HKCA SCHEDULES
FOR PLANT USED IN DAYWORKS
CARRIED OUT INCIDENTAL TO CONTRACT WORK
(2013 EDITION)
These Schedules of plant charges have been prepared for use in connection with
Dayworks carried out incidental to contract work where no other rates have been
agreed. They are not intended to be applicable to Dayworks ordered to be carried out
after the contract works have been substantially completed or to a contract to be
carried out wholly on a daywork basis. The circumstances of such works vary so
widely that the rates applicable call for special consideration and agreement between
contractor and employing authority.
All rights, including translation, reserved. Except for fair copying, no part of this
publication may be reproduced, stored in a retrieval system, or transmitted in any form
or by any means electronic, mechanical, photocopying, recording or otherwise, without
prior written permission being obtained from The Hong Kong Construction Association,
Ltd.
1
NOTES AND CONDITIONS
1. The following Schedules provide indicative `basic' rates against items of plant, these being
divided into eight separate sections. The basic rates quoted are nett of any element of
overhead and profit. At time of tender contractors are to be afforded opportunity to indicate a
separate percentage adjustment against the rates quoted in each individual section.
2. Land-based plant mounted on marine craft is to be valued at the applicable rate indicated in
Sections 01-07, prior to application of the percentage adjustment appropriate to marine plant
(Section 08).
3. The indicated rates apply only to the contractor's own plant and to hired plant, already on site,
and are exclusive of drivers and attendants. The rates are inclusive of fuel and fuel
distribution, licensing fees, the insurance of plant, repairs and maintenance, and of
consumable stores (unless these are stated to be charged in addition).
4. Save in respect of marine plant (Section 08) and subject to Note 5 below:
(i) The contractor is to be paid an additional three hours or the minimum hire period
(whichever shall be the longer) at the adjusted rate for each item of contractor-owned
plant or equipment specially brought on site on the instructions of the employing
authority or its agent (as the case may be) to carry out daywork, and a equivalent
period for removal of each such item of plant from site on completion of the daywork.
(ii) The contractor is to be paid an additional six hours or the minimum hire period
(whichever shall be the longer) at the adjusted rate for each item of contractor-owned
transport used to carry or tow any such item of plant to site for use on daywork, or
used in its removal from site on completion of the daywork.
5. In respect of marine plant (Section 08) and of land-based plant mounted on marine craft:
(i) The contractor is to be paid an additional six hours or the minimum hire period
(whichever shall be the longer) at the adjusted rate for each item of contractor-owned
plant or equipment specially brought on site on the instructions of the employing
authority or its agent (as the case may be) to carry out daywork, and an equivalent
period for removal of each such item of plant from site on completion of the daywork.
(ii) The contractor is to be paid an additional twelve hours or the minimum hire period at
the adjusted rate for any contractor-owned transport used to carry or tow any such
item of plant to site for use on daywork, or used in its removal from site on
completion of the daywork.
6. Externally hired plant specially brought on site on the instructions of the employing authority
or its agent (as the case may be) to carry out daywork is to be paid at invoiced cost (including
insurances, consumables, transport and labour), to which is to be added the cost of any
consumables or operating labour provided by the contractor, and to the sum of which is to be
added an agreed percentage oncost and profit.
7. Externally hired transport used to carry or tow plant specially ordered by the employing
authority or its agent (as the case may be) to be brought on site to carry out daywork or used
to remove such plant from site on completion of the daywork is to be paid at invoice cost
(including insurances, consumables and labour), to which is to be added the cost of any
consumables provided by the contractor, and to the sum of which is to be added an agreed
percentage oncost and profit.
5
8. In the event that plant is specially brought on site on the instructions of the employing
authority or its agent (as the case may be) to carry out daywork, any related set up or
dismantling costs are to be paid in addition to the applicable hire period.
9. The indicated rates are inclusive of primary power consumption via site-distribution of mains
power or common access to site-based power-generating equipment or integral power
generating equipment. However, where power for any plant item is generated or is stepped-
down by independent and dedicated equipment separately identified in the Schedules, then
such independent and dedicate equipment is to be paid for at the applicable rate in addition to
the plant item.
10. The cost of on-site transportation of labour, materials or plant used on dayworks to or from
the dayworks location is to be additionally charged.
11. The indicated rates are predicated on the contractor providing plant in serviceable condition.
The minimum hire charge for such plant shall be for the basic hire period quoted (unless
otherwise stated, the indicated rates are per machine hour).
12. The term `per day' used in these Schedules refers to the period of one calendar day or part
thereof.
13. The term ‘SAE’ used in these Schedules refers to the US Society of Automotive Engineers,
who determine bucket capacities as follows:
Struck capacity is that volume contained in a bucket after a load is levelled by drawing a
straight edge resting on the cutting edge and the back of the bucket
Heaped capacity is a struck capacity plus that additional material that would heap on the
struck load at a 2:1 angle of repose with the struck line parallel to the ground
The SAE bucket capacities indicated in the Schedules are related to heaped capacity.
14. Hire rates for mechanical or other special plant not normally classed as small tools and not
included in these Schedules shall be settled at prices reasonably related to the indicated rates.
15. Where QPME (Quality Powered Mechanical Equipment published by the Environmental
Protection Department) are ordered by the employing authority or its agent for works carried
out in daywork, the appropriate rates in the Schedules (not including those for silenced or
super silenced machines) are to be increased by 20%.
16. Metric capacities are adopted throughout these Schedules. These are not necessarily exact
conversions from their imperial equivalents but cater for variations arising from comparison
of plant manufacturers' ratings.
17. In order to allocate plant items whose specifications and data are related to imperial capacities
to appropriate current daywork items, the conversions set out in the table overleaf shall be
used.
6
SECTION: 01
EQUIPMENT: CONCRETING PLANT
2013 Rate
Item No. Description Nominal size or capacity Remarks
(HK$)
SECTION: 01
EQUIPMENT: CONCRETING PLANT
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
4.01 Concrete pump, skid or trailer mounted including pipe Up to 25m3 435
cleaning equipment (excluding piping)
Diameter
4.10 Piping per 3m length Up to 102mm 8 per day
4.11 Ditto Up to 127mm 13 per day
4.12 Ditto Up to 152mm 27.2 per day
4.13 Extra for bend, each Up to 102mm 13 per day
4.14 Extra for ditto Up to 127mm 22.4 per day
4.15 Extra for ditto Up to 152mm 34 per day
SECTION: 01
EQUIPMENT: CONCRETING PLANT
2013 Rate
Item No. Description Nominal size or capacity Remarks
(HK$)
SECTION: 01
EQUIPMENT: CONCRETING PLANT
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
5.18 Extra over items 5.16 and 5.17 for additional screed board per 300mm additional screed 4
length board length
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
1.01 Mobile, rubber tyred (site use only) full circle slew Up to 7.5 tonnes 364
1.02 Ditto Up to 10.0 tonnes 374
1.03 Ditto Up to 12.5 tonnes 425
1.04 Ditto Up to 15.0 tonnes 507
1.05 Ditto Up to 20.0 tonnes 572
1.06 Mobile, rubber tyred rough terrain type (site use Up to 15.0 tonnes 650
1.07 only)
Ditto Up to 20.0 tonnes 710
1.08 Ditto Up to 25.0 tonnes 930
1.09 Ditto Up to 50.0 tonnes 1323
1.10 Ditto Up to 75.0 tonnes 2042
1.11 Crawler mounted crane (site use only) Up to 30.0 tonnes 477
1.12 Ditto Up to 60.0 tonnes 980
1.13 Ditto Up to 80.0 tonnes 1426
1.14 Ditto Up to 100.0 tonnes 1715
1.15 Ditto Up to 125.0 tonnes 1774
1.16 Ditto Up to 150.0 tonnes 1915
1.17 Ditto Up to 200.0 tonnes 2412
1.18 Ditto Up to 250.0 tonnes 2680
1.19 Ditto Up to 300.0 tonnes 3350
1.20 Ditto Up to 400.0 tonnes Rates to be negotiated
1.21 Ditto Up to 500.0 tonnes
1.22 Lorry mounted or all terrain crane Up to 20.0 tonnes 705 These rates are
1.23 Ditto Up to 30.0 tonnes 876 applicable to wheeled,
mobile crane units,
1.24 Ditto Up to 50.0 tonnes 1097
fitted with cab,
1.25 Ditto Up to 75.0 tonnes 2009 outriggers, etc.
1.26 Ditto Up to 100.0 tonnes 2317
1.27 Ditto Up to 125.0 tonnes 2957
1.28 Ditto Up to 1500.0 tonnes 3720
1.29 Ditto Up to 200.0 tonnes 4023
1.30 Ditto Up to 300.0 tonnes 6715
1.31 Tower crane, electric, erected complete with Height under hook above ground
ballast. Standard trolley or luffing jib, rail for trolley jib cranes (Jib pivot
mounted (static or travelling) or fixed on cill plates height for luffing jib cranes)
or fixing angles. Capacity (in metre tonnes) is the
maximum radius at which the load can be lifted
when the crane is fitted with its maximum jib
length.
Up to 30 tonnes Up to 25m 285
SECTION: 02
EQUIPMENT: CRANEAGE AND PILING
2013 Rate
Item No. Description Nominal size or capacity Remarks
(HK$)
SECTION: 02
EQUIPMENT: CRANEAGE AND PILING
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
3.09 Drop hammer (bare) suitable for use with channel Up to 1016kg 31
or tubular leaders fitted with leather guides and
rubber inserts
3.10 Ditto Up to 2032kg 39
3.11 Ditto Up to 3048kg 48
3.12 Internal drop hammer (for use with cased piles): Up to 1270kg 24
Internal dia of cased pile up to 305mm
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
Diameter
3.68 Ditto Up to 100m 72
3.69 Ditto Up to 125m 86
3.70 Ditto Up to 150m 101
3.71 Under-reaming or belling out tool Rates to be negotiated
3.72 Side cutters, centre cutters Rates to be negotiated
3.73 Bucket, tremie concrete Up to 2.0m3 42
3.74 Ditto Up to 6.0m3 58
3.75 Casing oscillator, hydraulic, with power pack Up to 1500mm 795
3.76 Ditto Up to 1800mm 863
3.77 Ditto Up to 2000mm 943
3.78 Ditto Up to 2500mm 1077
3.79 Ditto Up to 3000mm 1211
3.80 Ditto Up to 3500mm 1345
3.81 Casing rotator hydraulic with power pack Up to 2000mm 2829
3.82 Ditto Up to 3000mm 3633
3.83 Ditto Up to 3200mm 4035
Line Pull
3.84 Casing vibrator Up to 41 tonnes 821
3.85 Ditto Up to 61 tonnes 1643
Bit diameter
3.86 Down the hole pre-drilling equipment, complete 450mm 836
with high torque rotator, power pack, 8 metre
length of drilling rod and hammer (excluding
3.87 Ditto 550mm 996
3.88 Extra for additional lengths of drilling rod 5 metre length 16
3.89 Auger piling, diaphragm walling machines and Rates to be negotiated
other specialist equipment
4 Piling
Temporary sheet piling, steel trench sheeting and
casings to be charged as material. The residual
value of recovered sheet piling, steel trench
sheeting and casings to be the subject of special
SECTION: 03
EQUIPMENT: EARTHMOVING
2013 Rate
Item No. Description Nominal size or capacity Remarks
(HK$)
SECTION: 03
EQUIPMENT: EARTHMOVING
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
2.01 Rope operated, full circle slew, crawler mounted, Up to 0.80m3 411
with single equipment (dragline)
2.02 Ditto Up to 1.00m3 461
2.03 Ditto Up to 1.20m3 551
2.04 Ditto Up to 1.50m3 669
2.05 Ditto Up to 2.00m3 843
2.06 Ditto Up to 2.30m3 958
2.07 Ditto Up to 2.70m3 1154
Maker's rated face shovel
capacity
2.08 Rope operated, full circle slew, crawler mounted, Up to 0.70m3 406
with single equipment (face shovel)
2.09 Ditto Up to 1.00m3 549
2.10 Ditto Up to 1.50m3 762
2.11 Ditto Up to 2.50m3 1286
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
6 Hoists
6.01 Goods hoist, cantilever or rope suspended c/w Up to 500kg 69
safety devices and limits, bottom gate and
landing gates, interlocked. Erected to 9.0m top
landing height
6.02 Extra over item 6.01 for mast extension including Per metre of mast extension 3
ties and additional landing gates
6.03 Goods hoist, rack and pinion c/w safety devices Up to 400kg 89
and limits, bottom gate and one landing gate,
interlocked. Erected to 50m top landing height
6.04 Extra over item 6.03 for mast extension including Per metre of mast extension 5
cable, ties etc. and additional landing gates
6.05 As item 6.03, single cage Up to 1500kg 105
6.06 As item 6.03, twin cage Up to 1500kg 157
6.07 Extra over item 6.05 or 6.06 for mast extension Per metre of mast extension 5
including cable, ties etc. and additional landing
gates
6.08 Passenger/goods hoist rack and pinion, c/w base Up to 1600kg/20 men 190
unit, bottom gate and one interlocking landing
gate, cable and mast to 60m top landing height,
single cage
6.09 Ditto, twin cage Up to 1600kg/20 men 285
6.10 Extra over item 6.08 or 6.09 for mast extension Per metre of mast extension 6
including cable, ties etc. and additional landing
gates
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
Wheelbase
8.21 Passenger/goods vehicle, cross country Up to 2.40m 130
8.22 Ditto Over 2.40m 130
8.23 Passenger/goods vehicle, station wagon Up to 7 persons 133
8.24 Ditto Up to 12 persons 150
8.25 Personnel carrier/coach/bus Up to 9/13 persons 170
8.26 Ditto Up to 14/17 persons 200
Hopper capacity
8.27 Road sweeper, cleaner self-propelled Up to 1.0m3 200
8.28 Ditto Up to 2.0m3 320
8.29 Tractor mounted brush (front or rear) non- 34
collector (excluding tractor)
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
10.02 Stores and similar facilities on site with usual Per 10m2 floor area 312 per week
fittings (i.e. lighting, counter, desks, tables,
forms, lighting, chairs, racks, shelves or bins,
etc.) excluding insurance
10.03 Toilet unit, single chemical type, with 700 per week
consumables (servicing, waste disposal, etc, to be
charged in addition)
10.04 Toilet unit, single mains flushing type with wash 700 per week
basin and consumables (servicing, waste
disposal, etc. to be charged in addition)
10.05 Metal container used as tool store, etc. Up to 13.0m long 103 per day
12 Pumps, portable Discharge branch dia. Basic rate Extra per working
per day hour HK$
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
13.09 Steel pipe suction or delivery, screwed and Up to 102mm 2 per m/day
socketed joints, excluding valve and strainer
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
15 Scaffolding
15.01 Tubular steel including all plates, brackets, tyres, 51mm dia. (nom), per 3m length 6 per week
couplers and boards
17 Shuttering
17.01 Steel shutters all types. Rates to be based on
those chargeable by Proprietary firms (wedges
keys and consumables to be added)
17.02 Steel road forms, per 10 metre length Up to 203mm 8
17.03 Ditto, heavy section, with rail 203mm 16
17.04 Ditto Up to 305mm 27
17.05 Telescopic floor centre extending lattice girder Span up to 2.76m 16 per week
17.06 type
Ditto Span up to 5.56m 23 per week
17.07 Telescopic steel prop extending Height up to 3.96m 11 per week
SECTION: 04
EQUIPMENT: MISCELLANEOUS
2013 Rate
Item No. Description Nominal size or capacity Remarks
(HK$)
SECTION: 04
EQUIPMENT: MISCELLANEOUS
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
17.08 Column shutter clamps extending, per set Up to 1.22m 13 per week
17.09 Beam shutter clamps clamping width 114mm to Up to 610mm arm 13 per week
850mm; per set
17.10 Wall shutter clamps, concrete thickness up to 11 per week
915mm; per set
17.12 Timber, used for shuttering. Wrought, minimum 117 per m3 day
charge 10 days (excluding wedges, nails, screws,
bolts, etc. these to be charged as consumables)
17.13 Plywood sheeting (excluding timber or steel Thickness up to 25mm 13 per 3m2/day
supports - these to be charged in addition, or
wedges, nails, screws, bolts, etc. these to be
charged as consumables)
18 Surveying Instruments
18.01 Dumpy level with tripod and staff 28 per day
Standard deviation
18.02 Auto level with tripod and staff 2.5mm/km 40 per day
18.03 Engineer's precise auto level with tripod and staff 2.0mm/km 47 per day
18.04 Ditto with parallel plate 1.0mm/km 84 per day
18.05 Digital theodolite 20 seconds 117 per day
18.06 Ditto 6 seconds 155 per day
18.07 Ditto 1 second 253 per day
18.08 Ranging rod or pole 3 per day
18.09 Rates for laser levelling or distance measuring
instruments to be based on those charged by
Proprietary firms
19 Tools Pneumatic
(excluding compressors but including, where Unless stated to
appropriate, up to 15m of hose) the contrary, rates
exclude
consumables
19.01 Breaker, including steels 35
19.02 Light pneumatic pick including steels 20
19.03 Pneumatic clay spade including blade 20
19.04 Chipping, sealing or caulking hammer 2
SECTION: 04
EQUIPMENT: MISCELLANEOUS
2013 Rate
Item No. Description Nominal size or capacity Remarks
(HK$)
SECTION: 04
EQUIPMENT: MISCELLANEOUS
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
22.03 Welding set (diesel), (excluding electrodes - 300 amp, single operator 66
these to be charged in addition)
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
Blade dia
24.18 Brickwork and masonry saw (excluding abrasive Up to 457mm 23
discs; these to be charged in addition)
24.19 Crossing plates (steel) 20mm thick 2 per m2/day
24.20 Flashing traffic warning lamp unit including 20 per day
24.21 batteries
Flashing traffic warning lamp unit including 22 per day
batteries bollard or tripod
24.22 Vehicle mounted illuminated directional arrow, 99 per day
up to 1.75m2 in area, pivoting, complete with
control boxes and fitments (excludes vehicle)
24.23 Trailer mounted ditto (ditto) 264 per day
24.24 Drainage rods and accessories, per 10m. length Up to 152mm dia 8 per day
24.25 set
Ditto per extra rod 91m length 2 per day
24.26 Drain stopper (expanding) Up to 152mm dia 2 per day
24.27 Ditto Up to 305mm dia 4 per day
24.28 Ditto Up to 457mm dia 9 per day
24.29 Ditto Up to 610mm dia 15 per day
24.30 Ditto Up to 762mm dia 27 per day
24.31 Ditto Up to 914mm dia 50 per day
24.32 Ditto Up to 1220mm dia 84 per day
SECTION: 04
EQUIPMENT: MISCELLANEOUS
2013 Rate
Item No. Description Nominal size or capacity Remarks
(HK$)
SECTION: 04
EQUIPMENT: MISCELLANEOUS
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
1 Asphalt Equipment
1.01 Asphalt and/or coated macadam spreader crawler or Up to 37kW 245
wheeled
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
1.01 Rotary rig with equipment for drilling hole up to 200 Up to 60m 402 Rate excludes grouting
mm dia up to 60m depth vertically in soils, rock, vertically equipment, and sample
boulders, cobbles or gravels. containers, rock coring
consumables, shoes and other
consumables
1.02 Hydraulic crawler drilling rig including drill rods for Up to 50m 800 Rate excludes drilling hammers,
holes up to 300mm dia. air compressor, grouting
equipment, welding set and other
extraneous equipment
1.03 Ditto including for holes up to 50mm dia. Up to 20m 523 Rate includes drilling hammers,
but excludes air compressor,
grouting equipment, welding set
and other extraneous equipment
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
1 Cameras
1.01 50mm dia monochrome camera with illumination from red light 35
emitting diode (LED) mounted on skids for 100mm or 150mm
drains
1.02 50mm dia colour camera with illumination from white light 64
emitting diode ditto
3 Monitors
3.01 225mm monochrome monitor with mains adaptor and video 122
recorder (VCR)
3.03 250mm colour monitor with mains adaptor and digital image 186
storage
4 Accessories
4.01 On-screen meterage unit for CS106 24
4.02 Text writer to overlay text on video reports 21
4.03 Radio drain location system including transmitter for fitting to 28
drain rod
4.04 Video recorder with case 23
4.05 Inverter to convert 12 volt vehicle power supply to 230 volt AC 9
supply
5 Mobile unit
5.01 Variable speed 4 wheel drive crawler, suitable for camera 366
mounting, complete with 3 sets of composite wheels for 150mm,
225 and 300mm drain inspection and a set of pneumatic wheels
for pipes of up to 1000mm dia. Rate includes 200m of cable and
a remote control unit.
SECTION: 07
EQUIPMENT: CCTV INSPECTION AND MAINTENANCE OF DRAINS AND SEWERS
Nominal size or Rate
Item No. Description Remarks
capacity (HK$)
SECTION: 07
EQUIPMENT: CCTV INSPECTION AND MAINTENANCE OF DRAINS
AND SEWERS
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
6 Comprehensive Services
6.01 Purpose-fitted van including office and client seating, and all Rates to be
necessary CCTV equipment for pipe inspections from 50mm negotiated
upwards with cameras, monitor, computer, printer, cable reel
and accessories. Rates to include electricity generator, trained
and certified operating crew and post-survey report preparation.
6.02 Purpose-fitted van including water jetting equipment for pipes Rates to be
up to 300mm dia, and trained and certified operating crew. negotiated
SECTION: 08
EQUIPMENT: MARINE
SECTION: 08
EQUIPMENT: MARINE
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
3.01 Flat top pontoon (c/w motorized anchor winches, 24.4m x 12.2m 1100
anchor chains and anchors)
4 Derrick Lighters
(complete with motorized winches and anchoring Nett registered tonnage
system), carriage of construction materials only
SECTION: 08
EQUIPMENT: MARINE
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
SECTION: 08
EQUIPMENT: MARINE
Note: Indicated hire rates are per unit machine hour, unless otherwise stated.
Pipeline dia
8.04 Extra for pipeline with floats, per 100 lin.m Up to 300mm 62
8.05 Ditto Up to 450mm 99
8.06 Ditto Up to 600mm 142