EXERCISES AND SOLUTIONS
.
Course Version: 17
Course Duration: 5 Hours 40 Minutes
Material Number: 50156880
SAP Copyrights, Trademarks and
Disclaimers
No part of this publication may be reproduced or transmitted in any form or for any purpose without the
express permission of SAP SE or an SAP affiliate company.
SAP and other SAP products and services mentioned herein as well as their respective logos are
trademarks or registered trademarks of SAP SE (or an SAP affiliate company) in Germany and other
countries. Please see http://global12.sap.com/corporate-en/legal/copyright/index.epx for additional
trademark information and notices.
Some software products marketed by SAP SE and its distributors contain proprietary software
components of other software vendors.
National product specifications may vary.
These materials may have been machine translated and may contain grammatical errors or
inaccuracies.
These materials are provided by SAP SE or an SAP affiliate company for informational purposes only,
without representation or warranty of any kind, and SAP SE or its affiliated companies shall not be liable
for errors or omissions with respect to the materials. The only warranties for SAP SE or SAP affiliate
company products and services are those that are set forth in the express warranty statements
accompanying such products and services, if any. Nothing herein should be construed as constituting an
additional warranty.
In particular, SAP SE or its affiliated companies have no obligation to pursue any course of business
outlined in this document or any related presentation, or to develop or release any functionality
mentioned therein. This document, or any related presentation, and SAP SE’s or its affiliated companies’
strategy and possible future developments, products, and/or platform directions and functionality are
all subject to change and may be changed by SAP SE or its affiliated companies at any time for any
reason without notice. The information in this document is not a commitment, promise, or legal
obligation to deliver any material, code, or functionality. All forward-looking statements are subject to
various risks and uncertainties that could cause actual results to differ materially from expectations.
Readers are cautioned not to place undue reliance on these forward-looking statements, which speak
only as of their dates, and they should not be relied upon in making purchasing decisions.
Demonstration
Procedure
Warning or Caution
Hint
Facilitated Discussion
Table 1: Header
Field Value
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Table 2: Item
Field Value
Sold-to-Party T-S50A##
Cust. Reference S4270_##_01
Field Value
Material T-F3##
Order Quantity 10
Req. Delivery Date Friday, act. week+1
3. Check in the schedule lines if the order is confirmed and save the order.
Table 3: Header
Field Value
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Table 4: Item
Field Value
Sold-to-Party T-S50A##
Cust. Reference S4270_##_02
Field Value
Material T-F3##
Order Quantity 25
Req. Delivery Date Friday, act. week+1
Table 5: Header
Field Value
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Table 6: Item
Field Value
Sold-to-Party T-S50A##
Cust. Reference S4270_##_03
Field Value
Material T-F3##
Order Quantity 25
Req. Delivery Date Friday, act. week+1
9. Save the first order, reject the second order, and leave the third order without saving. To
reject the second order, go back to checking of existing temporary quantity assignments
(steps 6-7), then delete the entries left by the second and third order. TQA must be empty.
Check if all the temporary quantity assignments are gone. If not, inform your instructor
immediately!
b) Choose plant 1010 and storage location 101A and press Enter.
c) Enter T-F3## for the material description and 25 PCs for the quantity.
Table 1: Header
Field Value
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Table 2: Item
Field Value
Sold-to-Party T-S50A##
Cust. Reference S4270_##_01
Field Value
Material T-F3##
Order Quantity 10
Req. Delivery Date Friday, act. week+1
a) Call transaction VA01 or navigate in the SAP Easy Access Menu to Logistics → Sales
and Distribution → Sales → Order → VA01 → Create.
c) Press Enter.
3. Check in the schedule lines if the order is confirmed and save the order.
a) Double-click on item line 10 and check the confirmed quantity in the view Schedule
Lines.
Table 3: Header
Field Value
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Table 4: Item
Field Value
Sold-to-Party T-S50A##
Cust. Reference S4270_##_02
Field Value
Material T-F3##
Order Quantity 25
Req. Delivery Date Friday, act. week+1
A dialog box appears informing you that the order could only be partially confirmed with 15
PCs.
a) Call transaction VA01 or navigate in the SAP Easy Access Menu to Logistics → Sales
and Distribution → Sales → Order → VA01 → Create.
c) Press Enter.
For the material there is stock of 25 PCs and one customer order of 10 PCs. Therefore
only 15 PCs remain for additional customer orders.
b) Go back to the Availability Overview and stay in the order without saving.
Yes, for your material there's an entry in the list which is not yet finally processed.
Table 5: Header
Field Value
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Table 6: Item
Field Value
Sold-to-Party T-S50A##
Cust. Reference S4270_##_03
Field Value
Material T-F3##
Order Quantity 25
Req. Delivery Date Friday, act. week+1
A dialog box appears letting you know that the order could again be partially confirmed
with 15 PCs.
a) Call transaction VA01 or navigate in the SAP Easy Access Menu to Logistics → Sales
and Distribution → Sales → Order → VA01 → Create.
c) Press Enter.
Note:
Due to the deletion of the temporary quantity assignment of the second
customer order, the confirmed quantity of this order is released again and
can be used for other customer demands although the second customer
order has still a confirmed requested quantity.
9. Save the first order, reject the second order, and leave the third order without saving. To
reject the second order, go back to checking of existing temporary quantity assignments
(steps 6-7), then delete the entries left by the second and third order. TQA must be empty.
Check if all the temporary quantity assignments are gone. If not, inform your instructor
immediately!
Field Value
Planned order profile LA
Material T-F3##
MRP Area 1010
Order quantity 10
Basic finished date tomorrow
2. Create a new sales order using the following information and check the current
requirement situation:
Table 7: Header
Field Value
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Table 8: Item
Field Value
Sold-to-Party T-S50A##
Cust. Reference S4270_##_04
Field Value
Material T-F3##
Order Quantity 25
Req. Delivery Date Friday, act. week+1
What is the result? Could the requested quantity covered by stock on hand and the
existing planned order? Why (not)? Analyze the situation by reviewing the scope of check.
3. Create a new scope of check #2/A in Customizing. To do this, copy the existing Y2/A
entry and include planned orders.
4. Assign the newly created #2 check group to the material master of your T-F3## product.
Table 9: Header
Field Value
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Field Value
Material T-F3##
Order Quantity 10
Req. Delivery Date Friday, act. week+1
Could the order be confirmed? What is the result of the availability check?
6. Create a new scope of check #2/A in Customizing. To do this, copy the existing entry
Y2/A.
Field Value
Sales Organization 1010
Distribution Chanel 10
Division 00
Field Value
Material T-F3##
Order Quantity 25
Req. Delivery Date Friday, act. week+1
Could the order be confirmed? What is the result of the availability check? Did you receive
a full confirmation? Why (not)?
Compare the situation in the Availability Overview with the situation delivered by the
Stock/Requirement List. Is the ATP situation the same in both transactions? Why (not)?
8. Include the planned orders in the existing scope of check #2/A in Customizing.
Field Value
Material T-F3##
Order Quantity 25
Req. Delivery Date Friday, act. week+1
10. Create a delivery for your last sales order using the following information:
Field Value
Shipping point 1010
Selection Date today + 2 weeks
Order number of your last sales order
11. Copy the existing scope of check from Y2/B to #2/B in Customizing.
12. Create a delivery for your last sales order again. Do not save the delivery. Use the following
information:
Field Value
Shipping point 1010
Selection Date today + 2 weeks
Order number of your last sales order
13. Use ATP check on storage location level. Assign the storage location 101B to your sales
order in the item-specific data.
14. Activate the ATP check against replenishment lead time and create a customer order
using the following information:
Field Value
Material T-F3##
Order Quantity 500
Req. Delivery Date today
Field Value
Planned order profile LA
Material T-F3##
MRP Area 1010
Order quantity 10
Basic finished date tomorrow
2. Create a new sales order using the following information and check the current
requirement situation:
Table 7: Header
Field Value
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Table 8: Item
Field Value
Sold-to-Party T-S50A##
Cust. Reference S4270_##_04
Field Value
Material T-F3##
Field Value
Order Quantity 25
Req. Delivery Date Friday, act. week+1
a) Call transaction VA01 or navigate in the SAP Easy Access Menu to Logistics → Sales
and Distribution → Sales → Order → VA01 → Create.
c) Press Enter.
What is the result? Could the requested quantity covered by stock on hand and the
existing planned order? Why (not)? Analyze the situation by reviewing the scope of check.
A dialog box appears letting you know that the order could only be partially confirmed with
15 PCs. This is due to the fact that planned orders are out of scope in the scope of check
for Y2/A.
3. Create a new scope of check #2/A in Customizing. To do this, copy the existing Y2/A
entry and include planned orders.
a) Call transaction OVZ2 or navigate in Customizing (transaction SPRO) to Sales and
Distribution → Basic Functions → Availability Check and Transfer of Requirements →
Availability Check → Availability Check with ATP Logic or Against Planning → Define
Availability Check Group.
b) Copy the existing Y2 check group and change the following values accordingly:
Field Value
Av (Checking Group for Availability Check #2 (#= A, B, C, D, … for group 01, 02, 03,
04,...)
Description Indiv. Requ. GR #2
Note:
Saving the customizing changes requires a customizing request. In the
prompt, select Create Request, add the description S4270-##, click on
Save and press Continue.
4. Assign the newly created #2 check group to the material master of your T-F3## product.
a) Call transaction MM02 or navigate in the SAP Easy Access Menu to
Logistics → Materials Management → Material Master → Material → Change → MM02
- Immediately.
b) In the Screen Change Material (Initial Screen), choose Select Views, maintain the plant
1010 and press Enter
c) Select view MRP3, press Enter and assign #2 as the checking group for your material.
Table 9: Header
Field Value
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Field Value
Material T-F3##
Order Quantity 10
Req. Delivery Date Friday, act. week+1
a) Call transaction VA01 or navigate in the SAP Easy Access Menu to Logistics → Sales
and Distribution → Sales → Order → VA01 → Create.
c) Press Enter.
Could the order be confirmed? What is the result of the availability check?
No, the availability check failed due to the missing setup of checking group #2 and
checking rule A.
6. Create a new scope of check #2/A in Customizing. To do this, copy the existing entry
Y2/A.
a) Call transaction OVZ9 or navigate in Customizing (transaction SPRO) to Sales and
Distribution → Basic Functions → Availability Check and Transfer of Requirements →
Availability Check → Availability Check with ATP Logic or Against Planning →
Configure Scope of Availability Check.
b) Copy the existing parameter Y2/A to #2/A and change the following values
accordingly:
Field Value
With Planned Orders Exclude
With Production orders X - All
With Dependent Requirements active
With Dependent Reservations X - All
Note:
Changes in customizing requires an assignment to an customizing request.
Therefore use your customizing request created above for this and for all
future customizing activities in this course!
Field Value
Material T-F3##
Order Quantity 25
Req. Delivery Date Friday, act. week+1
a) Call transaction VA01 or navigate in the SAP Easy Access Menu to Logistics → Sales
and Distribution → Sales → Order → VA01 → Create.
c) Press Enter.
Could the order be confirmed? What is the result of the availability check? Did you receive
a full confirmation? Why (not)?
The ATP check could be executed, but the confirmed quantity is still 15 PCs. In the scope
of check #2/A, planned orders are excluded.
Compare the situation in the Availability Overview with the situation delivered by the
Stock/Requirement List. Is the ATP situation the same in both transactions? Why (not)?
The transactions have different ATP situations. This is because transaction MD04
considers all MRP elements, while transaction CO09 takes only elements regarding the
scope of check into account. In the scope of check #2/A, planned orders are excluded.
8. Include the planned orders in the existing scope of check #2/A in Customizing.
a) Call transaction OVZ9 or navigate in Customizing (transaction SPRO) to Sales and
Distribution → Basic Functions → Availability Check and Transfer of Requirements →
Availability Check → Availability Check with ATP Logic or Against Planning →
Configure Scope of Availability Check.
c) Select the existing parameter #2/A and change the following values accordingly:
Field Value
With Planned Orders X - All
With Production orders X - All
With Dependent Requirements active
With Dependent Reservations X - All
Field Value
Distribution Chanel 10
Division 00
Field Value
Material T-F3##
Order Quantity 25
Req. Delivery Date Friday, act. week+1
a) Call transaction VA01 or navigate in the SAP Easy Access Menu to Logistics → Sales
and Distribution → Sales → Order → VA01 → Create.
c) Press Enter.
Could the order be confirmed? What is the result of the availability check? Compare
the situations in MD04 and CO09.
Yes, now the order could be confirmed in time. The situations in MD04 and CO09 are
identical.
10. Create a delivery for your last sales order using the following information:
Field Value
Shipping point 1010
Selection Date today + 2 weeks
Order number of your last sales order
a) Call transaction VL01N or navigate in the SAP Easy Access Menu to Logistics → Sales
and Distribution → Shipping and Transportation → Outbound
Delivery → Create → Single Document → VL01N - With Reference to Sales Order.
Was the creation of the delivery successful? Why (not)? What can you do to fix this
issue?
The creation of the delivery failed due to the missing scope of check #2/B. Add the
missing parameter in the Customizing accordingly.
11. Copy the existing scope of check from Y2/B to #2/B in Customizing.
a) Call transaction OVZ9 or navigate in Customizing (transaction SPRO) to Sales and
Distribution → Basic Functions → Availability Check and Transfer of Requirements →
Availability Check → Availability Check with ATP Logic or Against Planning →
Configure Scope of Availability Check.
12. Create a delivery for your last sales order again. Do not save the delivery. Use the following
information:
Field Value
Shipping point 1010
Selection Date today + 2 weeks
Order number of your last sales order
a) Call transaction VL01N or navigate in the SAP Easy Access Menu to Logistics → Sales
and Distribution → Shipping and Transportation → Outbound
Delivery → Create → Single Document → VL01N - With Reference to Sales Order.
Can the delivery be created successfully? Why (not)? What can you do to fix this
issue?
13. Use ATP check on storage location level. Assign the storage location 101B to your sales
order in the item-specific data.
The Availability control informs you, that the order now won't get a confirmation. Based on
the configuration the system now executes an ATP-check on plant and storage location
level. and the stock of storage location 101B is 0.
a) Call transaction VA02 or navigate in the SAP Easy Access Menu to Logistics → Sales
and Distribution → Sales → Order → VA02 – Change.
b) On the following screen your sales order number should appear automatically,
otherwise type in the number manually and hit Enter
c) In the GOTO menu, choose Item and select Shipping from the sub menu.
14. Activate the ATP check against replenishment lead time and create a customer order
using the following information:
Field Value
Material T-F3##
Order Quantity 500
Req. Delivery Date today
You will receive a partial confirmation about 25 PCs for the next working day, an additional
partial confirmation about 10 pcs. for the cfreation date of your planned order and a full
confirmation of the remaining quantity at the end of the replenishment lead time. Caution!
b) Deactivate the setting Without Replenishment Lead Time in the scope of availability
check #2/A.
d) Call transaction VA01 or navigate in the SAP Easy Access Menu to Logistics → Sales
and Distribution → Sales → Order → VA01 → Create.
f) Press Enter.
g) Check the result of the ATP check. Now the whole quantity could be confirmed at
replenishment lead time.
h) Leave this transaction without saving and activate the settingWithout Replenishment
Lead time in your scope of check again.
Note:
Reject all created sales orders except sales order 1!
1. Change the strategy group for your material T-F2## in plant 1010 from 40 to 20.
Field Value
Material T-F2##
Order Quantity 10
Req. Delivery Date Friday, act. week+1
What is the result of the ATP check? Could this order be confirmed? Why (not)?
3. Check the demand situation using the Monitor Material Coverage - Net Segments tile.
4. Select your material T-F2## and check the demand situation of this product.
5. Check the demand situation using the Monitor Material Coverage - Net/Individual
Segments tile.
1. Change the strategy group for your material T-F2## in plant 1010 from 40 to 20.
a) Call transaction MM02 or navigate in the SAP Easy Access menu to
Logistics → Materials Management → Material Master → Material → Change → MM02
- Immediately.
Field Value
Material T-F2##
Order Quantity 10
Req. Delivery Date Friday, act. week+1
What is the result of the ATP check? Could this order be confirmed? Why (not)?
Yes, the customer order could be confirmed. There is no stock on hand or planned
receipts, although the system confirms at the replenishment lead time.
a) Call transaction VA01 or navigate in the SAP Easy Access Menu to Logistics → Sales
and Distribution → Sales → Order → VA01 → Create.
c) Press Enter.
d) Check the result of the ATP check. Therefore mark your created order line and
navigate to the schedule lines via the menu Goto → Item→ Schedule Lines
3. Check the demand situation using the Monitor Material Coverage - Net Segments tile.
a) Choose the Monitor Material Coverage - Net Segments tile.
c) Switch the AOR Status of your MRP Controller 0## in plant 1010 to AOR assigned.
Leave the Area of Responsibility - No saving necessary.
Note:
When you call this tile for the first time, the system requires information
about your user. Background: Based on these settings the system
provides an overview which contains only the materials which are
assigned to your user. It's a one-time maintenance but can be changed
any time it is required.
4. Select your material T-F2## and check the demand situation of this product.
a) Select your material and choose Manage Material.
The Stock/Requirement List is empty.
The Monitor Material Coverage - Net Segments tile covers only demands in the net
segment and not in the individual customer segment. Therefore you should use the
Monitor Material Coverage - Net/Individual Segments tile. Due to the assigned strategy
20 the material T-F2## will not shown in the list.
5. Check the demand situation using the Monitor Material Coverage - Net/Individual
Segments tile.
a) Choose the Monitor Material Coverage - Net/Individual Segments tile.
Can you find you order in the Stock/Requirement List using this tile?
Yes, now the order is displayed and Monitor Material Coverage - Net/Individual
Segments provides information that you are running into a shortage situation very
soon.
1. Check the first order you created for your product T-F3## and write down the values of
the following fields. How does the system determine these values?
From the view Sales:
Field Value
Order Number
Material
Quantity
Field Value
Material Staging/Availability Date
Requirement Type
Schedule line category
Route (view Shipping)
2. Which parameter is responsible for the activation of the availability check? How is this
parameter determined?
Field Value
Transfer of requirements / Begin assembly
order from SD
Availability check for sales
Field Value
Product allocation
Note:
This priority is hard coded, but could be influenced if necessary. Information
about the hard coded sequence can be taken from the course material.
Field Value
MRP Group
Planning Strategy
Material type
Item Category and MRP type
7. The route contains the transportation duration from our plant to the customer. Where can
you find the route determination in Customizing? Which duration contains the route
R00025?
1. Check the first order you created for your product T-F3## and write down the values of
the following fields. How does the system determine these values?
From the view Sales:
Field Value
Order Number
Material
Quantity
Field Value
Material Staging/Availability Date
Requirement Type
Schedule line category
Route (view Shipping)
a) Check your customer order using transaction VA02 or navigate in the SAP Easy Access
Menu to Logistics → Sales and Distribution → Sales → Order → VA02 – Change.
b) Enter the number of your first customer order and press Enter.
Field Value
Order Number varied
Material T-F3##
Quantity 10
Field Value
Material Staging/Availability Date varied
Requirement Type KSV
Schedule line category CP
Route (view Shipping) R00025
2. Which parameter is responsible for the activation of the availability check? How is this
parameter determined?
The activation of the availability check is done in the requirement class. The requirement
class is linked to the requirement type. The requirement type itself can be determined via
the planning strategy and/or on the level of item category and MRP type, assigned in
Customizing.
b) Choose the requirement type KSV and write down which requirement class is assigned
to it.
Requirement type KSV = requirement class ____________
c) Check the settings of the requirement class 050 in Customizing using transaction
OVZG or by navigating in Customizing to Sales and Distribution → Basic
Functions → Availability Check and Transfer of Requirements → Transfer of
Requirements → Configure Requirement Classes. Note the values.
Field Value
Availability Check Active
Req. Transfer Active
Allocation 1 - Consume planning with assembly
Product Allocation Active
Field Value
Transfer of requirements / Begin assembly
order from SD
Availability check for sales
Field Value
Product allocation
Field Value
Transfer of requirements / Begin active
assembly order from SD
Availability check for sales active
Product allocation active
What is the relationship between the settings for availability check in the requirement
class and in the schedule line categories?
In the requirement class, these settings can be switched on or off. In the schedule line
categories these functions can only be switched off.
Note:
This priority is hard coded, but could be influenced if necessary. Information
about the hard coded sequence can be taken from the course material.
Field Value
MRP Group
Planning Strategy
Material type
Item Category and MRP type
Field Value
MRP Group 2
Planning Strategy 1
Material type 3
Field Value
Item Category and MRP type 4
7. The route contains the transportation duration from our plant to the customer. Where can
you find the route determination in Customizing? Which duration contains the route
R00025?
During an ATP check,the system generally confirms demands following the first come, first
served principle. This can lead to a situation where a CPD customer (one-time customer)
receives a confirmation while a top A Customer won't get a confirmation due to the fact that
the customer orders the material just a minute later. This should be prevented by using an
allocation check during the availability check.
1. Book a stock of 80 pcs for your material T-F1## in plant 1010 and storage location 101A
using transaction MI10.
2. Create a sales order for T-F1## for your customer T-S50B## (which has a priority of 2) of
60 pcs for Friday next week. Save your order!
3. Create a second sales order for T-F1## for your customer T-S50A## (which has a priority
of 1) of 30 pcs for Friday next week. Save your order, too!
5. Set up an allocation in the system T4N using the SAP Fiori app Configure Product
Allocation with the following values:
Object Values
Allocation Object S4AATP1_##
Description Allocation GR ##
Quantity Unit PC
Period Type Week
Check Date Time Type Requested Delivery Date
6. Maintain planning data for allocation using the app Manage Product Allocation Planning
Data:
Object Value
Material Number T-F1##
Object Value
Ship-to-party - Customer Number T-S50A##
and
Object Value
Material Number T-F1##
Sold-to-party T-S50B##
7. Use the App Manage Product Allocation Sequence to maintain the following data:
Object Value
Allocation Sequence Sequence ##_1
Description Group ##
Consumption Unit PC
Backward Consumption 1
Forward Consumption 3
8. Use the App Assign Product to Product Allocation to assing your product T-F1## to your
allocation.
9. Choose the tile Product Allocation Overview and review the current allocation situation.
Can you see your allocation data? What is the current allocation situation?
Note:
This App gives you an overview of all allocations maintained in the system.
Therefore it could be helpful activate a filter in the available in the header
Standard settings. It ois also possible to Adapt Filters by using the material
number as a selection criteria.
10. Create a sales order for T-F1## for your customer T-S50A## (which has a priority of 1) of
50 pcs for Friday, act. week+2.
11. Again create a second sales order for T-F1##, this time for your customer T-S50B##
(which has a priority of 2) about 30 pcs for Friday next week+2 and save the order.
During an ATP check,the system generally confirms demands following the first come, first
served principle. This can lead to a situation where a CPD customer (one-time customer)
receives a confirmation while a top A Customer won't get a confirmation due to the fact that
the customer orders the material just a minute later. This should be prevented by using an
allocation check during the availability check.
1. Book a stock of 80 pcs for your material T-F1## in plant 1010 and storage location 101A
using transaction MI10.
a) Book some stocks using transaction MI10 or via SAP Easy Access: SAP
Menu → Logistics → Material Management - Physical Inventory → Difference → Enter
W/o Document Reference.
b) Enter plant 1010 and storage location 101A and press Enter.
2. Create a sales order for T-F1## for your customer T-S50B## (which has a priority of 2) of
60 pcs for Friday next week. Save your order!
a) Create a customer order using transaction VA01 or via SAP Easy Access:
Logistics → Sales and Distribution → Order → VA01 → Create.
Header:
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Item
Sold-to-Party T-S50B##
Cust. Reference S4270_##_10
Material T-F1##
Order Quantity 60
Req. Delivery Date Friday, act. week+3
3. Create a second sales order for T-F1## for your customer T-S50A## (which has a priority
of 1) of 30 pcs for Friday next week. Save your order, too!
No, the customer with the lower priority receives a full confirmation, although the order
from the customer with high priority could not be confirmed completely in time.
a) Create a second customer order for your customer T-S50A## using transaction VA01
or via SAP Easy Access:Logistics → Sales and Distribution → Order → VA01 →
Create.
Header:
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Item
Sold-to-Party T-S50A##
Cust. Reference S4270_##_11
Material T-F1##
Order Quantity 30
Req. Delivery Date Friday, act. week+1
b) Confirm the result of the Availability Control screen by pressing Delivery Proposal
c) Save also the second order and note the order number:
Object Value
Order number order 1
Object Value
Order number order 2
c) In the Reason for rejection tab, choose Rejected by Approver as a reason for rejection.
5. Set up an allocation in the system T4N using the SAP Fiori app Configure Product
Allocation with the following values:
Object Values
Allocation Object S4AATP1_##
Description Allocation GR ##
Quantity Unit PC
Period Type Week
Check Date Time Type Requested Delivery Date
c) Maintain the Product Allocation Object using the values from the table above.
d) Choose Add and select Material Number and Customer Number from the Ship-to-
Party as characteristics for your allocation objects. Both characteristics are part of sub
menus of the sub menu Sales Document Item.
6. Maintain planning data for allocation using the app Manage Product Allocation Planning
Data:
Object Value
Material Number T-F1##
Ship-to-party - Customer Number T-S50A##
and
Object Value
Material Number T-F1##
Object Value
Sold-to-party T-S50B##
b) Choose GO. The allocation object you maintained in the last step should appear.
d) Choose Edit.
e) Choose Add.
Object Value
Material Number T-F1##
Ship-to-party T-S50A##
and
Object Value
Material Number T-F1##
Ship-to-party T-S50B##
7. Use the App Manage Product Allocation Sequence to maintain the following data:
Object Value
Allocation Sequence Sequence ##_1
Description Group ##
Consumption Unit PC
Backward Consumption 1
Forward Consumption 3
b) Choose Go.
c) Choose Create.
Object Value
Allocation Sequence Sequence_##_1
Description Group ##
Consumption Unit PC
Backward Consumption 1
Forward Consumption 3
e) Press Enter.
f) Choose > in the area of Sales Sequence Groups and assign your allocation object
S4AATP1_##.
8. Use the App Assign Product to Product Allocation to assing your product T-F1## to your
allocation.
a) Choose the tile Assign Product to Product Allocation.
b) Choose Go.
Object Value
Material T-F1##
Plant 1010
9. Choose the tile Product Allocation Overview and review the current allocation situation.
Can you see your allocation data? What is the current allocation situation?
Yes, the allocation data is displayed. At this time, there are no consumptions yet.
Note:
This App gives you an overview of all allocations maintained in the system.
Therefore it could be helpful activate a filter in the available in the header
Standard settings. It ois also possible to Adapt Filters by using the material
number as a selection criteria.
10. Create a sales order for T-F1## for your customer T-S50A## (which has a priority of 1) of
50 pcs for Friday, act. week+2.
a) Create a customer order for your customer T-S50A## using transaction VA01 or via
SAP Easy Access: Logistics → Sales and Distribution → Order → VA01 → Create.
Header:
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Item
Sold-to-Party T-S50A##
Cust. Reference S4270_##_12
Material T-F1##
Order Quantity 50
Req. Delivery Date Friday, act. week+2
11. Again create a second sales order for T-F1##, this time for your customer T-S50B##
(which has a priority of 2) about 30 pcs for Friday next week+2 and save the order.
a) Create a second customer order for your customer T-S50B## using transaction VA01
or via SAP Easy Access: Logistics → Sales and Distribution → Order → VA01 →
Create.
Header:
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Item
Sold-to-Party T-S50B##
Cust. Reference S4270_##_13
Material T-F1##
Order Quantity 30
Req. Delivery Date Friday, act. week+1
Result: This customer only receives a confirmation for 20 pcs due to inefficient
allocation.
Press Delivery Proposal, save this order as well and leave the transaction.
Yes, now the consumption and the changes in the allocation situation are visible.
1. From the sales manager it was decided to create a general allocation of 40 pcs for
material T-F1## in plant 1010 which can be used for all (other) customers. Maintain the
setup accordingly. Set up an allocation in the system T4N using the SAP Fiori app
Configure Product Allocation and the following values:
Object Values
Allocation Object S4AATP2_##
Description Allocation GR ##
Quantity Unit PC
Period Type Week
Check Date Time Type Requested Delivery Date
2. Maintain planning data for allocation using the app Manage Product Allocation Planning
Data. User the following data:
Object Value
Material Number T-F1##
Plant 1010
and
3. Use the App Manage Product Allocation Sequence to add an additional sales sequence
group for your existing Sequence ##_1 using the following data:
Object Value
Sales Sequence Group 20
Description Group ##
Consumption Unit PC
Backward Consumption 1
Object Value
Forward Consumption 3
Assign the allocation object S4AATP2_## to the new Sales Sequence Group 20.
4. Change your last created sales order and execute an availability check.
5. OPTIONAL: Check the actual allocation situation using App Product Allocation Overview
6. Finally, delete the assignment of your product T-F1## to the your Sequence_##_1 and
reject your sales orders created in this exercise.
7. Reject all your sales orders created for your material T-F1## and save your settings.
1. From the sales manager it was decided to create a general allocation of 40 pcs for
material T-F1## in plant 1010 which can be used for all (other) customers. Maintain the
setup accordingly. Set up an allocation in the system T4N using the SAP Fiori app
Configure Product Allocation and the following values:
Object Values
Allocation Object S4AATP2_##
Description Allocation GR ##
Quantity Unit PC
Period Type Week
Check Date Time Type Requested Delivery Date
c) Maintain the Product Allocation Object using the values from the table above.
d) Choose Add and select Material Number and Plant (from the sub menu of Sales
Document Item as characteristics for your allocation objects and press OK.
2. Maintain planning data for allocation using the app Manage Product Allocation Planning
Data. User the following data:
Object Value
Material Number T-F1##
Plant 1010
and
a) Choose the tile Manage Product Allocation Planning Data and press Go.
b) The allocation object you maintained in the last step should appear.
d) Choose Edit.
e) Choose Add.
Object Value
Material Number T-F1##
Plant 1010
3. Use the App Manage Product Allocation Sequence to add an additional sales sequence
group for your existing Sequence ##_1 using the following data:
Object Value
Sales Sequence Group 20
Description Group ##
Consumption Unit PC
Backward Consumption 1
Forward Consumption 3
Assign the allocation object S4AATP2_## to the new Sales Sequence Group 20.
a) Choose the tile Manage Product Allocation Sequences.
b) Choose Go.
d) Press Edit and afterward Create to maintain an additional sequence in the area Sales
Sequence Group (1) using the following data:
Object Value
Sales Sequence Group 20
Description Group_##_2
Consumption Unit PC
Backward Consumption 1
Forward Consumption 3
e) Press Enter.
f) Choose > in the area of Sales Sequence Groups and assign your allocation object
S4AATP2_##.
4. Change your last created sales order and execute an availability check.
Yes, now the last order gets also a full confirmation, although to a later date.
a) Change your customer order using transaction VA02 or via SAP Easy Access:
Logistics → Sales and Distribution → Order → VA02 → Change.
b) Select the order line 10 and execute the availability check manually by pressing the
Check Item Availability button.
c) Confirm the result of the Availability Control by pressing Delivery Proposal and save the
order changes.
5. OPTIONAL: Check the actual allocation situation using App Product Allocation Overview
6. Finally, delete the assignment of your product T-F1## to the your Sequence_##_1 and
reject your sales orders created in this exercise.
a) Choose the tile Assign Product to Product Allocation.
b) Choose GO.
d) Choose Edit, mark your material plant assignment and then choose Delete.
7. Reject all your sales orders created for your material T-F1## and save your settings.
a) Change your customer order using transaction VA02 or via SAP Easy Access:
Logistics → Sales and Distribution → Order → VA02 → Change.
b) Switch to the view Reason for Rejection and select the reason for rejection Copied and
rejected.
1. Check the actual availability situation for your product T-F1## in location 1010 using
checking rule A.
2. The sales manager has requested to check a customer demand which cannot be
confirmed due to a product allocation issue and should in addition be checked against the
capacity allocation. Therefore an additional allocation of 90pcs for material T-F1## in
plant 1010 for the current week +8 should be taken into account. Maintain the setup
accordingly. Set up an allocation in the system T4N using the SAP Fiori app Configure
Product Allocation with the following values:
Object Values
Allocation Object S4AATP3_##
Description Allocation GR ##
Quantity Unit PC
Period Type Week
Check Date Time Type Requested Delivery Date
3. Maintain planning data for allocation using the app Manage Product Allocation Planning
Data. Use the following data:
Object Value
Allocation Object S4AATP3_##
Plant 1010
4. Use the Manage Product Allocation Sequence app and maintain the following settings:
General Information
Object Value
Allocation Sequence Sequence _##_3
Object Value
Description Group ##
Consumption Unit PC
Backward Consumption 3
Forward Consumption 3
Note:
The numbering of the Sequence Group will be handled by the system
internally. Due to the fact that this numbering is important for later system
behavior, please create first the sequence group 10 (Sales) and after this 20
(Capacity), 30 (Sales) and 40 (Capacity) in the correct area
7. Create a sales order for T-F1## in plant 1010 for your customer T-S50A## of 5 pcs for
today +1 Week.
Press Delivery Proposal and change the quantity to 25 pcs for today + 1 week.
Press Delivery Proposal and change the quantity again to 85 pcs for today + 1 weeks.
8. Change your last created sales order for T-F1## in plant 1010 and reduce the quantity to
55 pcs for Friday next week.
9. Change your sales order for T-F1## in plant 1010 a last time and enhance the quantity to
110 pcs for Friday next week.
10. OPTIONAL: Check the actual allocation situation using app Product Allocation Overview
11. Delete the assignment of your product T-F1## to your Sequence ##_3 and reject your
sales orders created in this exercise.
12. Reject all sales order for your material T-F1##and save your settings.
1. Check the actual availability situation for your product T-F1## in location 1010 using
checking rule A.
a) Check the current availability situation using transaction CO09 or via SAP Easy Access:
SAP Menu → Logistics → Sales and Distribution → Sales → Environment → CO09 -
Availability Overview .
2. The sales manager has requested to check a customer demand which cannot be
confirmed due to a product allocation issue and should in addition be checked against the
capacity allocation. Therefore an additional allocation of 90pcs for material T-F1## in
plant 1010 for the current week +8 should be taken into account. Maintain the setup
accordingly. Set up an allocation in the system T4N using the SAP Fiori app Configure
Product Allocation with the following values:
Object Values
Allocation Object S4AATP3_##
Description Allocation GR ##
Quantity Unit PC
Period Type Week
Check Date Time Type Requested Delivery Date
c) Maintain the product allocation object using the values from the table above.
d) Choose Add and select Material Number and Plant (as before from sub menu
Sales Document Item as characteristics for your allocation objects. Confirm your by
pressing OK.
3. Maintain planning data for allocation using the app Manage Product Allocation Planning
Data. Use the following data:
Object Value
Allocation Object S4AATP3_##
Plant 1010
b) Choose GO. The allocation object you maintained in the last step should appear.
d) Choose Edit.
e) Choose Add.
Object Value
Allocation Object S4AATP3_##
Plant 1010
4. Use the Manage Product Allocation Sequence app and maintain the following settings:
General Information
Object Value
Allocation Sequence Sequence _##_3
Description Group ##
Consumption Unit PC
Backward Consumption 3
Forward Consumption 3
b) Choose Go.
c) Choose Create.
Object Value
Allocation Sequence Sequence_##_3
Description Group ##
Consumption Unit PC
Backward Consumption 3
Forward Consumption 3
Object Value
Sequence Group 30
Description Sales Consumption Long
Backward consumption 3
Forward consumption 9
Allocation Object S4AATP1_##
Object Value
Sequence Group 40
Object Value
Description Capacity Consumption Long
Backward consumption 3
Forward consumption 9
Allocation Object S4AATP3_##
e) Press Enter.
f) Choose > in the area of Sales Sequence Groups and assign your allocation object
accordingly following the values in the table above.
Note:
The numbering of the Sequence Group will be handled by the system
internally. Due to the fact that this numbering is important for later system
behavior, please create first the sequence group 10 (Sales) and after this 20
(Capacity), 30 (Sales) and 40 (Capacity) in the correct area
b) Press Go,
d) Maintain a new Material-Plant Assignment for your product T-F1## in plant 1010.
7. Create a sales order for T-F1## in plant 1010 for your customer T-S50A## of 5 pcs for
today +1 Week.
Full confirmation with delay on the current week +3 due to capacity restrictions.
Press Delivery Proposal and change the quantity to 25 pcs for today + 1 week.
Partial confirmation of 20 pcs. for today + 3 weeks and 5 pcs. for the current week +8 due
to capacity restrictions.
Press Delivery Proposal and change the quantity again to 85 pcs for today + 1 weeks.
Partial confirmation of 20 pcs. for today + 3 weeks and 60 pcs. for the current week +8
due to ATP restrictions.
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Item
Sold-to-Party T-S50A##
Cust. Reference S4270_##_10
Material T-F1##
Order Quantity 85
Req. Delivery Date Friday next week
8. Change your last created sales order for T-F1## in plant 1010 and reduce the quantity to
55 pcs for Friday next week.
Partial confirmation - 20 pcs for the current week+3 and 35 pcs for the current week+9.
Material T-F1##
Order Quantity 55
Req. Delivery Date Friday next week
9. Change your sales order for T-F1## in plant 1010 a last time and enhance the quantity to
110 pcs for Friday next week.
Partial confirmation - 20 pcs for the current week+3 and 60 pcs for the current week+9
(limited by ATP).
Material T-F1##
Order Quantity 110
Req. Delivery Date Friday next week
10. OPTIONAL: Check the actual allocation situation using app Product Allocation Overview
11. Delete the assignment of your product T-F1## to your Sequence ##_3 and reject your
sales orders created in this exercise.
a) Choose the tile Assign Product to Product Allocation.
b) Choose GO.
12. Reject all sales order for your material T-F1##and save your settings.
a) Change your customer order using transaction VA02 or via SAP Easy Access:
Logistics → Sales and Distribution → Order → VA02 → Change.
b) Switch to the view Reason for Rejection and select the reason for rejection Copied and
rejected.
You plan to group your customer regarding their total revenue in customer group A and
customer group B using the Characteristic Catalog for sales orders. Therefore customer T-
S50A## should be grouped to customer group 1 and customer T-S66A## should be grouped
to customer group 2. Execute the necessary setup and maintain an allocation for Group 1 of
50 pcs and for Group 2 of 30 pcs.
1. Create a new characteristic value group Value Group## for Product Allocation with the
description Value Group ## depending on customer numbers using the following
parameter:
2. Create a new allocation object, S4AATP4_##, using the app Configure Product Allocation
with the following values:
Object Values
Allocation Object S4AATP4_##
Description Allocation GR ##
Quantity Unit PC
Period Type Week
Check Date Time Type Requested Delivery Date
Mark your Value Group ## and press OK to assign it to your new allocation object. You will
find your group in the characteristics structure Sales Document→ Sales Document Item
Business partners→ Ship-To-Party → Customer Number
Object Value
Allocation Sequence Sequence _##_4
Description Group ##
Object Value
Consumption Unit PC
Backward Consumption 0
Forward Consumption 2
4. Maintain planning data for allocation using the app Manage Product Allocation Planning
Data:
Object Value
Material Number T-F1##
Plant 1010
and
Object Value
Material Number T-F1##
Plant 1010
6. Create a sales order of 20 pcs for T-F1## for your customer T-S50B## for Friday of the
current week+2.
7. Create a second sales order of 40 pcs for T-F1## for your customer T-S66A## for Friday
of the current week+2.
8. Create a third sales order of 20 pcs for T-F1## for your customer T-S50A## for Friday of
the current week+2.
9. Check the result of the allocation check in the app Product Allocation Overview.
10. Reject all sales orders you created in this session and delete the assignment of the
Product to Product Allocation.
You plan to group your customer regarding their total revenue in customer group A and
customer group B using the Characteristic Catalog for sales orders. Therefore customer T-
S50A## should be grouped to customer group 1 and customer T-S66A## should be grouped
to customer group 2. Execute the necessary setup and maintain an allocation for Group 1 of
50 pcs and for Group 2 of 30 pcs.
1. Create a new characteristic value group Value Group## for Product Allocation with the
description Value Group ## depending on customer numbers using the following
parameter:
a) Open the SAP Fiori app Manage Characteristic Catalogs for the product allocation Base
(Sales Order).
b) Choose > to call the detailed view of the characteristic catalog for Base (Sales Order).
g) Select the characteristic Customer Number form the pop-up in the area Sales
Document→ Sales Document Item→ Business Partners→ Ship-to-Party→ Customer
Number and choose OK.
h) Create a new value group, Value_Group##, with the description Value Group ##.
i) Choose Apply.
k) Choose Create and maintain a Customer Priority A ## as the Group Value for you
parent . Select this line and choose Apply.
l) Select the line with your entry Customer Priority A ## and choose >.
m) Choose Create and assign your customer T-S50A## as a parent value to your
Customer Priority A ##. Press Create and assign T-S50B##in the same way.
Confirm the assignments by pressing Apply only once.
n) Create an additional group value, Customer Priority B ##, with the description
Customer Priority B ##. Assign T-S66A## and T-S66B## in the same way as
before.
2. Create a new allocation object, S4AATP4_##, using the app Configure Product Allocation
with the following values:
Object Values
Allocation Object S4AATP4_##
Description Allocation GR ##
Quantity Unit PC
Period Type Week
Check Date Time Type Requested Delivery Date
Mark your Value Group ## and press OK to assign it to your new allocation object. You will
find your group in the characteristics structure Sales Document→ Sales Document Item
Business partners→ Ship-To-Party → Customer Number
a) Choose the tile Configure Product Allocation.
c) Maintain the product allocation object using the values from the table above and press
Add.
d) Select your created characteristic Value Group## from the pop-up that appears. You
will find the characteristic on the path Sales Document→ Sales Document Item→
Business Partners→ Ship-to-Party→ Customer Number→ Value_Group##.
Object Value
Allocation Sequence Sequence _##_4
Description Group ##
Consumption Unit PC
Backward Consumption 0
Forward Consumption 2
b) Choose Create.
Object Value
Allocation Sequence Sequence_##_4
Description Group ##
Consumption Unit PC
Backward Consumption 0
Forward Consumption 2
Sequence Group 10
Description Customer Group A
Backward consumption 0
Forward consumption 2
Allocation Object S4AATP4_##
d) Choose Enter.
e) Choose > in the area of Sales Sequence Groups and assign your allocation object
S4AATP4_##for the Sales Sequence Group 10
4. Maintain planning data for allocation using the app Manage Product Allocation Planning
Data:
Object Value
Material Number T-F1##
Plant 1010
and
Object Value
Material Number T-F1##
Object Value
Plant 1010
d) Choose Edit.
e) Choose Add.
Object Value
Customer_Priority CUSTOMER_PRIORITY_A
Object Value
Customer_Priority CUSTOMER_PRIORITY_B
b) Choose Go.
d) Choose Edit.
e) Choose Add.
f) Maintain an assignment for your Material-Plant combination T-F1## and plant 1010.
6. Create a sales order of 20 pcs for T-F1## for your customer T-S50B## for Friday of the
current week+2.
a) Create a customer order using transaction VA01 or via SAP Easy Access:
Logistics → Sales and Distribution → Order → VA01 → Create.
Header:
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Item
Sold-to-Party T-S50B##
Cust. Reference S4270_##_C1
Material T-F1##
Order Quantity 20
Req. Delivery Date Friday, act. week+2
7. Create a second sales order of 40 pcs for T-F1## for your customer T-S66A## for Friday
of the current week+2.
a) Create a customer order using transaction VA01 or via SAP Easy Access:
Logistics → Sales and Distribution → Order → VA01 → Create.
Header:
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Item
Sold-to-Party T-S66A##
Cust. Reference S4270_##_C2
Material T-F1##
Order Quantity 40
Req. Delivery Date Friday, act. week+2
No, the order receives only a partial confirmation of 30 pcs due to allocation.
8. Create a third sales order of 20 pcs for T-F1## for your customer T-S50A## for Friday of
the current week+2.
a) Create a customer order using transaction VA01 or via SAP Easy Access:
Logistics → Sales and Distribution → Order → VA01 → Create.
Header:
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Item
Sold-to-Party T-S50A##
Cust. Reference S4270_##_C3
Material T-F1##
Order Quantity 20
Req. Delivery Date Friday, act. week+3
9. Check the result of the allocation check in the app Product Allocation Overview.
Yes, customer priority B allocations are completely consumed, for customer priority A 20
% of the allocation is still available.
10. Reject all sales orders you created in this session and delete the assignment of the
Product to Product Allocation.
a) Reject the created sales orders by using transaction VA02 and assign a rejection
reason. Save the orders.
c) Choose Go.
e) Choose Edit.
1. You receive an order from your customer T-S50B## for your material T-F1## in plant
1010 for 60 pcs for today +1 week.
Create the order using the following details:
Header:
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Item
Sold-to-Party T-S50B##
Cust. Reference S4270_##
Material T-F1##
Order Quantity 60
Req. Delivery Date today + 1 week
2. Unfortunately, you received an additional order from your top customer T-S50A## for
your material T-F1## in plant 1010 for 40 pcs. The requested delivery date is ASAP, and
express delivery is required.
Header:
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Item
Sold-to-Party T-S50B##
Cust. Reference S4270_##_EXPRESS
Material T-F1##
Order Quantity 40
Req. Delivery Date today
3. This request should be handled using the new app, Release for Delivery. As a prerequisite,
use the App. Configure Order Fulfillment Responsibilities and create a setup using the
name Responsibility GR## for material T-F1## in a horizon of 10 days.
Object Value
Responsibility Name GR##
Responsibility Description Responsibility_GR##
4. Check the alert situation for the Release for Delivery app. You should receive at least one
alert for Release for Delivery. Otherwise, refresh the your browser.
6. Execute the necessary steps to fix this issue. Reduce the first order of your customer T-
S50B## form 60 pcs. to 40 pcs, and enhance the confirmed order quantity for the urgent
order of your top customer T-S50A## form 20 pcs to40 pcs. In addition postpone the
delivery creation for the first order
7. Finally, in the back-end system (for example, using MD04) check if the situation has
changed.
8. Delete the created delivery for your second order using transaction VL02N or via SAP Easy
Access: Logistics → Logistics Execution → Outbound Process → Goods Issue for
Outbound Delivery → Outbound Delivery → Change → VL02N - Single Document .
1. You receive an order from your customer T-S50B## for your material T-F1## in plant
1010 for 60 pcs for today +1 week.
Create the order using the following details:
Header:
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Item
Sold-to-Party T-S50B##
Cust. Reference S4270_##
Material T-F1##
Order Quantity 60
Req. Delivery Date today + 1 week
a) Create a customer order using transaction VA01 or via SAP Easy Access:
Logistics → Sales and Distribution → Order → VA01 → Create.
Header:
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Item
Sold-to-Party T-S50B##
Cust. Reference S4270_##
Material T-F1##
Order Quantity 60
Req. Delivery Date today + 1 Week
2. Unfortunately, you received an additional order from your top customer T-S50A## for
your material T-F1## in plant 1010 for 40 pcs. The requested delivery date is ASAP, and
express delivery is required.
Header:
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Item
Sold-to-Party T-S50B##
Cust. Reference S4270_##_EXPRESS
Material T-F1##
Order Quantity 40
Req. Delivery Date today
No, the order only gets a partial confirmation for 20 pcs, the day after the day after
tomorrow.
a) Create a customer order using transaction VA01 or via SAP Easy Access:
Logistics → Sales and Distribution → Order → VA01 → Create.
Header:
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Item
Sold-to-Party T-S50A##
Cust. Reference S4270_##_EXPRESS
Material T-F1##
Order Quantity 40
Req. Delivery Date today
3. This request should be handled using the new app, Release for Delivery. As a prerequisite,
use the App. Configure Order Fulfillment Responsibilities and create a setup using the
name Responsibility GR## for material T-F1## in a horizon of 10 days.
Object Value
Responsibility Name GR##
Responsibility Description Responsibility_GR##
Object Value
Responsibility Name GR##
Responsibility Description Responsibility_GR##
Default Horizon 10
Selection Conditions Product Number
is T-F1##
Include Sales Orders active
Note:
After saving the settings for Order Fulfillment Responsibility the assigned
user disappear. The number in brackets behind the Order Fulfillment Resp.
Assignments (1) indicates that one user is already assigned. Switching to
change mode the user will be displayed.
4. Check the alert situation for the Release for Delivery app. You should receive at least one
alert for Release for Delivery. Otherwise, refresh the your browser.
b) To analyze/fix this issue, select the entry with your material T-F1## and choose >.
c) You receive an overview of all sales orders for your material T-F1## and a note that
you have a delay of approximately two days.
6. Execute the necessary steps to fix this issue. Reduce the first order of your customer T-
S50B## form 60 pcs. to 40 pcs, and enhance the confirmed order quantity for the urgent
order of your top customer T-S50A## form 20 pcs to40 pcs. In addition postpone the
delivery creation for the first order
a) To fix this issue, switch to the detailed view, reduce the first order of your customer T-
S50B## form 60 pcs. to 40 pcs.
b) Enhance the confirmed order quantity for the urgent order of your top customer T-
S50A## form 20 pcs to40 pcs.
c) Click for the first order on the icon Postpone to postpone delivery creation. Choose
Publish and Back.
Note:
To undo the status postpone select the order on the view Postponed Items
and press again postpone.
d) Now the status changed. The number of Unprepared is reduced to zero, the number of
Prepared is increased by one.
e) Choose the Prepared icon, select the entry with your product T-F1##, and check the
situation by choosing >.
f) Go back and select the entry with your product T-F1## and choose Release for
Delivery. Now the status changes again. The number of Prepared is reduced by one,
while the number of Released is increased by one.
7. Finally, in the back-end system (for example, using MD04) check if the situation has
changed.
Yes, only the delivery for the urgent order was created, for the other order no delivery was
created.
a) Check the stock/requirement situation using transaction MD04 or via SAP Easy
Access: SAP Menu → Logistics → Production → MRP → Evaluations → MD04 - Stock/
Requirements List.
b) Enter your material T-F1## and plant 1010 and press Enter.
Yes, only the delivery for the urgent order was created, for the other order no delivery
was created.
c) Double-click on your outbound delivery and copy the outbound delivery number.
8. Delete the created delivery for your second order using transaction VL02N or via SAP Easy
Access: Logistics → Logistics Execution → Outbound Process → Goods Issue for
Outbound Delivery → Outbound Delivery → Change → VL02N - Single Document .
a) Enter your outbound delivery number (from the previous step) and press Enter.
b) Select the relevant item line and choose the Delete button.
b) Switch to folder Reason for rejection and assign a Reason for rejection
1. Check/change the strategy group for your material T-F2## in plant 1010 back to 40.
2. Create/copy master data for your product T-F2## from plant 1010 to plant 1030.
Select the following views: Sales Views, Purchasing, MRP Views , Advanced Planning,
General Plant Data/Storage 1, General Plant Data / Storage 2 and the views for
Accounting and take the default settings form plant 1010. Change the Delivering Plant in
the view Sales: sales org. 1 from 1010 to 1030, for the purchasing group maintain the value
0##, switch the Procurement Type to F and deactivate the advanced planning
functionality.
3. As a prerequisite for this exercise, create a purchase requisition using the following values:
Material T-F2##
Plant 1030
Quantity 13 pcs
Delivery Date today +3 weeks
Purchasing Group 0##
5. Check the current stock situation for your material T-F2## using the transaction Stock
Overview
6. Create a sales order for material T-F2## in plant 1010 for your customer T-S50A## about
20 pcs for Friday next week using the following data:
Header:
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Item
Material T-F2##
Order Quantity 20
Plant 1010
Req. Delivery Date Friday, act. week+1
7. Set up the system for an Alternative-Based Confirmation scenario. For this, first configure
a substitution strategy in the fiori frontend system T4N using the following data:
Object Value
Strategy Name S4270_##
Strategy Description Strategy Group ##
Substitution Item Type Force Inline Substitution
Consider Alternatives Always
Alternative Determination FULL_CONFIRMATION
8. Configure an Alternative Control for your material T-F2## in location 1010 and assign
your Substitution Strategy S4270_##.
9. Create a new sales order for your customer T-S50A## and the T-F2## in plant 1010for
your customer T-S50A## for 20 pcs for Friday next week.
Ignore the warning message regarding scheduling issue in plant 1040
Confirm the result of the availability check by pressing Copy
10. On-time-Confirmation - change the settings in your Substitution Strategy accordingly and
create a new order for material T-F2## in plant 1010for your customer T-S50A## about
20 pcs for Friday next week using the following data:
Header:
Order Type OR
Item
Material T-F2##
Order Quantity 20
Plant 1010
Req. Delivery Date Friday, act. week+1
11. Create Customer Order using transaction VA01 or via SAP Easy Access: Logistics → Sales
and Distribution → Order → VA01 → Create.
Header:
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Item
Material T-F2##
Order Quantity 20
Plant 1040
Req. Delivery Date Friday, act. week+1
and press Enter. Confirm the appearing warning message by pressing Enter again.
1. Check/change the strategy group for your material T-F2## in plant 1010 back to 40.
a) Change the material master using transaction MM02 or via SAP Easy Access: SAP
Menu → Logistics → Materials Management → Material
Master → Material → Change → MM02 – Immediately.
Object Value
Material T-F2##
Material Master View MRP3
Plant 1010
Strategy Group 40
2. Create/copy master data for your product T-F2## from plant 1010 to plant 1030.
Select the following views: Sales Views, Purchasing, MRP Views , Advanced Planning,
General Plant Data/Storage 1, General Plant Data / Storage 2 and the views for
Accounting and take the default settings form plant 1010. Change the Delivering Plant in
the view Sales: sales org. 1 from 1010 to 1030, for the purchasing group maintain the value
0##, switch the Procurement Type to F and deactivate the advanced planning
functionality.
a) Create the material master using transaction MM01 or via SAP Easy Access: SAP
Menu → Logistics → Materials Management → Material Master → Material → Create
(General) → MM01– Immediately.
b) Copy the existing material master from plant 1010 using the following values:
Object Value
Material T-F2##
Industry Sector Mechanical Engineering
Material type Finished Product
Object Value
Copy from Material T-F2##
Press Enter.
c) Select Sales Views, MRP-views, General Plant Data/Storage 1, General Plant Data /
Storage 2 and the views for Accounting and press Enter.
Press Enter.
3. As a prerequisite for this exercise, create a purchase requisition using the following values:
Material T-F2##
Plant 1030
Quantity 13 pcs
Delivery Date today +3 weeks
Purchasing Group 0##
a) Create a purchase requisition using transaction ME51N or via SAP Easy Access: SAP
Menu → Logistics → Material Management → Purchasing → Purchase Requisition
→ ME51N - Create using the values form the table above.
Save your settings and leave the transaction.
a) Navigate in the customizing via SAP Customizing Implementation Guide→ Sales and
Distribution → Basic Functions → Availability Check and Transfer of Requirements→
Availability Check → Availability Check with ATP Logic or Against Planning → Configure
Scope of Availability Check
5. Check the current stock situation for your material T-F2## using the transaction Stock
Overview
Plant 1010: 0 pcs, Plant 1020: 12 pcs, Plant 1030: 0 pcs, Plant 1040: 40 pcs
a) Check the current stock situation using transaction MMBE or call the stock overview via
SAP Easy Access: SAP Menu → Logistics → Material Management → Inventory
Management → Environment → Stock → MMBE - Stock Overview using the values
form the table above.
Note the current stock situation and leave the transaction.
6. Create a sales order for material T-F2## in plant 1010 for your customer T-S50A## about
20 pcs for Friday next week using the following data:
Header:
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Item
Material T-F2##
Order Quantity 20
Plant 1010
Req. Delivery Date Friday, act. week+1
a) Create a Sales Order using transaction VA01 or via SAP Easy Access:
Logistics → Sales and Distribution → Order → VA01 → Create.
Header:
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Item
Material T-F2##
Order Quantity 20
Plant 1010
Req. Delivery Date Friday, act. week+1
b) Press Continue and change the plant manually to 1040 and press Enter. Press again
Enter to confirm the warning message
Yes, no pop-up appears, due to the fact that the sales order for T-F2## in plant 1040
gets a full confirmation.
7. Set up the system for an Alternative-Based Confirmation scenario. For this, first configure
a substitution strategy in the fiori frontend system T4N using the following data:
Object Value
Strategy Name S4270_##
Strategy Description Strategy Group ##
Object Value
Substitution Item Type Force Inline Substitution
Consider Alternatives Always
Alternative Determination FULL_CONFIRMATION
Object Value
Strategy Name S4270_##
Strategy Description Strategy Group ##
Substitution Item Type Force Inline Substitution
Consider Alternatives Always
Alternative Determination FULL_CONFIRMATION
8. Configure an Alternative Control for your material T-F2## in location 1010 and assign
your Substitution Strategy S4270_##.
a) Call fiori Configure Alternative Control
b) Press Edit
c) Check/create Control Characteristics by pressing the push button in the upper right
corner and add (if not yet existing) the Material Number with the Ordinal Number 1 and
the Plant with the Ordinal Number 2. Finally press Apply
d) Press Add and assign your material T-F2## in plant 1010 to your Substitution Strategy
S4270_##.
9. Create a new sales order for your customer T-S50A## and the T-F2## in plant 1010for
your customer T-S50A## for 20 pcs for Friday next week.
Ignore the warning message regarding scheduling issue in plant 1040
Confirm the result of the availability check by pressing Copy
The system switches the delivery plant from 1010 to 1040 automatically. The original plant
1010 will be overwritten in the sales order item.
a) Create Customer Order using transaction VA01 or via SAP Easy Access:
Logistics → Sales and Distribution → Order → VA01 → Create.
Header:
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Item
Material T-F2##
Order Quantity 20
Plant 1010
Req. Delivery Date Friday, act. week+1
b) An pop-up Standard Order: Availability control informs you about the changed delivery
plant
10. On-time-Confirmation - change the settings in your Substitution Strategy accordingly and
create a new order for material T-F2## in plant 1010for your customer T-S50A## about
20 pcs for Friday next week using the following data:
Header:
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Item
Material T-F2##
Order Quantity 20
Plant 1010
Req. Delivery Date Friday, act. week+1
a) Call fiori app Configure Substitution Strategy , mark your strategy S4270_## and
press >
b) Press Edit
11. Create Customer Order using transaction VA01 or via SAP Easy Access: Logistics → Sales
and Distribution → Order → VA01 → Create.
Header:
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Item
Material T-F2##
Order Quantity 20
Plant 1040
Req. Delivery Date Friday, act. week+1
and press Enter. Confirm the appearing warning message by pressing Enter again.
1. Maximum Confirmation Earlier - change the substitution Item Type to Force Subitem
Generation and change the settings in your Substitution Strategy
MAX_EARLIER_CONFIRMATION.
2. Create Customer Order using transaction VA01 or via SAP Easy Access: Logistics → Sales
and Distribution → Order → VA01 → Create.
Header:
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Item
Material T-F2##
Order Quantity 20
Plant 1010
Req. Delivery Date Friday, act. week+1
Do you receive a confirmation? What's the difference against the last availability check?
Confirm all warning messages and check the result of your last changes.
Do NOT leave the order!
Did the confirmation situation changed? Explain the result of the last ATP-check!
Note:
In the UI create sales order: overview the items are sorted strictly against plant
number, not against confirmation status!
1. Maximum Confirmation Earlier - change the substitution Item Type to Force Subitem
Generation and change the settings in your Substitution Strategy
MAX_EARLIER_CONFIRMATION.
a) Call fiori app Configure Substitution Strategy , mark your strategy S4270_## and
press >
b) Press Edit
d) In addition switch your settings for the Alternative Determination via F4 Help to
MAX_EARLIER_CONFIRMATION
2. Create Customer Order using transaction VA01 or via SAP Easy Access: Logistics → Sales
and Distribution → Order → VA01 → Create.
Header:
Order Type OR
Sales Organization 1010
Distribution Chanel 10
Division 00
Item
Material T-F2##
Order Quantity 20
Plant 1010
Do you receive a confirmation? What's the difference against the last availability check?
Again plant substitution and full confirmation from plant 1040. But the original item line
still exists (with item category TAPA). The system creates a sub-item.
Yes, now two sub-items exists, one for plant 1020 with a quantity of 10 pcs and one sub-
item for plant 1040 with a confirmed quantity of 40 pcs
Confirm all warning messages and check the result of your last changes.
Do NOT leave the order!
Did the confirmation situation changed? Explain the result of the last ATP-check!
Yes, now the order contains four sub-items, one for plant 1010 with an unconfirmed
quantity of 15 pcs, a second sub-item for 1020 with a confirmed quantity of 12 pcs, a third
sub-item for 1030 with a confirmed quantity of 13 pcs (but with a delay due to the
purchase requisition) and one sub-item for plant 1040 with a confirmed quantity of 40
pcs.
Note:
In the UI create sales order: overview the items are sorted strictly against plant
number, not against confirmation status!
1. Change the order quantity for you existing sales customer order for material T-F3## from
10 to 20 pcs and switch the Sold-To_Party from T-S50A## to T-S50B##.
2. Create a second sales order for your top customer T-S50A## and material T-F3## about
10 pcs. using the following data:
Field Value
Material T-F3##
Order Quantity 10
Req. Delivery Date Friday, act. week+1
What is the result of the ATP check? Could this order be confirmed? Why (not)?
3. Reduce the quantity of the second order for your material T-F3## in plant 1010 and
increase the confirmed quantity of the first order using backorder processing for Material
(CO06).
Object Value
Material T-F3##
Plant 1010
Checking Rule A
4. Change the checking group for the material T-F3## from #2 to 02 and save the changes.
5. Reduce the quantity of the first order and increase the confirmed quantity of the second
order using backorder processing for Material (CO06).
7. Change the checking group for the material T-F3## back from 02 to #2 and save the
changes.
8. Finally, reject all sales orders you for your material T-F3## so that you have only a stock
on hand of 25 PCs.
1. Change the order quantity for you existing sales customer order for material T-F3## from
10 to 20 pcs and switch the Sold-To_Party from T-S50A## to T-S50B##.
a) Call transaction VA02 or navigate in the SAP Easy Access Menu to Logistics → Sales
and Distribution → Sales → Order → VA02 → Change.
b) Type in your sales order number (this is the number of the sales order you created in
the first exercise and press Enter
Note:
The changes of the Sold-To-Party and Ship-To-Party leads to several
system internal checks and changes e.g route detemination, taxes,
shipping condition, etc.
2. Create a second sales order for your top customer T-S50A## and material T-F3## about
10 pcs. using the following data:
Field Value
Material T-F3##
Order Quantity 10
Req. Delivery Date Friday, act. week+1
What is the result of the ATP check? Could this order be confirmed? Why (not)?
The first order receives a confirmation following the principles "first come - first serve".
The second order receives only a partial confirmation of 5 pcs, although its the order from
our top customer.
a) Call transaction VA01 or navigate in the SAP Easy Access Menu to Logistics → Sales
and Distribution → Sales → Order → VA01 → Create.
c) Press Enter.
3. Reduce the quantity of the second order for your material T-F3## in plant 1010 and
increase the confirmed quantity of the first order using backorder processing for Material
(CO06).
Object Value
Material T-F3##
Plant 1010
Checking Rule A
No, because advanced ATP materials cannot be processed with transaction CO06. For
more information, see SAP Note 2642047.
4. Change the checking group for the material T-F3## from #2 to 02 and save the changes.
a) Call transaction MM02 or navigate in the SAP Easy Access Menu to
Logistics → Materials Management → Material Master → Material → Change → MM02
- Immediately.
b) Go to view MRP3 and assign 02 as the checking group for your material.
5. Reduce the quantity of the first order and increase the confirmed quantity of the second
order using backorder processing for Material (CO06).
Yes, it is possible, but carrying out that many manual steps is not very comfortable.
a) Execute backorder processing using transaction CO06 or via SAP Easy Access: SAP
Menu → Logistics → Sales and Distribution → Sales → Backorders → Backorder
Processing → CO06 - Material.
Object Value
Material T-F3##
Plant 1010
Checking Rule A
7. Change the checking group for the material T-F3## back from 02 to #2 and save the
changes.
a) Change the material master for the material T-F3##using transaction MM02 or via SAP
Easy Access: SAP Menu → Logistics → Materials Management → Material
Master → Material → Change → MM02 – Immediately.
c) Change the checking group for the material T-F3## back from 02 to Y2 and save the
changes.
8. Finally, reject all sales orders you for your material T-F3## so that you have only a stock
on hand of 25 PCs.
a) Change your customer order using transaction VA02 or via SAP Easy Access: SAP
Menu → Logistics → Sales and Distribution → Sales → Order → VA02 – Change.
b) Set a reason for rejection, save the order, and leave the transaction.
1. Create four customer orders for your material T-F1## in plant 1010 for Friday +1 week,
using the following data:
Customer T- High 10 0
S50A##
Object Value
Segment Name GAIN_##
Object Value
Segment Name FILL_##
Object Value
Segment Name WIN_##
Object Value
Variant Name Variant_##
Variant Description Variant_##
Use the defined segments from the previous step for the WIN, GAIN, and FILL segments.
4. Execute a simulation of your BOP variant using the App. Configure BOP Variant and check
the result
Could the system reschedule the customer orders (in simulation mode) successfully?
Why (not)?
5. Reduce the existing stock for T-F1## in plant 1010 from 80 to 25 PCs in back-end system
T41
6. Execute again a simulation of your BOP variant using the App. Configure BOP Varaint and
check the result
Could the system reschedule the customer orders successfully? Why (not)?
Could the system reschedule the customer orders successfully? Why (not)?
7. Enhance your existing BOP variant VARIANT_## with a variant for fallback. Therefore
create as the first step a segment using the following data:
Object Value
Variant Name Variant_##_2
Variant Description Variant_## Fallback
9. Assign your fallback back variant VARIANT_##_2 in the header data of your BOP variant
VARIANT_##
10. Execute a simulation of your BOP variant using the App. Configure BOP Varaint and check
the result
Could the system reschedule the customer orders successfully? Why (not)?
Could the system reschedule the customer orders successfully? Why (not)?
Object Value
Job Template ATP: Backorder Processing Default
What is the result of the BOP run? Was the run successful? Why (not)?
13. Check the results for your fourth order for your top customer.
Are the results form Backorder Processing updated in the sales order?
14. Check the updates from back-order processing in the related sales order
1. Create four customer orders for your material T-F1## in plant 1010 for Friday +1 week,
using the following data:
Customer T- High 10 0
S50A##
No, it's not. The system confirms the order strictly following the first come, first served
principle, independently of customer priorities.
c) Press Save.
Object Value
Segment Name GAIN_##
Object Value
Date on which the record was created Ascending
Object Value
Segment Name FILL_##
Object Value
Segment Name WIN_##
b) Choose Create.
c) Create your first BOP segment GAIN_## using the following values
Object Value
Segment Name GAIN_##
d) Define additional two BOP segments in the same way using the following data for FILL
and WIN.
For FiLL use the following values:
Object Value
Segment Name FILL_##
Object Value
Segment Description FILL_##
Object Value
Segment Name WIN_##
Object Value
Variant Name Variant_##
Variant Description Variant_##
Use the defined segments from the previous step for the WIN, GAIN, and FILL segments.
a) Choose the Configure BOP Variant tile.
b) Choose +.
Object Value
Variant Name Variant_##
Variant Description Variant_##
e) Choose Add to Win from the dropdown list on the top right of this page and assign
the segment WIN_##.
f) Choose Add to Gain from the dropdown list on the top right of this page and assign
the segment GAIN_##.
g) Choose Add to Lose from the dropdown list on the top right of this page and assign
the segment FILL_##.
4. Execute a simulation of your BOP variant using the App. Configure BOP Variant and check
the result
Could the system reschedule the customer orders (in simulation mode) successfully?
Why (not)?
Yes, the system rescheduled the orders regarding the defined BOP variant.
a) On the screen Configure BOP Variant mark your variant Variant_## and click on > on
the very right side.
b) Press on Simulate on the top right side of your variant. You receive a system
message that has been scheduled in simulation mode.
d) Click twice on > at the very right side of BOP variant Variant_## to receive detailed
information of your last simulation.
Could the system reschedule the customer orders successfully? Why (not)?
Yes, the system rescheduled the orders regarding the defined BOP variant. All your
orders receive a full confirmation except your first order. This order only received a
partial confirmation.
5. Reduce the existing stock for T-F1## in plant 1010 from 80 to 25 PCs in back-end system
T41
a) Call transaction MI10 or navigate in the SAP Menu to Materials
Management → Physical Inventory → Difference → MI10 - Enter W/o Document
Reference.
b) Choose plant 1010 and storage location 101A and press Enter.
c) Enter T-F1## for the material description and 25 for the quantity.
6. Execute again a simulation of your BOP variant using the App. Configure BOP Varaint and
check the result
Could the system reschedule the customer orders successfully? Why (not)?
No, the job failed and has the processing status Processing Issues. This is normal system
behavior following the confirmation strategy WIN and GAIN.
a) On the screen Configure BOP Variant mark your variant Variant_## and click on > on
the very right side.
b) Press on Simulate on the top right side of your variant. You receive a system
message that has been scheduled in simulation mode.
d) Click twice on > at the very right side of BOP variant Variant_## to receive detailed
information of your last simulation.
Could the system reschedule the customer orders successfully? Why (not)?
No, the job failed and has the processing status Processing Issues. This is normal system
behavior following the confirmation strategy WIN and GAIN.
7. Enhance your existing BOP variant VARIANT_## with a variant for fallback. Therefore
create as the first step a segment using the following data:
b) Choose +.
c) Maintain your BOP segment accordingly to the values provided in the table.
Object Value
Variant Name Variant_##_2
Variant Description Variant_## Fallback
b) Choose +.
Object Value
Variant Name Variant_##_2
Variant Description Variant_## Fallback
d) Choose Add to Win from the drop down list on the top right of this page and assign
the segment WIN_##.
e) Save your settings and go back to the view Configure BOP Variant.
g) Press Save and press one time < to go back to the view Configure BOP Variant.
9. Assign your fallback back variant VARIANT_##_2 in the header data of your BOP variant
VARIANT_##
a) Choose the Configure BOP Variant tile.
b) In the fiori App. Configure BOP Variantselect your variant VARIANT_## and choose >.
d) Choose Edit Header and assign your fallback variant VARIANT_##_2 in the
Configuration options area.
10. Execute a simulation of your BOP variant using the App. Configure BOP Varaint and check
the result
Could the system reschedule the customer orders successfully? Why (not)?
Yes, the system now (re-) confirms the orders accordingly to your setup. The order for
your top customer (WIN section) received a confirmation although not all orders could be
confirmed in the WIN and GAIN section.
a) On the screen Configure BOP Variant mark your variant Variant_## and click on > on
the very right side.
b) Press on Simulate on the top right side of your variant. You receive a system
message that has been scheduled in simulation mode.
In case the simulation isn't finished yet the Processing Status is In Processing. In this
case pree Refresh until the status changed to No Processing Issues or to Processing
Issues
d) Click twice on > at the very right side of BOP variant Variant_## to receive detailed
information of your last simulation.
Could the system reschedule the customer orders successfully? Why (not)?
Yes, the system now (re-) confirms the orders accordingly to your setup. The order for
your top customer (WIN section) received a confirmation although not all orders could be
confirmed in the WIN and GAIN section.
Object Value
Job Template ATP: Backorder Processing Default
b) Choose Create and maintain a new job using the following data:
Object Value
Job Template ATP: Backorder Processing
Default
Object Value
Variant Name VARIANT_##
Force Log activate
Object Value
Granularity All
Simulation Mode De-Activated
What is the result of the BOP run? Was the run successful? Why (not)?
The job ends with a Warning log. To get more detailed information click twice on the
warning and check the warning message. The warning occur due to an exception.
c) In the resulting list, click on the line for your the product T-F1## or choose > to check
the results of your job.
d) Go back using the Back button and check the results of the fallback runs
Could the system reschedule the customer orders successfully? Why (not)?
Yes, the system now (re-) confirms the orders accordingly to your setup. The order for
your top customer (WIN section) received a confirmation, all other orders not.
13. Check the results for your fourth order for your top customer.
Are the results form Backorder Processing updated in the sales order?
Yes, now the sales order for the top customer received a confirmation.
a) Call transaction VA02 or navigate in the SAP Easy Access Menu to Logistics → Sales
and Distribution → Sales → Order → VA02 → Change.
14. Check the updates from back-order processing in the related sales order
a) Type in the sales order number for your top customer noted in step 1 and press Enter