PINNACLE INFRASTRUCTURE CONSULTING

(TESTING DIVISION)

Reference No………….. Dated:…………….

TEST RESULTS

CLIENT NAME :-

PROJECT :-

SAMPLE :-
SAMPLING :-
CONDITION OF SAMPLE
TESTED AS PER :-
DATE OF RECEIVING :-
DATE OF TESTING :-
LAB CODE (UID) :-
RESULTS :- Shown in Table

TABLE INDICATING TEST RESULTS OF SIEVE ANALYSIS,

SL. I.S. SIEVE RETAINED RETAINED CUMULATIVE PERCENTAGE


NO. SIZE (mm) MATERIAL (gm) MATERIAL (%) RETAINED PASSING (%)
MATERIAL
(%)
WEIGHT OF SAMPLE 5000gm
1 40.00 mm
2 20.00 mm
3 10.00 mm
4 4.75 mm

Note:
- Sample will be destroyed after 30 days from the date of issue of test report unless otherwise specified.
- The report shall not be reproduced except in full, without the approval of the PIC

Page 1 of 2

Laboratory: B-94, Ramchandra Mission, Gate No.3, IIM Road, Lucknow-226013


Tel: 9910393180
E-mail: pinnacleinfraconsult@gmail.com
PINNACLE INFRASTRUCTURE CONSULTING
(TESTING DIVISION)

TABLE INDICATING TEST RESULTS OF COARSE AGGREGATE (20mm)

Sl.No. TEST COARSE AGGREGATE (20mm)

1 BULK DENSITY
a Average Loose Bulk Density (kg/litre)
b Average Compacted Bulk Density
(kg/litre)
2 SPECIFIC GRAVITY
3 WATER ABSORPTION
4 SOUNDNESS
a Na2So4
5 FLAKINESS INDEX
6 ELONGATION INDEX

Mayank Rajpal Surya Prakash Pandey


Quality Manager Technical Manager

Note:
- Sample will be destroyed after 30 days from the date of issue of test report unless otherwise specified.
- The report shall not be reproduced except in full, without the approval of the PIC

“End of the report”