IRIS INSPECTION Contract No. : CO21012082
Procedure No. : 8408-40-28
REPORT Page. : 1 of 12
Item/ Tag No. : E-25A-02 Client : PREMIER OIL VIETNAM OFFSHORE B.V
Part/ Item : AFTERCOOLER FOR GL-A COMPRESSOR Location : CHIM SAO FIELD BLOCK 12W, OFFSHORE VIETNAM
ALPHANDT POVO
Inspected by: TRAN NHAT HAO Reviewed by: PHAM NGOC TUAN Approved by:
TI LEVEL II ASNT UT LEVEL III, ID 323881
Date: Date: Date:
Approved by:
Date:
Signature:
Report No. :AL-IRIS-E-25A-02-003
IRIS INSPECTION Contract No. : CO21012082
Procedure No. : 8408-40-28
REPORT Page. : 2 of 12
Item/ Tag No. : E-25A-02 Client : PREMIER OIL VIETNAM OFFSHORE B.V
Part/ Item : AFTERCOOLER FOR GL-A COMPRESSOR Location : CHIM SAO FIELD BLOCK 12W, OFFSHORE VIETNAM
CONTENT
Exchanger : E-25A-02
Description : Air Fin Cooler Tube
Tube Material : Carbon Steel SA179
Tube Size : Ø 25.5 mm x WT 2.77 mm
Inpsection End : Front side
Scanning Location : From rear side to front side
Orientation : Horizontal
Tube Sheet Diagram : View from front side
Gain 1 : 44 dB
Gain 2 : 65 dB
Material : Carbon Steel
Blanking : 1
Velocity : 5890 m/s
Thickness : 2.77 mm
Outside diameter : 25.4 mm
IRIS inspection is an ultrasonic immersion pulse echo technique. A transducer located inside a turbine generates an ultrasound pulse along the axis of the tube.
The ultrasound is reflected on a 45° mirror and oriented toward the tube wall. When it reaches the internal surface of the tube, the ultrasound is partially reflected,
then transmitted inside the tube wall, and finally reflected on the outside surface.
The tube wall thickness can be calculated by using the ultrasound velocity in the tube material and the time of flight different between the outer and inside
diameter echoes. A water flow is going inside the cable, through the turbine and rotates continuously the mirror. This rotation allows a full inspection of the tube
wall thickness.
Report No. :AL-IRIS-E-25A-02-003
IRIS INSPECTION Contract No. : CO21012082
Procedure No. : 8408-40-28
REPORT Page: : 4 of 12
Item/ Tag No. : E-25A-02 Client : PREMIER OIL VIETNAM OFFSHORE B.V
Part/ Item :AFTERCOOLER FOR GL-A COMPRESSOR Location : CHIM SAO FIELD BLOCK 12W, OFFSHORE VIETNAM
Table 1 below shows the comparison the IRIS result performed on Calibration tube and its certificate. The result indicated the measurement
from IRIS well matched with values on the certificate.
Table 1: Comparison between measurement of IRIS and actual value on certificate of Calibration tube
The calibration tube of carbon steel material with 2.77 mm wall thickness is manufactured with four defects which are 40% and 60% OD groove representing for corrosion and
100%, 80% & 60% corresponding to hole and pitting defect. The tolerance of tube is ± 0.003” (0.076mm).
The general overview of the inspected areas and its inspection results are presented in the attached colour scan reports, with the wall loss represented in colour classes as depicted in
the colour palette below.
Report No. :AL-IRIS-E-25A-02-003
IRIS INSPECTION Contract No. : CO21012082
Procedure No. : 8408-40-28
REPORT Page: : 6 of 12
Item/ Tag No. : E-25A-02 Client : PREMIER OIL VIETNAM OFFSHORE B.V
Part/ Item :AFTERCOOLER FOR GL-A COMPRESSOR Location : CHIM SAO FIELD BLOCK 12W, OFFSHORE VIETNAM
E-1111J
Figure 3: 77.25% OD FBH defect of calibration Tube. Actual result displays 76% of WT.
25% Groove
Figure 4: 57.4% OD FBH defect of calibration tube. Actual result displays 55% of WT.
4 x 25% FBH
Figure 5: 40.07% OD Groove defect of calibration tube. Actual result shows 42% of WT.
Report No. :AL-IRIS-E-25A-02-003
IRIS INSPECTION Contract No. : CO21012082
Procedure No. : 8408-40-28
REPORT Page: : 7 of 12
Item/ Tag No. : E-25A-02 Client : PREMIER OIL VIETNAM OFFSHORE B.V
Part/ Item :AFTERCOOLER FOR GL-A COMPRESSOR Location : CHIM SAO FIELD BLOCK 12W, OFFSHORE VIETNAM
E-1111J
50% FBH
Figure 6: 59.57% OD Groove Defect of calibration tube. Actual result displays 60% of WT.
COMMENTS / OBSERVATION:
1. IRIS was carried out on 49 tubes out of 162 tubes as per client requirement. There are 8 tubes found corrsosion with maximum wall loss of 20 % on row 30
tube 40 and row 4 tube 40. The remaining inspected tubes were in good condition with no defect. Please refer to the detailed results for more information.
Report No. :AL-IRIS-E-25A-02-003
Contract No. : CO21012082
IRIS INSPECTION REPORT Procedure No. : 8408-40-28
Page. : 8 of 12
Item/ Tag No. : E-25A-02 Client : PREMIER OIL VIETNAM OFFSHORE B.V
Part/ Item :AFTERCOOLER FOR GL-A COMPRESSOR Location : CHIM SAO FIELD BLOCK 12W, OFFSHORE VIETNAM
E-25A-02
#
Report No. :AL-IRIS-E-25A-02-003
Contract No. : CO21012082
IRIS INSPECTION REPORT Procedure No. : 8408-40-28
Page. : 9 of 12
Item/ Tag No. : E-25A-02 Client : PREMIER OIL VIETNAM OFFSHORE B.V
Part/ Item : AFTERCOOLER FOR GL-A COMPRESSOR Location : CHIM SAO FIELD BLOCK 12W, OFFSHORE VIETNAM
E-25A-02
S
Report No. :AL-IRIS-E-25A-02-003
Contract No. : CO21012082
IRIS INSPECTION REPORT Procedure No. : 8408-40-28
Page. : 10 of 12
Item/ Tag No. : E-25A-02 Client : PREMIER OIL VIETNAM OFFSHORE B.V
Part/ Item : AFTERCOOLER FOR GL-B COMPRESSOR Location : CHIM SAO FIELD BLOCK 12W, OFFSHORE VIETNAM
Row Col Wall Loss Nominal Actual Remaining Thickness Actual Thickness
No. Result
No. No. (%) Thickness (mm) Wall Loss (mm) (mm) (mm)
1 3 1 - 2.77 - - 2.71 NDD
2 3 2 - 2.77 - - 2.74 NDD
3 2 3 - 2.77 - - 2.72 NDD
4 2 4 - 2.77 - - 2.71 NDD
5 2 5 - 2.77 - - 2.74 NDD
6 2 6 - 2.77 - - 2.74 NDD
7 3 7 - 2.77 - - 2.74 NDD
8 3 8 - 2.77 - - 2.77 NDD
9 3 9 - 2.77 - - 2.74 NDD
10 3 10 - 2.77 - - 2.71 NDD
11 3 11 - 2.77 - - 2.74 NDD
12 3 12 - 2.77 - - 2.74 NDD
13 3 13 - 2.77 - - 2.74 NDD
14 3 14 - 2.77 - - 2.71 NDD
15 3 15 - 2.77 - - 2.74 NDD
16 3 16 - 2.77 - - 2.77 NDD
17 3 17 - 2.77 - - 2.74 NDD
18 3 18 - 2.77 - - 2.74 NDD
19 3 19 - 2.77 - - 2.74 NDD
20 3 20 - 2.77 - - 2.71 NDD
21 3 21 - 2.77 - - 2.74 NDD
22 3 22 - 2.77 - - 2.71 NDD
23 3 23 - 2.77 - - 2.77 NDD
24 3 24 - 2.77 - - 2.74 NDD
25 3 25 - 2.77 - - 2.74 NDD
26 3 26 - 2.77 - - 2.77 NDD
27 3 27 - 2.77 - - 2.74 NDD
28 3 28 - 2.77 - - 2.77 NDD
29 3 29 - 2.77 - - 2.74 NDD
30 3 30 - 2.77 - - 2.74 NDD
31 3 31 - 2.77 - - 2.73 NDD
32 3 32 - 2.77 - - 2.73 NDD
33 3 33 - 2.77 - - 2.71 NDD
34 3 34 - 2.77 - - 2.77 NDD
35 3 35 - 2.77 - - 2.71 NDD
36 3 36 - 2.77 - - 2.74 NDD
37 3 37 - 2.77 - - 2.71 NDD
38 3 38 - 2.77 - - 2.74 NDD
39 3 39 - 2.77 - - 2.77 NDD
40 3 40 20 2.77 0.55 2.22 - OD_CORR
41 4 1 - 2.77 - - 2.77 NDD
42 4 14 17 2.77 0.47 2.30 - OD_CORR
43 4 17 19 2.77 0.53 2.24 - OD_CORR
44 4 20 14 2.77 0.39 2.38 - OD_CORR
45 4 21 - 2.77 - - 2.77 NDD
46 4 22 19 2.77 0.53 2.24 - OD_CORR
47 4 24 18 2.77 0.50 2.27 - OD_CORR
48 4 25 18 2.77 0.50 2.27 - OD_CORR
49 4 40 20 2.77 0.55 2.22 - OD_CORR
Report No. :AL-IRIS-E-25A-02-003
IRIS INSPECTION Contract No. : CO21012082
Procedure No. : 8408-40-28
REPORT Page. : 11 of 12
Item/ Tag No. : E-25A-02 Client : PREMIER OIL VIETNAM OFFSHORE B.V
Part/ Item : AFTERCOOLER FOR GL-B COMPRESSOR Location : CHIM SAO FIELD BLOCK 12W, OFFSHORE VIETNAM
Row Col Wall Loss Nominal Actual Remaining Thickness Actual Thickness
No. Result
No. No. (%) Thickness (mm) Wall Loss (mm) (mm) (mm)
Legend:
NDD No defect _ Accepted (Compared to min thickness requirement) Based on the client’s specification
Row 4, Column 40 :