Well: LLB-12 13-3/8" Squeeze Design: Pt. Cosl Indo

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 6

Well : LLB-12

13-3/8" Squeeze Design


for

PHE ONWJ
with

Rig:ENSCO-67

Presented to:
Mr. Heru Mardjito
Ibu. Diah

Prepared by: Sun Hongbo Date: 30-Mar-14

Checked by: Zhang Xiaodong Date: 30-Mar-14

Approved by: Qiu Guoliang Date: 30-Mar-14

PT. COSL INDO


Prudential Building, 19 Floor, JI. Jend. Sudirman No. 79

Telp. +62-21-57932563, Fax. +62-21-57932562

Jakarta 10210
LLB-12 13-3/8" Squeeze Design

1. Well Data
Weight 0.D I.D Depth Capacity Plug Volume
Item Casing Type
Stick up @ -5.00 ft (lbs/ft) (in) (in) (ft) (bbl/ft) (bbl/ft)
13-3/8"CSG 61 K55 BTC 13.375 12.515 2270.00 0.1522
12-1/4" OH 12.250 0.1458
5-1/2"DP 24.7 5.50 4.525 4170.00 0.0199
2. Slurry Recipe
Cement Class: INDO G cement Base Water: Sea Water
Slurry Properties Scavenger Lead Tail
Slurry Density ppg 15.80
Slurry Yield Cuft/sks 1.161
Total mixing fluid gal/sks 5.142
Thickening time@70BC minutes 230.00
Fluid loss@1000psi,30min ml 137.00
Free water % 0.00
UCA Compressive strength 24Hrs, psi

Chemical Concentration Unit Tail


Sea water GPS 4.340
Defoamer PC-X61L GPS 0.045
13-3/8" @ 2100.00 ft Dispersant PC-F41L GPS 0.096
CR Fluid Loss Additive PC-G71L GPS 0.644
Top of Boundinig agent PC-GS2L GPS
cement @ 2100.00 ft Retarder PC-H21L GPS 0.017

13-3/8" @ 2270.00 ft 3. Calculation


casing TOP Bottom Capacity Volume Total Cement M/Fluid
Slurry Section EOC
(ft) (ft) (bbl/ft) (bbl) (bbl) (sks) (bbl)
Scavenger

Tail slurry
1. plug 2100.00 2270.00 0.1522 0% 25.88
75.46 364.92 44.68
2. squeeze 2270.00 2610.00 0.1458 0% 49.58
4. Chemicals usage
Bottom of Description Code Unit Scavenger Lead Tail Total
cement @ 2610.00 ft Sea water S/W bbl 38.00 38.00
Defoamer PC-X61L gal 17.00 17.00
Dispersant PC-F41L gal 36.00 36.00
Fluid Loss Additive PC-G71L gal 237.00 237.00
Bounding agent PC-GS2L gal 0.00 0.00
Retarder PC-H21L gal 7.00 7.00
5. Displacement
12-1/4"OH @ 4170.00 ft Balance plug displacement volume= 41.89 bbl
LLB-12 13-3/8" Squeeze Design
6. Cementing Procedure 7. Cementing Pumping Schedule
Volume Pump Rate
1. Set 13-3/8" cement retainer as procedure. No. Description bbl bpm Pumping Time

2. Stab in stinger and perform injection test and fill table Step 8. 1. Preflush 10 3 4 min

3. Break circulation until cementing is ready. 2. Pressure test 10 min

4. Stab in stinger and slack off 10klbs on CR. 3. Tail slurry 75 2 40 min

5. Close BOP, pressure DP&CSG 500psi. 5. Displace by CMT pump 42 2 20 min

6. Pump sea water 10bbl and pressure test line 3000psi X 10min. 7. Circulate 30 min

7. Mix and Pump the Tail Slurry : 75 bbl @ 15.80 ppg. 6. POOH

8. Continue displacement 42 bbls of Mud with Rig Pump.

9. Bleed off pressure and open BOP.

10. Pull out stinger and circulate to clean DP. Total job time= 104 min

11. POOH. Job time from mixing cement until CIP= 60 min

Thickening time of slury= 230 min

Extra time for Safety Margin= 170 min

8. Injection test record

Rate Time Initial pressure Inject volume Final pressure Static time Static pressure Return
item (bpm) (HH:MM) (psi) (bbl) (psi) (min) (psi) (bbl)

1 0.5

2 1

3 1.5

4 2

5 2.5

9. Material Consumption and Cost


Unit Price Total
Description Code Total Unit US$ Cost US$
provided by
G cement 365 sks PHE ONWJ

Defoamer PC-X61L 17.00 gal 12.50 212.50

Dispersant PC-F41L 36.00 gal 9.50 342.00

Fluid Loss Additive PC-G71L 237.00 gal 20.00 4740.00

Bounding agent PC-GS2L 0.00 gal 8.00 0.00 Cementing Engineer:

Retarder PC-H21L 7.00 gal 2.20 15.40 Date:

13-3/8" cement retainer 1 ea 3500.00 3500.00 Drilling supervisor:

Date:

Total: 8809.90
JAKARTA LABORATORY SERVICES
LABORATORY REPORT
This report is the property of COSLand neither it nor any part thereof nor a copy thereof is to published or disclosed without first securing the express written approval of laboratory
management; it may, however, be used in the course of regular business operations by any person or concern and the employees thereof receiving such report form COSL Services.

Report No. : ONWJ-losses plug-22/02/14-120℉


Date : 22/Feb/14
TO :
Oilfield Chemicals - PT. COSL INDO
JAKARTA - INDONESIA

FOR : PERTAMINA PHE ONWJ


Well Name: LLB-12
Job Type : 13-3/8" squeeze CONFIRMATION

Purposes

Determine the thickening time, compressive strength, free water, fluid loss, and rheological properties of the indicated
cementing compositions, using INDO cement class G and water sample from Location.

Results

Test were conducted according to modified API RP 10B, 22 nd Edition, December, 1997. The test data results are
listed in the following tables.

Analyst : Respectfully submitted,


- Widagdo Endroyono JAKARTA LABORATORY
- Qiu Guoliang
- Rijal
- Sun Hongbo

Liu Menghui
Scientist-Chemist

Prepared By: Ari

LIMITATION OF LIABILITY. This report is based on sound engineering practices, but because of variable conditions and the information which must be relied upon,

COSL makes no warranty, express or implied, as to the accuracy of the data or of any calculations or opinions expressed herein. You agree that COSL shall not liable for any loss or damage

whether due to negligence or otherwise arising out of or in connection with such data calculations or opinions.
February 22, 2014
13-3/8" squeeze
Page 2 of 3

Well Information
Measuring Well Depth Feet 2,300
Total Vertical Depth Feet 2,300
BHST ºF 140
BHCT ºF 120
Test Schedule - squeeze
Pipe Size inch 13-3/8"

Test #

Slurry Type Scavenger Lead Tail


Slurry Composition
INDO G Class lb/sk 94.000
1 PC-C81S, Silica Flour % -
2 PC-X61L, Defoamer gal/sk 0.045
3 PC-F41L, Dispersant gal/sk 0.096
4 PC-G71L, Fluid Loss gal/sk 0.644
5 PC-GS2L, Bonding Agent gal/sk
6 PC-P70L, Extender gal/sk
7 PC-H21L, Retarder gal/sk 0.017

Water Type Sea Water


Mixing Water (Sea Water) gal/sk 4.340
Total Mixing Fluid gal/sk 5.142
Slurry Weight lb/gal 15.800
Slurry Yield ft3/sk 1.161

Thickening Time Test


Final Temperature ºF 120
Final Pressure psi 2,000
Time to BHCT min 10
Consistency 40 Bc hr:min 3:43
Consistency 50 Bc hr:min 3:48
Consistency 70 Bc hr:min 3:50
Consistency 100 Bc hr:min 3:52

Free Water Test


Temperature ºF 80
Inclined Angle V/H/I I
Free Water % Nil

Fluid Loss Test


Temperature ºF 120
Pressure psi 1,000
Api Fluid Loss ml/30mnt 137

Rheology Test
Temperature ºF 80 120
FANN dial reading 300 160.0 139.0
200 118.0 100.0
100 74.0 60.0
6 22.0 11.0
3 18.0 9.0
Plastic Viscosity cps 129.0 118.5
Yield Point lbf/100ft² 31.0 20.5

Compressive Strength Test


UCA Strength Test
Curing Temperature ºF
250 psi reach with in hr:min
500 psi reach with in hr:min
12 hours psi
24 hours psi

SGSA( from 100 to 500 lbs/100ft2) min


Crash Strength Test
24 hours psi 2,562

Amount of Additive per 1 bbl Mix Fluid Scavenger Lead Tail


Sea Water gal BATCH NO. BATCH NO. BATCH NO. 35.45
PC-X61L, Defoamer gal 07232013 0.37
PC-F41L, Dispersant gal 0.78
PC-G71L, Fluid Loss gal 1303231 5.26
PC-GS2L, Bonding Agent gal 0.00
PC-P70L, Extender gal
PC-H21L, Retarder gal 20130813 0.14

Total Fluid gal 42.00


Report No.: ONWJ-losses plug-22/02/14-120℉ Client: PERTAMINA PHE ONWJ
February 22, 2014
13-3/8" squeeze
ED-11 Page 3 of 3

THICKENING TIME CHART

T.T. Chart

Slurry UCA Chart

Report No.: ONWJ-losses plug-22/02/14-120℉ Client: PERTAMINA PHE ONWJ