Contact:
Phone:
+1 (951) 256-4320
+1 (951) 346-3156 fax
EMEA
+ 4 (0) 733 545 702
Email:
daniel.daia@itvizion.com