Inspection Release Note (General) : Verification of Completion Yes No N/A Comments
Inspection Release Note (General) : Verification of Completion Yes No N/A Comments
Inspection Release Note (General) : Verification of Completion Yes No N/A Comments
ITEM INSPECTED : J-4 LOWER JACKET LEG-A (BAY-1) ALONG WITH ANODES (EXCLUDING NODES)
n Additional NDT such as Hardness, PMI, Ferrite testing completed and accepted. ✘
n Final Preservation Completed (Lay up, Nitrogen Purging, Covering Protection etc.) ✘
n All Inspection Test Record (ITR) Certifcates signed off. ✘ Anode ITR's
Released for :
✘
Painting Testing Released for Erection Transfer to Other facility
REMARKS : Coating shall be performed on Weld Joint Flush Ground area inside
Punch Comments:-N/A
CONTRACTOR EMPLOYER
LEL PRODUCTION LEL QC
(Seaway 7) (Seagreen)
NAME : JESWIN JOHN
DESIGNATION : QC Inspector
SIGNATURE :
Form : 20/2101/LGQCF021
Rev. : 0
Date : June. 2020