Assignment 5
Assignment 5
A. Using the following data, design a overflow spillway with the profiles.
For the upstream profile you may use either of the two alternatives:
Alternative -1:
B. In order to dissipate the energy below the spillway, it is proposed to form a hydraulic jump in a stilling
basin at the toe of the spillway. Calculate the length and height of the sidewall of the stilling basin.