ELIGIBLE RE POWER PLANTS FOR RENEWABLE PORTFOLIO STANDARDS (RPS) COMPLIANCE FOR ON-GRID AND OFF-GRID AREAS

as of December 31, 2021

START OF
COMMERCIAL CONTRACT NO. PROJECT NAME COMPANY NAME LOCATION ELIGIBLE CAPACITY (MW) REMARKS
OPERATION
BIOMASS POWER PLANTS 264.845
Montalban Landfill Methane Recovery and
11-Jun-2009 BREOC No. 2010-01-009 Montalban Methane Power Corporation Rodriguez, Rizal 2.175 FIT System
Power Generation Facility
4-Sep-2009 BREOC No. 2010-01-005 Bagasse-Fired Cogeneration Power Plant First Farmers Holding Corp. Talisay City, Negros Occidental 8.000 FIT System

06-Dec-10 BREOC No. 2011-01-019 Biomass Cogeneration Plant Crystal Sugar Company, Inc. Maramag, Bukidnon 9.000 Non-FIT (No power export since 2016)

6-Dec-2010 BREOC No. 2011-03-021 Bagasse-Fired Cogeneration Power Plant Central Azucarera de San Antonio Passi City, Iloilo 8.000 FIT System

22-Nov-2012 BREOC No. 2012-02-025 Bagasse-Fired Cogeneration Power Plant Green Future Innovations Inc. San Mariano, Isabela 14.000 FIT System

Payatas Landfill Methane Recovery and


5-Mar-2013 BREOC No. 2011-08-023 Pangea Green Energy Philippines, Inc. Quezon City 0.876 FIT System
Power Generation Facility

Rice Husk-Fired Biomass Power Plant


2-Nov-2014 BREOC No. 2011-01-013 San Jose City I Power Corporation San Jose City, Nueva Ecija 10.800 FIT System
(Phase I)

4-Feb-2015 BREOC No. 2013-02-029 Bagasse Cogeneration Power Plant Hawaiian Philippine Company Silay City, Negros Occidental 2.000 FIT System

10-Jul-2015 BREOC No. 2010-01-008 Rice Husk-Fired Biomass Power Plant Bataan 2020 Power Ventures, Inc. Samal, Bataan 11.100 FIT System

6-Oct-2015 BREOC No. 2013-03-030 Rice Husk-Fired Biomass Power Plant Isabela Biomass Energy Corporation Alicia, Isabela 18.000 FIT System

Bagasse-Fired Biomass Cogeneration Power Kabankalan City, Negros


21-Oct-2015 BREOC No. 2013-11-040 Universal Robina Corporation 20.000 FIT System
Plant Occidental

23-Oct-2015 BREOC No. 2011-02-018 Bagasse-Fired Cogeneration Power Plant Victorias Milling Company Inc. Victorias City, Negros Occidental 2.500 FIT System

Green Innovations for Tomorrow


27-Feb-2016 BREOC No. 2013-09-037 Rice Husk-Fired Biomass Power Plant Talavera, Nueva Ecija 10.800 FIT System
Corporation

10-Oct-2016 BREOC No. 2013-09-038 Rice Husk-Fired Biomass Power Plant Bicol Biomass Energy Corporation Pili, Camarines Sur 4.400 FIT System

30-Dec-2016 BREOC No. 2013-12-044 Rice Husk-Fired Biomass Power Plant Lamsan Power Corporation Sultan Kudarat, Maguindanao 13.500 FIT System

Payatas Landfill Methane Recovery and


17-Feb-2017 BREOC No. 2011-08-023 Pangea Green Energy Philippines, Inc. Quezon City 0.424 FIT System
Power Generation Facility (Phase II: 640kW)

27-May-2017 BREOC No. 2014-09-050 Multi-Feedstock Biomass Power Plant Green Earth Enersource Corporation Buluan, Maguindanao 1.640 FIT System

21-Jul-2017 BREOC No. 2014-07-049 Biogas Power Plant Asian Carbon Neutral Power Corporation Tarlac City, Tarlac 1.700 FIT System

Rice Husk-Fired Biomass Power Plant


22-Sep-17 BREOC No. 2011-01-013 San Jose City I Power Corporation San Jose City, Nueva Ecija 10.800 FIT System
(Phase II)

16-Feb-18 BREOC No. 2016-06-063 Bagasse-Fired Cogeneration Power Plant Central Azucarera Don Pedro, Inc Nasugbu, Batangas 2.000 FIT System
ELIGIBLE RE POWER PLANTS FOR RENEWABLE PORTFOLIO STANDARDS (RPS) COMPLIANCE FOR ON-GRID AND OFF-GRID AREAS
as of December 31, 2021

START OF
COMMERCIAL CONTRACT NO. PROJECT NAME COMPANY NAME LOCATION ELIGIBLE CAPACITY (MW) REMARKS
OPERATION
08-May-18 BREOC No. 2017-11-082 Biomass Cogeneration Plant Biotech Farms, Inc. Tantangan, South Cotabato 3.500 FIT System

With COE-FIT (Commercial operations once


January 19, 2019 BREOC No. 2013-02-029 28.58 MW Biomass Power Plant Hawaiian-Philippine Company Negros Occidental 7.500 NGCP's CNP Backbone Stage 3 Project is
completed)

With COE-FIT (Commercial operations once


February 24, 2019 BREOC No. 2011-01-018 63 MW Biomass Expansion Project Victorias Milling Company, Inc. Victorias City, Negros Occidental 21.450 NGCP's CNP Backbone Stage 3 Project is
completed)

December 5, 2018 (Phase


I) BREOC No. 2017-11-081 12.39 MW Biogas Power Plant Biotech Farms, Inc. Banga, South Cotabato 6.400 With COE-FIT
July 31, 2019 (Phase II)

San Carlos City, Negros


August 29, 2019 BREOC No. 2010-01-004 8 MW Biomass Cogeneration Plant San Carlos Bioenergy, Inc. 1.500 With COE-FIT
Occidental

15 MW Rice Husk-Fired Biomass Power


October 3, 2019 BREOC No. 2018-07-090 Cagayan Biomass Energy Corporation Burgos, Isabela 13.500 With COE-FIT
Plant
ELIGIBLE RE POWER PLANTS FOR RENEWABLE PORTFOLIO STANDARDS (RPS) COMPLIANCE FOR ON-GRID AND OFF-GRID AREAS
as of December 31, 2021

START OF
COMMERCIAL CONTRACT NO. PROJECT NAME COMPANY NAME LOCATION ELIGIBLE CAPACITY (MW) REMARKS
OPERATION
With COE-FIT (Commercial operations once
November 14, 2019 BREOC No. 2016-08-066 25 MW Biomass Cogeneration Plant Central Azucarera de Bais Bais City, Negros Oriental 12.000 NGCP's CNP Backbone Stage 3 Project is
completed)

13-Dec-19 BREOC No. 2014-12-051 12 MW Biomass Power Plant Project Grass Gold Renewable Energy Corporation Llanera, Nueva Ecija 10.800 With COE-FIT

Green Innovations for Tomorrow


25-Dec-19 BREOC No. 2013-09-037 6 MW Biomass Power Plant (Phase II) Talavera, Nueva Ecija 5.400 With COE-FIT
Corporation

With COE-FIT (Commercial operations once


48.5 MW Bagasse-Fired Cogeneration
28-Nov-19 BREOC No. 2016-09-069 BISCOM, Inc. Binalbagan, Negros Occidental 12.700 NGCP's CNP Backbone Stage 3 Project is
Power Plant
completed)

31-Dec-19 BREOC No. 2017-03-076 6 MW Biomass Power Plant VS Gripal Power Corporation San Jose City, Nueva Ecija 5.400 With COE-FIT

31-Dec-19 BREOC No. 2017-02-073 6 MW Biomass Power Plant Cleangreen Energy Corporation Orani, Bataan 7.700 With COE-FIT

29-Jan-20 BREOC No. 2018-02-085 6 MW Biomass Power Plant Surallah Power Generation, Inc. Surallah, South Cotabato 5.280 With COE-FIT

RE FACILITIES COMPLETED BUT NOT YET COMMERCIALLY OPERATING

Commercial operations once NGCP's CNP


- BREOC No. 2011-12-024 20 MW Multi-Feedstock Power Plant San Carlos Biopower, Inc. San Carlos, Negros Occidental 18.000
Backbone Stage 3 Project is completed

Commercial operations once NGCP's CNP


- BREOC No. 2018-03-140 25 MW Biomass Power Plant North Negros Biopower, Inc. Manapla, Negros Occidental 22.370
Backbone Stage 3 Project is completed

Commercial operations once NGCP's CNP


- BREOC No. 2016-06-065 25 MW Biomass Power Plant South Negros Biopower, Inc. La Carlota City, Negros Occidental 22.370
Backbone Stage 3 Project is completed
ELIGIBLE RE POWER PLANTS FOR RENEWABLE PORTFOLIO STANDARDS (RPS) COMPLIANCE FOR ON-GRID AND OFF-GRID AREAS
as of December 31, 2021

START OF
COMMERCIAL CONTRACT NO. PROJECT NAME COMPANY NAME LOCATION ELIGIBLE CAPACITY (MW) REMARKS
OPERATION
GEOTHERMAL POWER PLANTS 218.500
Non-Fit System (under Bilateral with PHINMA
8-Feb-2014 GRESC No. 2010-02-012 Maibarara 1 Geothermal Power Plant Maibarara Geothermal Inc. Santo Tomas, Batangas 20.000
Energy Corp.)

Southern Negros Geothermal Production Non-Fit (under Bilateral Agreement with


21-Jul-2014 GRESC No. 2009-10-002 Energy Development Corporation Valencia, Negros Oriental 30.000
Field -Nasulo Geothermal Power Plant Bohol Light Company Inc.)

Non-Fit (under Bilateral Agreement with


5-Feb-2015 GOC No. 2012-04-027 Bacon Manito Geothermal Power Plant Bac-man Geothermal Inc. Sorsogon 140.000 CASURECO II, INEC, KAELCO, MOPRECO,
PELCO II)
Non-FIT System
Declared to our Bilateral Contract Quantity
Makban Geothermal Power Plant - customers specifically to Advent Energy Inc. and
26-Jul-2016 GREOC No. 2009-10-007 AP Renewables Inc. Bitin, Bay, Laguna 6.000
Binary Geothermal Power Plant
Aboitiz Energy Solutions Inc.

Non-Fit System (under Bilateral with PHINMA


30-Apr-2018 GRESC No. 2010-02-012 Maibarara 2 Geothermal Power Plant Maibarara Geothermal Inc. Santo Tomas, Batangas 12.000
Energy Corp.)

18-May-2019 GOC No. 2012-04-026 Tongonan 1 Power Plant Green Core Geothermal Inc. Kananga, Leyte 10.500 Non-FIT (Under WESM)

SOLAR POWER PLANTS 1312.960


San Carlos City, Negros
15-May-2014 SESC No. 2013-09-037 San Carlos Solar Power Plant Phase I-A San Carlos Solar Energy Inc. 13.000 FIT System
Occidental

San Carlos City, Negros


16-Aug-2014 SESC No. 2013-09-037 San Carlos Solar Power Plant Phase I-B San Carlos Solar Energy Inc. 9.000 FIT System
Occidental

5-Feb-2015 SESC No. 2014-01-062 Pampanga Solar Power Plant (Phase I) RASLAG Corp. Mexico, Pampanga 10.046 FIT System

5-Mar-2015 SESC No. 2014-07-088 Burgos Solar Power Plant (Phase I) Energy Development Corporation Burgos, Ilocos Norte 4.100 FIT System

15-Mar-2015 SESC No. 2013-10-040 Cavite Economic Zone Solar Power Plant Majestics Energy Corporation Rosario and General Trias, Cavite 41.300 FIT System

4-Apr-2015 SESC No. 2012-08-019 Ormoc Solar Power Plant First Solar Energy Corp. Ormoc City, Leyte 30.355 FIT System

Solar Philippines Commercial Rooftop


7-Apr-2015 SESC No. 2014-04-072 SM North Solar Power Plant Quezon City, Metro Manila 1.469 FIT System
Projects, Inc.

San Carlos Solar Power Plant Phase I-C and San Carlos City, Negros
6-Sep-2015 SESC No. 2013-09-037 San Carlos Solar Energy Inc. 23.000 FIT System
I-D Occidental

Solar Philippines Commercial Rooftop Central Mall Biñan, Biñan City, Non-FIT (Under Bilateral Agreement with
21-Oct-2015 SESC No. 2014-04-071 Central Mall Biñan Solar Power Plant 0.700
Projects, Inc. Laguna End-User)

Non-FIT ( Under Bilateral Agreement with


26-Nov-2015 SESC No. 2012-03-004 Kirahon Solar Power Plant Kirahon Solar Energy Corporation Villanueva, Misamis Oriental 12.500
CEPALCO

9-Dec-2015 SESC No. 2013-10-043 Centrala Solar Power Plant nv vogt Philippines Solar Energy One, Inc. Surallah, South Cotabato 6.230 FIT System

23-Dec-2015 SESC No. 2014-01-062 Pampanga Solar Power Plant (Phase II) RASLAG Corp. Mexico, Pampanga 13.140 FIT System
ELIGIBLE RE POWER PLANTS FOR RENEWABLE PORTFOLIO STANDARDS (RPS) COMPLIANCE FOR ON-GRID AND OFF-GRID AREAS
as of December 31, 2021

START OF
COMMERCIAL CONTRACT NO. PROJECT NAME COMPANY NAME LOCATION ELIGIBLE CAPACITY (MW) REMARKS
OPERATION
19-Jan-2016 SESC No. 2014-07-088 Burgos Solar Power Plant (Phase II) Energy Development Corporation Burgos, Ilocos Norte 2.660 FIT System

10-Feb-2016 SESC No. 2015-03-115 Tarlac Solar Power Plant PetroSolar Corporation Tarlac City, Tarlac 50.070 FIT System

12-Feb-2016 SESC No. 2015-06-241 Hermosa Solar Power Plant YH Green Energy Incorporated Hermosa, Bataan 14.510 FIT System

29-Feb-2016 SESC No. 2012-08-020 Currimao Solar Power Plant Mirae Asia Energy Corporation Currimao, Ilocos Norte 20.000 FIT System

8-Mar-2016 SESC No. 2015-03-116 Lian Solar Power Plant Absolut Distillers, Inc. Lian, Batangas 2.040 FIT System

8-Mar-2016 SESC No. 2015-09-253 Valenzuela Solar Power Plant Valenzuela Solar Energy Inc. Valenzuela City, Metro Manila 8.500 FIT System

11-Mar-2016 SESC No. 2012-08-018 Cabanatuan Solar Power Plant First Cabanatuan Renewable Ventures, Inc. Cabanatuan City, Nueva Ecija 10.260 FIT System

11-Mar-2016 SESC No. 2014-12-091 Calatagan Solar Power Plant Solar Philippines Calatagan Corporation Calatagan, Batangas 63.300 FIT System

11-Mar-2016 SESC No. 2014-09-090 Bais Solar Power Plant Monte Solar Energy Inc. Bais City, Negros Oriental 18.000 FIT System

Enfinity Philippines Renewable Resources Clark Special Economic Zone,


12-Mar-2016 SESC No. 2014-07-086 Clark Solar Power Plant 22.330 FIT System
Inc. Pampanga

SPARC Solar Powered Agri-Rural


13-Mar-2016 SESC No. 2012-03-013 Palauig Solar Power Plant Palauig, Zambales 5.020 FIT System
Communities Corporation

13-Mar-2016 SESC No. 2014-04-074 Kibawe Solar Power Plant Asian Greenenergy Corp. Kibawe, Bukidnon 10.490 FIT System

14-Mar-2016 SESC No. 2015-06-231 Bulacan III Solar Power Plant Bulacan Solar Energy Corp. San Ildefonso, Bulacan 15.000 FIT System

14-Mar-2016 SESC No. 2013-06-035 Cadiz Solar Power Plant Helios Solar Energy Corp. Cadiz City, Negros Occidental 132.500 FIT System

San Carlos City, Negros


Mar-2016 SESC No. 2015-05-226 SACASUN Solar Power Plant San Carlos Sun Power Inc. 58.980 Non-FIT (Under WESM)
Occidental

Mar-2016 SESC No. 2015-02-100 Digos Solar Power Plant Alterpower Digos Solar, Inc. Digos City , Davao del Sur 28.590 Non-FIT (Under WESM)

Mar-2016 SESC No. 2016-03-290 La Carlota Solar Power Plant (ISLASOL II) Negros Island Solar Power Inc. La Carlota City, Negros Occidental 32.000 Non-FIT (Under WESM)

Mar-2016 SESC No. 2014-05-080 Manapla Solar Power Plant Negros Island Solar Power Inc. Manapla, Negros Occidental 48.000 Non-FIT (Under WESM)

8-Apr-2016 SESC No. 2013-10-039 Sta. Rita Solar Power Plant (Phase I) Jobin-Sqm, Inc. Morong and Hermosa, Bataan 7.144 Non-FIT (Under WESM)

Apr-2016 SESC No. 2015-04-225 Silay Solar Power Plant Silay Solar Power, Inc. Silay City, Negros Occidental 25.010 Non-FIT (Under WESM)

Sep-2016 SESC No. 2013-09-036 Miag-ao Solar Power Plant Cosmo Solar Energy, Inc. Iloilo City, Iloilo 5.670 Non-FIT (Under WESM)

Oct-2016 SESC No. 2014-04-073 Palo Solar Power Plant Sulu Electric Power and Light (Phils.), Inc. Palo, Leyte 49.810 Non-FIT (Under WESM)

Tarlac City, San Jose & Capas,


Dec-2016 SESC No. 2016-02-277 Armenia Solar Power Plant nv vogt Philippines Solar Energy Three, Inc. 8.840 Non-FIT (Under WESM)
Tarlac
ELIGIBLE RE POWER PLANTS FOR RENEWABLE PORTFOLIO STANDARDS (RPS) COMPLIANCE FOR ON-GRID AND OFF-GRID AREAS
as of December 31, 2021

START OF
COMMERCIAL CONTRACT NO. PROJECT NAME COMPANY NAME LOCATION ELIGIBLE CAPACITY (MW) REMARKS
OPERATION
Dec-2016 SESC No. 2016-02-278 Dalayap Solar Power Plant nv vogt Philippines Solar Energy Four, Inc. Tarlac City & Victoria, Tarlac 7.480 Non-FIT (Under WESM)

SPARC Solar Powered Agri-Rural


Dec-2016 SESC No. 2012-03-014 Morong Solar Power Plant Morong, Bataan 5.020 Non-FIT (Under WESM)
Communities Corporation

SPARC Solar Powered Agri-Rural


Dec-2016 SESC No. 2012-03-012 San Rafael Solar Power Plant San Rafael, Bulacan 3.820 Non-FIT (Under WESM)
Communities Corporation

Phase IV, Freeport Area of Bataan,


Feb-2017 SESC No. 2014-04-076 Bataan Solar Power Plant Next Generation Power Technology Corp. 18.000 Non-FIT (Under WESM)
Mariveles City, Bataan

8-Mar-2017 SESC No. 2013-10-039 Sta. Rita Solar Power Plant (Phase II) Jobin-Sqm, Inc. Morong and Hermosa, Bataan 25.197 Non-FIT (Under WESM)

Solar Philippines Commercial Rooftop CityMall Roxas, Arnaldo Blvd., Non-FIT (Under Bilateral Agreement with
30-Mar-2017 SESC No. 2015-02-110 Roxas City Mall Solar Rooftop Project 0.587
Projects Inc. Roxas City, Capiz End-User)

Jun-2017 SESC No. 2015-05-230 Toledo Solar Power Plant First Toledo Solar Energy Corp. Toledo, Cebu 60.000 Non-FIT (Under WESM)

1-Mar-2018 SESC No. 2016-02-276 Sarrat Solar Power Plant Bosung Solartec, Inc. Sarrat, Ilocos Norte 1.000 Non-FIT (Under WESM)

Non-FIT (Under Bilateral Agreement with


23-Sep-2018 SESC No. 2016-06-312 Kalibo Solar Power Plant Solar Pacific Citysun Corporation Kalibo, Aklan 0.218
End-User)
Kabankalan City, Negros Non-FIT (Under Bilateral Agreement with
25-Sep-2018 SESC No. 2016-06-317 Kabankalan Solar Power Plant Solar Pacific Citysun Corporation 0.605
Occidental End-User)
Non-FIT (Under Bilateral Agreement with
25-Sep-2018 SESC No. 2016-06-318 Victorias Solar Power Plant Solar Pacific Citysun Corporation Victorias City, Negros Occidental 0.635
End-User)
Non-FIT (Under Bilateral Agreement with
25-Sep-2018 SESC No. 2016-06-314 Dumaguete Solar Power Plant Solar Pacific Citysun Corporation Dumaguete City, Negros Oriental
0.265 End-User)

Non-FIT (Under Bilateral Agreement with


25-Sep-2018 SESC No. 2016-06-316 Tagum Solar Power Plant Solar Pacific Citysun Corporation Tagum City, Davao del Norte
End-User)
1.110

Non-FIT (Under Bilateral Agreement with


30-Sep-2018 SESC No. 2016-08-325 Boracay Solar Power Plant Solar Pacific Citysun Corporation Malay, Aklan 0.363
End-User)

Non-FIT (Under Bilateral Agreement with


12-Apr-2019 SESC No. 2018-05-481 CityMall Mandalangan Solar Power Plant Solar Pacific Citysun Corporation Bacolod City, Negros Occidental 0.634
End-User)

Non-FIT (Under Bilateral Agreement with


29-May-2019 SESC No. 2018-05-484 Dau Solar Power Plant Solar Pacific Citysun Corporation Mabalacat, Pampanga
End-User)
0.238

Solar Philippines Commercial Rooftop Non-FIT (Under Bilateral Agreement with


28-Jun-2019 SESC No. 2015-02-111 SM Mall of Asia Solar Power Project Pasay City, Metro Manila
Projects, Inc. End-User)
2.686

Non-FIT (Under Bilateral Agreement with


12-Sep-2019 SESC No. 2017-07-442 Concepcion 1 Solar Power Project Solar Philippines Tarlac Corporation Concepcion, Tarlac
MERALCO)
100.613

Non-FIT (Under Bilateral Agreement with


17-Oct-2019 SESC No. 2016-11-352 Gaisano Iloilo Solar Rooftop Project EDC Siklab Power Corporation Iloilo City, Iloilo
End-User)
1.030

General Santos City, South Non-FIT (Under Bilateral Agreement with


3-Dec-2019 SESC No. 2014-12-096 Santos Solar Power Plant Astronergy Development GenSan Inc.
Cotabato SOCOTECO 2)
24.960

21-Jan-2020 SESC No. 2017-03-371 Isla Solar Power Project Ecopark Energy of Valenzuela Corp Barangay Isla, Valenzuela City 4.700 Non-FIT (under WESM)
ELIGIBLE RE POWER PLANTS FOR RENEWABLE PORTFOLIO STANDARDS (RPS) COMPLIANCE FOR ON-GRID AND OFF-GRID AREAS
as of December 31, 2021

START OF
COMMERCIAL CONTRACT NO. PROJECT NAME COMPANY NAME LOCATION ELIGIBLE CAPACITY (MW) REMARKS
OPERATION

Non-FIT (Under Bilateral Agreement with


4-Feb-2020 SESC No. 2018-08-489 Tumingad Solar Power Project SUWECO Tablas Energy Corporation Odiongan, Romblon 7.500
TIELCO)

Sitio Sabang, Barangay


4-Aug-2020 SESC No. 2014-05-081 Palawan Solar Power Project Sabang Renewable Energy Corporation Cabayugan, Puerto Princesa City, 1.458 Non-FIT (Under QTP)
Palawan
Non-FIT (Under Bilateral Agreement with
12-May-2021 SESC No. 2016-08-327 San Miguel Solar Power Project Powersource First Bulacan Solar Inc. San Miguel, Bulacan 80.923
MERALCO)

28-May-2021 SESC No. 2017-03-370 Tagalag Solar Power Project Ecopark Energy of Valenzuela Corp. Brgy. Tagalag, Valenzuela City 16.000 Non-FIT (Under WESM)

5-Jul-2021 SEOC No. 2020-02-560 GIGASOL3 Solar Power Project Gigasol3, Inc. Barrio Salaza, Palauig, Zambales 54.992 Non-FIT (Under WESM)

10-Sep-2021 SEOC No. 2020-11-572 Alaminos Solar Power Project Solarace1 Energy Corp. Alaminos, Laguna 89.362 Non-FIT (Under WESM)

HYDRO POWER PLANTS 412.802


February 2010
(Units I & II) Cantingas Hydroelectric Power Plant (Units I, San Fernando, Sibuyan Island, Non-Fit (Under Bilateral Agreement with
HSC No. 2012-08-220 Cantingas Mini-Hydro Power Corporation 1.350
January 2016 II & III) Romblon ROMELCO)
(Unit III)

24-Dec-2009 (Unit I)
HSC No. 2016-06-665 Pantabangan Hydroelectric Power Plant First Gen Hydro Power Corporation Pantabangan, Nueva Ecija 20.800 Non-Fit (under WESM)
08-Dec-2010 (Unit II)

Non-FIT (Under Bilateral Agreement with


January 2010 HSC No. 2010-03-131 Ambangal Hydroelectric Power Plant Provincial Government of Ifugao Kiangan, Ifugao 0.200
IFELCO)

24-May-2010 HOC No. 2016-04-628 Sibulan B Hydroelectric Power Plant Hedcor, Inc. Sta. Cruz, Davao del Sur 26.256 Non-FIT

9-Aug-2010 HOC No. 2016-04-627 Sibulan A Hydroelectric Power Plant Hedcor, Inc. Sta. Cruz, Davao del Sur 16.328 Non-FIT

Non-FIT (Under Bilateral Agreement with


2-Nov-2010 HSC No. 2010-02-084 Hitoma 1 Hydroelectric Power Plant Sunwest Water & Electric Company, Inc. Caramoran, Catanduanes 1.500
FICELCO)

Commonal-Uddiawan Hydroelectric Power


26-Dec-2010 HSC No. 2010-02-060 Smith Bell Mini-Hydro Corp. Solano, Nueva Vizcaya 1.800 FIT System
Plant

Non-FIT (Under Bilateral Agreement with


1-Feb-2011 HSC No. 2010-02-085 Solong Hydroelectric Power Plant Sunwest Water & Electric Company, Inc. San Miguel, Catanduanes 2.100
FICELCO)

Unit 1 – 15 June 2011


Unit 2 – 08 June 2011 HSC No. 2016-04-619 Ambuklao Hydroelectric Power Plant SN Aboitiz Power - Benguet, Inc. Ambuklao, Benguet 104.550 Non-FIT
Unit 3 – 25 May 2011

Unit 1 – 17 July 2012


Unit 2 – 06 July 2013
Unit 3 – 21 January 2013 HSC No. 2016-05-620 Binga Hydroelectric Power Plant SN Aboitiz Power - Benguet, Inc. Itogon, Benguet 40.080 Non-FIT
Unit 4 – 20 December
2011
Linao-Cawayan (Lower Cascade) Non-FIT ( Under Bilateral Agreement with
29-Dec-2011 HSC No. 2010-02-078 Oriental Mindoro Electric Cooperative, Inc. Baco, Oriental Mindoro 2.100
Hydroelectric Power Plant ORMECO)

30-Apr-2012 HOC No. 2012-09-224 Irisan 1 Hydroelectric Power Plant HEDCOR, Inc. Tuba, Benguet 3.800 FIT System

Non-FIT ( Under Bilateral Agreement with


13-Nov-2012 HSC No. 2009-10-002 Cabulig Hydroelectric Power Plant Mindanao Energy Systems, Inc. Clarveria, Misamis Oriental 8.000
CEPALCO)
ELIGIBLE RE POWER PLANTS FOR RENEWABLE PORTFOLIO STANDARDS (RPS) COMPLIANCE FOR ON-GRID AND OFF-GRID AREAS
as of December 31, 2021

START OF
COMMERCIAL CONTRACT NO. PROJECT NAME COMPANY NAME LOCATION ELIGIBLE CAPACITY (MW) REMARKS
OPERATION
Non-FIT ( Under Bilateral Agreement with
1-Mar-2014 HSC No. 2012-08-219 Tudaya 1 Hydroelectric Power Plant Hedcor Sibulan, Inc . Sta. Cruz, Davao del Sur 6.600
DLPC)

11-Apr-2014 HSC No. 2012-04-204 Tudaya 2 Hydroelectric Power Plant Hedcor Tudaya, Inc. Sta. Cruz, Davao del Sur 8.137 FIT System

Non-FIT ( Under Bilateral Agreement with


November 2014 HSC No. 2015-04-566 Lateral B Hydroelectric Power Plant National Irrigation Administration San Mateo, Isabela 0.045
ISELCO)
Linao-Cawayan (Upper Cascade) Non-FIT ( Under Bilateral Agreement with
2-Feb-2015 HSC No. 2010-02-079 Oriental Mindoro Electric Cooperative, Inc. Baco, Oriental Mindoro 3.000
Hydroelectric Power Plant ORMECO)

2-Jun-2015 HSC No. 2012-04-201 Sabangan Hydroelectric Power Plant Hedcor Sabangan, Inc. Sabangan, Mountain Province 14.139 FIT System

Non-FIT ( Under Bilateral Agreement with


9-Jul-2015 HSC No. 2016-07-670 Likud Hydroelectric Power Plant Provincial Government of Ifugao Asipulo & Kiangan, Ifugao 0.820
IFELCO)

28-Feb-2016 HSC No. 2013-08-267 Bulanao Hydroelectric Power Project DPJ Engineers and Consultants Tabuk, Kalinga 1.000 Non-FIT ( Under Bilateral Agreement)

Sunwest Water and Electric Company 2,


17-Apr-2016 HSC No. 2010-02-086 Villasiga Hydroelectric Power Project Bugasong, Antique 8.000 FIT System
Inc.
Non-FIT ( Under Bilateral Agreement with
1-Jul-2016 HSC No. 2013-12-346 Prismc Hydroelectric Power Plant PNOC-Renewables Corporation Rizal, Nueva Ecija 1.000
NEECO 2 Area 2)
Maris Main Canal 1 Hydroelectric Power
20-Nov-2017 HSC No. 2013-11-329 SN Aboitiz Power - Magat, Inc. Ramon, Isabela 8.500 FIT System
Plant

6-Mar-2018 HSC No. 2011-12-170 New Bataan Hydroelectric Power Plant Euro Hydro Power (Asia) Holdings, Inc. New Bataan, Compostela Valley 3.188 FIT System

2-Jul-2018 HSC No. 2013-11-326 Manolo Fortich 1 Hydroelectric Power Plant Hedcor Bukidnon, Inc. Santiago, Bukidnon 45.936 FIT System

23-Jul-2018 HSC No. 2016-011-694 Balugbog Hydroelectric Power Plant PHILPODECO Nagcarlan, Laguna 1.100 FIT System

19-Oct-2018 HSC No. 2016-11-693 Palakpakin Hydroelectric Power Plant PHILPODECO San Pablo City, Laguna 1.500 FIT System

23-Nov-2018 HSC No. 2013-11-327 Manolo Fortich 2 Hydroelectric Power Plant Hedcor Bukidnon, Inc. Santiago, Bukidnon 27.387 FIT System

Non-FIT (under Bilateral Agreement with


14-Jan-2019 HSC No. 2010-03-132 Inabasan Hydroelectric Power Plant Ormin Power, Inc. San Teodoro, Oriental Mindoro 10.000
ORMECO)
Non-FIT (under Bilateral Agreement with
15-Apr-2019 HSC No. 2010-03-136 Catuiran Hydroelectric Power Plant Catuiran Hydropower Corporation Naujan, Oriental Mindoro 8.000
ORMECO)

17-May-2019 HSC No. 2014-04-437 Majayjay Hydroelectric Power Plant Majayjay Hydropower Corporation Majayjay, Laguna 2.190 FIT System

Non-FIT (under Bilateral Agreement with


17-May-2019 HSC No. 2011-12-172 Asiga Hydroelectric Power Plant Asiga Green Energy Corporation Santiago, Agusan del Norte 8.000
ANECO)

1-Jul-2019 HSC No. 2015-05-568 La Trinidad Hydroelectric Power Plant Hedcor, Inc. La Trinidad, Benguet 20.400 FIT System

25-Dec-19 HSC No. 2015-04-565 Loboc 2 Hydroelectric Power Plant Sta. Clara Power Corp. Bohol 1.240 FIT System

Philippine Power and Development


6-Jan-2020 HSC No. 2016-11-695 Calibato Hydroelectric Power Plant San Pablo City, Laguna 0.300 FIT System
Corporation
Labayat River (Upper Cascade)
1-Sep-2021 HSC No. 2014-02-389 Labayat 1 Hydropower Corporation Real, Quezon 3.456 FIT System
Hydroelectric Power Plant

WIND POWER PLANTS 409.900


ELIGIBLE RE POWER PLANTS FOR RENEWABLE PORTFOLIO STANDARDS (RPS) COMPLIANCE FOR ON-GRID AND OFF-GRID AREAS
as of December 31, 2021

START OF
COMMERCIAL CONTRACT NO. PROJECT NAME COMPANY NAME LOCATION ELIGIBLE CAPACITY (MW) REMARKS
OPERATION

10-Oct-2014 WESC No. 2012-07-058 Bangui Bay Wind Power Project Phase 3 NorthWind Power Development Corporation Bangui, Ilocos Norte 18.900 FIT System

11-Nov-2014 WESC No. 2009-09-004 Burgos Wind Power Project EDC Burgos Wind Power Corporation Burgos, Ilocos Norte 150.000 FIT System

11-Nov-2014 WESC No. 2009-09-005 Caparispisan Wind Power Project North Luzon Renewable Energy Corporation Pagudpud, Ilocos Norte 81.000 FIT System

27-Dec-2014 WESC No. 2009-10-009 San Lorenzo Wind Power Project Guimaras Wind Corporation San Lorenzo, Guimaras 54.000 FIT System

9-Jun-2015 WESC No. 2009-09-018-AF1 Pililla Wind Power Project Alternergy Wind One Corporation Pililia, Rizal 54.000 FIT System

10-Jun-2015 WESC No. 2009-09-002 Nabas Wind Power Project PetroWind Energy Inc. Nabas, Aklan 36.000 FIT System
Non-FIT (Under Bilateral Agreement with
5-Dec-2019 WESC No. 2011-03-045 Puerto Galera Wind Power Plant Philippine Hybrid Energy Systems, Inc. Puerto Galera, Mindoro 16.000
ORMECO)
TOTAL ELIGIBLE CAPACTIY 2,619.01
Eligibility of RE Facilities are based on the criteria provided in Sections 10 and 11 of Department Circular No. DC2017-12-0015 and Sections 9 and 10 of Department Circular No. DC2018-08-0024.