Ceoomented Second Time
Ceoomented Second Time
Ceoomented Second Time
BILL OF QUANTITIES
FOR
SUB TOTAL -
O SWIMMING POOL -
P MISCELLANIOUS STRUCTURES -
Q PROVISIONAL SUMS -
R CONTINGENCIES 3% -
GRAND TOTAL -
CONTRACTOR
Authorized signature ( 1 )-
Name-
Address-
Date-
WITNESS
Signature ( 1 )-
Name-
Address-
Date-
Grand Summary
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
A PRELIMINARIES
The Contractor is advised to visit the site of the proposed work, Note All detailes are incorporated
as it is his responsibility to ascertain the conditions governing for as previous issue. Revised
access to the site, external working space, storage area etc., details given in under autocad file name issue can not identyfy,
DTR1 are not included in the bill. pls. Please give where apply??
rectify References
All temporary works shall be dismantled and cleared away from Note
the site on completion of the work.
Any other preliminary items not listed below, but to be necessary Note
for completion of the work to be included in the Contract rates, as
no extras would be made in this regard.
Maintenance work during the defects liability period shall include Note
but not be limited to:
Keeping in good working order (suspension, opening and closing)
of doors, windows etc.
Keeping clean and if necessary unblocking of the sewerage
system in cases the proper functioning is interrupted.
Repairing of such defaults and damages caused by shrinkage,
expansion or any other movement of materials or constructions.
The required regular adjusting and maintenance of installations.
Any other maintenance requirements mentioned in the
Specifications.
The contractor shall be responsible for any loss or damage to the Note
works, existing structures, adjoining structures and unfixed
materials.
1 Allow for maintaining the site in a clean and orderly fashion at all Month 12.00 -
times during the entire contract period. Materials, etc., shall be
kept neatly stacked on the site with all access - ways kept clear.
All dust, debris and rubbish etc., arising out of his own work shall
be continually cleared and removed from the site. The burying of
rubbish and debris on site will not be allowed.
2 Allow for construction and furnishing of temporary site office, Item 1.00 -
sample room, stores, work shops, yards, sanitary facilities for the
contractor.
C/F -
1/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
B/F -
A PRELIMINARIES CONT'D
3 Allow for maintaining of temporary site office, stores, yards, Month 12.00 -
sanitary facilities for the contractor.
6 Allow for necessary barricades, railing, temporary walk ways, Item 1.00 -
protective netting, hoarding and screens around the site
boundaries and other precautions at site for the protection work,
adjoining properties and public to the required standard and to the
approval of the Engineer. The Contractor shall submit the details
of his proposal to the Engineer for approval.
7 Allow for necessary lighting, watchmen, protection of work and any Month 12.00 -
materials with suitable security measures during construction until
handing over.
8 Allow for Surveyor to define the building site works etc., and check Item 1.00 - only the perimeter survey and setting out is Normal practice is need to
the layout and all levels and other such surveys as may be enough appoint a surveyor to the
necessary to establish accurately the placing of forms and pouring setting out of the building,
of concrete and all other works and setting out in both vertical and Which is not include to the
horizontal plane. Engineer or his representatives may desire to rate.
check the easy relationship to the Survey Markings and the Bench
Marks or Datum established especially for the construction of the
works.
9 Allow for submission of performance bond bank guarantee Item 1.00 - Insurance bonds not OK verbally you said to insert for
Performance bond. if not
need, I will remove. Please
confirm.
11 Allow for establishment of hoists and any other lifting and vertical Item 1.00 -
transport system
12 Allow for maintenance of hoists and other lifting and vertical Item 1.00 -
transportation system
13 Allow for submission of shop drawings and co ordination drawings Item 1.00 - keep a provision for the contractor to verify Done
with necessary technical information's whenever relevant to the and adjust all arch and eng drawings on
Engineer in two copies. (2 sets to be hard copies and one site as required by site conditions
electronic Auto Cad copy)
15 Allow for providing and maintaining first aid facilities at site. Month 12.00 - Contractors responsibly Yes. But need to pay by
Client. It is a site
requirement as CIDA
16 Allow for removal of all temporary work and facilities, rubbish and Item 12.00 - Put one item as monthly rent Done
debris and clearing up site on completion, leaving all in good order
in handing over including making good to all disturbed.
17 Allow for any other preliminary items necessary for the completion Item 1.00 - - Optional, is it yes
of the work. (Contractor shall state details of items if this item is
priced by the Contractor)
2/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
18 Clearing Site, vegetation, Removing all debris away from site Sqr - This is already done by client , what should Optional. AS condition. But if
we do no need will remove item.
Excavation
Earth Filling
24 Selected excavated hard earth for filling below ground floor slab Cube -
26 Imported granular earth filling for well compacted below ground Cube -
floor slab
Disposal
28 All excavated material shall be a property of the Client and to be Cube - This is not clear to me, pls explain, why Assumed disposal on site.
disposed off from the site as directed. (Less than 250m distance) 250 m Please confirm, Where
The contractor shall obtain approval from the relevant Authorities should be dispose the
for transportation of earth and suitable location and procedure for excavated material??..
dumping the same.
Termite Treatment
3/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
C CONCRETE WORK
The contractor shall refer the followings prior to pricing the items
in this trade.
All concrete shall be so cast as to receive fair face finish on it's Hardner and desifier Can not understand.. What
exposed faces suitable receive paint/sealer directly .Any poor do you mean?
quality finish on removal of form work to be rectified with out any
cost to the Employer.
Rates for lean concrete shall include for preparation of bottom of chip metal to be used in polished concrete Please issue structural spec
excavation prior to pouring of lean concrete. areas pls to the contractor
and what about cutting and polishing floors Under finishes section
Contractor shall ensure that the top of the lean concrete layer
shall be finished semi rough to receive waterproofing layer where
applicable.
Reinforced concrete
34 4" thick slab on ground Cube - is this in engineering details Structural detail. Please
amend structural drg
accordingly
I dont think we need enforcements in floor
slabs., but we need chip metal
Vibrated Reinforced Concrete Grade 25 as described to:
C/F -
4/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
B/F -
CONCRETE WORK CON'TD
Reinforcement
High yield Tor Steel reinforcement bars & Mild Steel Bars in the
following.
54 Plinth/ground beams Kg -
67 Staircase Kg -
C/F -
5/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
B/F -
Formwork
69 Tie beams Sqr - pl. use steel form work and put a rental if
you think its OK Will consider on pricing
70 Column base , Shafts and staircase base and shaft and Sqr -
foundation beams
Miscellaneous
86 Pantry/ store Counter; 1'-6" wide, 4" thick, including Concrete, Lft -
Reinforcement and form work
87 Work top Counter; 2'-00" wide, 4" thick, including Concrete, Lft -
Reinforcement and form work
90 Built in Seat; 2'-0" wide; seat including concrete, reinforcement Lft - built in seats may be included in interior
and form work , including all associated builders works as detailed works, am i right These are built in seats. If
in drawings not required or not doing by
main contractor, please
confirm to remove from BOQ
C/F -
6/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
B/F -
93 Bar counter and shelf; size 1'-10" x 11'-0" x 3'-10" high; including No -
concrete, reinforcement and form work or blockwork, including all These are built in structures.
associated builders works as approved by Architect. If not required or not doing
by main contractor, please
Interior confirm to remove from BOQ
96 Cement work top; size 2'-9" x 10'-0"; cement work top to receive No -
saltwater aquarium; including concrete, reinforcement and form
work or blockwork, including all associated builders works as
detailed on drawing
97 Precast concrete column; 8'-7" clear heigh, non load bearing No - pls. refer to the dwg no. cant find the detail FCKM/19/07R3/WDR1/51
natural finish curved column as detailed in drawing No. with this
FCKM/19/07R3/WDR1/51 and as per the engineers specification
and approval of the architect
98 Concrete plinth for "Tharadevi statue"; size 2'-3" x 1'-5"x 1'-8" clear No -
heigh, as detailed in drawing and as per the engineers These are built in structures.
specification and approval of the architect If not required or not doing
by main contractor, please
Interior confirm to remove from BOQ
Lintels
4" to 9" average wide size of Lintel (refer drawing) with high
reinforced with 2 nos 10mm dia tor steel rods at top and bottom
and 6mm dia S-stirrups at 200mm centers and necessary
formwork in the following.
Pergola
103 Post tensioned precast concrete pergola; size 11/2" x 11/2" Sqr -
,natural finish; fixing to slab including all associated builders work
as detailed in drawing and as per the engineers specification and
approval of the architect - Vertically,
104 Post tensioned precast concrete pergola; size 1" x 2" ,natural Sqr -
finish including all associated builders work fixing as detailed in
drawing and as per the engineers specification and approval of
the architect - Horizontally
7/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
D MASONRY WORK
Rate for masonry works shall include for plumbing angles Note
forming rebates revels square cutting and racking of joints for
plastering
Rubble work
105 Fair face rubble masonry wall in cement and sand 1:5 in wall Cube -
foundation with minimum mortar visibility. this is a wall between garage and pool yes
106 Random rubble masonry foundation in cement and sand 1:5 in Cube -
wall foundation.
Brick Work
117 Allow for forming of Brick masonry stump at pool sides; Size 3'-00" No
x 3'-6" x 1'-6" high
118 1'-6" wide Brick masonry guard wall around pool Cuft
119 Allow for brick masonry roof supporting stud; Size 9" x 9" x 1'-3" No -
high
120 5" thick - Ground Floor Plant Trough Sqr - Noted. to be removed From
compress earth blocks are in the boundary BOQ
wall, and will not be included in contract.
121 6" thick - Ground Floor Plant Trough Sqr - Noted. to be removed From
plant trough goes with the interior BOQ
122 6" thick - Perimeter Boundary wall Sqr Noted. to be removed From
BOQ
123 Extra over for forming arches; as shown in drawing No - Noted. to be removed From
BOQ
124 Extra over for filling to cavity and form wall thickness wider Sqr - Noted. to be removed From
(approximately 12"); as shown in drawing BOQ
8/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
The contractor shall refer the followings prior to pricing the items
in this trade
Rates shall include cutting top line, notching bending and extra
materials for lapping.
125 DPC in 1:3 cement and sand 3/4" thick with two layers of hot Sqr -
tar
1000 gauge damp proof polythene membrane under floors and Noted. to be removed From
where excavated surfaces are in contact, with minimum 150 mm BOQ
end and side laps, measured net to the followings.
Not reqd in this contract
126 Below pool base Sqr we may include the pool in this contract,
but under a separate heading, showing the
cost of the house in one document.
this applies only to the pool.
600 gauge damp proof polythene membrane to receive heat
installation layer in contact, with minimum 150 mm end and side
laps, measured net to the followings.
Toilet wall
9/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
B/F -
137 Swimming pool base including pool steps Sqr may be we can show all water bodies
under a separate chapter, is it possible to
do that
141 To external spray plastered masonry wall Sqr - should be spary plastered Updated accordingly
Water bar
Allow for approved type water bar 3mm thick 8" height at wall as
per the structural details, drawing and specification in the
following.
10/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
All door frames and sashes shall be well seasoned, approved Note
type teak timber treated in Approved method. (Timber supplied
by Client) timber to be supplied by client Updated accordingly
All the wood works shall be well sanded with application of Note
approved type wood preservative, approved apparatus, applied
with approved coating and painting systems
Rate for timber shall include for cutting waste transport, Note
handling and well seasoned for insect attacks with an
application of wood preservative
Doors
Before was not done Door
window s that is why it was
red coloured
145 Supply and installation of Decorated Timber double sash flushed No -
paneled Door, including 3" x 6" timber frame,; type D1, size 3'-6" x All door windows updated as
9'-7" high overall newly issued schedule.
C/F -
B/F -
160 Supply and installation of sliding door window Timber double sash No - to be removed from the BOQ
flushed paneled Door, including 3" x 6" timber frame,; type ID4,
size 4'-00" x 9'-0" high overall
161 Supply and installation of sliding door window Timber double sash No -
flushed paneled Door, including 3" x 6" timber frame,; type ID5,
size 4'-00" x 9'-0" high overall
162 Supply and installation of sliding door window Timber double sash No -
flushed paneled Door, including 3" x 6" timber frame,; type ID6,
size 4'-00" x 9'-0" high overall
11/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
163 Supply and installation of sliding door window Timber double sash No -
flushed paneled Door, including 3" x 6" timber frame,; type ID7,
size 4'-00" x 9'-0" high overall
164 Supply and installation of sliding door window Timber double sash No -
flushed paneled Door, including 3" x 6" timber frame,; type ID8,
size 4'-00" x 9'-0" high overall
165 Supply and installation of sliding door window Timber double sash No -
flushed paneled Door, including 3" x 6" timber frame,; type ID9,
size 4'-00" x 9'-0" high overall
Windows
166 Supply and installation of solid window, including 3" x 4" timber No -
frame, ; type W1, size 2'-1" x 3'-11" high overall
167 Supply and installation of solid window, including 3" x 4" timber No -
frame, ; type W1a, size 2'-1" x 6'-2" high overall
168 Supply and installation of Glazed French window, including 3" x 4" No -
timber frame, ; type W2, size 7'-2" x 9'-10" high overall
169 Supply and installation of Glazed French window, including 3" x 4" No -
timber frame, ; type W3, size 8'-1" x 9'-10" high overall
170 Supply and installation of Glazed French window, including 3" x 4" No - 1 No only in the schedule,
timber frame, ; type W4, size 2'-7" x 3'-11" high overall but 5 No showing lay out
drag. Which is correct??/
171 Supply and installation of Glazed sliding window, including 3" x 4" No -
timber frame,; type W5, size 23'-5" x 5'-5" high overall
172 Supply and installation of Glazed sliding window, including 3" x 4" No -
timber frame,; type W6, size 4'-0" x 5'-5" high overall
173 Supply and installation of Glazed window, including 3" x 4" timber No -
frame,; type W7, size 6'-5" x 7'-8" high overall
174 Supply and installation of architectural timber Trellis work window, No -
including 3" x 4" timber frame,; type W8, size 3'-8" x 4'-2" high
overall
C/F -
12/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
B/F -
Fanlight
177 Supply and installation of 3mm thick clear float fixed glass wall No -
opening, including 3" x 4" timber frame,; type F2, size 2'-7"
diameter
179 Supply and installation of Access hatch, including 3" x 4" timber No -
frame,; type AD1, size 3'-0" x 3'-6" high overall
Miscellaneous
183 Installation of Decorative timber column; 9'-3" high and maximum No - finishing to be decided on site, include a Noted.
diameter 1'-1" complete as detailed on drawing; include for sum for finishing
surface preparation and approved type finishing as specified; all molded timber column will be supplied
fixing to concrete or blockwork in accordance with as per the by client
Architects approval and manufacturer's recommendations,
including all associated builders works.
( Column supplied by Client)
184 Railway sleeper pool deck; 9" wide complete as detailed on Sqft - no new finishes Noted.
drawing; fixing with brass studs and surface preparation as
specified; fixing to concrete or blockwork in accordance with as
per the Architects approval and manufacturer's recommendations,
including all associated builders works. ( Railway sleeps supplied
by Client)
185 Railway sleeper; to duct cover including 2" x 3" timber frame work Item -
as detailed on drawing ( Railway sleeps supplied by Client)
186 Railway sleeper plant trough; size1'-6" wide; including with Lft - this is a mistake, no timber plant trough Please refer DTR1
necessary builders work and fixing accessories and finish with
cement slurry coated inside as detailed on drawing ( Railway
sleeps supplied by Client)
187 Timber pergola; 2" x 2" teak timber for fixing of tempered glass Sqft - if this is the terrace near family room, no
roof cover ( measured separately) fixing to timber column and RCC column, but timber column, antique,
beam or masonry wall; including all associated builders works and supplied by client
accessories as detailed on Drawing. ( All Timber and timber
column supplied by Client)
Noted
TOTAL FOR JOINERY (WOOD WORK) WORK CARRIED TO -
SUMMARY
13/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
G METAL WORK
Miscellaneous
show pantry similar to the swimming pool
in a new chapter.
191 Stainless steel Cooker top; Size 2'-6" x 3'-00" No - the logic is, even though pantry is interior, Noted. To be removed
you need it to reside in the house, pool its
easy to construct when the main contractor
is available
192 Transparent roof; with 4mm tempered glass cover fixing to 2"x2" Sqft - refer to a place Please confirm pergola size
timber frame (measured separately); including all associated 2"X1" shown on revised
builders works as detailed in drawing FCKM/19/07/R3/WDR1/24 drg.FCKM/19/07/R3/WDR1/2
and approved by Architect 4
193 Tempered glass roof; with 4mm tempered glass cover fixing to Sqft - refer to a place Lay out drg only. As verbally
concrete post tension pergola; including all associated builders confirmed car park area.
works as detailed in drawing and approved by Architect
194 Approved type Coir based geo cell for climbing green plantains Sqr - not reqd in this bill Noted. To be removed
with reinforced concrete column and beam to receive wall
plantation; include for surface preparation and paint finishing as
specified; fixing to concrete or blockwork, including all associated
builders works.
195 Approximately 18" wide concrete trench with 10" wide heavy duty Lft - refer to dwg pls Lay out drg only. As verbally
cast iron grating cover fixing as detailed in drawing in Ground floor confirmed car park area.
Rate shall include reinforcement, formwork and all other finishes Detail from -
and accessories. FCKM/19/07/R3/WDR1/24
196 - Ditto - Approximately 12" to18" wide concrete trench with 12" Lft -
wide heavy duty cast iron grating
197 - Ditto - Approximately 12" wide concrete trench circular with 9" Lft -
wide heavy duty cast iron grating
198 Supply and installation of Zn/Al sheet roller door with GI Framed No - refer to a brand pls. Please specification with
fixed with motorized system (remote motor ); type RD1, size 9'-3" ex - elcardo is very poor quality. your recommendation
x 11'-9" , . Rate shall including necessary accessories in contract document
accordance with approved manufacturer's recommendations and
all completed as per the Drawings and Specifications.
199 Supply and installation of sliding gate; type AD2, size 16'-0" x 3'-0" No -
to car park entrance. Rate shall including necessary accessories
in accordance with manufacturer's recommendations and all
completed as per the Drawings and Specifications.
200 Supply and installation of openable remote control steel gate; type No - cul de sac entrance Can not understand???/
FG1, size 18'-2" x 7'-8" to car park entrance. Rate shall including
necessary accessories in accordance with manufacturer's
recommendations and all completed as per the Drawings and
Specifications.
C/F -
14/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
B/F -
METAL WORK CONT'D
201 Supply and installation of openable manual operated steel gate; No - this is not remote controlled Noted
type G1, size 3'-4" x 8'-9" to car park entrance. Rate shall
including necessary accessories in accordance with
manufacturer's recommendations and all completed as per the
Drawings and Specifications.
202 Supply and installation of openable manual operated steel gate; No - this is not remote controlled Noted
type G2, size 3'-0" x 7'-8" to car park entrance. Rate shall
including necessary accessories in accordance with
manufacturer's recommendations and all completed as per the
Drawings and Specifications.
203 Supply and installation of openable manual operated steel gate; No - this is not remote controlled Noted
type G3, size 2'-6" x 7'-11" to car park entrance. Rate shall
including necessary accessories in accordance with
manufacturer's recommendations and all completed as per the
Drawings and Specifications.
204 Supply and installation of 1" -2" thick calcium silicate panel Sqr - no painting, we fix it unto al grid, as Noted
partition with wet titanium coated finish as duct cover; Rate shall detailed by specialist subcontractor
including necessary accessories in accordance with
manufacturer's recommendations and all completed as per the
Drawings and Specifications.
15/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
Roof Covering
205 Asbestos corrugated exposed rafter roof and half round recycled Sqr - timber to be supplied by client Noted and updated the BOQ
terra cotta tile covering with teak wood timber roof frame including no ceiling, we paint the underside of
king post, 3"x4" wall plate, 4"x8" timber beams and verticals, 3"x4" asbestos layer
cobble plate, 4"x3" purlins, 2"x4" rafters, coble stones and reapers stain is for reapers only, all other roof
where necessary. All sizes are finished size. including panting of timbers to be white washed (resin barrier,
under side of asbestos complete with adequate laps, all seyrlack ....)
accessories. Rate shall include for sand papering and smoothing
and finishing. All timber should be well seasoned and white
washed. Reppers only apply wood stain(Jat holding) before use.
All exposed timber to be plained smooth as instructed by the
Architect and applying of three coat of resin barrier with water
based clear sealer coat as specified in drawings. (All timber
supplied by Client)
206 Hard wood timber ridge plate in roof, size 4"x6". Lft -
207 Hard wood timber Barge board in roof, size 9"x1". Rate shall Lft -
include applying two coat of wood preservative, priming and
painting.
208 Roof flashing in 0.47 mm thick Zn/Al sheet. Rate shall include Lft -
cutting, bending and installation as per the Engineer's instruction;
girth 18"
16/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
FLOOR FINISHES
Ceramic floor tiles, approved size and in an approved tiles supplied by client Noted and updated the BOQ
manufacture colour , quality and design laid to a pattern
including bedding to Approved thickness, adhesives and grout all
completed as per the drawings and specifications to the floor in
the following. (Tile supplied by Client)
Palmana Cut Stone, 4" thick approved size and in an approved this is natural stone with very rough Noted and updated the BOQ
manufacture, quality and design laid to a pattern including texture,
bedding to Approved thickness, adhesives and grout all dont mention a colour by specialist
completed as per the drawings and specifications to the floor in
the following.
Chemically coated polished concrete including slope surface, no sloping surface will be polished this description not
level drops as per detailed drawings in an approved colour , (concrete) mentioned sloping surfaces
quality and design laid to a pattern including adhesives and need to be polished but
grout all completed as per the drawings and specifications to the should have finish and
floor in the following. complete accordingly.
If there is a sloping surface
213 Ground floor Sqr -
C/F -
17/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
B/F -
Chemically coated terracotta tile including slope surface, level no terracotta in sloping surfaces this description not
drops as per detailed drawings in an approved colour , quality and mentioned sloping surfaces
design laid to a pattern including adhesives and grout all need to be polished but
completed as per the drawings and specifications to the floor in should have finish and
the following. complete accordingly.
If there is a sloping surface
220 Ground floor Sqr -
223 To staircase steps and risers Sqft - ref detail pls Noted to be updated
Chemically coated wet titanium floor including slope surface, level no sloping surface for titanium this description not
drops as per detailed drawings in an approved colour , quality and slope in bath, roof slabs and terraces mentioned sloping surfaces
design laid to a pattern including adhesives and grout all need to be polished but
completed as per the drawings and specifications to the floor in should have finish and
the following. complete accordingly.
If there is a sloping surface
225 Ground floor Sqr -
Supply and laying approved size concrete tile ( Prestona). Laid on write up not clear Updated with new drg
approx. 10" thick washed sand base layer rate shall include
preparation, trimming, leveling at edge complete.
Supply and laying Liquid glass on dolomite finish. including slope this is a mistake / dolomite only in matster Already there in the BOQ
surface, level drops as per detailed drawings in an approved bath
colour , quality and design laid to a pattern including adhesives
and grout all completed as per the drawings and specifications to
the floor in the following.
Miscellaneous
229 Hand dressed 4" thick palamana cut stone step including stone No -
caving's design as per the detailed on drawings and
specifications; Internally; size approximately 6'-5" diameter half
round
232 Cut and polish cement finish to Pantry/ store Counter; 1'-6" wide, Lft -
including surface preparation as specified
C/F -
18/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
-
B/F
FLOOR, WALL & CEILING FINISHES CON'TD
233 Cut and polish cement finish to Work top Counter; 2'-00" wide, Lft -
including surface preparation as specified specify place Shown on layout drgs
234 Cut and polish cement finish to Worktop on baby bedroom Lft -
including surface preparation as specified
235 Cut and polish cement finish to Vanity Counter; 1'-6" wide, Lft - Bath which have vanity
including surface preparation as specified which bath basins
236 Cut and polish cement finish to 2'-0" wide Built in Seat; including Lft -
surface preparation as specified These are built in structures.
If not required or not doing
by main contractor, please
reconfirm to remove from
Interior BOQ
238 Cut and polish cement finish to Bed with bedside drawers; Sqft -
including surface preparation as specified; all associated builders These are built in structures.
works as approved by Architect. If not required or not doing
by main contractor, please
reconfirm to remove from
Interior BOQ
239 Bamboo panel cladding finish to Bar shelf and cut and polish No -
cement finish to bar counter ; size 1'-10" x 11'-0" x 3'-10";
including surface preparation as specified, completed with all
associated builders works as approved by Architect. Cut cement Will remove from BOQ
240 Cut and polish cement finish to Coffee Table; size 1'-6" x 2'-6"; No -
including surface preparation as specified, all associated builders
works as detailed on drawing. Interior Noted
241 Cut and polish cement finish to Armchair; size 2'-6" x 2'-6"; No -
including surface preparation as specified, all associated builders
works as detailed on drawing. Interior Noted
242 Cut and polish cement finish to concrete plinth for "Tharadevi No -
statue"; size 2'-3" x 1'-5"x 1'-8" clear heigh, including surface These are built in structures.
preparation as specified, all associated builders works as detailed If not required or not doing
on drawing. by main contractor, please
reconfirm to remove from
Interior BOQ
WALL FINISHES
C/F -
19/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
B/F -
Cut cement finish with clear pool coated (Finex or approved type)
surface; including rendering with backing to approved thickness,
adhesives and grout all completed as per the drawings and
specifications, Architect approved quality and design.
Pool coat (clear) okey
249 Extra over for forming Nitch - Size 3'-2" x 2'-1" overall No -
Column plaster
C/F -
20/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
B/F -
External Plaster
264 Cement cut and polished finish to rendered walls Sqr - To external wall. Please
refer places place refer drg sections
(3/4") thick Plinth Plastering in cement and sand 1:3 mix and
finished Smooth with 1 :15 Cement & Titanium Finish.
Miscellaneous
Pond finishes
266 Central court yard pond - Approved type finish to floor Sqr -
267 Central court yard pond - Approved type finish to wall Sqr -
C/F -
21/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
B/F -
Coping finished wall edges; approved size and quality and design
fixed to pattern including backing to approved thickness and grout
all completed as per the drawings and specifications and pointing
to match the colour .
CEILING FINISHES
Soffit Plaster
280 (3/4") thick Soffit plaster in lime cement and sand 1:1:5 finished Sqr -
smooth to receive paint finish; including sides and soffit of
beams
281 (3/4") thick Soffit plaster in cement and sand 1:5 finished semi Sqr -
rough to receive Paint finish; including sides and soffit of beams
283 (3/4") thick Soffit plaster in cement and sand 1:5 finished smooth Sqr -
to receive skim coat plaster to soffit, sides and soffit of beams
Fabric
284 Supply and install chemically coated handloom batik painted Sqr - Liquitex varnish done
fabric ceiling. approved size and in an approved manufacture no hardener here, thats my mistake
colour, quality and design fixing to a pattern including approved fabric to be batik painting
type frame work and accessories all completed as per the
drawings and specifications.
22/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
Ceiling Paint
291 To semi rough finish cement plastered soffit and beams Sqr -
23/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
T 600 uPVC pipes and fittings with sealed joints fixed with
brackets or clips plugged and screwed, complete with all sleeves,
to blockwork, concrete or metalwork pl. put a provisional sum Noted
DRINGAGE INSTALLATION
T 600 UPVC pipes and fittings with sealed joints buried in ground
or fixed with brackets or clips plugged and screwed to wall ,
complete with all instruments( Vent cowl etc.), sleeves
C/F -
24/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
B/F -
J PLUMBING, DRAINAGE AND SANITARY INSTALLATION
CONT'D
308 Septic tank; Size 4'-00" diameter , all inclusive with complete No -
installation as per project specifications and drawings ( brand this is OK Noted
Buffalos)
309 Sewer & Waste water Soakage pit; size: 4'-00" diameter and No -
buried to ground 2'-00" above the ground water table. All inclusive
with complete installation as per project specifications and
drawings ( brand Buffalos)
310 Waste water Soakage pit; size: 4'-00" diameter and buried to No -
ground 2'-00" above the ground water table. All inclusive with
complete installation as per project specifications and drawings (
brand Buffalos)
313 Wash hand basin complete with mixer and pop-up waste - free No
-
stand Vanity type
314 Wash hand basin complete with mixer and pop-up waste - free No
-
stand Pedestal type
316 Bath tub complete with single lever bath mixer set and associated No
-
accessories.
318 Mirror; size 7'-00" x 4'-00" 'L' shaped including timber framed. No -
324 Shower No -
326 Eastern type squatting pan complete with cistern, fittings and No
-
fixtures.
C/F -
25/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
B/F -
PVC Type 1000 (10 Bar pressure rating) pipes with approved
sealed joints and fittings, buried in ground or fixing pipe supports
to concrete, blockwork or metalwork, including all fittings all as per
specification and drawings
332 Supply & Laying 25mm PVC Pipe for City Line ( approx.. Qty ) Lft -
Valves
333 Isolation Valve 20 mm diameter No - all pipes to be S-Lon / Nalota make Pls issue a spec
343 Booster pump set (Stand by + Duty) capacity 1.5 Lt/ Sec @ 20 m Set -
head
26/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
LIGHTING INSTALLATION
362 Up light No -
C/F -
27/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
B/F -
372 Bell No -
374 13A socket outlet No - to be of shnider electric brand Pls issue a spec
Telephone system
TV outlet
C/F -
28/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
B/F -
General Earthing
384 Supply and installation of earthing system with inter connection Item -
with the internal DBs up to MSB and providing required nos of cu
earth rods to achieve less than 5ohm earth impedance of the
system
385 Supply and installation of wall mounted smart interface system Item -
with inter connection with the internal electrical system devices
brand to be cisco, sala enterprises make or
providing required system accessories and equipment.
equivalent Pls issue a spec
386 Supply and Installation of Lightning Protection system including air Item -
terminal, down conductors, earth pit with all necessary
accessories required to complete the entire Lighting Protection
system
CCTV SYSTEM
390 Supply and Installation of 24inch HDMI monitor at FCC room with No -
necessary accessories
391 Supply and installation of complete cable network including CAT6, Item - Noted
Fiber, test LAN for ISO standards using network analyzer &
necessary accessories to complete to working order as per the
detailed drawings and specifications. Im not sure with this cabe, cold be CAT 3,
will veryfy
392 Supply and installation of 19" Rack with enclosure. Item -
393 Allow for installing, testing and commissioning of CCTV system Item -
items and submission of commissioning report, manuals and other
documents in triplicate, including necessary accessories to
complete to working order as per the detailed drawings and
specifications.
29/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
N EXTERNAL WORKS
394 Site preparation to reduced level including removing debris, loose Sqr
material etc. And trimming and leveling the site to receive external
finish
395 Selected earth for filling and levelling well compacted to receive Cube
buffalo grass
396 Palmana cut stone finish steps; 1'-0" wide with risers, Rate shall Lft
include for preparation, trimming, leveling as manufactures
recommendation; all as described on drawings and specification
397 Approved type Stone paving on approx. 50mm sand/quarry base Sqr
layer. Rate shall include preparation, trimming, leveling, compact
with plate Hammer , 125 concrete wedges to edges complete
398 Supply and plant buffalo grass including forming planting area and Sqr
providing soil mixture and compacted earth measured separately
399 Geotextile Filter Fabric; approved type Geotextile root barrior Sqr
mesh to plant trough, Rate shall include for pin to secure fabric,
laps as manufactures recommendation; all as described on
drawings and specification
401 Pebble layer on ground; approved type and approximately 3" thick Sqft
402 Washed sand layer; approved type and approximately 3" thick Sqr
403 Allow for the name board and letter box as per the Engineer No
instructions and in accordance with the detailed in Drawings to the
Boundary wall
30/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
O SWIMMING POOL
31/25 BOQ-TCM
PROPOSED RESIDENCE FOR MR. KESARA AND MRS. MADHOO AT NEGOMBO ROAD, KURUNAGALA
Q PROVISIONAL SUMS
403 Allow a provisional sum for Strom Water installation systems. PSum
404 Allow a provisional sum for pond system installation including PSum
MEP systems.
408 Allow a provisional sum for Saline aquarium by specialist system PSum
409 Allow a provisional sum for 4'-00" high "Tharadevi" statue PSum
410 Allow a provisional sum for 4'-00" high "Awalokeshwara" statue PSum
412 Allow a provisional sum for Swimming pool construction including PSum
all the finishing work in and out side the pool and the all MEP
work.
32/25 BOQ-TCM