Kuakata - CRS Building 3rd RA Bill (Samhee-1)
Kuakata - CRS Building 3rd RA Bill (Samhee-1)
Country Manager.
Samhee Construction Co., Ltd.
House# 18,Road-44, Level-5,Gulsan 2
Dhaka-1212
Best Regards,
Engr. H. M. Shohel
Executive Director
Base Builders
Bill Of Quantity Amount
Unit Rate
Item No. Description of item of Work Unit Quantity
CIVIL WORKS (in Taka)
1 Earth work in excavation in all kinds of soil for foundation trenches including.
layout, providing center lines, local bench-mark pillars, leveling, ramming and
preparing the base, fixing bamboo spikes and marking layout with chalk powder,
providing necessary tools and plants, protecting and maintaining the trench dry
etc., stacking, cleaning the excavated earth at a safe distance out of the area
enclosed by the layout etc. all complete and accepted by the Engineer, subject to
submit method statement of carrying out excavation work to the Engineer for
approval. However, Engineer’s approval shall not relieve the contractor of his
responsibilities and obligations under the contract.
3 Supplying and laying of two layer approved quality Polythene Sheet weighing1kg
per 6. Square meter in floor or foundation bed where ever prescribed below
cement mortar or on approved area etc. including cost of all material, equipment
Sqm 28.88 54.00 1,559.52
and other charges to complete the work as per drawing & direction of the Engineer-
in-charge.
60 grade deformed bar with minimum fy = 415 Mpa. kg 3,970.33 85.00 337,478.05
Total= 941,959
Bill Of Quantity
Aditional Works:
Amount
Unit Rate
Item No. Description of item of Work Unit Quantity
(in Taka)
1 Epoxy Kg. 70.000 2,100.000 147,000.00
2 Worker for Epoxy implementation & Rust Clean Each 21.000 650.000 13,650.00
Total= 160,650.00
TIE BEAM