Plan For Cost Estimation-7
Plan For Cost Estimation-7
Plan For Cost Estimation-7
APEX 7.735
1,400
5692mm
MONUMENT METAL
S F S
2,700
4392mm CLADDING
MONUMENT METAL
CLADDING FRAMES
FFL 3.292 3292mm 3292mm F
34c
E1 ELEVATION
1:100
APEX 7.735
1,400
MONUMENT METAL
CLADDING
FFL 6.335
CL 5.992
343
5692mm 5692mm 5692mm
A 4692mm
S F
2,700
4392mm A F A 4392mm
MONUMENT METAL
ATTACHED B'PIERS 41c CLADDING FRAMES
FFL 3.292
343
29c
25c
WHITE PAINT RENDER
2,949
TO RENDER OPENING RED FACE BRICK
S F S 9c LIMESTONE
RET. WALL
FFL 0.000 (00c)
E2 ELEVATION
1:100
APEX 7.735
1,400
FFL 6.335
CL 5.992
343
WHITE PAINT TO
WEATHERBOARD CLADDING
2,700
41c
FFL 3.292
24c
COLORBOND
FENCE/GATE
WHITE PAINT RENDER
2,949
TO RENDER POOL
HEATER
LIMESTONE
RET. WALL
FFL 0.000 (00c)
ATTACHED B'PIERS
LIMESTONE RET. WALL
E3 ELEVATION
1:100
MODERN
Two-Storey Residence CULTURE.
Working Drawings ARCHITECTURAL DRAFTING/
616 Great Northern Highway DEVELOPMENT/
Herne Hill, WA 6056 RENOVATION.
Modern Culture 88a Telford Crescent, Stirling WA 6021 [BUILDING MADE EASY]
T: 0411 770 753 E: info@modernculture.com.au ABN: 31 048 491 511
GSPublisherVersion 0.0.100.100