Dian

Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

I

WH

RH
AIWA- TECHNOLOGIES PHILIPPINES
REF INC.

A.G.C. DESIGN CONCEPTS

4x1.25mm TF WIRE IN
MCB NEMA 1
SMC6F (SUB-METER) 150AT/AF, 3P

EDP6F BUSBAR GUTTER


MCB

M M M M M M M M

60AT, 60AT, 60AT, 60AT, 60AT, 60AT, 60AT, 60AT,


100AF, 100AF, 100AF, 100AF, 100AF, 100AF, 100AF, 100AF,
1P 1P 1P 1P 1P 1P 1P 1P

P603
P607

P605

P601
P604
P608

P606

P602
ALEXANDER G. CO
MCB NEMA 1
SMC5F (SUB-METER) 150AT/AF, 3P FDAS RISER DIAGRAM
EDP5F BUSBAR GUTTER
MCB SCALE NTS
M M M M M M M M

60AT, 60AT, 60AT, 60AT, 60AT, 60AT, 60AT, 60AT,


100AF, 100AF, 100AF, 100AF, 100AF, 100AF, 100AF, 100AF,
1P 1P 1P 1P 1P 1P 1P 1P

P503
P507

P505

P501
P504
P508

P506

P502
MCB NEMA 1
SMC4F (SUB-METER) 150AT/AF, 3P

EDP4F BUSBAR GUTTER


MCB

M M M M M M M M

60AT, 60AT, 60AT, 60AT, 60AT, 60AT, 60AT, 60AT,


100AF, 100AF, 100AF, 100AF, 100AF, 100AF, 100AF, 100AF,
1P 1P 1P 1P 1P 1P 1P 1P

P403
P407

P405

P401
P404
P408

P406

P402
MCB NEMA 1
SMC3F (SUB-METER) 150AT/AF, 3P

EDP3F BUSBAR GUTTER


MCB

M M M M M M M M

60AT, 60AT, 60AT, 60AT, 60AT, 60AT, 60AT, 60AT,


100AF, 100AF, 100AF, 100AF, 100AF, 100AF, 100AF, 100AF,
1P 1P 1P 1P 1P 1P 1P 1P

P303
P307

P305

P301
P304
P308

P306

P302
3428
7323275 - 01,02,2019 - Q.C

PP2C

PP1C

PP2B

PP1B

PP2A

PP1A
MEP EDPGF 100AT, 70AT, 100AT, 70AT, 100AT, 70AT,
M kWH METER
100AF, 100AF, 100AF, 100AF, 100AF, 100AF,
1P 1P 1P 1P 1P 1P MDP

M M
M M M M M M MCB MCB NEMA 4X
200kVA, 400V, 800AT/AF, 3P
3P, 3W+N+G, 60Hz ADP (ATS)
GENERATOR SET MCB MCB NEMA1
BUSBAR GUTTER 150AT/AF, 3P

SMCGF (SUB-METER)

CCTV RISER DIAGRAM


POWER RISER DIAGRAM SCALE NTS
SCALE NTS

I I I I I I I I

I I I I I I I I

I I I I I I I I

I I I I I I I I

I I I

I I I I

INTERCOM RISER DIAGRAM CATV RISER DIAGRAM CATV RISER DIAGRAM


SCALE NTS SCALE NTS SCALE NTS
a a a
a down
Sa a Sa b to C.O
Sab
b c c a a STUDIO 6
a a' b'
b a' a c b b
UNIT 1C a b'
a b a' b'
Sabc b down
b to C.O a
c a
a b a' b'
b b a
down going a' going b'
a b a b Sabc up
to C.O up going
down Sab AIWA- TECHNOLOGIES PHILIPPINES
S3b' down
UNIT 2C Sab to C.O c Sabc Sab NOTE
S3a' S3a' S3b' Scd S3c' INC.
b a b 3F: ADP-3
a STUDIO 5 4F: ADP-4
c b b c a
a b a b a b a b a 5F: ADP-5
b a b a b a 6F: ADP-6
a b a
Sabc b a Sabc a
a Sabc
b down
Sabc STUDIO 4
a
Sabc
Sdef
aa Sab
b b Sab a to C.O A.G.C. DESIGN CONCEPTS
a c a STUDIO 8 b
e b a Sabc c
Sa c a down c
b a b a b
d to C.O
a b Sab
UNIT 1B d c
b a b LIGHT b
f a b c
b COURT a
c down UNIT 2B a
a b a b to C.O a
c a d
down c Sabc
to C.O a STUDIO 3
b b a b b Sab
e
b a
d b a
down
a down
ALEXANDER G. CO
d Sab to C.O b
a a to C.O c
c b a c a a b c
b f b b a Sab
b b
down UNIT 1A c down
to C.O to C.O c b
c b STUDIO 2 a STUDIO 7
a a Sabc b Sab
e b a a d
Sa
b d Sab
a
a a d a a b a
Sa b a b a
a a
f
UNIT 2A
c FIRE EXIT c
Sabc a going b a
a' down b b
c
g S3a'b' b a b a S3b'c' Sab
UTILITY RM.
S3a' Sg e c a
going d
STUDIO 1 a a
down b
up b' b' to C.O c' c' d
Sabc
Sab down
b to C.O
b a
d d c a b a
c a c
a b

3428
d 7323275 - 01,02,2019 - Q.C
c d c

GROUND FLOOR LIGHTING LAYOUT SECOND FLOOR LIGHTING LAYOUT 3RD TO 6TH FLOOR LIGHTING LAYOUT
SCALE 1:100 SCALE 1:100 SCALE 1:100

LOAD SCHEDULE COMPUTATION


e' 30AT,1P,23
0V
NEMA-3R EN IN
e' UNIT 1C SUMP PIT CL.
PUMP
e'
RISER UP
SMCGF EDPGF
e' tap to
e' MEP ADP lights
tap to MDP

going
lights AIWA- TECHNOLOGIES PHILIPPINES
S3e' UNIT 2C
down INC.
COVERED AREA going

I
up

PP1C MIPB
I PP2C
I I going
down
A.G.C. DESIGN CONCEPTS
I
PP1B
PP2B

UNIT 1B
LIGHT
COURT
UNIT 2B
tap to
lights tap to
lights

OPEN ROOF DECK


tap to
lights ALEXANDER G. CO

I
PP2A
UNIT 1A

PP1A

UNIT 2A
PIPE
CHASE

I
30AT,3P,400V IN
NEMA-3R ENCL.
TRANSFER PUMP

tap to
30AT,3P,400V IN lights
NEMA-3R ENCL.
TRANSFER PUMP 300AT,3P,400V IN
NEMA-3R ENCL.
FIRE PUMP

40AT,3P,400V IN
NEMA-3R ENCL.
3428
JOCKEY PUMP
7323275 - 01,02,2019 - Q.C

ROOFDECK LIGHTING LAYOUT GROUND FLOOR POWER & AUXILIARY LAYOUT SECOND FLOOR POWER & AUXILIARY LAYOUT
SCALE 1:100 SCALE 1:100 SCALE 1:100
e' 30AT,1P,23
0V
NEMA-3R EN IN
e' UNIT 1C SUMP PIT CL.
PUMP
e'
RISER UP
SMCGF EDPGF
e' tap to
e' MEP ADP lights
tap to MDP

going
lights AIWA- TECHNOLOGIES PHILIPPINES
S3e' UNIT 2C
down INC.
COVERED AREA going

I
up

PP1C MIPB
I PP2C
I I going
down
A.G.C. DESIGN CONCEPTS
I
PP1B
PP2B

UNIT 1B
LIGHT
COURT
UNIT 2B
tap to
lights tap to
lights

OPEN ROOF DECK


tap to
lights ALEXANDER G. CO

I
PP2A
UNIT 1A

PP1A

UNIT 2A
PIPE
CHASE

I
30AT,3P,400V IN
NEMA-3R ENCL.
TRANSFER PUMP

tap to
30AT,3P,400V IN lights
NEMA-3R ENCL.
TRANSFER PUMP 300AT,3P,400V IN
NEMA-3R ENCL.
FIRE PUMP

40AT,3P,400V IN
NEMA-3R ENCL.
3428
JOCKEY PUMP
7323275 - 01,02,2019 - Q.C

ROOFDECK LIGHTING LAYOUT GROUND FLOOR POWER & AUXILIARY LAYOUT SECOND FLOOR POWER & AUXILIARY LAYOUT
SCALE 1:100 SCALE 1:100 SCALE 1:100
WH

tap to
lights
STUDIO 6
30AT,1P,230V IN
NEMA-3R ENCL.
BOOSTER PUMP
LIGHTNING
ARRE
50M RADIUSSTER
RH R

WH
RH R

P306
60AT,3P,400V IN
NEMA-1 ENCL.
AIWA- TECHNOLOGIES PHILIPPINES

I
REF ELEVATOR
tap to I
lights INC.
STUDIO 5 COVERED AREA
P305
P304
REF

RH R

I P308
STUDIO 4
WH A.G.C. DESIGN CONCEPTS
tap to STUDIO 8
lights I
WH REF

LIGHT LIGHT
COURT COURT
R
P303
REF

RH R
RH

I
STUDIO 3
WH

tap to OPEN ROOF DECK


lights
ALEXANDER G. CO
tap to
WH
lights
P302

tap to STUDIO 2 STUDIO 7


lights I
R
I

RH

REF

NOTE
RH R
P307 ADP-9 : 3F & 4F
ADP-11 : 5F & 6F
WH

FIRE EXIT SUB-METER


CENTER RISER UP
UTILITY RM.
P301 EDP3F
STUDIO 1
MTTC
I

WH going
up MCTVPB
REF
IPB3F
tap to
lights

RH R

3428
7323275 - 01,02,2019 - Q.C

3RD TO 6TH FLOOR POWER & AUXILIARY LAYOUT ROOFDECK POWER LAYOUT GROUND CCTV & FDAS LAYOUT
SCALE 1:100 SCALE 1:100 SCALE 1:100
STUDIO 6

RISER DOWN
TAP TO 6F
AIWA- TECHNOLOGIES PHILIPPINES
INC.
STUDIO 5 COVERED AREA

STUDIO 4 A.G.C. DESIGN CONCEPTS


STUDIO 8

LIGHT LIGHT
COURT COURT

STUDIO 3
OPEN ROOF DECK
ALEXANDER G. CO

STUDIO 2 STUDIO 7

RISER
FIRE EXIT
DOWN
UTILITY RM.
STUDIO 1

3428
7323275 - 01,02,2019 - Q.C

SECOND FLOOR CCTV & FDAS LAYOUT 3RD TO 6TH FLOOR CCTV & FDAS LAYOUT ROOFDECK CCTV & FDAS LAYOUT
SCALE 1:100 SCALE 1:100 SCALE 1:100

VOLTAGE DROP CALCULATION SHORT CIRCUIT ANALYSIS DESIGN ANALYSIS


L=20 L=50 L=25 L=12 Pole Mounted Service Entrance LIGHTING & CONVENIENCE RECEPTACLE LOAD
VD=.176 VD=1.6 VD=1 VD=.333 DT = 500kVA
%Z=6% 2020 SQ.M x 24VA/SQ.M = 48,480 VA
34.5kV 20 SMALL APPLIANCES = 40,000 VA
2SETS I = 1,000,000kVA
4x250mm2 THHN 2x50mm2 THHN 2x14mm2 THHN 2x5.5mm2 THHN SUB TOTAL = 88,480 VA
FAULT
SERVICE FARTHEST
ENTRANCE MDP SMC6F P606 MDP APPLICATION OF DEMAND FACTOR
LOAD
2xkxIxL 1.732xkxIxL Where: k , Copper = 12
Z u= .0005 Z t = .06 Zse = .0019
FIRST 10,000VA @ 100% D.F = 10,000 VA
CM CM Aluminum = 18 FAULT
34.5kV REMINDER @ 40@ D.F = 31,392A
VOLTAGE DROP @ MDP Isc = 1,000,000kVA SUB TOTAL = 41,392 VA
VD = 1.732xkxIxL = 1.732x12x563.5x20 = .234V
CM 2*500,000
VOLTAGE DROP @ SMC6F MOTOR LOADS @ 100% D.F
VD = 2xkxIxL = 2x12x111.62x50 = 1.6V Zu = kVA base = 500 kVA = .0005 Z t = %Z = 6 = .06 32 - 2HP ACCU = 88,320 VA
CM 83690 utility SC kVA 1,000,000 kVA 100 100
VOLTAGE DROP @ P606 9 - 4.2kW ACCU = 37,800 VA
Zse = R2 + X2 Z Total = Zu + Z t + Z se
VD = 2xkxIxL = 2x12x44.11x25 = 1V = .0005+.06+.0019 1 - 2HP BOOSTER PUMP = 2,760 VA
CM 26240
Service Entrance, L=20m,2SETS(4-250mm2 ) Z Total = .0624 1 - 2HP ELEVATOR PIT PUMP = 2,760 VA
VOLTAGE DROP @ FARTHEST LOAD Resistance (R) , R = .029 /305m
VD = 2xkxIxL = 2x12x12x12 = .333V 20m =.00095 I sc = 1.732*V = 1.732*400V
1 - 15HP ELEVATOR MOTOR = 18,706 VA
CM 10380 Rse = .029 Z .0624
2*305m 2 - 5HP TRANSFER PUMP = 13,440 VA
TOTAL VOLTAGE DROP I sc = 11,103A
VD = .234+1.6+1+.333 = 3.17V Reactance (X) , X = .048 /305m 1 - 60HP FIRE PUMP = 71,358 VA
Xse = .048 20m =.0016 THEREFORE, THE MINIMUM 1 - 7.5HP JOCKEY PUMP = 9,699 VA
% VD = VD x 100 = 3.17 x 100 = .79% 2*305m KAIC RATING TO BE USE @
V 400
THEREFORE, THE VOLTAGE DROP FROM
Zse = .000952 +.00162 = .0019 MDP IS 18kAIC OTHER LOADS
TRANSFORMER TO FURTHEST LOAD IS .79% ONLY 32 - REFRIGERATOR = 32,000 VA
32 - RANGE/RANGEHOOD = 96,000 VA

TOTAL COMPUTED LOAD = 414,235 VA

SERVICE ENTRANCE CONDUCTOR


TOTAL FULL LOAD CURRENT: [414,235VA + 25%(18,706)//(400V)(1.732) = 604.66A
USE: 2SETS (4-250mm THHN + 1-50mm
MAIN: 800AT/400AF, 400V,3P,18kAIC