PR-Satellite Link - 2023.1

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 5

中 海 石 油 乌干达有限 公 司

CNOOC UGANDA LTD


PROCUREMENT REQUISITION FORM (PR FORM-1)
Ref.
Services/Goods:
Satellite Backup Link for Name of User Department: Date of Requisition:
Kingfisher and for link between Admin and Support 30/1/2023
Kampala and Beijing
Description of Services/Goods, attached with all the Information covering detailed description of
services/goods, standards, specifications, quantities etc. (refer to Attachment if necessary)

1. Introduction/Background:

CNOOC Uganda Limited (CUL) is required to transmit drilling data from the well sites to Kampala
office as well as Beijing office. There is also required to share real time drilling data with the real
time data processing center of the petroleum authority. CUL also need to access system located
in Beijing such as SAP, TMS.

Currently, the Company is implementing a leased line connectivity from Kingfisher camp to
Kampala office as well as an international leased line from Kampala office to headquarter office in
Beijing China. There is no physical fiber connection between Kingfisher and Kampala due to the
high cliff and bad weather can bring unstable to this link.

Considering the requirements of real time, reliability, safety in the transmission service and the
reliability of ground communication network, to guarantee the transmission of data from Kingfisher
to Kampala office and from Kampala office to Beijing, satellite service as backup is required

2. Project Objective

The major objective of this project includes the following:


(1) Establishing VSAT link between Kingfisher and Kampala, VSAT link between Kampala and
CNOOC headquarter. C-Band will be adopted to reach best availability.
(2) Establishing SDWAN between Kingfisher and Kampala, between Kampala and Beijing as
backup for leased line and provide additional bandwidth to improve user experience.
(3) Establishing a visualized bandwidth management system to dynamically show and
manage the status of links (mainly real-time traffic) among leased line, SDWAN and VSAT.
(4) To comply with the requirement from the regulator for real time transmission, reliability,
safety of drilling data.

3. Scope Highlights

The scope of the projects shall include the following key highlights:
(1) Survey of Kingfisher oil field, Kampala office and Beijing office.
(2) VSAT
a) Provide 10Mbps/10Mbps C-Band VSAT link between Kingfisher drilling camp and Kampala
office
b) Provide 10Mbps/10Mbps C-Band VSAT link between Kampala office and CNOOC
headquarter office (Beijing, China)
c) Burst bandwidth 5Mbps/5Mbps C-Band VSAT link between Kingfisher and Teleport,
5Mbps/5Mbps C-Band VSAT link between Kampala and Teleport shall be provided. Burst
bandwidth shall be activated for free when primary leased line is down to provide additional
中 海 石 油 乌干达有限 公 司
CNOOC UGANDA LTD
bandwidth.
d) VSAT platform in Teleport shall support multi-point sharing of bandwidth, when failure
occurs in Kampala office or Kingfisher camp, communication with CNOOC headquarter
office is still normal.
e) Committed and burst bandwidth shall support layer 2 transmission.
f) To reduce the impact of weather conditions on link quality, C band shall be adopted and
the antenna size of the Teleport shall be no less than 16m.
g) VSAT Teleport shall be able to connect to CNOOC enterprise network, round trip delay to
CNOOC headquarter shall be less than 45ms.
h) Spare parts for key VAST equipment in Kingfisher and Kampala office shall be provided
such as LNB, BUC, and Modem.
i) Install the satellite equipment at Kingfisher, Kampala and Hongkong or Beijing.
j) Chinese Satellite resource is preferred.

(3) SDWAN
a) Provide SDAWN service for both of the two satellite link.
b) The round-trip delay from Kampala office to the mail system of CNOOC Headquarters
should be less than 350ms.
c) SDWAN terminal shall support DPI.

(4) Configuration and Optimization


a) Configure and optimize VSAT signal.
b) Running various tests to confirm optimal performance and stability
c) Establishing switching mechanism among leased line, SDWAN, VSAT for optimal
performance.
d) Visualization management platform should be provided and it will be used for the leased
line, SDWAN, VSAT management to enable user get whole picture of devices and links
such as interface traffic, link bandwidth, etc.

(5) Others
a) Training of the internal IT team on operation and maintenance of the various systems or
platforms
b) Detailed system documentation of each deployment
c) Preparation of operation manuals for the systems and or platforms
d) Transitioning the various systems into operation and support phase.
e) Project handoff.

4. Bidder Criteria
The bidder must meet minimum criteria as below:
(1) A certified partner and or reseller or distributor of the OEM (original equipment
manufacturer) of the key equipment. The bidder must attach a valid partnership certificate
(2) Have manufacturer authorization from the OEM to ascertain that the products are genuine
and provider has been fully authorized to supply and deploy each of the products. The
bidder must attach a valid manufacturer authorization with validity period exceeding the
duration of the project.
(3) Has executed similar projects in recent three years. The bidder shall share a list of similar
projects or contracts preferably with customer recommendations.
(4) Bidder must have no less than two 7*24 NOC centers in different city as backup for each
other, which can be able to provide Chinese and English technical support service.
中 海 石 油 乌干达有限 公 司
CNOOC UGANDA LTD
Address, photo, Tel number shall be provided.
(5) The bidder shall commit to deliver the project within the project completion period of 3
months after contract signing.

5. Highlights of Terms of Contract


a) Reliable C-band is require owing to the critical nature of the data that will be transmitted
b) The contract is valid for a period 5 years or 60 months subject to satisfactory performance.
c) Three year warranty and support for hardware
d) Levels of support shall be determined and SLA drafted accordingly.
e) Engineers shall be provided as and when required during contract duration on-site or
remote depending on the level of support required or SLA terms.
f) The contractor shall undertake quarterly health checks and preventive maintenance of the
satellite equipment and provide quarterly report.
g) Incident reports with root cause analysis shall be sent through within 48 hours of incident
occurrence.
h) The contract price shall form basis for similar or related works subject to the contractor’s
performance or upgrade of bandwidth.
i) Annual contractor performance reviews shall be performed.
j) Any unforeseen circumstances that may affect the timelines agreed for delivery of the
project shall be communicated in writing at least 4 weeks before completion of the project.

6. Items to Note
a) The detailed scope of work along with the Instructions to bidders (ITT) will be shared
before RFQ submission
b) A detailed pricing structure shall also be attached before RFP is sent out to the bidders.
c) Site survey is mandatory for all bidders.
d) Collaboration with other contractors shall be necessary for this project’s success.

Specifications:
Item Qty. Description/Specifications
1. Satellite Service VSAT Transceiver
1.1 Satellite service subscription 10M/10M Satellite subscription for 10M/10M
fee uplink/downlink bandwidth between Kingfisher
site and Kampala site;
Satellite subscription for 10M/10M
uplink/downlink bandwidth between Kampala
site and Teleport to connect to CNOOC HQ in
Beijing;
Service provider shall provide additional
5Mbps/5Mbps burst bandwidth for emergency
situation;
2. VSAT Equipment
2.1 VSAT ODU at Kingfisher, 03 VSAT ODU at Kingfisher, Kampala and
Kampala and Hongkong/Beijing Hongkong/Beijing
provide spare parts on each site
2.2 Satellite Modem at 03 VSAT Satellite modem at Kingfisher, Kampala
Kingfisher, Kampala and and Hongkong/Beijing
Hongkong/Beijing Provide spare parts on each site
3. Installation Accessories
中 海 石 油 乌干达有限 公 司
CNOOC UGANDA LTD
3.1 Installation Accessories TBD Installation Accessories for Satellite
equipment at all three sites
4. Deployment cost
4.1 Deployment cost of satellite 01 Deployment cost of satellite service
service
5. Satellite station maintenance
5.1 Satellite Ground station 3 Satellite Ground station maintenance cost
maintenance cost
6. SDWAN Equipment
6.1 SDWAN terminals at three 03 Service provider shall provide SDWAN
sites terminals at Kingfisher, Kampala office,
Hongkang/Beijing.
SDWAN terminals access and process
transmission service. It is required to support
DPI function and differentiated handling of
different service types.
7. SDWAN line Service
7.1 Provide SDWAN Backbone 10M SDWAN as backup for the implementing
dedicated line leased line.

Date of Required Delivery of Goods, or Date of Completion of Services, or Weeks of Lead Time:
3 months
Cost Estimate for whole contract period (US$):$ Budget/AFE (US$):
US$ 3,200,000 US$ 1,000,000
APP Line-Item Ref: TBD

Accounting Code/Charged to:


[to be completed by the Planning & Budget personnel]

Method of Procurement (Tick the appropriate method of procurement):


 Open Bidding: □
 Selective Bidding: □
 Others: Public bidding method

Candidate bidders recommended by User Department, complete with necessary contact


information (refer to Attachment if necessary). [refer to notes below]

Bidders shall be determined through public bidding.

Requestor: John Bosco Iga End User Dept. mgr. approve PR(<USD100,000)
中 海 石 油 乌干达有限 公 司
CNOOC UGANDA LTD
Budget verification by the Planning & VP for End User (including VP for P&C when P&C is
Finance Dept. (Approve any value) : the end user) approve PR (≥USD100,000)

Notes:
1. For better Planning, user departments are requested to adhere to the below
recommended lead time: -
a. For procurements below US$2,000,000.00: 2-4 months lead time.
b. For Procurements above US$2,000,000.00: Minimum of 4 months lead time.
2. Before a procurement requisition form is submission for authorization, user department is
required to attach but not limited to: (i) the detailed scope of work/supply; (ii) standard
codes and specifications, and (iii) all the relevant certifications applicable to the
procurement etc.