Contrary to the requirements of CSA N299.2-16 Clauses 5.5.20.1 m), 5.5.20.2 r), 5.5.14.3 and 5.5.14.1
a) b), it was observed that:
The CSA N299.1 Audit Checklist for the internal audit performed in 2022 was incomplete and
did not include the Audit Result Summary information and the audit results for each section
(Satisfactory, Unsatisfactory, Not Applicable). Also, many sections did not include the
Assessment / Summary and many tables did not include information.
The CSA N299.3 Audit Checklists included in the final Audit File for Marshield and Atelier Pedro
supplier audits were almost empty and not filled out as required.
(within 30 days)
SUBMITTED BY
(NAME AND TITLE)
DATE CHOOSE DATE
CORRECTIVE ACTION HAS BEEN IMPLEMENTED BY
FUNCTION MANAGER DATE CHOOSE DATE
CORRECTIVE ACTION HAS BEEN VERIFIED EFFECTIVE BY
QUALITY AUTHORITY DATE CHOOSE DATE
(Return this form, in Microsoft word format, to Lead Auditor on or before due dates noted in Section 1 & II with all objective evidence)
FORM # JP-CP-PROC01-FRM05
Rev 01
Page 2 of 4
CANPAC
NON-CONFORMANCE AND
CORRECTIVE ACTION REQUEST
PRINT NAME
SIGNATURE
FORM # JP-CP-PROC01-FRM05
Rev 01
Page 3 of 4
CANPAC
NON-CONFORMANCE AND
CORRECTIVE ACTION REQUEST
Instructions to Suppliers:
1. Complete Section II with identification of the cause of the conditions and proposed corrective action
(s).
2. Identify the date that the corrective actions will be completed and implemented (See *Note 1 below)
3. Identify the name/position of the person responsible for the submission of the completed form
4. Return the electronic word document with Section II completed to the Lead Auditor (do not pdf
form) within 30 days of receipt of the NCAR form or as per the due date reflected on the form.
5. The Lead Auditor will evaluate your response and return form with acceptance / rejection comments
as applicable.
6. Complete corrective actions by due date you have proposed/agreed upon with the Auditor.
7. Provide appropriate objective evidence of all proposed corrective actions prior to due date. One pdf
containing all back-up information per NCAR should be submitted for auditor verification. Do not
provide separate files or native files where possible.
8. CANPAC Lead Auditor will verify and close the NCAR after review of supplier actions and provide a
copy of the closed NCAR to the CANPAC Program Manager and supplier for their records.
*Note: Due date of corrective actions should not exceed 90 days of original NCAR issuance. If more time
is needed by Supplier due to extent/nature of corrective action required, Auditor agreement must be
sought before submitting form. Any CARs exceeding 120 days require CANPAC Program Manager
Approval / Utility approval.
FORM # JP-CP-PROC01-FRM05