PT Report of Hit Ace 28-03-2022-11423
PT Report of Hit Ace 28-03-2022-11423
PT Report of Hit Ace 28-03-2022-11423
Date of REPORT No
3/28/2022 GPTI-NDE-PT-11423 Page : 01 0F 02
Examination: & Rev no :
Client :
HIT ACE Material : SA 516 Gr.60N
# LIQUID PENETRANT LEAK TEST WAS CARRIED OUT ON ALL TANK SUMP WELDS AFTER THE ROOT PASSES.
# TOTAL QUANTITY - 8 SUMP.
# Evaluation done 1 hour after the application of developer on weld side and other side penetrant. .
# FOUND ACCEPTABLE AS PER SPECIFICATION.
ACCEPT REJECT
TEST RESULT
TECHNICIAN : AKHIL R KRISHNAN CLIENT REP: AI/TPI:
LEVEL : LEVEL II NAME : NAME :
SIGNATURE : SIGNATURE : SIGNATURE :
NDT RESULT
SL.NO. TANK NO. JOINT NAME DRG.NO. JOINT NO. WELDER NO. QUANTITY
REFERANCE
ACCEPT REJECT
VN2154-101-A-
4 31-TK-001-A SUMP NECK BUTT JOINT SNJ1 W.NO:037/036 1 ✓
DGN-0361-01
VN2154-101-A-
8 31-TK-001-B SUMP NECK BUTT JOINT SNJ1 W.NO:037/036 1 ✓
DGN-0361-01
VN2154-101-A-
12 31-TK-002 SUMP NECK BUTT JOINT SNJ1 W.NO:037/036 2 ✓
DGN-0409-01
PICTURES