De Test Reports 2023
De Test Reports 2023
De Test Reports 2023
iv
STAND BY-SUMMATION- NEW-METER
TIME :
at 16:18 on 11.04.2023
GWH( I - E ) :
00000006.52/0000000.92
000000001.67
GVARH(G) ( E - I ) :
GVARH(D) ( I - E ) : 000000001.60
GVAH ( E - I ) : 00000007.62/00000001.34
GVA(MMD)
0.994796 on 22/12/2022 at 12:30hrs/0.669060
on 22.12.2022 at 13:00hrs.
:
No of Resets : 4 /5
6.640596/1.075408 {7.635392/1074468}
CMD :
PF : **
V
VI ENERGY METER SET
STAND BY-SUMMATION- NEW-METER
VIII REMARKS :
Divisional Engineer
MRT, Peddapally
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : PEDDAPALLY
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/s. EE&CAD kaleshwaram project 400KV NANDI MEDARAM
Distribution: NANDI MEDARAM
S.C.NO: PDL236 C.M.D: 30.1MVA CAT: HT-IV
Section: KHILAVANAPARTHY Sub- Division: DHARMARAM Dt:11-04-2023
Division: PEDDAPLLY
ii METER PARTICULARS: CHECK-SUMMATION
FEEDER - 1-NEW FEEDER - 2-NEW SUMMATION- NEW
Make : SECURE SECURE SECURE
Type : R3E9/2021 R3E9/2021 S3E9/2021
CTR : 2000/1A 2000/1A ***
PTR : 400KV/110V 400KV/110V ***
Class : 0.2s 0.2s ***
Meter Constant :
iii PT Set Particulars : PT-1 PT-2 PT-3
Make : CGL CGL CGL
Sl.No. : 64258 64259 64260
PTR : 400KV/110V 400KV/110V 400KV/110V
iv
CHECK-SUMMATION-NEW METER
at 15:47 on 11.04.2023
TIME :
GWH( I - E ) : 0000005.48
0000002.44
GVARH(G) ( E - I ) :
GVARH(D) ( I - E ) : 0000001.15
GVAH ( E - I ) : 0000006.13/0000002.83
GVA(MMD)
0.605012 on 21/12/2022 at 13:52hrs/0.00 on
21.12.2022 at 12:45hrs.
:
No of Resets : 11 /12
10.760168/5.108764 {11.365180/5.108764}
CMD :
PF : **
V
VI ENERGY METER SET
CHECK-SUMMATION- NEW-NEW METER
TTB PANNEL BOTTOM
TTBPANNEL TOP
TTB PANNEL BACK SIDE
TTB
MTC
METER COVER N4992637 BPS
MRI PORT N4992638 BPS
MD KNOB N4992637 BPS
METER BOX
VIII REMARKS :
Divisional Engineer
MRT, Peddapally
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : PEDDAPALLY
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/s. EE&CAD kaleshwaram project 400KV NANDI MEDARAM
Distribution: NANDI MEDARAM
S.C.NO: PDL236 C.M.D: 30.1MVA CAT: HT-IV
Section: KHILAVANAPARTHY Sub- Division: DHARAMARAM Dt:11-04-2023
Division: PEDDAPLLY
ii METER PARTICULARS: MAIN-SUMMATION
FEEDER - 1-NEW FEEDER - 2-NEW SUMMATION- NEW
Make : SECURE SECURE SECURE
Sl.No. : APZ01062 APZ01063 APMB6290
Type : R3E9/2021 R3E9/2021 S3E9/2021
CTR : 2000/1A 2000/1A ***
PTR : 400KV/110V 400KV/110V ***
Class : 0.2s 0.2s ***
iii PT Set Particulars : PT-1 PT-2 PT-3
Make : CGL CGL CGL
Sl.No. : 64258 64259 64260
PTR : 400KV/110V 400KV/110V 400KV/110V
Class 0.2s 0.2s 0.2s
SEAL BIT OLD 6929671-BPS 6929672-BPS 6929673-BPS
SEAL BIT NEW N4968487-BPS N4968488-BPS N4968489-BPS
iii CT Set Particulars : CT-1 CT-2 CT-3
Make : CGL CGL CGL
:
Sl.No. 64240 64241 64242
iv
MAIN-SUMMATION-NEW METER
at 15:47 on 11.04.2023
TIME :
GWH( I - E ) : 0000003.98
GVARH(G) ( E - I ) : 0000001.58
GVARH(D) ( I - E ) : 0000001.89
GVAH ( E - I ) : 0000005.06/0000002.25
GVA(MMD)
2.768092 on 22/12/2022 at 17:00hrs/1.010932
on 22.12.2022 at 17:00hrs.
:
No of Resets : 3/4
7.535144/2.258776
CMD :
PF : **
V
VI ENERGY METER SET
MAIN SUMMATION- NEW METER
TTB PANNEL BOTTOM
TTBPANNEL TOP
TTB PANNEL BACK SIDE
TTB
MTC
METER COVER N4992635 BPS
MRI PORT N4992636 BPS
MD KNOB N4992635 BPS
METER BOX
VIII REMARKS :
Divisional Engineer
MRT, Peddapally
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : PEDDAPALLY
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:M/s. EE&CAD kaleshwaram project 400KV NANDI MEDARAM Distribution: NANDI MEDARAM
Divisional Engineer
MRT, Peddapally
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : PEDDAPALLY
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:M/s. EE&CAD kaleshwaram project 400KV NANDI MEDARAM Distribution: NANDI MEDARAM
Divisional Engineer
MRT, Peddapally
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : PEDDAPALLY
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/s. EE&CAD kaleshwaram project 400KV NANDI MEDARAM Distribution: NANDI MEDARAM
S.C.NO: PDL236 C.M.D: 30.1MVA CAT: HT-IV
Section: KHILAVANAPARTHY Sub- Division: DHARMARAM Dt:11-04-2023
ii METER PARTICULARS: MAIN - FEEDER- II Division: PEDDAPLLY
OLD NEW
Make : L&T SECURE
Sl.No. : 0012288030 APZ01063
Type : ER300P R3E9/2021
CTR : 1000/1A 2000/1A
PTR : 400KV/110V 400KV/110V
Class : 0.2s 0.2s
iii PT Set Particulars : PT-1 PT-2 PT-3
Make : CG CG CG
Sl.No. : 64264 64265 64266
PTR : 400KV/110V 400KV/110V 400KV/110V
Class 0.2s 0.2s 0.2s
SEAL BIT OLD 6578919-BPS 6578920-BPS 6578921-BPS
SEAL BIT NEW N4992606-BPS N4992607-BPS N4992608-BPS
iii CT Set Particulars : CT-1 CT-2 CT-3
Make : CG CG CG
:
Sl.No. 64246 64247 64248
iv Burden
1.383764 on 22/12/2022 at
59.148/0.0002 on
MVA(MMD) GVA(MMD) 17:00hrs/0.714676 on
07.03.2023 at 04:15hrs.
22.12.2022 at 18:00hrs.
: :
42 3/4
No of Resets : No of Resets :
2.134460/0.556088
4109 / 976
{after reset-3.518224/1.270320}
CMD : CMD :
PF : ** PF : **
Adpted CTR : 1000/1A Adpted CTR : 2000/1A
MF FOR Units : 2000 MF FOR Units : 1000000
MF FOR MVA : 2000 MF FOR MVA : 1000000
V Meter Dislay Voltages,Currents
V1 23.83 L1 0 V1 L1 0
V2 23.88 L2 0 V2 L2 0
V3 23.66 L3 0 V3 L3 0
Divisional Engineer
MRT, Peddapally
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : PEDDAPALLY
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:M/s. EE&CAD kaleshwaram project 400KV NANDI MEDARAM Distribution: NANDI MEDARAM
N4992601 (CHAMBER)-
TTB N4992642,43-BPS BPS
Divisional Engineer
MRT, Peddapally
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : PEDDAPALLY
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:M/s. EE&CAD kaleshwaram project 400KV NANDI MEDARAM Distribution: NANDI MEDARAM
Divisional Engineer
MRT, Peddapally
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : PEDDAPALLY
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/s. EE&CAD kaleshwaram project 400KV NANDI MEDARAM Distribution: NANDI MEDARAM
:
Sl.No. 64240 64241 64242
iv
V1 23.75 L1 0 V1 246.47 L1 0
V2 23.93 L2 0 V2 248.51 L2 0
V3 23.72 L3 0 V3 244.76 L3 0
Divisional Engineer
MRT, Peddapally
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : PEDDAPALLY
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/s Railways Divisional Manger Distribution: Ramagundam
S.C.NO: PDL012 C.M.D: 17000KVA CAT: HT- V
Section: RAMAGUNDAM Sub- Division: RAMAGUNDAM Dt:18-10-2022
ii METER PARTICULARS: Division: PEDDAPLLY
Make : SECURE(ENTITY)
Sl.No. : APE21046
Type : E3V051
CTR : 100/1A
PTR : 132KV/110V
Class : 0.5s
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available : 150/1A
CTR Adopted : 150/1A
PTR : 132KV/110V
Class
iv Burden
MWH : 429084
MVARH(G) : 21804
MVARH(D) : 176089
MVAH : 433753
No of Resets : 134
CMD : 1597.6
PF : 0.82 lead
V1 139.9 L1 0.65
V2 *** L2 *** 3-Ph -2wire Method
V3 139.9 L3 17.49
VI
ENERGY METER SET
AB SWITCH
MWH : 0044243.9
MVARH(G) : 0015540.7
MVARH(D) : 0001628.4
MVAH : 0048438.2
No of Resets : 80
CMD : 00175.1
PF : 0.856
1)On complaint received from ADE/C&O/Siricilla that the LV-II PT was failed on 26.09.2022 , the service
was inspected on 04.10.2022.It is observed that the LV-II was kept off on 26.09.2022 at 18:hrs . The LV-II
was charged after replacement of PT on 04.10.2022 at 16:02 hrs
AT 14:44 Hrs on
TIME : TIME AT 15:11 Hrs on 26.09.2022
26.09.2022
MWH 21067.87 : KWH 0000002
MVARH(G) 15226.51 : KVARH(G) 0000000
MVARH(D) 00122.36 : KVARH(D) 0000000
MVAH 26512.78 : KVAH 0000002
0.917, At 18:30 hrs on 4.02 At 8:30 hrs on
MVA(MMD) : KVA(MMD)
11.07.2020 30.07.2021
Meter Dislay
V
Voltages,Currents
OLD METER NEW METER OLD METER NEW METER
6.77 V1 6.52 4.99 L1 0.0
6.7 V2 6.47 5.16 L2 0.0
6.75 V3 6.49 5.64 L3 0.0
VI
ENERGY METER
OLD METER NEW METER
SET
AB SWITCH
BPS 4598265, 66 METER BOARD N-4930114, 15 BPS
BPS N-3963719, 20 TTB N-4930116, 17 BPS
BPS 4598269, 70 MTC N-4930118, 19 BPS
BPS 4598271 METER COVER N-4930120 BPS
MRI PORT N-4930121 BPS
MD KNOB N-4930122 BPS
RPS N-3251095 METER BOX N-4930123 BPS
VIII REMARKS :
1)1)As per intimation of ADE/C&O/Siriclla regarding LV-I Y-phase CT failure on 25.09.2022 at 14:15 Hrs , joint
inspection conducted on 26.09.2022 along with ADE/DPE/Karimnagar and ADE/C&O/Siricilla and the failed CT
was replaced. The meter was also changed as the MD push button plunger broken
Import/Export
at 14:49 on 18.10.2022 TIME
429084 KWH
21804 KVARH(G)
176089 KVARH(D)
433753 KVAH
134 No of Resets
1597.6 CMD
0.82 lead PF
0 V2 6.5 123.32 L2
VI
ENERGY METER SET
AB SWITCH
METER BOARD
METER BOX
VIII REMARKS :
1) During the periodical inspection on 24.11.2022, Observed that there is Voltage drop in B phase, the joint Inspection was conducted along
with DE/DPE/KNR & AE/C&O/Siricilla on 13.12.2022 and rectified the voltage drop
109
110
123
Divisional Engineer
MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
NAME OF THE CONSUMER:
i 33/11KV SS Rajannapet Distribution: C&O Siricilla
Meter Dislay
V Voltages,Currents
OLD METER NEW METER OLD METER NEW METER
V1 6.55 L1 0.0
No
V2 6.49 No Display L2 0.0
Display
V3 6.55 L3 0.0
VI
ENERGY METER
OLD METER NEW METER
SET
AB SWITCH
IMP1001 00275F, 76, 77, 78F METER BOARD
BPS N-2252351, 52 TTB N-2252388, 89 BPS
IMP1001 00281, 82F MTC
1001 00283, 84, 85F METER COVER N-2252390, 91 BPS
MRI PORT N-2252392 BPS
RPS N-325056 MD KNOB N-2252393 BPS
BPS N-2252353 METER BOX N-2252394 BPS
VIIIREMARKS :
1)As per intimation of ADE/C&O/Siriclla regarding LV-I R-phase CT oil gushed out , joint inspection
conducted on 05.07.2022 along with ADE/DPE/Karimnagar and ADE/C&O/Siricilla.During inspection it is
observed that the continuity of meter in R-Phase failed. Therefore MRI dump could not taken
2) The service was again inspected on 18.07.2022 and meter replaced with new energy meter on
18.07.2022
2)Meter MF changed from 8000 to 2000
3) New meter M.F : 2000 w.e.f 18.07.2022
4)Meter sealed as above.
Sl.No. : 06677768
Type : ER300P
CTR : 50/1A
PTR : 11KV/110V
Class : 0.5S
CT / PT
iii Set Particulars :
CTR Available :
CTR Adopted : 400/1A
PTR : 11KV/110V
Class
iv Burden Old Meter
TIME
KWH
KVARH(G)
KVARH(D)
KVAH
KVA(MMD)
NO DISPLAY
No of Resets
CMD
PF
Adpted CTR
MF FOR Units
MF FOR MVA
Meter Dislay
V Voltages,Currents
OLD METER NEW METER OLD METER NEW METER
V1 6.55 L1 0.0
No
V2 6.49 No Display L2 0.0
Display
V3 6.55 L3 0.0
VI
ENERGY METER
OLD METER NEW METER
SET
AB SWITCH
IMP1001 00275F, 76, 77, 78F METER BOARD
BPS N-2252351, 52 TTB N-2252388, 89 BPS
IMP1001 00281, 82F MTC
1001 00283, 84, 85F METER COVER N-2252390, 91 BPS
MRI PORT N-2252392 BPS
RPS N-325056 MD KNOB N-2252393 BPS
BPS N-2252353 METER BOX N-2252394 BPS
VIII
REMARKS :
1)As per intimation of ADE/C&O/Siriclla regarding LV-I R-phase CT oil gushed out , joint inspection
conducted on 05.07.2022 along with ADE/DPE/Karimnagar and ADE/C&O/Siricilla.During inspection it is
observed that the continuity of meter in R-Phase failed. Therefore MRI dump could not taken
Meter Dislay
V Voltages,Currents
OLD METER NEW METER OLD METER NEW METER
6.78 V1 6.32 0 L1 49.07
6.72 V2 6.27 0 L2 48.26
6.8 V3 6.25 0 L3 50.66
VI
ENERGY METER
OLD METER NEW METER
SET
AB SWITCH
METER BOARD
BPS N-3963946, 47 TTB N-3963946, 47 BPS
BPS 8390084, 85 MTC N-2252378, 79 BPS
BPS 8390086 METER COVER N-2252380 BPS
MRI PORT - -
RPS N-3257838 MD KNOB N-2252381 BPS
METER BOX
VIII
REMARKS :
1)The service was inspected on 08.07.2022 and the meter was changed as the MD push button plunger
broken
2)Meter MF changed from 1333.33 to 2000
3) New meter M.F : 2000 w.e.f 08.07.2022
4)Meter sealed as above.
Meter Constant :
PF 0.94 : PF 0.957
:
Meter Constant
:
iii CT / PT Set Particular
CTR Available :
CTR Adopted : 400/5A
PTR : 11KV/110V
Class
iv Burden Old Meter New Meter
at 12:46Hrs on 08.07.2022 : TIME
TIME at 13:48Hrs on 08.07.2022
KWH 228298 : MWH 00000.0
KVARH(G) 120565 : MVARH(G) 000000.0
KVARH(D) 343874 : MVARH(D) 000000.0
KVAH 661492 : MVAH 000000.0
121.8 at 6:30 on
KVA(MMD) : MVA(MMD) 0.03 at 11:30 Hrs on 10.07.2020
29.06.2022
V1 6.52 L1 0
V2 6.63 L2 0
V3 6.53 L3 0
VI
ENERGY METER
SET
AB SWITCH N3963979 BPS
399029, 039,
IMP1020 METER BOARD
049, 59,69
BPS 3471740, 41 TTB
IMP1020 39910G, 11G MTC
YPS 0254403 METER COVER
MRI PORT
RPS 2140590 MD KNOB
BPS 5558927 METER BOX N3963979 BPS
VIII REMARKS :
ii METER PARTICULARS: Main New meter Check New meter Standby New meter
Make : Secure Secure Secure
Type : E3M024 E3M024 E3M024
Sl.No. : X0640788 X0640776 X0640780
CTR : 200/1A 200/1A 200/1A
PTR : 11KV/110V 11KV/110V 11KV/110V
Class : 0.2s 0.2s 0.2s
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 75/1A 75/1A 75/1A
PTR : 132KV/110V 132KV/110V 132KV/110V
Class
iv Burden
- / 8995093, 94
MTC (BPS)
-/8995100, 01 (BPS) -/8389215, 16(BPS)
Divisional Engineer
MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11 KV SS Adavi Padira Distribution: C&O SIRICILLA
S.C.NO: C.M.D:5 MVA CAT: HT-7 Dt: 16.03.2022
Section: C&O SIRICILLA Sub- Division: Siricilla Division:KNR
ii METER PARTICULARS:
Make : Secure
Sl.No. : X0650248
Type : E3M024
CTR : 300/1A
PTR : 11KV/110V
Class : 0.2S
Meter Constant :
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 300/1A
PTR : 11KV/110V
Class
iv Burden
TIME : 14:33 Hrs on 16.03.2022
MWH : 000000.0
MVARH(G) : 000000.0
MVARH(D) : 000000.0
MVAH : 00000.0
MVA(MMD) 0
:
No of Resets : 0/01
CMD : 0/0.10
PF : -
Adpted CTR : 300/1A
MF FOR Units : 1000
MF FOR MVA : 1000
V Meter Dislay Voltages,Currents
V1 6.32 L1 0
V2 6..33 L2 0.02
V3 6.41 L3 0.01
VI
ENERGY METER SET
AB SWITCH
METER BOARD
V1 6.63 L1 0.15
V2 6.56 L2 0.15
V3 6.62 L3 0.04
VI
ENERGY METER SET
AB SWITCH
METER BOARD
V1 6.45 L1 0
V2 6.51 L2 0
V3 6.39 L3 0
VI
1) Service was inspected on 23.11.2021 as per the instructions vide memo.No.SE/OP/KNR/DE(T)/ADE© /AE©/Sub-
II/D.No.1141/21, Dt: 29.10.2021SE/OP/KNR for dismantling of the service
MWH : 027532.2 0
MVARH(G) : 015095.1 0
MVARH(D) : 004424.8 0
MVAH : 032763.8 0
PF : 0.91 0.93
V1 6.68 L1 78.94
V2 6.67 L2 75.54
V3 6.62 L3 69.59
VI
ENERGY METER SET
AB SWITCH
1001 34934C, 35C, METER BOARD
BPS N2259103,04 TTB N2292435,36 RPS
1001 34938C, 39C MTC
1001 34940C, 41C METER COVER
MRI PORT
RPS N0489834 MD KNOB
RPS N0489835 METER BOX N2292437 BPS
VIII REMARKS :
1)As on reciept of complaint from ADE/C&O/SIRICILLA regarding voltage drop. The joint inspection
conducted on 06.08.2021 along with DE/DPE/KNR & ADE/C&O/SIRICILLA. During inspection B-phase
voltage drop found.
3)Meter MF= 1000for all.
4)Meter sealed as above.
Sd/- Sd/- Sd/- Sd/-
consumer DE/OP/KNR DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 21-22, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/S Avenue supermarts Distribution: Karimnagar
S.C.NO: KRN-730 C.M.D:225KVA CAT:HT-II Dt:05.08.2021
Section: KNR Town-3 Sub- Division: Karimnagar-1 Division: Karimnagar
ii METER PARTICULARS: OLD NEW(NET METER)
Make : Secure Secure
Sl.No. : TSN00324 X1233664
Type : E3M024 E3M024
CTR : 10/5A 10/5A
PTR : 11KV/110V 11KV/110V
Class : 0.2S 0.2s
iii CT / PT Set Particulars : OLD NEW
Make :
Sl.No. :
CTR Available :
CTR Adopted : 20/5A 20/5A
PTR : 11KV/110V 11KV/110V
Class
iv Burden 5 VA
V1 6.54 L1 0.00
V2 6.50 L2 0.00
V3 6.55 L3 0.00
VI
ENERGY METER SET
AB SWITCH
83897942, 43, N3897876, 77, 78, 79,
BPS METER BOARD BPS
44, 45, 46, 47 80 ,81
BPS N2259254, 55 TTB N3897882, 83 BPS
BPS 8387850, 51 MTC N3897884, 85 BPS
BPS 8387852 METER COVER N3897886 BPS
MRI PORT N3897887 BPS
N0019158 MD KNOB N3897888 BPS
RPS N0019159 METER BOX N3897889 BPS
VIII REMARKS :
V1 6.54 L1 1.57
V2 6.54 L2 1.09
V3 6.61 L3 0.87
VI
ENERGY METER SET
AB SWITCH
1)On intimation of DE/OP/KNR reagrding failure of PT on 14.05.2021 at 15:00Hrs of the above service.
The inspection was conducted along with the DE/DPE/KNR & ADE/OP/T/KNR on 15.05.2021.
V1 6.62 L1 5.97
V2 6.67 L2 0.10
V3 6.77 L3 5.89
VI
ENERGY METER SET
AB SWITCH
1)The service was inspected on 01.04.21 and all the parameteters are found normal
V1 6.86 L1
V2 6.86 L2
V3 6.83 L3
VI
ENERGY METER SET
AB SWITCH
1)As per intimation of ADE/C&O/Siricilla regarding Y phase CT failed on 05.05.2021 due to oil gushed out
from CT. The inspection was conducted along with the ADE/C&O/Siricilla and DE/DPE/KNR on 07.05.2021.
2)The failed CT was replaced with new CT on 07.05.2021, Voltages and currents at TTB & MTS were tested
ok. Also new meter fixed in place of old meter on 08.05.2021 at 17:58Hrs.
3)Meter MF=750 for all.
4)Meter sealed as above.
V1 6.42 L1 95.45
V2 6.51 L2 95.02
V3 6.56 L3 100.32
VI
ENERGY METER SET
AB SWITCH
METER BOARD
1001 10692A, 93A
BPS 6929619, 20 TTB N2258052 BPS
1001 10696A, 97A MTC
1001 10698A, 99A METER COVER
MRI PORT
MD KNOB
BPS N0487934 METER BOX N2258050, 51 BPS
VIII REMARKS :
1)On complaint of PT failure on 17.03.2021 at 16:30Hrs, The inspection was conducted and the failed PT
replaced with New PT ON 18.03.2021 at 13:15 Hrs.
2)Meter MF=1333.33 for all.
3)Meter sealed as above.
METER BOARD
2)
V1 6.19 L1 77.18
V2 6.13 L2 83.94
V3 6.18 L3 82.10
VI
ENERGY METER SET
AB SWITCH
METER BOARD
METER BOARD
V1 237.11 L1 0.0
V2 238.57 L2 0.0
V3 236.42 L3 0.0
VI SEAL BITS PARTICULARS :
ENERGY METER SET
AB SWITCH
METER BOARD
MRI PORT
BPS 8389627 MD KNOB 8389333 BPS
BPS 8389628 METER BOX 8389427 BPS
VIII REMARKS :
1)Thippapur Bay-I Check Meter charged on 21.12.2020.
2)Meter MF=1000 for all.
3)Meter seals are provided as above.
Sd/- Sd/- Sd/- Sd/-
Consumer DE/OP/KNR AE/LIS/KNR/TSTRANSCO DE/MRT/KNR
Endt.No.DE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy communicated to the Divisional Engineer, DPE,Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: 400KV Lift irrigation, Thippapur Distribution:Ellanthakunta
S.C.NO: KRN-957 C.M.D: CAT:HT-VII Dt: 21.12.2020.
Section: C&O Siricilla Sub- Division: C&O Siricilla Division:Karimnagar
ii METER PARTICULARS: Stand by Meter
Make : L&T
Sl.No. : 0018141152
Type : ER300P
CTR : 2000/1A
PTR : 400KV/110V
Class : 0.2S
iii CT / PT Set Particulars
Make :
Sl.No. :
CTR Available :
CTR Adopted : 2000/1A
PTR : 400KV/110V
Class :
iv Burden :
EXPORT IMPORT
TIME : 14:58Hrs at 21.12.2020
MWH : 1387 724
MVARH(G) : 708 351
MVARH(D) : 382 560
MVAH : 1978 1294
MVA(MMD) 0.0 0.0
:
No of Resets : 12 13
CMD : 1674 1576
PF :
Adpted CTR : 2000/1A 2000/1A
MF FOR Units : 1000 1000
MF FOR MVA : 1000 1000
V Meter Dislay Voltages,Currents
V1 237.66 L1 0.0
V2 238.98 L2 0.0
V3 236.95 L3 0.0
VI SEAL BITS PARTICULARS :
ENERGY METER SET
AB SWITCH
METER BOARD 0452211, 12, 13, 14, 15, 16 YPS
MRI PORT
BPS 8389629 MD KNOB 8389335 BPS
BPS 8389630 METER BOX 8389420 BPS
VIII REMARKS :
1)Thippapur Bay-I Stand by Meter charged on 21.12.2020.
2)Meter MF=1000 for all.
3)Meter seals are provided as above.
Sd/- Sd/- Sd/- Sd/-
Consumer DE/OP/KNR AE/LIS/KNR/TSTRANSCO DE/MRT/KNR
Endt.No.DE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy communicated to the Divisional Engineer, DPE,Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: 400KV Lift irrigation, Thippapur Distribution:Ellanthakunta
S.C.NO: KRN-957 C.M.D: CAT:HT-VII Dt: 21.12.2020.
Section: C&O Siricilla Sub- Division: C&O Siricilla Division:Karimnagar
ii METER PARTICULARS: Main Meter
Make : L&T
Sl.No. : 0018141170
Type : ER300P
CTR : 2000/1A
PTR : 400KV/110V
Class : 0.2S
iii CT / PT Set Particulars
Make :
Sl.No. :
CTR Available :
CTR Adopted : 2000/1A
PTR : 400KV/110V
Class :
iv Burden :
EXPORT IMPORT
TIME : 14:40Hrs at 21.12.2020
MWH : 1385 723
MVARH(G) : 659 344
MVARH(D) : 388 609
MVAH : 1931 1335
MVA(MMD) 0.0 0.0
:
No of Resets : 12 13
CMD : 1667 1575
PF :
Adpted CTR : 2000/1A 2000/1A
MF FOR Units : 1000 1000
MF FOR MVA : 1000 1000
V Meter Dislay Voltages,Currents
V1 237.58 L1 0.0
V2 238.94 L2 0.0
V3 236.94 L3 0.0
VI SEAL BITS PARTICULARS :
ENERGY METER SET
AB SWITCH
METER BOARD 7878386, 87, 88 ,89, 90, 91 BPS
V1 138.5 L1 0.297
V2 - L2 -
V3 139.5 L3 17.567
VI SEAL BITS PARTICULARS :
ENERGY METER SET
AB SWITCH
5362801, 02, 03,
BPS METER BOARD
04
BPS 8389482, 483 TTB
5362807,
BPS METER COVER
11006898
MRI PORT
RPS 4072344 MD KNOB 8389648 BPS
RPS 4072345 METER BOX 8389649 BPS
VIII REMARKS :
1)The existing service was inspected on 10.12.2020, and Load enhanced from 12MVA to 15MVA.
2)Meter MF=1000 for all.
3)Meter seals are provided as above.
Sd/- Sd/- Sd/- Sd/-
Consumer DE/OP/HZB SSE/PSI/TRD/KZJ DE/MRT/KNR
Endt.No.DE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy communicated to the Divisional Engineer, DPE,Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/s Sneha forms pvt.ltd Distribution:Chenjarla
S.C.NO: KRN-514 C.M.D: 900KVA CAT:HT-I Dt: 09.12.2020
Section: Chenjarla Sub- Division: Alugunur Division:Karimnagar Rural
ii METER PARTICULARS: New Meter(Net Meter) Old Meter
Make : Secure L&T
Sl.No. : X034790 06677627
Type : E3MO24 ER300P
CTR : 100/1A 50/1A
PTR : 33KV/110V 33KV/110V
Class : 0.2s 0.5s
iii CT / PT Set Particulars
Make :
Sl.No. :
CTR Available :
CTR Adopted : 25/1A
PTR : 33KV/110V 33KV/110V
Class : 0.2 0.5
iv Burden :
New Meter Old Meter
TIME : at 17:35Hrs on 09.12.2020 TIME at 13:51Hrs on 05.12.2020
KWH : 000000.0 MWH 0024334.6
KVARH(G) : 000000.0 MVARH(G) 0000559.2
KVARH(D) : 000000.0 MVARH(D) 0010372.8
KVAH : 000000.0 MVAH 0024387.4
1.1209 at 15:00Hrs on
KVA(MMD) 0.09 at 16:30Hrs on 07.10.2017 MVA(MMD)
: 21.11.2020
No of Resets : 0 No of Resets 83
CMD : 0.0 CMD 0000092.2
PF : 0.035 PF 0.967
Adpted CTR : 100/1A Adpted CTR 50/1A
MF FOR Units : 250 MF FOR Units 500
MF FOR MVA : 250 MF FOR MVA 500
V Meter Dislay Voltages,Currents
Old New Old New
20.11 V1 19.81 1.93 L1 3.05
14.59 V2 20.01 1.87 L2 3.06
19.8 V3 19.83 1.84 L3 2.91
VI
ENERGY METER SET
AB SWITCH
8389610, 11, 12,
BPS METER BOARD 2125874, 75, 76, 77, 78 79 BPS
13, 14, 15
BPS 8389616, 17 TTB 8389596, 97 BPS
BPS 8389618, 19 MTC 2125882, 83 BPS
2)R,Y,B PTs were replaced with new PTs of calss 0.5 with new PTs of class 0.2, The meter is replaced due to NON-DLMS and low
class of accuracy.
V1 6.40 L1 0.16
V2 6.43 L2 0.24
V3 6.34 L3 0.14
VI SEAL BITS PARTICULARS :
ENERGY METER SET
AB SWITCH
5362569, 70, 71,
BPS METER BOARD
72, 73, 74,
YPS 0401860, 61 TTB
5362577,
BPS, YPS MTC
0452369
MRI PORT
RPS 3815245 MD KNOB
RPS 3815246 METER BOX 8389569 BPS
VIII REMARKS :
1)The existing service inspected as per the Memo.No.SE/OP/KNR/DE(T)/ADE©/Sub-II/D.No.1025/20, Dt:04.11.2020. The joint
inspection conducted along with DE/DPE/KNR and DE/OP/KNR.
2)Meter MF=1 for all.
3)Meter seals are provided as above.
Sd/- Sd/- Sd/- Sd/-
Consumer DE/OP/KNR DE/DPE/KNR DE/MRT/KNR
Endt.No.DE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy communicated to the Divisional Engineer, DPE,Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11 KV SS Korem Distribution: C&O SIRICILLA
S.C.NO: KRN-029 C.M.D: CAT: Dt:13.11.2020
Section: C&O SIRICILLA Sub- Division: Siricilla Division:KNR
ii METER PARTICULARS:
Make : Secure
Sl.No. : XC452017
Type : E3M024
CTR : 100/1A
PTR : 11KV/110V
Class : 0.2s
Meter Constant :
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 400/1A
PTR :
Class
iv Burden
TIME : 16:06Hrs at 13.11.2020.
MWH : 02705.21
MVARH(G) : 01931.24
MVARH(D) : 00001.30
MVAH : 03466.85
MVA(MMD) 0.182 14:30Hrs at
: 24.10.2020
No of Resets : 43
CMD : 013.966
PF : 0.66
Adpted CTR : 100/1A
MF FOR Units : 4000
MF FOR MVA : 4000
V Meter Dislay Voltages,Currents
V1 6.38 L1 7.19
V2 6.35 L2 9.2
V3 6.33 L3 7.27
VI
ENERGY METER SET
AB SWITCH
METER BOARD
V1 6.61 L1 0.0
V2 6.69 L2 0.0
V3 6.53 L3 0.0
VI
ENERGY METER SET
AB SWITCH
V1 6.16 L1 40.11
V2 6.46 L2 24.43
V3 6.26 L3 31.33
VI
ENERGY METER SET
AB SWITCH
METER BOARD
V1 6.85 L1 6.73
V2 6.94 L2 7.03
V3 6.84 L3 7.54
VI SEAL BITS PARTICULARS :
ENERGY METER SET
METER BOARD 34961C, 62C IMP1001
BPS 8389529, 30 TTB 8392351, 52 BPS
BPS 8389531, 32 MTC 34965C, 66C IMP1001
METER COVER 34967C, 68C, 69C IMP1001
MRI PORT
MD KNOB 4555135 RPS
BPS 8389533 METER BOX 4555136 RPS
VIII REMARKS :
1)As per intimation of AE/C&O/SIRICILLA regarding "R"phase voltage drop '0'. Joint inspection
conducted along wih DE/DPE/KNR, AE/C&O/SIRICILLA, ADE/C&O/SIRICILLA and AE/OP/CESS on
07.11.2020.
2)During inspection it is found that R phase voltage drop in meter display and TTB found abnormal
voltages. Further checked and found got rusted at PT marshelling box. Also observed that B phase
current '0'.
3)Meter MF=8000 for all.
4)Meter sealed as above.
KVA(MMD) : 1:55
No of Resets : 0:00
CMD : 0000062.6
PF : 0.91
Adpted CTR : 100/1A
MF FOR Units : 0:00
MF FOR MVA : 0:00
V Meter Dislay Voltages,Currents
V1 19.89 L1 51.53
V2 20.04 L2 50.8
V3 19.86 L3 48.63
VI SEAL BITS PARTICULARS :
ENERGY METER SET
AB SWITCH
METER BOARD
TTB
MTC
METER COVER
MRI PORT
MD KNOB
METER BOX
VIII REMARKS :
1)As per the ADE/C&O/Sircilla complaint, LV-I B-Phase current drop intimated by ADE/C&O/Siricilla.
2)It is observed that LV-I Breaker switch problem.
3)Meter MF=1000 for all.
4)Meter sealed as above.
V1 6.4 L1 55.3
V2 5.97 L2 54.67
V3 6.45 L3 48.49
VI SEAL BITS PARTICULARS :
ENERGY METER SET
METER BOARD
TTB 0401042, 43 YPS
MTC 4860530, 31 BPS
METER COVER
MRI PORT
MD KNOB 4555717 RPS
METER BOX
VIII REMARKS :
1)As per the complaint of ADE/C&O/Siricilla, the joint inspection conducted along with DE/DPE/KNR
and ADE/C&O/Siricilla on
2)It is observed that
3)Meter MF=1000 for all.
4)Meter sealed as above.
MVA(MMD) : 0.6591
No of Resets : 30
CMD : 29.2
PF : 0.84 lag
Adpted CTR : 300/1A
MF FOR Units : 1000
MF FOR MVA : 1000
V Meter Dislay Voltages,Currents
V1 6.33 L1 23.67
V2 6.41 L2 0.0
V3 6.4 L3 0.0
VI SEAL BITS PARTICULARS :
ENERGY METER SET
METER BOARD
TTB 838962, 63 BPS
MTC 4860402' 03 BPS
BPS 8389398 METER COVER
MRI PORT
MD KNOB 4556079 RPS
METER BOX
VIII REMARKS :
1)The service was inspected on 11.06.2020 regarding zero currents in Y&B Phases
2)Meter MF=1000 for all.
3)Meter sealed as above.
1)LV-II old meter changed with new meter as per intimation of ADE/C&O/SIRICILLA regarding voltage
drop notice during monthly reading date 18.07.2020. i.e.,60.2/0.320, 65.8/0.308, 65.4/0.292 and joint
inspection conducted along with DE/DPE/KNR and ADE/C&O/SIRICILLA on 28.07.2020.
2)During inspection it is found that old secure blocked meter Non-DLMS voltages are normal and
meter display reading taken with MRI, meter changed.
3)Meter MF=40 for all.
4)Meter seals are provided as above.
TTB
MTC
METER COVER S-40115, 16 IMP 1001
MRI PORT
MD KNOB 4897101 RPS
BPS 8389445 METER BOX 4897102 RPS
VIII REMARKS :
1)serice inspected as per Memo No. CGM(IPC&RAC)/ GM(IPC&RAC)/ DE(IPC)/ ADE/ F:89/
D.NO.163/20,DT:25.07.2020 Joint inspection conducted on 31.07.2020.
2)Meter MF=2000 for all.
3)Meter seals are provided as above.
Sd/- Sd/- Sd/- Sd/-
Consumer DE/OP/KNR DE/MRT/TRANSCO DE/MRT/KNR
Endt.No.DE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy communicated to the Divisional.Engineer,DPE,Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/s.Saraswathi power Ind.pvt.ltd Distribution:
S.C.NO: KRN- C.M.D: CAT: Dt: 31.07.2020.
Section: Sub- Division: Division:KNR
ii METER PARTICULARS:
Make : Secure
Sl.No. : AP909659
Type : E3MO21
CTR : 75/1A
PTR : 33KV/110V
Class : 0.2S
iii CT / PT Set Particulars
Make :
Sl.No. :
CTR Available :
CTR Adopted : 75/1A
PTR : 33KV/110V
Class :
iv Burden : EXPORT IMPORT
TIME : 12:38Hrs at 31.07.2020
MWH : 000186.8 0025678
MVARH(G) : 000429.4 000038.5
MVARH(D) : 000019.7 000788.5
MVAH : 000472.6 002595.0
0 0
MVA(MMD) :
No of Resets : 136
CMD : 0010.11 0048.50
PF : 1.0
Adpted CTR : 75/1A 75/1A
MF FOR Units : 1000 1000
MF FOR MVA : 1000 1000
V Meter Dislay Voltages,Currents
Load Load
V1 18.77 L1 0.044
V2 18.47 L2 0.048
V3 18.08 L3 0.042
VI SEAL BITS PARTICULARS :
ENERGY METER SET
CTPT INSP
AB SWITCH
METER BOARD
TTB 0379707, 08
MTC X68206, 207 IMP 1017
METER COVER X68208, 09
MRI PORT
MD KNOB 1508722 RPS
BPS 8389457 METER BOX 0400637 YPS
VIII REMARKS :
1) Service inspected on 07.08.2020 as per the instructions of SE/OP/KNR vide memo
No.SE/OP/KNR/DE(T)/ADE(C)/AE©/SUB-II/D.No.354/Dt 09.07.2020.
2)Meter brought to 33/11KV SS manakondur due to non availability of supply at the above premises and
meter readings noted in the presence of consumer
3)Meter MF=01 for all.
4)Meter seals are provided as above.
Sd/- Sd/- Sd/- Sd/-
Consumer ADE/ALG DE/DPE/KNR DE/MRT/KNR
Endt.No.DE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy communicated to The SAO,Operation circle, Karimnagar.
Copy Submitted to the Superintending Engineer,op,Karimnagar. Divisional Engineer
Copy to ADE/OP/Alugunur. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/S. Life Line Hospital Distribution: Town-III
S.C.NO: KRN-859 C.M.D: 100 KVA CAT: HT-II Dt: 25.06.2020.
Section:Town-III Sub- Division: Karimnagar Town Division:KNR TOWN
ii METER PARTICULARS: New Meter Old Meter
Make : Secure Secure
Sl.No. : X1233667 X0348470
Type : E3M024 E3M024
CTR : 10/5A 10/5A
PTR : 11KV/110V 11KV/110V
Class : 0.2S 0.2S
iii CT / PT Set Particulars
Make : Vishal
Sl.No. : Vis/3VL/31/3/2018-160
CTR Available : 10/5A
CTR Adopted : 10/5A
PTR : 11KV/110V
iv Burden : 5VA-10VA
NEW METER OLD METER
EXPORT IMPORT
TIME 18:33Hrs at 25.06.2020 TIME 18:59Hrs at 25.06.2020
KWH 0000001 0000000 KWH 0342412
KVARH(G) 0000000 0000000 KVARH(G) 0065553
KVARH(D) 0000000 0000000 KVARH(D) 0153358
KVAH 0000001 0000000 KVAH 0355951
2.4 20:30Hrs at 53.0 18:00Hrs at
MVA(MMD) 04.02.2019 KVA(MMD) 23.06.2020
No of Resets 00 No of Resets 26
CMD 00000.0 00000.0 CMD 01345.9
PF 0.22 PF 0.95
Adpted CTR 10/5A Adpted CTR 10/5A
MF FOR Units 01 MF FOR Units 01
MF FOR KVA 01 MF FOR KVA 01
V Meter Dislay Voltages,Currents
New Meter Old Meter New Meter Old Meter
6.71 V1 6.64 0.018 L1 0.84
6.77 V2 6.57 0.018 L2 0.96
6.78 V3 6.64 0.023 L3 0.72
VI SEAL BITS PARTICULARS :
ENERGY METER SET
BPS 6412376, 79, 78, 80, 81 8389404, 05, 06, 07, BPS
METER BOARD 08, 09
BPS 8388828, 29 TTB 8389410, 411 BPS
BPS 6412384, 85 MTC 8389412, 413 BPS
BPS 6412386 METER COVER 8389414 BPS
MRI PORT 8389415 BPS
RPS 4909458 MD KNOB 8389416 BPS
RPS 4909459 METER BOX 8389418 BPS
VIII REMARKS :
1)Solar Net meter fixed as per Release order vide Memo.No. DE/OP/KNR/AE©/D.No. 141/20 , Dt:23.06.2020.
No of Resets : 38 39
CMD : 37.9 5.9
PF :
Adpted CTR : 100/1A 100/1A
MF FOR Units : 250 250
MF FOR MVA : 250 250