Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

New Site Integration Report: Region: UPPER BSC: Site: 2227 Huawei BSS6000 Radio System Ericsson/Huawei Core

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 26

New Site Integration Report

Written by
Approved by

Engineer's Name
Manager's Name

New Site Integration Report


Region: UPPER
BSC:
Site: 2227
Huawei BSS6000 Radio System
Ericsson/Huawei Core
Etislat Misr 2011

RAN/OPT/OC/Reports/IR_Rev1.0

1/26

New Site Integration Report

Written by
Approved by

Engineer's Name
Manager's Name

Contents:
New Site Integration Report................................................................................................1
Region: UPPER...................................................................................................................1
BSC: ....................................................................................................................................1
Site: 2227.............................................................................................................................1
Huawei BSS6000 Radio System..........................................................................................1
Ericsson/Huawei Core.........................................................................................................1
Etislat Misr 2011..................................................................................................................1
Abstract................................................................................................................................3
Site Data Verification..........................................................................................................3
KPIs......................................................................................................................................9
1.1 2G KPIs......................................................................................................................9
Primary Tests.....................................................................................................................10
1.2 2G Time Slot Tests..................................................................................................10
1.3 2G TRX Tests..........................................................................................................11
1.4 2G Intra-Site HO Matrix Test..................................................................................13
1.5 2G Inter-Site HO Matrix Test .................................................................................13
1.6 GPRS/EDGE test.....................................................................................................14
2G Drive Test Plots............................................................................................................15
1.7 2G Coverage footprint.............................................................................................15
1.8 2G Coverage Level..................................................................................................20
1.9 2G Coverage Quality...............................................................................................21
1.10 2G Serving Cells....................................................................................................22
1.11 2G TA....................................................................................................................23
2G DT KPIs.......................................................................................................................24
1.12 Dropped Calls........................................................................................................24
1.13 Blocked Calls Rate.................................................................................................24
1.14 Level Distribution..................................................................................................24
1.15 Quality Distribution...............................................................................................25
1.16 TA Distribution......................................................................................................25
Conclusion.........................................................................................................................26

RAN/OPT/OC/Reports/IR_Rev1.0

2/26

New Site Integration Report

Written by
Approved by

Engineer's Name
Manager's Name

Abstract
This is site integration report, all site's parameters, KPIs, DT
results are illustrated in order to justify the final decision whether
the site is accepted or rejected

Site Data Verification


The following table is the site's data as configured in the OMC
and verified in the field

Address
Long
Lat

From
Database
QNA_Alum_Std
31.53539
26.00844

From Field
QNA_Alum_Std
31.53539
26.00844

BSC
Site Code

UPP2227P2

UPP2227P2

Site Name

QNA_Alum_Std

QNA_Alum_Std

On-AIR
Date
2G
LAC/RAC
3G
LAC/RAC/S
AC
RAN/OPT/OC/Reports/IR_Rev1.0

3/26

New Site Integration Report

Written by
Approved by

Engineer's Name
Manager's Name

Table 1 Site Data

The following table shows the radio parameters as stated in the


planned database, and as verified in field
Sector

Technology

Sector 1

GSM/UL

DCS/OL

RAN/OPT/OC/Reports/IR_Rev1.0

Paramete
r
CI
BSIC
Height
Antenna
Type
Azimuth
Tilt
BCCH
TCH2
TCH3
TCH4
CI
BSIC
Height
Antenna
Type
Azimuth
Tilt
TCH3
TCH4
TCH5
TCH6

DB
22271
11

Actual
22271
11

60

60

1002
984
1019
1021
22271
11

1002
984
1019
1021
22271
11

60

60

517
522
529
535

517
522
529
535

4/26

New Site Integration Report

Written by
Approved by

Engineer's Name
Manager's Name

3G

RAN/OPT/OC/Reports/IR_Rev1.0

CI
SC
HBA
Antenna
Type
Azimuth

5/26

New Site Integration Report

Written by
Approved by

Sector

Engineer's Name
Manager's Name

Technology

GSM/UL

Sector 2
DCS/OL

3G

RAN/OPT/OC/Reports/IR_Rev1.0

Parameter
CI
BSIC
Height
Antenna
Type
Azimuth
Tilt
BCCH
TCH2
TCH3
TCH4
CI
BSIC
Height
Antenna
Type
Azimuth
Tilt
TCH3
TCH4
TCH5
TCH6
CI
SC
HBA
Antenna
Type
Azimuth
Tilt

DB
22272
11

Actual
22272
11

140

140

975
977
981
1011
22272
11

975
977
981
1011
22272
11

140

140

513
521
523
531

513
521
523
531

6/26

New Site Integration Report

Written by
Approved by

Sector

Engineer's Name
Manager's Name

Technology

GSM/UL

Sector3

DCS/OL

3G

RAN/OPT/OC/Reports/IR_Rev1.0

Parameter
CI
BSIC
Height
Antenna
Type
Azimuth
Tilt
BCCH
TCH2
TCH3
TCH4
TCH5
TCH6
CI
BSIC
Height
Antenna
Type
Azimuth
Tilt
TCH7
TCH8
TCH9
TCH10
CI
SC

DB
22273
11

Actual
22273
11

230

230

986
988
992
996
998
1010
22273
11

986
988
992
996
998
1010
22273
11

230

230

515
519
525
528

515
519
525
528

Antenna
Type
Azimuth
Tilt

7/26

New Site Integration Report

Written by
Approved by

Sector

Engineer's Name
Manager's Name

Technology

GSM/UL

Sector 4

DCS/OL

3G

RAN/OPT/OC/Reports/IR_Rev1.0

Parameter
CI
BSIC
Height
Antenna
Type
Azimuth
Tilt
BCCH
TCH2
TCH3
TCH4
TCH5
TCH6
CI
BSIC
Height
Antenna
Type
Azimuth
Tilt
TCH7
TCH8
TCH9
TCH10
TCH11
TCH12
CI
SC
HBA
Antenna
Type
Azimuth
Tilt

DB
22274
11

Actual
22274
11

315

315

1017
994
1000
1004
1006
1014
22274
11

1017
994
1000
1004
1006
1014
22274
11

315

315

512
527
530
530
533
536

512
527
530
530
533
536

8/26

New Site Integration Report

Written by
Approved by

Engineer's Name
Manager's Name

KPIs
In this section the main KPIs are listed for the last three days

1.1 2G KPIs
The following table illustrates the 2G KPIs as per the last three days
KPI

Threshold

Call Drop Rate (Average)

2% or less

Call Setup Success Rate (Peak)

90% or more

Handover Success Rate


(Average)

85% or more

TCH Traffic (Total)

3 Erlang or
more

TCH Setup Blocking Rate (Peak)

3% or less

SDCCH Traffic (Total)

1 Erlang or
more

SDCCH Blocking Rate (Peak)

2% or less

Values
S1

S2

S3

S4

S1

S2

S3

S4

Table 2 2G KPIs table

RAN/OPT/OC/Reports/IR_Rev1.0

9/26

New Site Integration Report

Written by
Approved by

Engineer's Name
Manager's Name

Primary Tests

1.2 2G Time Slot Tests


The following table shows the silent
Secto
Freq
r
0 1 2 3
101 O O
BCCH
3
101 O O
TCH2
5
101 O O
TCH3
7
102 O O
TCH4
1
Sector
1
100 O O
TCH5
1
100 O O
TCH6
8
101 O O
TCH7
0
102 O O
TCH8
3
BCCH
980
O
TCH2
982
O
TCH3
992
O
100
O
TCH4
0
100
O
TCH5
2
100
O
Sector
TCH6
6
2
TCH7
512
O
TCH8
514
O
TCH9
516
O
TCH10
518
O
BCCH
976 O O
Sector
TCH2
978 O O
3
TCH3
998 O O
100 O O
TCH4
4
TCH5
520
O
TCH6
522
O
TCH7
524
O
RAN/OPT/OC/Reports/IR_Rev1.0

call test results


4

7
O
O
O
O
O
O
O
O

O
O
O
O

O
O
O
O

O
O
O
O
O
O
O
O

O
O
O
O

O
O
O

O
O
O
10/26

New Site Integration Report

Written by
Approved by

Engineer's Name
Manager's Name

Secto
r

Freq
TCH8
BCCH
TCH2
TCH3
TCH4
TCH5
TCH6
TCH7
TCH8
TCH9
TCH10
TCH11
TCH12

Sector
4

0
526
984
986
988
990
994
996
513
515
528
530
533
535

2
O

O
O
O
O
O
O

5
O

O
O
O
O
O
O
O
O
O
O
O
O

O
O
O
O
O
O

7
O

O
O
O
O
O
O
O
O
O
O
O
O

Table 3 2G TS Checks, O:OK, N:Silent, blank are not tested

1.3 2G TRX Tests


Freq
Sector

Sector
1

Sector
2

BCCH
TCH2
TCH3
TCH4
TCH5
TCH6
TCH7
TCH8

1013
1015
1017
1021
1001
1008
1010
1023

BCCH
TCH2
TCH3
TCH4
TCH5

980
982
992
1000
1002

RAN/OPT/OC/Reports/IR_Rev1.0

Level & quality at


TA < 1
RXLEV
RXQUAL
Sub
Sub
-64
0
-65
0
-67
0
-66
0
-69
0
-70
0
-67
0
-66
0

-67
-66
-59
-60
-67

0
0
0
0
0

Level & quality at 1 <


TA < 4
RXLEV
RXQUAL
Sub
Sub
-67
0
-78
0
-75
0
-73
0
-75
0
-75
0
-73
0
-75
0

-75
-73
-78
-80
-73

0
0
0
0
0
11/26

New Site Integration Report

Written by
Approved by

Engineer's Name
Manager's Name

Freq
Sector

Sector
3

Level & quality at 1 <


TA < 4
RXLEV
RXQUAL
Sub
Sub
-75
0
-80
0
-75
0
-80
0
-80
0
-79
0
-78
0
-80
0
-75
0

TCH6
TCH7
TCH8
TCH9
TCH10
BCCH
TCH2
TCH3
TCH4

1006
512
514
516
518
976
978
998
1004

TCH5

520

-60

-80

TCH6

522

-67

-73

TCH7

524

-67

-75

TCH8

526
984

-60

-80

-63

-75

986

-66

-80

TCH3

988

-60

-80

TCH4

990

-65

-78

TCH5

994

-67

-75

TCH6

996

-66

-73

TCH7

513

-69

-75

TCH8

515

-70

-75

TCH9

528

-60

-80

TCH10

530

-63

-75

TCH11

533

-63

-75

TCH12

535

-64

-77

BCCH
TCH2

Sector
4

Level & quality at


TA < 1
RXLEV
RXQUAL
Sub
Sub
-67
0
-60
0
-63
0
-66
0
-60
0
-44
0
-59
0
-60
0
-63
0

RAN/OPT/OC/Reports/IR_Rev1.0

12/26

New Site Integration Report

Written by
Approved by

Engineer's Name
Manager's Name

1.4 2G Intra-Site HO Matrix Test


The following table includes the test results of intra-site HO.
S1
GS
DC
M
S
S
1
S
2
S
3
S
4

GS
M
DC
S
GS
M
DC
S
GS
M
DC
S
GS
M
DC
S

S2
GS
DC
M
S

S3
GS
DC
M
S

S4
GS
DC
M
S
O

O
O
O
O

O
O

Table 4 2G Intra-site HO matrix, O:OK, N:NOK, blank : not tested

1.5 2G Inter-Site HO Matrix Test


The following table shows the results of 2G inter-site HO results
S1
S1

RAN/OPT/OC/Reports/IR_Rev1.0

S2

S3

S4

O
13/26

New Site Integration Report

Written by
Approved by

Engineer's Name
Manager's Name

O
O
O

S2
S3
S4

1.6 GPRS/EDGE test

Max
Throughput(kbps)
Average
Throughput(kbps)
Min Throughput(kbps)

RAN/OPT/OC/Reports/IR_Rev1.0

S1

S2

S3

90

79

89

75

76

74

S
4
83
77
0.
5

14/26

New Site Integration Report

Written by
Approved by

Engineer's Name
Manager's Name

2G Drive Test Plots


In this section the 2G drive test results are presented, showing
the DT coverage level, DT quality, serving cells, and coverage
footprint of each sector
1.7 2G Coverage footprint
S1:

Figure 1

RAN/OPT/OC/Reports/IR_Rev1.0

15/26

New Site Integration Report

Written by
Approved by

Engineer's Name
Manager's Name

S2:

Figure 2

RAN/OPT/OC/Reports/IR_Rev1.0

16/26

New Site Integration Report

Written by
Approved by

Engineer's Name
Manager's Name

S3:

Figure 3

RAN/OPT/OC/Reports/IR_Rev1.0

17/26

New Site Integration Report

Written by
Approved by

Engineer's Name
Manager's Name

S4:

Figure 4

RAN/OPT/OC/Reports/IR_Rev1.0

18/26

New Site Integration Report

Written by
Approved by

RAN/OPT/OC/Reports/IR_Rev1.0

Engineer's Name
Manager's Name

19/26

New Site Integration Report

Written by
Approved by

Engineer's Name
Manager's Name

1.8 2G Coverage Level


The following figure shows the coverage level, the MS was
camped on 2G

RAN/OPT/OC/Reports/IR_Rev1.0

20/26

New Site Integration Report

Written by
Approved by

Engineer's Name
Manager's Name

1.9 2G Coverage Quality


The following figure shows the coverage quality, the MS was
camped on 2G

RAN/OPT/OC/Reports/IR_Rev1.0

21/26

New Site Integration Report

Written by
Approved by

Engineer's Name
Manager's Name

1.10 2G Serving Cells


The following figure shows serving cells by CI

Result: No Cross between sectors

RAN/OPT/OC/Reports/IR_Rev1.0

22/26

New Site Integration Report

Written by
Approved by

Engineer's Name
Manager's Name

1.11 2G TA
The following figure shows the timing advance, the MS was
camped on 2G

RAN/OPT/OC/Reports/IR_Rev1.0

23/26

New Site Integration Report

Written by
Approved by

Engineer's Name
Manager's Name

2G DT KPIs
In this section the 2G DT main starts are presented
1.12 Dropped Calls
CDR = 100 * (Number of Dropped Calls/ Number of Call Established)
= 100 * (0/15) = 0 %
1.13 Blocked Calls Rate
CBR = 100 * (Number of Blocked Calls/ Number of Call Attempt)
= 100 * (0/15) = 0 %

1.14 Level Distribution


The following table shows the level ranges for the whole DT, the
MS was camped on 2G

RAN/OPT/OC/Reports/IR_Rev1.0

24/26

New Site Integration Report

Written by
Approved by

Engineer's Name
Manager's Name

1.15 Quality Distribution


The following table shows the quality ranges for the whole DT,
the MS was camped on 2G

1.16 TA Distribution
The following table shows the timing advance ranges for the
whole DT, the MS was camped on 2G

RAN/OPT/OC/Reports/IR_Rev1.0

25/26

New Site Integration Report

Written by
Approved by

Engineer's Name
Manager's Name

Conclusion
As per the above test and verification outcomes, the site is
ACCEPTED.

RAN/OPT/OC/Reports/IR_Rev1.0

26/26

You might also like