COMMERCIAL CONTRACT NO. PROJECT NAME COMPANY NAME LOCATION ELIGIBLE CAPACITY (MW) REMARKS
OPERATION
BIOMASS POWER PLANTS 264.845
Montalban Landfill Methane Recovery and
11-Jun-2009 BREOC No. 2010-01-009 Montalban Methane Power Corporation Rodriguez, Rizal 2.175 FIT System
Power Generation Facility
4-Sep-2009 BREOC No. 2010-01-005 Bagasse-Fired Cogeneration Power Plant First Farmers Holding Corp. Talisay City, Negros Occidental 8.000 FIT System
06-Dec-10 BREOC No. 2011-01-019 Biomass Cogeneration Plant Crystal Sugar Company, Inc. Maramag, Bukidnon 9.000 Non-FIT (No power export since 2016)
6-Dec-2010 BREOC No. 2011-03-021 Bagasse-Fired Cogeneration Power Plant Central Azucarera de San Antonio Passi City, Iloilo 8.000 FIT System
22-Nov-2012 BREOC No. 2012-02-025 Bagasse-Fired Cogeneration Power Plant Green Future Innovations Inc. San Mariano, Isabela 14.000 FIT System
4-Feb-2015 BREOC No. 2013-02-029 Bagasse Cogeneration Power Plant Hawaiian Philippine Company Silay City, Negros Occidental 2.000 FIT System
10-Jul-2015 BREOC No. 2010-01-008 Rice Husk-Fired Biomass Power Plant Bataan 2020 Power Ventures, Inc. Samal, Bataan 11.100 FIT System
6-Oct-2015 BREOC No. 2013-03-030 Rice Husk-Fired Biomass Power Plant Isabela Biomass Energy Corporation Alicia, Isabela 18.000 FIT System
23-Oct-2015 BREOC No. 2011-02-018 Bagasse-Fired Cogeneration Power Plant Victorias Milling Company Inc. Victorias City, Negros Occidental 2.500 FIT System
10-Oct-2016 BREOC No. 2013-09-038 Rice Husk-Fired Biomass Power Plant Bicol Biomass Energy Corporation Pili, Camarines Sur 4.400 FIT System
30-Dec-2016 BREOC No. 2013-12-044 Rice Husk-Fired Biomass Power Plant Lamsan Power Corporation Sultan Kudarat, Maguindanao 13.500 FIT System
27-May-2017 BREOC No. 2014-09-050 Multi-Feedstock Biomass Power Plant Green Earth Enersource Corporation Buluan, Maguindanao 1.640 FIT System
21-Jul-2017 BREOC No. 2014-07-049 Biogas Power Plant Asian Carbon Neutral Power Corporation Tarlac City, Tarlac 1.700 FIT System
16-Feb-18 BREOC No. 2016-06-063 Bagasse-Fired Cogeneration Power Plant Central Azucarera Don Pedro, Inc Nasugbu, Batangas 2.000 FIT System
ELIGIBLE RE POWER PLANTS FOR RENEWABLE PORTFOLIO STANDARDS (RPS) COMPLIANCE FOR ON-GRID AND OFF-GRID AREAS
as of December 31, 2021
START OF
COMMERCIAL CONTRACT NO. PROJECT NAME COMPANY NAME LOCATION ELIGIBLE CAPACITY (MW) REMARKS
OPERATION
08-May-18 BREOC No. 2017-11-082 Biomass Cogeneration Plant Biotech Farms, Inc. Tantangan, South Cotabato 3.500 FIT System
START OF
COMMERCIAL CONTRACT NO. PROJECT NAME COMPANY NAME LOCATION ELIGIBLE CAPACITY (MW) REMARKS
OPERATION
With COE-FIT (Commercial operations once
November 14, 2019 BREOC No. 2016-08-066 25 MW Biomass Cogeneration Plant Central Azucarera de Bais Bais City, Negros Oriental 12.000 NGCP's CNP Backbone Stage 3 Project is
completed)
13-Dec-19 BREOC No. 2014-12-051 12 MW Biomass Power Plant Project Grass Gold Renewable Energy Corporation Llanera, Nueva Ecija 10.800 With COE-FIT
31-Dec-19 BREOC No. 2017-03-076 6 MW Biomass Power Plant VS Gripal Power Corporation San Jose City, Nueva Ecija 5.400 With COE-FIT
31-Dec-19 BREOC No. 2017-02-073 6 MW Biomass Power Plant Cleangreen Energy Corporation Orani, Bataan 7.700 With COE-FIT
29-Jan-20 BREOC No. 2018-02-085 6 MW Biomass Power Plant Surallah Power Generation, Inc. Surallah, South Cotabato 5.280 With COE-FIT
START OF
COMMERCIAL CONTRACT NO. PROJECT NAME COMPANY NAME LOCATION ELIGIBLE CAPACITY (MW) REMARKS
OPERATION
GEOTHERMAL POWER PLANTS 218.500
Non-Fit System (under Bilateral with PHINMA
8-Feb-2014 GRESC No. 2010-02-012 Maibarara 1 Geothermal Power Plant Maibarara Geothermal Inc. Santo Tomas, Batangas 20.000
Energy Corp.)
18-May-2019 GOC No. 2012-04-026 Tongonan 1 Power Plant Green Core Geothermal Inc. Kananga, Leyte 10.500 Non-FIT (Under WESM)
5-Feb-2015 SESC No. 2014-01-062 Pampanga Solar Power Plant (Phase I) RASLAG Corp. Mexico, Pampanga 10.046 FIT System
5-Mar-2015 SESC No. 2014-07-088 Burgos Solar Power Plant (Phase I) Energy Development Corporation Burgos, Ilocos Norte 4.100 FIT System
15-Mar-2015 SESC No. 2013-10-040 Cavite Economic Zone Solar Power Plant Majestics Energy Corporation Rosario and General Trias, Cavite 41.300 FIT System
4-Apr-2015 SESC No. 2012-08-019 Ormoc Solar Power Plant First Solar Energy Corp. Ormoc City, Leyte 30.355 FIT System
San Carlos Solar Power Plant Phase I-C and San Carlos City, Negros
6-Sep-2015 SESC No. 2013-09-037 San Carlos Solar Energy Inc. 23.000 FIT System
I-D Occidental
Solar Philippines Commercial Rooftop Central Mall Biñan, Biñan City, Non-FIT (Under Bilateral Agreement with
21-Oct-2015 SESC No. 2014-04-071 Central Mall Biñan Solar Power Plant 0.700
Projects, Inc. Laguna End-User)
9-Dec-2015 SESC No. 2013-10-043 Centrala Solar Power Plant nv vogt Philippines Solar Energy One, Inc. Surallah, South Cotabato 6.230 FIT System
23-Dec-2015 SESC No. 2014-01-062 Pampanga Solar Power Plant (Phase II) RASLAG Corp. Mexico, Pampanga 13.140 FIT System
ELIGIBLE RE POWER PLANTS FOR RENEWABLE PORTFOLIO STANDARDS (RPS) COMPLIANCE FOR ON-GRID AND OFF-GRID AREAS
as of December 31, 2021
START OF
COMMERCIAL CONTRACT NO. PROJECT NAME COMPANY NAME LOCATION ELIGIBLE CAPACITY (MW) REMARKS
OPERATION
19-Jan-2016 SESC No. 2014-07-088 Burgos Solar Power Plant (Phase II) Energy Development Corporation Burgos, Ilocos Norte 2.660 FIT System
10-Feb-2016 SESC No. 2015-03-115 Tarlac Solar Power Plant PetroSolar Corporation Tarlac City, Tarlac 50.070 FIT System
12-Feb-2016 SESC No. 2015-06-241 Hermosa Solar Power Plant YH Green Energy Incorporated Hermosa, Bataan 14.510 FIT System
29-Feb-2016 SESC No. 2012-08-020 Currimao Solar Power Plant Mirae Asia Energy Corporation Currimao, Ilocos Norte 20.000 FIT System
8-Mar-2016 SESC No. 2015-03-116 Lian Solar Power Plant Absolut Distillers, Inc. Lian, Batangas 2.040 FIT System
8-Mar-2016 SESC No. 2015-09-253 Valenzuela Solar Power Plant Valenzuela Solar Energy Inc. Valenzuela City, Metro Manila 8.500 FIT System
11-Mar-2016 SESC No. 2012-08-018 Cabanatuan Solar Power Plant First Cabanatuan Renewable Ventures, Inc. Cabanatuan City, Nueva Ecija 10.260 FIT System
11-Mar-2016 SESC No. 2014-12-091 Calatagan Solar Power Plant Solar Philippines Calatagan Corporation Calatagan, Batangas 63.300 FIT System
11-Mar-2016 SESC No. 2014-09-090 Bais Solar Power Plant Monte Solar Energy Inc. Bais City, Negros Oriental 18.000 FIT System
13-Mar-2016 SESC No. 2014-04-074 Kibawe Solar Power Plant Asian Greenenergy Corp. Kibawe, Bukidnon 10.490 FIT System
14-Mar-2016 SESC No. 2015-06-231 Bulacan III Solar Power Plant Bulacan Solar Energy Corp. San Ildefonso, Bulacan 15.000 FIT System
14-Mar-2016 SESC No. 2013-06-035 Cadiz Solar Power Plant Helios Solar Energy Corp. Cadiz City, Negros Occidental 132.500 FIT System
Mar-2016 SESC No. 2015-02-100 Digos Solar Power Plant Alterpower Digos Solar, Inc. Digos City , Davao del Sur 28.590 Non-FIT (Under WESM)
Mar-2016 SESC No. 2016-03-290 La Carlota Solar Power Plant (ISLASOL II) Negros Island Solar Power Inc. La Carlota City, Negros Occidental 32.000 Non-FIT (Under WESM)
Mar-2016 SESC No. 2014-05-080 Manapla Solar Power Plant Negros Island Solar Power Inc. Manapla, Negros Occidental 48.000 Non-FIT (Under WESM)
8-Apr-2016 SESC No. 2013-10-039 Sta. Rita Solar Power Plant (Phase I) Jobin-Sqm, Inc. Morong and Hermosa, Bataan 7.144 Non-FIT (Under WESM)
Apr-2016 SESC No. 2015-04-225 Silay Solar Power Plant Silay Solar Power, Inc. Silay City, Negros Occidental 25.010 Non-FIT (Under WESM)
Sep-2016 SESC No. 2013-09-036 Miag-ao Solar Power Plant Cosmo Solar Energy, Inc. Iloilo City, Iloilo 5.670 Non-FIT (Under WESM)
Oct-2016 SESC No. 2014-04-073 Palo Solar Power Plant Sulu Electric Power and Light (Phils.), Inc. Palo, Leyte 49.810 Non-FIT (Under WESM)
START OF
COMMERCIAL CONTRACT NO. PROJECT NAME COMPANY NAME LOCATION ELIGIBLE CAPACITY (MW) REMARKS
OPERATION
Dec-2016 SESC No. 2016-02-278 Dalayap Solar Power Plant nv vogt Philippines Solar Energy Four, Inc. Tarlac City & Victoria, Tarlac 7.480 Non-FIT (Under WESM)
8-Mar-2017 SESC No. 2013-10-039 Sta. Rita Solar Power Plant (Phase II) Jobin-Sqm, Inc. Morong and Hermosa, Bataan 25.197 Non-FIT (Under WESM)
Solar Philippines Commercial Rooftop CityMall Roxas, Arnaldo Blvd., Non-FIT (Under Bilateral Agreement with
30-Mar-2017 SESC No. 2015-02-110 Roxas City Mall Solar Rooftop Project 0.587
Projects Inc. Roxas City, Capiz End-User)
Jun-2017 SESC No. 2015-05-230 Toledo Solar Power Plant First Toledo Solar Energy Corp. Toledo, Cebu 60.000 Non-FIT (Under WESM)
1-Mar-2018 SESC No. 2016-02-276 Sarrat Solar Power Plant Bosung Solartec, Inc. Sarrat, Ilocos Norte 1.000 Non-FIT (Under WESM)
21-Jan-2020 SESC No. 2017-03-371 Isla Solar Power Project Ecopark Energy of Valenzuela Corp Barangay Isla, Valenzuela City 4.700 Non-FIT (under WESM)
ELIGIBLE RE POWER PLANTS FOR RENEWABLE PORTFOLIO STANDARDS (RPS) COMPLIANCE FOR ON-GRID AND OFF-GRID AREAS
as of December 31, 2021
START OF
COMMERCIAL CONTRACT NO. PROJECT NAME COMPANY NAME LOCATION ELIGIBLE CAPACITY (MW) REMARKS
OPERATION
28-May-2021 SESC No. 2017-03-370 Tagalag Solar Power Project Ecopark Energy of Valenzuela Corp. Brgy. Tagalag, Valenzuela City 16.000 Non-FIT (Under WESM)
5-Jul-2021 SEOC No. 2020-02-560 GIGASOL3 Solar Power Project Gigasol3, Inc. Barrio Salaza, Palauig, Zambales 54.992 Non-FIT (Under WESM)
10-Sep-2021 SEOC No. 2020-11-572 Alaminos Solar Power Project Solarace1 Energy Corp. Alaminos, Laguna 89.362 Non-FIT (Under WESM)
24-Dec-2009 (Unit I)
HSC No. 2016-06-665 Pantabangan Hydroelectric Power Plant First Gen Hydro Power Corporation Pantabangan, Nueva Ecija 20.800 Non-Fit (under WESM)
08-Dec-2010 (Unit II)
24-May-2010 HOC No. 2016-04-628 Sibulan B Hydroelectric Power Plant Hedcor, Inc. Sta. Cruz, Davao del Sur 26.256 Non-FIT
9-Aug-2010 HOC No. 2016-04-627 Sibulan A Hydroelectric Power Plant Hedcor, Inc. Sta. Cruz, Davao del Sur 16.328 Non-FIT
30-Apr-2012 HOC No. 2012-09-224 Irisan 1 Hydroelectric Power Plant HEDCOR, Inc. Tuba, Benguet 3.800 FIT System
START OF
COMMERCIAL CONTRACT NO. PROJECT NAME COMPANY NAME LOCATION ELIGIBLE CAPACITY (MW) REMARKS
OPERATION
Non-FIT ( Under Bilateral Agreement with
1-Mar-2014 HSC No. 2012-08-219 Tudaya 1 Hydroelectric Power Plant Hedcor Sibulan, Inc . Sta. Cruz, Davao del Sur 6.600
DLPC)
11-Apr-2014 HSC No. 2012-04-204 Tudaya 2 Hydroelectric Power Plant Hedcor Tudaya, Inc. Sta. Cruz, Davao del Sur 8.137 FIT System
2-Jun-2015 HSC No. 2012-04-201 Sabangan Hydroelectric Power Plant Hedcor Sabangan, Inc. Sabangan, Mountain Province 14.139 FIT System
28-Feb-2016 HSC No. 2013-08-267 Bulanao Hydroelectric Power Project DPJ Engineers and Consultants Tabuk, Kalinga 1.000 Non-FIT ( Under Bilateral Agreement)
6-Mar-2018 HSC No. 2011-12-170 New Bataan Hydroelectric Power Plant Euro Hydro Power (Asia) Holdings, Inc. New Bataan, Compostela Valley 3.188 FIT System
2-Jul-2018 HSC No. 2013-11-326 Manolo Fortich 1 Hydroelectric Power Plant Hedcor Bukidnon, Inc. Santiago, Bukidnon 45.936 FIT System
23-Jul-2018 HSC No. 2016-011-694 Balugbog Hydroelectric Power Plant PHILPODECO Nagcarlan, Laguna 1.100 FIT System
19-Oct-2018 HSC No. 2016-11-693 Palakpakin Hydroelectric Power Plant PHILPODECO San Pablo City, Laguna 1.500 FIT System
23-Nov-2018 HSC No. 2013-11-327 Manolo Fortich 2 Hydroelectric Power Plant Hedcor Bukidnon, Inc. Santiago, Bukidnon 27.387 FIT System
17-May-2019 HSC No. 2014-04-437 Majayjay Hydroelectric Power Plant Majayjay Hydropower Corporation Majayjay, Laguna 2.190 FIT System
1-Jul-2019 HSC No. 2015-05-568 La Trinidad Hydroelectric Power Plant Hedcor, Inc. La Trinidad, Benguet 20.400 FIT System
25-Dec-19 HSC No. 2015-04-565 Loboc 2 Hydroelectric Power Plant Sta. Clara Power Corp. Bohol 1.240 FIT System
START OF
COMMERCIAL CONTRACT NO. PROJECT NAME COMPANY NAME LOCATION ELIGIBLE CAPACITY (MW) REMARKS
OPERATION
10-Oct-2014 WESC No. 2012-07-058 Bangui Bay Wind Power Project Phase 3 NorthWind Power Development Corporation Bangui, Ilocos Norte 18.900 FIT System
11-Nov-2014 WESC No. 2009-09-004 Burgos Wind Power Project EDC Burgos Wind Power Corporation Burgos, Ilocos Norte 150.000 FIT System
11-Nov-2014 WESC No. 2009-09-005 Caparispisan Wind Power Project North Luzon Renewable Energy Corporation Pagudpud, Ilocos Norte 81.000 FIT System
27-Dec-2014 WESC No. 2009-10-009 San Lorenzo Wind Power Project Guimaras Wind Corporation San Lorenzo, Guimaras 54.000 FIT System
9-Jun-2015 WESC No. 2009-09-018-AF1 Pililla Wind Power Project Alternergy Wind One Corporation Pililia, Rizal 54.000 FIT System
10-Jun-2015 WESC No. 2009-09-002 Nabas Wind Power Project PetroWind Energy Inc. Nabas, Aklan 36.000 FIT System
Non-FIT (Under Bilateral Agreement with
5-Dec-2019 WESC No. 2011-03-045 Puerto Galera Wind Power Plant Philippine Hybrid Energy Systems, Inc. Puerto Galera, Mindoro 16.000
ORMECO)
TOTAL ELIGIBLE CAPACTIY 2,619.01
Eligibility of RE Facilities are based on the criteria provided in Sections 10 and 11 of Department Circular No. DC2017-12-0015 and Sections 9 and 10 of Department Circular No. DC2018-08-0024.