1 Energy Investment Opportunities in Mindanao
1 Energy Investment Opportunities in Mindanao
1 Energy Investment Opportunities in Mindanao
Opportunities in the
Philippine Energy
Sector
Actual
Notes
a. Required Reserve Margin (RM) i.e. 4% regulating reserve and contingency and dispatchable reserve requirement
b. 5.6 % peak demand growth rate resulted from observed 0.8 elasticity ratio of demand for electric power with national economic growth
applied to 7 percent GDP growth rate (GR) target for 2014-2015.
c. 12.8 % peak demand growth rate resulted from observed 1.6 elasticity ratio of demand for electric power with national economic growth
applied to 8 percent GDP growth rate (GR) target for 2016
d. 8 % peak demand growth rate resulted from observed 1 elasticity ratio of demand for electric power with national economic growth applied
to 8 percent GDP growth rate (GR) target for 2017-2020
e. Assumed monthly average forced outage of the total available capacity
f. Factored 2014-2016 Grid Operating and Maintenance Program (GOMP) of NGCP, as submitted to NGCP Q2 2014
COMMITTED POWER PROJECTS
Mindanao Grid Committed Power Projects, 1,876.7 MW
Target
Rated Capacity Target Testing &
Type Name of the Project Project Proponent Mother/ JV Company Location Commercial
(MW) Commissioning
Operation
National Highway,
3x6.97 PSI MW Bunker- Peak Power Soccsargen, Peak Power Energy Inc.
OIL Brgy.Apopong, General 20.9 Aug-14 Sep-14
Fired Power Plant Inc. (PSI) (subsidiary of A Brown)
Santos City
ASELCO Compound,
1x5.2 MW PSFI Bunker- Peak Power San Peak Power Energy Inc.
OIL Brgy. San Isidro,San 5.2 Aug-14 Sep-14
Fired Power Plant Francisco (PSFI) (subsidiary of A Brown)
Francisco, Agusan del Sur
2 X 100 MW Southern
Sarangani Energy Alsons Power Brgy, Kamanga, Maasim, Unit 1 Sep-15
COAL Mindanao Coal Fired 200 Feb-15
Corporation Corporation Sarangani Unit 2 Nov-16
Power Station
Puyo Hydroelectric Power First Gen Mindanao First Gen Power Jabonga, Agusan del
HYDRO 30 Jul-15 Sep-15
Project Hydropower Corp. Corporation Norte
San Miguel
SMC Davao Power Plant San Miguel Consolidated Brgy. Culaman, Malita, U1 - Oct 2015 U2 U1 - Dec 2015
COAL Consolidated Power 300
Project Phase I Power Corporation Davao del Sur - Jul 2016 U2 - Sep 2016
Corporation
COMMITTED POWER PROJECTS
Mindanao Grid Committed Power Projects, 1,876.7 MW
Rated Target Testing Target
Mother/ JV
Type Name of the Project Project Proponent Location Capacity & Commercial
Company
(MW) Commissioning Operation
10 MW Kalilangan Bio-
Energy Corporation Kalilangan Bio-Energy Kalilangan Bio- FIBECO, Anahawan,
BIOMASS 10 Dec-15 Feb-16
Multi Feedstock Power Corporation Energy Corporation maramag, Bukidnon
Generating Facility
10 MW Don Carlos Bio-
Energy Corporation Don Carlos Bio- Don Carlos Bio- FIBECO, Anahawan,
BIOMASS 10 Dec-15 Feb-16
Multi Feedstock Power Energy Corporation Energy Corporation maramag, Bukidnon
Generating Facility
10 MW Malaybalay Bio-
Energy Corporation Malaybalay Bioenergy Malaybalay Bioenergy FIBECO, Anahawan,
BIOMASS 10 Dec-15 Feb-16
Multi Feedstock Power Corporation Corporation maramag, Bukidnon
Generating Facility
15 MW LPC Biomass Lamsan Power Lamsan Power
BIOMASS Maguindanao 10 Dec-15 Feb-16
Power Plant Project Corporation Corporation
Agusan Power Jabonga, Agusan del
HYDRO Lake Mainit Tranzen Group Inc. 25 Mar-16 May-16
Corporation Norte
3 X 135 MW FDC-
U1 – Dec 2015 U1 – Jun 2016
Misamis Circulating Phividec Industrial
U2 – Mar 2016 U2 – Sep 2016
COAL Fluidized Bed (CFB) FDC Utilities, Inc. FDC Utilities, Inc. Estate, Villanueva, 405
U3 – Jun 2016 U3 – Dec 2016
Coal-Fired Power Plant Misamis Oriental
Project
Limbatangon Turbines Resources
Turbines Resource & Cagayan de Oro City,
HYDRO Hydroelectric Power and Development 9 Jan-17 Mar-17
Development Corp. Misamis Oriental
Project Corp. (TRDC)
PsagCorp Coal-Fired GN Power Kauswagan, Lanao del
COAL GN Power Ltd. Co. 540 Dec-16 Mar-17
Power Plant Kausawagan Norte
3 MW Biomass Philippine Trade Philippine Trade
BIOMASS Maguindanao 1.6 TBA TBA
Cogeneration Facility Center, Inc. Center, Inc.
TOTAL 1,876.70
INDICATIVE POWER PROJECTS
Mindanao Grid Indicative Power Projects, 1,726.6 MW
Rated Capacity
Name of the Project Project Proponent Mother/ JV Company Location Target Commissioning
(MW)
Davao del Norte 20 MW
Circulating Fluidized Bed Maco, Davao del
FDC Utilities, Inc. FDC Utilities, Inc. 20 Mar-15
Biomass-Coal Fired Norte
Thermal Power Plant
Brgy. Culaman,
300 MW SMC Davao Power San Miguel Consolidated Power San Miguel Consolidated 150 MW - Oct. 2015
Malita, Davao del 300
Plant Project Phase I Corporation Power Corporation
Sur 150 MW - March 2016
ZAM 100 MW Circulating Sitio San Ramon,
Fluidized Bed (CFB) Coal- San Ramon Power Inc. Mapalad Power Corporation Bgry. Talisayan, 100 Dec-15
Fired Power Station Zamboanga City
Sibuguey Power Plant Philippine National Oil Company Philippine National Oil Sibugay,
100 Sep-16
Project (PNOC-EC) Company (PNOC) Zamboanga
2x55 MW Balingasag
Thermal Power Plant Brgy. Mandangoa,
(Circulating Fluidized Bed Minergy Coal Corporation Minergy Balingasag, 110 Jan-17
Combustion (CFBC) Coal- Misamis Oriental
Fired Power Plant Plant)
Brgy. Culaman,
600 MW SMC Davao Power San Miguel Consolidated Power San Miguel Consolidated 300 MW - Dec 2019
Malita, Davao del 600
Plant Project Phase III Corporation Power Corporation
Sur 300 MW - Dec 2020
Brgy. Culaman,
300 MW SMC Davao Power San Miguel Consolidated Power San Miguel Consolidated
Malita, Davao del 300 Dec-20
Plant Project Phase II Corporation Power Corporation
Sur
TOTAL COAL 1,530.00
Energy Development Energy Development Kidapawan, North
Mindanao 3 Geothermal 50 Dec-17
Corporation Corporation Cotabato
TOTAL GEO 50
INDICATIVE POWER PROJECTS
Mindanao Grid Indicative Power Projects, 1,726.6 MW
Rated Capacity
Name of the Project Project Proponent Mother/ JV Company Location Target Commissioning
(MW)
Impasugong &
First Gen Mindanao First Gen Power
Tagoloan Hydropower Sumilao, 39 Oct-15
Hydropower Corp. Corporation
Bukidnon
Bubunawan Hydroelectric First Gen Mindanao First Gen Power Baungon and
23 Oct-15
Power Project Hydropower Corp. Corporation Libona, Bukidnon
Tumalaong Hydroelectric First Gen Mindanao First Gen Power Baungon,
9 Oct-15
Power Project Hydropower Corp. Corporation Bukidnon
Cabadbaran Hydroelectric First Gen Mindanao First Gen Power Cabadbaran,
9.75 Dec-15
Power Project Hydropower Corp. Corporation Agusan del Norte
Pasonanca Philcarbon, Inc. Philcarbon, Inc. Zamboanga City 0.1 Mar-17
Culaman Hydroelectric Oriental Energy and Power Oriental Energy and Power Manolo Fortich,
10 Jun-18
Power Project Generation Corporation Generation Corporation Bukidnon
TOTAL HYDRO 90.8
Digos Solar Photovoltaic Enfinity Philippines Renewable Digos City, Davao
Enfinity 10 Oct-14
Power Project Resources, Inc. del Sur
Darong Solar Photovoltaic Sta. Cruz, Davao September 2015 (Subject
PhilNew Energy Inc. PhilNew Energy Inc. 35
Power Project del Sur to FIT)
TOTAL SOLAR 45
12 MW Biomass Power Misamis Oriental Bio-Energy Misamis Oriental Bio-
Misamis Oriental 10.8 2015
Plant Project Corporations Energy Corporations
TOTAL BIOMASS 10.8
TOTAL 1,726.60
SUMMARY – Mindanao Power Projects
Summary of Power Projects
Note: Target Commissioning
In red – no Target Commissioning
Mindanao - Committed
Plant Type 2014 2015 2016 2017 2018 2019 2020 TOTAL by Type
COAL 550 655 540 1,745.00
OIL-BASED 26.1 26.1
HYDRO 30 25 9 64.00
BIOMASS 40 1.6 41.60
TOTAL by year 26.1 580.0 720 550.6 0.00 0.00 0.00 1,876.7
Mindanao - Indicative
Plant Type 2014 2015 2016 2017 2018 2019 2020 TOTAL by Type
COAL 120 400 310 700 1,530.00
GEO 50 50.00
HYDRO 81 0.1 10 90.80
SOLAR 10 35 45.00
BIOMASS 11 10.80
TOTAL by year 10.00 246.55 400.00 360.05 710.00 0.00 0.00 1,726.60
Oil & Gas
Petroleum Basin There are 16
Sedimentary basins
Prospectivity Map representing an area of
SC
64
PECR 5
Areas for Offer
BASIN AREAS
SOUTHEAST AREA 1
LUZON
MASBATE- AREAS 2 & 3
ILOILO
NORTHEAST AREAS 4 & 5
PALAWAN
SOUTHEAST AREA 6
PALAWAN
RECTO BANK AREA 7
ET LOOP
Develop strategic (EDSA – Taft Loop)
infrastructure for 40 kms. (2020)
MINDANAO
Alternative Fuels
Compressed Natural Gas
Fuel Displacement & CO2 Avoidance
Particulars
2010 2011
2 Certificates of Authority to
Import 10 CNG Buses each
issued for RRCG and N. dela
Rosa Liner
Targets: 15,000 units CNG buses; 16,000 units CNG taxis by 2030; 150
refilling stations nationwide
Natural Gas
Luzon 6 2 4
Visayas 26 20 1
Mindanao 16 9 1
Total 150 66 6
E-Vehicles
HYDRO 37 331.35
WIND 12 720.40
SOLAR 7 160.00
BIOMASS 9 126.701
TOTAL 65 1,338.451
Note:
• Department Circular No. 2009-07-0011 entitled “Guidelines governing a transparent and competitive
system of awarding renewable energy service/operating contracts and providing for the registration
process or RE developers” is currently being revisited to facilitate the processing of RE Applications.
• FIT Rules approved by ERC on 12 July 2010 and took effect on 12 August 2010
• ERC approved the FIT Rates on 27 July 2012
• Issuance of DC 2013-05-009 prescribing DOE Guidelines for the Selection Process of Renewable
Energy Projects Under FIT System and the Award of Certificate for FIT Eligibility
THANK YOU