This liquid penetrant testing report summarizes the results of inspections on welds from the Design and Construction of KIZAD Gas Network project. Three welds were inspected - a fillet weld on Valve Pit-1, a fillet weld on Valve Pit-2, and a fillet weld on Valve Pit-3. The material was carbon steel and the welds were inspected according to ASTM E709 standards. No relevant indications were found on any of the welds, so all three passed the inspection and were deemed acceptable according to AWS D1.1 2020 standards. The inspection was performed by Sievert Emirates Inspection LLC for ALNASR Contracting company LLC on the K
This liquid penetrant testing report summarizes the results of inspections on welds from the Design and Construction of KIZAD Gas Network project. Three welds were inspected - a fillet weld on Valve Pit-1, a fillet weld on Valve Pit-2, and a fillet weld on Valve Pit-3. The material was carbon steel and the welds were inspected according to ASTM E709 standards. No relevant indications were found on any of the welds, so all three passed the inspection and were deemed acceptable according to AWS D1.1 2020 standards. The inspection was performed by Sievert Emirates Inspection LLC for ALNASR Contracting company LLC on the K
This liquid penetrant testing report summarizes the results of inspections on welds from the Design and Construction of KIZAD Gas Network project. Three welds were inspected - a fillet weld on Valve Pit-1, a fillet weld on Valve Pit-2, and a fillet weld on Valve Pit-3. The material was carbon steel and the welds were inspected according to ASTM E709 standards. No relevant indications were found on any of the welds, so all three passed the inspection and were deemed acceptable according to AWS D1.1 2020 standards. The inspection was performed by Sievert Emirates Inspection LLC for ALNASR Contracting company LLC on the K
This liquid penetrant testing report summarizes the results of inspections on welds from the Design and Construction of KIZAD Gas Network project. Three welds were inspected - a fillet weld on Valve Pit-1, a fillet weld on Valve Pit-2, and a fillet weld on Valve Pit-3. The material was carbon steel and the welds were inspected according to ASTM E709 standards. No relevant indications were found on any of the welds, so all three passed the inspection and were deemed acceptable according to AWS D1.1 2020 standards. The inspection was performed by Sievert Emirates Inspection LLC for ALNASR Contracting company LLC on the K
Download as XLSX, PDF, TXT or read online from Scribd
Download as xlsx, pdf, or txt
You are on page 1of 1
CLIENT : ABU DHABI PORTS
SIEVERT EMIRATES INSPECTION LLC Contractor: Al Nasr Contracting
PO BOX: 54069, Abu Dhabi, UAE Tel: +971 2 5506781/82, company LL.C Fax: +971 2 5506784 PROJECT : Design and Email: sievertabudhabi.ae@ae.bureauveritas.com Website : www.sievert.in Construction of KIZAD Gas Project: Network –Phase 1
REPORT NO. : ANC-PL-PT-001
DATE OF EXAMINATION 13/01/2022
LIQUID PENETRANT TESTING REPORT
PROJECT : Design and Construction of KIZAD Gas Network –Phase 1 Any Major Report / Alteration Carried on the equipment: N/A SITE: AL NASR OG 119 Kizad Site Office PRODUCTION NO. :2201-236 Procedure & Rev.: 2201-236-V8-7300-00195 Revision 0 Deviation / Additions / Exclusions of the Procedure if any:N/A ANC-2201-236-STR-WPS-002
Material Type & Dimension: CS Examination Standard: ASTM – E – 709
Purpose of test : N/A SPECIFICATION: ASTM – E – 709 Edition
Test piece designation:N/A Acceptance Criteria:AWS D1.1 2020 Edition
1. The inspection results relate exclusively to the work ordered or the object(s) or the lot inspected as above. 2. The inspection report shall not be reproduced except in full without the approval of the Sievert Emirates and its client;