Tender Query 8
Tender Query 8
Tender Query 8
Contractor's
Query No. Tenderer's Query Consultants Response Discipline Client Response
Query Date
The ceiling finish in Finishes Schedule for WF Pump Room HL00 – 015 is C-011 but in Reflected
160 7/2/2020 Please follow C011 for the ceiling finish Arch As per consultants response
Ceiling plan it is C-004.
The ceiling finish in Finishes Schedule for Shisha Prep. HL00 – 016 is C-005 but in Reflected Ceiling
161 7/2/2020 Please follow C005 for the ceiling finish Arch As per consultants response
plan it is C-004.
The ceiling finish in Finishes Schedule for Store HL00 – 022 is C-002 but in Reflected Ceiling plan it
162 7/2/2020 Please follow C002 for the ceiling finish Arch As per consultants response
is C-001.
The floor finish in Finishes Schedule for Beverage HL00 - 046 is F-0010 but in floor finish drawing it
163 7/2/2020 Please follow F-017 for the floor finish Arch As per consultants response
is F-015.
The ceiling finish in Finishes Schedule for House Keeping HL001 – 005 is C-002 but in Reflected
164 7/2/2020 Please follow C002 for the ceiling finish Arch As per consultants response
Ceiling plan it is C-001.
The ceiling finish in Finishes Schedule for Furniture Store HL006 – 006 is C-002 but in Reflected
165 7/2/2020 Please follow C002 for the ceiling finish Arch As per consultants response
Ceiling plan it is C-001.
The ceiling finish in Finishes Schedule for Shisha Prep. HL006 – 007 is C-005 but in Reflected
166 7/2/2020 Please follow C005 for the ceiling finish Arch As per consultants response
Ceiling plan it is C-001.
The floor finish in Finishes Schedule for MEP Plant Room HL06 - 015 is F-001 but in floor finish
167 7/2/2020 Please follow F-002 for the floor finish Arch As per consultants response
drawing it is F-002.
168 MEP 7/2/2020 Please see the repsonses noted below: As per consultants response
Active components for ICT and Audio-Visual Systems shall be included as part of Contract scope. Refer design layouts and
specification sections 271100,272000,273100,274200 for details.
Audio Visual System Should be part of Contractor scope.
Kindly confirm all the Active components for the IT/ICT, GSM, WiFi and IP Telephony shall be Active components for GSM systems shall be covered as part Lead Mobile Providers scope .However passive backbones
169 7/2/2020 MEP
carried out by Service providers. and terminations, system racks, power distribution units and cable pathways shall be covered as part of Contract scope.
Refer design layouts for details. CNS (ICT/Wifi/IP Telephony) should be Under Provisional Sum.
Please confirm whether that the Converged Network System for Hotel & Branded apartment are For specification sections refer response identified under query 169
170 7/2/2020 MEP CNS (ICT/Wifi/IP Telephony) should be Under Provisional Sum.
under Provisional Sum or not.
Not part of provisional sum - under measured works
There shall be no dedicated GRMS system for the project .Guest Room Management for the project shall form part of BMS
system and to be included as part of Contract scope.
IP Telephony system shall be included as part Contract scope. For specification sections refer response identified under
We presume that Guest room management system, IP TV system, IP Telephony system including
171 7/2/2020 query 169 MEP CNS (ICT/Wifi/ IP Telephony) should be Under Provisional Sum.
PABX, Guest room door access control system are under Provisional Sum. Please confirm.
IPTV system for Hotel Zone is not part of this Contract scope.
Elevator Contractor to provide separate price for EMS. Final requirement subject to approval by Client / Operator. This is
179 Please confirm that there is no requirement of elevator monitoring system (EMS). 7/2/2020 detailed in Section 1.13 of VT Specifications (Section 142100) - Lift monitoring system is required and to be included as VT as per consultant's response
part of contractor scope of works as per VT specificaiton. Also it needs to be in security control room
As per tender query QA 7 VT drawings and specifications for the apartment building have been
180 issued along with tender documents and also it is mentioned in the tender query “attached”, we did 7/2/2020 Please find attached the VT specifications for reference Arch as per consultant's response
not receive the same, please send us.
Please provide us the details and location for EIFS system as measured in Hotel and Branded
181 7/2/2020 The EIFS refers to interanl podium level walls between AC and Non-AC areas. Arch as per consultant's response
Apartments BOQ page G24 item 36 and page F26 item 37 respectively.