PROJECT PROPOSAL
Administration
Submitted To: BATI Town Administration, City and Infrastructure office and
Mob.NO: +251910646844
May, 2022
BATI, ETHIOPIA
Table of Contents
PROJECT INFORMATION.................................................................................................................4
Executive Summary........................................................................................................................6
1. Introduction................................................................................................................................7
1.1. General Background............................................................................................................7
1.2. Project Rationale..................................................................................................................9
1.3. Objective of the project.....................................................................................................11
2.4. The significance of the project...........................................................................................11
2.5. Background of the Project Location...................................................................................12
2.6. Proposed Project Location.................................................................................................14
2. Service Description and Application.........................................................................................15
3. Market Study and Service Capacity...........................................................................................16
3.1. Market Study.....................................................................................................................16
3.1.1. Past Supply and Present Demand...............................................................................16
3.1.2. Projected Demand......................................................................................................16
3.1.3. Pricing.........................................................................................................................17
3.1.4. Marketing promotion and strategy.............................................................................18
3.1.5. Marketing and Sales Strategy......................................................................................19
3.2. Plant capacity.....................................................................................................................20
3.3. Service delivery program...................................................................................................20
4. Materials and Consumables and Inputs....................................................................................21
4.1. Materials and Consumables...............................................................................................21
5. Technology and Engineering.....................................................................................................22
5.1. Technology.........................................................................................................................22
5.2 Civil Engineering Cost..........................................................................................................22
5.2.1. Locations and Site.......................................................................................................24
5.2.2. Project implementation..............................................................................................24
6. Manpower and Training Requirement......................................................................................25
6.1. Manpower Requirement....................................................................................................25
6.2. Training Requirement........................................................................................................26
2
7. Financial Analysis......................................................................................................................27
7.1. Underlying Assumption......................................................................................................27
7.2. Total Initial Investment Cost..............................................................................................29
7.3. Operation Cost...................................................................................................................30
7.4. Financial Evaluation...........................................................................................................31
3
PROJECT INFORMATION
Proposed Project: Establishment of new recreation center
Requested Area: The site is 2500 M2 square in area, located Bati town
Kebele 03 around Qeresa Vegetable Area
Total investment cost: 15 Million
Our value:-
Loyalty and Reliability
Customer focus
Innovative culture
Cost effectiveness
Social responsibility
Care for the environment
Compliance with code of conduct
4
Need and Desirability: The envisaged project deemed to add to the
economic development of the Region in general and zone and town in
specific with following ways:
A. Source of Revenue
B. Employment opportunity
C. Sources of social service
D. Income
E. Source Of Fund
F. Hospitality – focus on the customers, promoting an exceptional
guest experience.
G. Efficiency – offer a good service with the adequate resources.
H. Superior Customer Service
Objective:
5
Executive Summary
This profile envisages the establishment of recreational center in Bati
town Amhara Regional State. Demand projection divulges that there is
high demand for recreational centers in the region. Accordingly, the
planned plant is set to provide a recreational service in zonal largest
city is Bati town. The proposed Recreation Centre will meet the
current and long-term needs of the community of Bati Town
Administration and Bati Town Administration. The total investment cost
of the project including working capital is estimated at Birr 15 million
and creates 85 job opportunity .The proposed infrastructure will support
the Government’s objective to provide conditions and services. The
proposed recreation facility will enhance the tourism experience in many
ways and create opportunities for residents and businesses in Bati town.
The financial result indicates that the project will generate profit
beginning from the first year of operation. Moreover, the project will
break even at 29.6% of capacity utilization and it wills payback fully the
initial investment less working capital in 3 years. The result further
show that the calculated IRR of the project is 25.7% and NPV discounted
at 18% of Birr 351,871.79 .In addition to this, the proposed project
possesses wide range of economic and social benefits such as increasing
the level of investment, tax revenue and employment creation. Generally’
the project is technically feasible, financially and commercially viable as
well as socially and economically acceptable. Hence the project is worth
implementing. To this effect, the promoter the owner of the envisaged
project, planned to establishment of recreational center in Bati town and
undertaken this project study to check the market, technical and financial
feasibility of this project. The promoter is very ambitious and committed
to realize the project. Hence, they expects to get the necessary support
from Bati Town Administration Industry and investment office and city
administration to make the project to be operational
6
1. Introduction
7
Service delivery is the provision of comprehensive and coordinated
services to people in need. Human service delivery is complex in
contemporary Western societies, with high community expectations,
competing demands and often delivered under fiscal constraints.
Specializations can mean that individual service providers or agencies
develop the expertise to deliver a very specific service, yet individuals,
families and communities often experience multiple needs and
interrelated problems The Government of the Federal Democratic
Republic of Ethiopia, after closely examining youth issues, gave
attention to youth problems and established the Ministry of Youth,
Sports and Culture in October 2001. This ministry has the duty and
responsibility to follow up, direct and coordinate youth affairs. The
Ministry of Youth, Sport and culture formulated a new National Youth
Policy in 2004. Following the formulation of the National Youth Policy,
the Ethiopian government developed an Urban and Rural Youth
Development Package in 2006 and has started partnering with
different local governmental organizations, community based
organizations and international agencies for program implementation.
The Urban Youth Development Package is a comprehensive development
package that is designed to solve the socio- economic problems of urban
youth. In Ethiopia youth Perception towards youth center service
delivery have not as such received significant research attention of
concerned bodies. This has resulted in scarce literature, low practice
and intervention on the area of youth services delivery.
8
and committed to realize the project. Hence, expects to get the necessary
support from the city administration to make the project to be
operational.
9
experience, but the values of recreation which give it depth and fullness
of meaning include the maintenance and improvement of physical and
psychic well-being, the growth and development of personality, and the
easing of social adjustments. Recreation is one of the keys to abundant
living. Because of its importance in the building of our social fabric,
recreation is more than a personal responsibility. As ingenious and
resourceful as man may be, his attempts to provide for him self
recreationally, meets an impasse unless he pools his resources with
those of his fellow man to enable provision of certain kinds of recreation
opportunity.
The very things that have given us increased freedom and leisure have also
worked in many ways to our disadvantage. The rapid increase in population
and the new leisure have created vast new economic markets and helped
to promote financial affluence. During the past quarter century while we
have been depleting our recreation resource potential, the recreation
needs and demands of the population have increased many times over.
Scientific and technological advances have prolonged life, produced
labor-saving devices, increased production per man-hour of work, and
reduced the work day and the work week. Longer life combined with
compulsory retirement practices has produced a new leisure group of
"senior citizens." The increase in leisure provides for small allotments of
time on weekdays, larger allotments on weekends and occasional holidays,
and substantial blocks of time for vacations. If this time is to be enjoyed and
used in a manner that will contribute to the positive growth of our culture,
suitable recreation opportunities must be conveniently accessible.
10
1.3. Objective of the project
The major goal of this project is to contribute towards the growth of the
trade sector in Bati town. Its specific objectives include the following:
The proposed infrastructure upgrade will create both short and long
term job opportunity for the local community and develop the local
skills base.
A. Source of Revenue
B. Employment opportunity
Based on figures from the Central Statistical Agency in 2005, Baati has an
estimated total population of 24,257 of whom 12,229 are men and 11,958 are
women.[2] The 1994 census reported this town had a total population of
13,965 of whom 6,471 were men and 7,494 were women. the total area of
land of the city was estimated over 1928.8 hectares . on the other hand
According to the 2013 ADM, StatisticS the total population of Oromia zone for
2013 was estimated to be 596,687 and the Bati town population is also
estimated to be above 42,725.
Bati town is one of the oldest town in the eastern part of the region and its
strategic location and availability of major infrastructures makes it the main
market center for crop productive and cattle and camel market, and
surrounding areas such as south wello zone of amhara region and zone 5 of
Afar Region.
Area:
According to the current used master plan, Bati has the total area of 1928.8
hectares. Information on land zoning of the town shows, 7.2% of the total
area of the town is to be covered by residential buildings, 1.5% by
commercial activities, 0.4% by Industrial activities, 4.7% by social & public
services, 0.2% by administrative zone, 4.6% is land reserved for construction
of roads and the proportion of land left for other infrastructures is about
81.4%.
Ecologically
Bati Town lies in wet land Ecosystem .It is bounded by wet evergreen
mountain forest land ecosystem. Because of the climatic stability the
green coverage of the city, is very significant and estimated to be about
35% including farmlands & vacant places. In the city green areas are
found long streets, in urban parks, in public & private gardens, along
stream banks and flood plains, in stream and downstream, ridges and
hills and left over spaces.
14
In spite of the rapid urban population growth and associated growing
demand for greenery during the past 10 years, only few planned green
structures, i.e. one is Yosef Ayalew green recreational center (TVET
college), Chigign tabia green recreational center, Project Dam Green
Area, & One private parks were developed for public greenery and
recreation in the city.
15
2. Service Description and Application
Recreational centers are places where people get entertainment and
enjoyment. The facilities provided include various indoor and outdoor
games, swimming pools, cinema halls and facilities to stage theaters and
music shows. At the same time these facilities also serve for conducting
various ceremonies such as wedding, and other assemblies. The
dedicated sports facility is proposed to be provided by way of a new
Community Recreation Centre (including swimming pool, multi-use
recreation hall, change rooms and ancillary rooms and service areas). It
is to be integrated with the adjacent existing community sports oval. The
proposed facilities are intended to balance the commercial and social
benefits for all community. To create a welcoming space to help cultivate
a strong sense of community, promote health and wellness in our
community and support for the needs of local residents. There will also
be indirect benefits from complimentary development which will occur
adjacent to the facility, promoting greater business investment interest,
regional awareness and tourism opportunities. The proposed recreation
facility will enhance the tourism experience in many ways and create
opportunities for residents and businesses in Bati.
16
3. Market Study and Service Capacity
17
Increases by 3%, the target population will increases Substantially as
shown in table 1 below.
3.1.3. Pricing
The envisaged plant as a startup will focus on providing entertainment
activities such as video games, snooker, watching of video films and
refreshment drinks. Moreover, the center shall rent its hall and
compound for weeding and meeting purposes. Based on the market
research result and the capacity of the envisaged plant, the following
selling price is set.
18
• Birr 2,000 for renting the hall for weeding ceremony
• Birr 600 per day for renting the hall for assembly purpose
• Birr 15 on average per person for soft drinks, hot drinks and food.
improving
with changing situations.
19
3.1.5. Marketing and Sales Strategy
The marketing strategy for this new hotel is going to be driven basically
by making available standard excellent customer service and provision of
complimentary services. We will work hard to build a loyal customer
base; customers that will always patronize us over and over again and as
well help us use word of mouth publicity to get their friends and
acquaintance to patronize us. Our marketing strategy is a simple one:
satisfied customers are our best marketing tool. When a customer leaves
our business, they know that they got the best price and service money
can buy, our name and service will stand on its own via our cheaper process
and very competitive prices.
• Advertise our hotel on national dailies, local TV stations and local radio
station
• Promote online via our official website and all available social media
platforms and Continuous improving the performance of our brands
• Hire the services of experts to make our brands the first choice
20
3.2. Plant capacity
Thus, given the expected demand for the service, and the planned
technology, the envisaged plant is set to attract the following number of
visitors.
per program.
21
4. Materials and Consumables and Inputs
The annual raw material and utility requirement and the associated cost
for the envisaged plant is listed in table 2 here under.
According to the above table the annual cost of material and utility at full
capacity of operation is estimated to be Birr 5 million
22
5. Technology and Engineering
5.1. Technology
The machineries and equipment required for providing the various
services stated earlier is detailed in table 3 below
Recreation Centre:
Gymnasium
The laundry center provides in-house cleaning service to bed room, and
sauna/stem bathrooms by providing clean towels, linens, covers and
uniform of the employees with the required time and quantity. The main
processes of laundry center are sewing (if any), washing, and squeezing
drying, folding and pressing. The laundry center will have a daily
capacity of providing 200 clean sets of towels, 300 sets of linen and cover
100 sets of uniforms and other miscellaneous items.
24
5.2.1. Locations and Site
The appropriate locations for the envisaged project in view of the
availability of infrastructure as well as market for the output are Bati city
03 Kebele Around Bati TVET College or Qeresa area.
2022/2023
Land acquisition Don
e
Document Preparation
Construction of □ □
Factory Buildings
Debt Financing
Import of Machinery
Purchase of Vehicles
& Equip
Recruitment,
Installation and
Commissioning
Operation
Grace Period
25
6. Manpower and Training Requirement
26
16 Cleaner 10 Unskilled 450 27,000
19 Guard 5
20 watires 5
Total 85 327,000
27
7. Financial Analysis
The financial analysis of the international standard Recreational center is
based on the data presented in the previous chapters and the following
assumptions:-
28
Depreciation
29
7.2. Total Initial Investment Cost
The total investment cost of the project including working capital is
estimated at Birr 15 million. The major breakdown of the total initial
investment cost is shown in Table 7.1.
Vehicles 700,000
30
7.3. Operation Cost
The annual production cost at full operation capacity is estimated at Birr
12.06 million (see Table 7.2). The major components of the production
cost depreciation, financial cost and material and input which account
for 26.82%, 22.63% and 18.72%, respectively. The remaining 31.82% is
the share of direct labor, utility, repair and maintenance, labor overhead
and other administration cost
31
7.4. Financial Evaluation
I. Profitability
For the envisaged project the simple rate of return equals to 25.1%
Based on cash flow statement described in the annex part, the calculated
IRR of the project is 25.7% and the net present value at 18 % discount
32
VI. Sensitivity Analysis
The envisaged project possesses wide range of benefits that promotes the
socio-economic goals and objectives stated in the strategic plan of the Bati
town in Amhara Regional state. It also plays a role in diversifying the
economic activity of the region. These other benefits are listed as follows
A. Profit Generation
B. Tax Revenue
In the project life under consideration, the region will collect about Birr
about 1million from corporate tax payment alone (i.e. excluding income
tax and). Such result create additional fund for the regional government
that will be used in expanding social and other basic services in the
region
33