Well: LLB-12 13-3/8" Squeeze Design: Pt. Cosl Indo
Well: LLB-12 13-3/8" Squeeze Design: Pt. Cosl Indo
Well: LLB-12 13-3/8" Squeeze Design: Pt. Cosl Indo
PHE ONWJ
with
Rig:ENSCO-67
Presented to:
Mr. Heru Mardjito
Ibu. Diah
Jakarta 10210
LLB-12 13-3/8" Squeeze Design
1. Well Data
Weight 0.D I.D Depth Capacity Plug Volume
Item Casing Type
Stick up @ -5.00 ft (lbs/ft) (in) (in) (ft) (bbl/ft) (bbl/ft)
13-3/8"CSG 61 K55 BTC 13.375 12.515 2270.00 0.1522
12-1/4" OH 12.250 0.1458
5-1/2"DP 24.7 5.50 4.525 4170.00 0.0199
2. Slurry Recipe
Cement Class: INDO G cement Base Water: Sea Water
Slurry Properties Scavenger Lead Tail
Slurry Density ppg 15.80
Slurry Yield Cuft/sks 1.161
Total mixing fluid gal/sks 5.142
Thickening time@70BC minutes 230.00
Fluid loss@1000psi,30min ml 137.00
Free water % 0.00
UCA Compressive strength 24Hrs, psi
Tail slurry
1. plug 2100.00 2270.00 0.1522 0% 25.88
75.46 364.92 44.68
2. squeeze 2270.00 2610.00 0.1458 0% 49.58
4. Chemicals usage
Bottom of Description Code Unit Scavenger Lead Tail Total
cement @ 2610.00 ft Sea water S/W bbl 38.00 38.00
Defoamer PC-X61L gal 17.00 17.00
Dispersant PC-F41L gal 36.00 36.00
Fluid Loss Additive PC-G71L gal 237.00 237.00
Bounding agent PC-GS2L gal 0.00 0.00
Retarder PC-H21L gal 7.00 7.00
5. Displacement
12-1/4"OH @ 4170.00 ft Balance plug displacement volume= 41.89 bbl
LLB-12 13-3/8" Squeeze Design
6. Cementing Procedure 7. Cementing Pumping Schedule
Volume Pump Rate
1. Set 13-3/8" cement retainer as procedure. No. Description bbl bpm Pumping Time
2. Stab in stinger and perform injection test and fill table Step 8. 1. Preflush 10 3 4 min
4. Stab in stinger and slack off 10klbs on CR. 3. Tail slurry 75 2 40 min
6. Pump sea water 10bbl and pressure test line 3000psi X 10min. 7. Circulate 30 min
7. Mix and Pump the Tail Slurry : 75 bbl @ 15.80 ppg. 6. POOH
10. Pull out stinger and circulate to clean DP. Total job time= 104 min
11. POOH. Job time from mixing cement until CIP= 60 min
Rate Time Initial pressure Inject volume Final pressure Static time Static pressure Return
item (bpm) (HH:MM) (psi) (bbl) (psi) (min) (psi) (bbl)
1 0.5
2 1
3 1.5
4 2
5 2.5
Date:
Total: 8809.90
JAKARTA LABORATORY SERVICES
LABORATORY REPORT
This report is the property of COSLand neither it nor any part thereof nor a copy thereof is to published or disclosed without first securing the express written approval of laboratory
management; it may, however, be used in the course of regular business operations by any person or concern and the employees thereof receiving such report form COSL Services.
Purposes
Determine the thickening time, compressive strength, free water, fluid loss, and rheological properties of the indicated
cementing compositions, using INDO cement class G and water sample from Location.
Results
Test were conducted according to modified API RP 10B, 22 nd Edition, December, 1997. The test data results are
listed in the following tables.
Liu Menghui
Scientist-Chemist
LIMITATION OF LIABILITY. This report is based on sound engineering practices, but because of variable conditions and the information which must be relied upon,
COSL makes no warranty, express or implied, as to the accuracy of the data or of any calculations or opinions expressed herein. You agree that COSL shall not liable for any loss or damage
whether due to negligence or otherwise arising out of or in connection with such data calculations or opinions.
February 22, 2014
13-3/8" squeeze
Page 2 of 3
Well Information
Measuring Well Depth Feet 2,300
Total Vertical Depth Feet 2,300
BHST ºF 140
BHCT ºF 120
Test Schedule - squeeze
Pipe Size inch 13-3/8"
Test #
Rheology Test
Temperature ºF 80 120
FANN dial reading 300 160.0 139.0
200 118.0 100.0
100 74.0 60.0
6 22.0 11.0
3 18.0 9.0
Plastic Viscosity cps 129.0 118.5
Yield Point lbf/100ft² 31.0 20.5
T.T. Chart