7. Opening step of ATS-T 8.

Open the ATS-T


ATS-T
User Manual a 300mm b

1. Introduction 300mm
300mm

The Auto-Transfer Switch Three Phase (ATS - T)controls the switching of the contactors to provide power to the EPS load in both grid-tied
and off-grid conditions. The ATS-T integrates a contactor to provide users with a simple connection. It is used with Growatt Hybrid inverter
and AC coupled inverter (Three phase). Configured with ATS-T, when the power outage, ATS-T can automatically switch to Off-Grid state, it
can continue to supply power to the EPS load, the load can continue to run. 300mm

c
2. The location of ATS - T in the system 3. Configuration
1.To leave at least 300mm
As shown in chart 2.1, the input side ATS-T is connected with space from ATS-T
Model Name Growatt ATS - T 2.Make the position of 2
EPS and GRID of Hybird inverter, the output side is connected As shown above, please put the key into the Keyhole on the ATS - T
with EPS LOAD, and the position in the system is shown in the holes(282mm) . right, clockwise rotation of 90°, the lower end of the first lock up
circle in the chart 2.1. EPS LOAD default connect with Grid Grid Normal Voltage 230/400a.c.V 50/60Hz 3.Drill holes with φ10 drill gently move Open, remove the lock at the upper end of the buckle,
power, if Grid is lost, EPS LOAD will turn to EPS output of hybrid Depth: at least 40mm. then you can open the cover, Step of locking the cover opposite to
inverter. Grid Max Current 30A the above.

EPS Normal Voltage 230/400a.c.V 50/60Hz


9. Wiring Connection
EPS Max Current 30A
9.1 total wire diagram
Load Normal Voltage 230/400a.c.V 50/60Hz
There are two type wire connection diagram of ATS - T, show as below:
Load Max Current 30A
2
Cooling Concept Natural

Ingress Protection IP65

Installation Wall Mountable

Operation Ambient -25℃ ~ +50℃


Temperature

Compatible Model Growatt Hybrid inverter and AC


coupled inverter (three phase )

4. General Information - Parts List

Part List Part List

Item Item Name Qty Item Item Name Qty Standard 1 is for general using, and standard 2 is for like Australia where Neutral line can't be switched. When connect with ATS - T,
please check which standard is suit for you.
ATS-T ( Auto-Transfer Switch
A 1 E Key 2
Three Phase )
A B C B User Manual 1 F Cold pressed terminal(large /small) 20
9.2 wires making Note:
1.These include 4pcs 10AWG wire (2pcs red, 2pcs black) for
shorting contactor ports 2 and 4, 6 and 8(each contactor), Its length
C Anchor Bolt 2 G Contactor control line 4 1. Wires below are needed before installation(16AWG wire is about 60cm, 10 AWG N wire (for standard2)length is about 50cm.
has been configured in accessory bag).

D E F G D O -type terminal 3 2.Use the diagonal plier to trip 15mm of insulation from one side of
the 10AWG wires(12pcs);
Use the diagonal plier to trip 15mm of insulation from two side of
5. Dimension & Weight 6. Tool the 10AWG wires (4pcs,If it is standard 2, you need 5pcs);
Use the diagonal plier to trip 10mm of insulation from two side of
the 12AWG wires(4pcs);
Use the diagonal plier to trip one side of GND wire about
7mm(3pcs).

NO Description NO Description

1 Pipe clamp 4 Rubber hammer

2 Diagonal plier 5 Driller


Dimension (L x W x H):312*295*85mm
Weight : 3.8KG 3 Screwdriver
3.There are three types wire need to be machining, please check Use the screwdriver to unscrew the nut with position numbers 2, 9.7 Checking
ref to section 9.1 wired diagram. The follow three type wire are Use the screwdriver to unscrew the nut with position numbers
R1 and R7(each contactor) in the contactor, and then insert 4, 6 and 8(each contactor) in the contactor, and the red 10AWG
show as below: short wire ends were inserted into the contactor port 2 and 4,
GRID-R,GRID-S,GRID-T wires and GRID-N wire into the port P l e a s e m a k e s u r e t h a t a l l w i r i n g i n t h e AT S - T i s
of contactor(R1&R7) through the cable nut and tighten them The Black 10AWG short wire ends were inserted into the
contactor port 6 and 8, then insert EPS load-R,EPS load-S,EPS tightened,check the connection diagram with section 9.1.
with screwdriver. Use a screwdriver to lock the ground wire
on the E-wire copper bar. load-T wires and EPS load-N wires into the port of
contactor(2&6) through the cable nut and tighten them with
screwdriver. Use a screwdriver to lock the ground wire on the E-
wire copper bar. 10. Trouble shooting
9.5 EPS-wires Connection

In the process of use, if the EPS load does not work when the
Note: on-grid, please turn off the Hybird inverter, and then open the
The following step is an example for Australian grid system ATS-T cover, check the GRID and EPS LOAD line is connected
where neutral line can't be switched. (If you do not have this properly.
requirement, ignore the following step) If the load does not work when off-grid, please turn off the
inverter, and then open the ATS-T cover, check the control line,
the EPS wiring and the EPS LOAD wiring is normal.
a b c

9.3 Control coil-wires Connection


11. ATS - T usage methods

After connecting the ATS - T internal wire, close the cover, the
GRID and EPS end of the ATS-T are respectively connected
with the AC GRID and EPS output of Hybird inverter, EPS load
end access load, run Hybird inverter, load to normal operation.

12. Caution
Please use the equipment within the scope of specification.
A EPS-R wire Connect to EPS-R Excessive current or voltage may cause device damage
To avoid personal injury due to energy hazard, remove
B Control coil-L wire1 Connect the contactor 1 of 3 and A1 wristwatches and jewelry when repairing. Use tools with
Use the screwdriver to unscrew the nut with position
insulated handles.
C EPS-N wire Connect to EPS-N numbers 3 and 5(each contactor) in the contactor, and then
Repair are to be performed only by qualified technical personal
insert EPS-R, EPS-S,EPS-T wires and EPS-N wires into the
authorized by Growatt.
D Control coil-N wire1 Connect the contactor2 of 5 and A2 port of contactor(3&5) through the cable nut and tighten them
with screwdriver. Use a screwdriver to lock the ground wire
Connect the contactor 2 of 5 and on the E-wire copper bar.
E Control coil-N wire2 contactor 1 of A2
Use the screwdriver to unscrew the nut with position numbers 5
Connect the contactor 1 of 3 and Note:
F Control coil-L wire2 and 7(contactor2) in the contactor, and use 10 AWG wire shorting
contactor 2 of A1 Please prevent other wires from getting loose during
contacts 2 of 5 and 7 ports and tighten with a screwdriver.
operation.

9.4 GRID-wires Connection 9.6 EPS LOAD-wires Connection

Growatt New Energy


Download
Manual

Shenzhen Growatt New Energy Technology CO.,LTD


No.28 Guangming Road, Shiyan Street, Bao’an District,
Shenzhen, P.R.China
T +86 0755 2747 1942
E service@ginverter.com
W www.ginverter.com
GR-UM-163-A-01

You might also like