Quality Plan
Quality Plan
Quality Plan
PLANT TECH
Date 10/10/2022
PT/QCR/13-REV-00
QUALITY PLAN
Page 1 of 20
QUALITY PLAN 2022
PLANT TECH
Date 10/10/2022
PT/QCR/13-REV-00
:
1. INTRODUCTION
3. QUALITY SYSTEM
3.6 PLANNING
3.12 INFRASTUCTURE
Page 2 of 20
QUALITY PLAN 2022
PLANT TECH
Date 10/10/2022
PT/QCR/13-REV-00
3.17 PURCHASING
Page 3 of 20
QUALITY PLAN 2022
PLANT TECH
Date 10/10/2022
PT/QCR/13-REV-00
1. INTRODUCTION
This quality plan is based upon the PLANT-TECH “Quality
Plans” and sets out the specific quality practices and resources relevant
to work carried out by Plant-tech, Jubail, Kingdom of Saudi Arabia.
This quality plan has been prepared taking into account the specific
nature of the scope of work set out in contract documentation, JUBAIL,
and Kingdom of Saudi Arabia.
This quality plan covers all of the major tasks and identifies all
witness and hold points for inspection. It includes details of the
PLANT-TECH quality control system, including references to
procedures for final inspection and completion of scope.
Page 4 of 20
QUALITY PLAN 2022
PLANT TECH
Date 10/10/2022
PT/QCR/13-REV-00
2.3 QC Responsibility:
• To make the quality and inspection and test plan for all activities to
be done in work area.
• To attend meetings with Quality Control Department to update them
with our inspection test plan
• To maintain the record of all activities going on in the sight in a
professional way (Soft and Hard form)
• Once the job is completed for some particular equipment, some
additional records are to be maintained i.e., inspection report from
inspection team, Box-Up Certificates (Plant-Tech Format or Format
Page 6 of 20
QUALITY PLAN 2022
PLANT TECH
Date 10/10/2022
PT/QCR/13-REV-00
3. Quality system:
The PLANT-TECH Quality system has been designed to comply
with ISO 9001:2015 standards. The following sections provide a brief
description of the Plant-tech Quality system.
Page 7 of 20
QUALITY PLAN 2022
PLANT TECH
Date 10/10/2022
PT/QCR/13-REV-00
Page 8 of 20
QUALITY PLAN 2022
PLANT TECH
Date 10/10/2022
PT/QCR/13-REV-00
3.6 Planning
Quality objectives have been established and are regularly
reviewed. Any changes to objectives or the quality management system
are carried out according to a pre-determined plan of action.
Page 9 of 20
QUALITY PLAN 2022
PLANT TECH
Date 10/10/2022
PT/QCR/13-REV-00
Page 10 of 20
QUALITY PLAN 2022
PLANT TECH
Date 10/10/2022
PT/QCR/13-REV-00
3.12 Infrastructure
The infrastructure requirements (Plant, workspace, tools, and
equipment, information, transport, technology and support services)
that are necessary for our work are defined by committee, management
Quality Review Committee, as well as through Management Meetings.
It is crucial that the existing infrastructure is maintained and that
improvements to the infrastructure are identified and acquired when the
need is identified.
Page 11 of 20
QUALITY PLAN 2022
PLANT TECH
Date 10/10/2022
PT/QCR/13-REV-00
Page 12 of 20
QUALITY PLAN 2022
PLANT TECH
Date 10/10/2022
PT/QCR/13-REV-00
3.17 Purchasing
Purchased product may be included in, or form a part of a Plant-
Tech product. If essential that supplied product is controlled, monitored
and verified. An effective purchasing process has been developed that
ensures the purchased product and services meet requirements. The
purchasing process includes, among other things, controls to verify the
product or service against defined needs, monitoring the performance of
suppliers and vendors, ensuring the timely provision of product or
service and retention or records of supplier’s capability.
All purchased products are handled, stored and protected in
accordance with the manufacturer’s instructions. Product that is
produced or manufactured within Plant-Tech is handled, packed, stored
and delivered so that damage, deterioration or misuse is prevented.
Inspections are also carried out for equipment’s if specified.
Page 13 of 20
QUALITY PLAN 2022
PLANT TECH
Date 10/10/2022
PT/QCR/13-REV-00
Page 14 of 20
QUALITY PLAN 2022
PLANT TECH
Date 10/10/2022
PT/QCR/13-REV-00
5. APPROVAL:
A permit to Work system will be in operation on facilities. Plant-
Tech personnel shall acquaint themselves with the permit to work
system and will comply with requirements. Permit receivers shall be
appointed and shall attend applicable training courses and seminars.
Applications for Permits to work will be made in sufficient time
so as not to delay the work. The applicable Permit to work shall be
displayed at the location of the work.
5.1 FORMS:
Attached are several important forms that form a part of the quality
control system that will be used on site. However, there are other forms
that are too numerous to be listed in this quality plan. All document
required for the project needed to be finalized by client and contractor
prior execution of the work. Project Manager and the Project
Supervisors shall be issued with all of the company forms to be used as
appropriate.
Page 15 of 20
QUALITY PLAN 2022
PLANT TECH
Date 10/10/2022
PT/QCR/13-REV-00
Page 16 of 20
QUALITY PLAN 2022
PLANT TECH
Date 10/10/2022
PT/QCR/13-REV-00
Page 17 of 20
QUALITY PLAN 2022
PLANT TECH
Date 10/10/2022
PT/QCR/13-REV-00
Page 18 of 20
QUALITY PLAN 2022
PLANT TECH
Date 10/10/2022
PT/QCR/13-REV-00
5.2 RECORDS:
1 WPS/PQR PT/QCR/03
2 HYDRO TEST INSPECTION REPORT PT/QCR/04
3 WELDERS TEST RECORD PT/QCR/05
BOLT TORQUING AND TENSIONING
4 PT/QCR/06
CERTIFICATES
5 EQUIPMENT INSPECTION REPORT PT/QCR/07
6 BOXUP CERTIFICATE PT/QCR/08
7 FINAL WELDING VISUAL REPORT PT/QCR/09
8 FIT-UP REPORT PT/QCR/10
9 RADIOGRAPHY RECORD PT/QCR/11
10 RADIOGRAPHY REQUEST PT/QCR/12
11 QUALITY PLAN PT/QCR/13
12 INSPECTION AND TEST PLAN PT/QCR/14
13 QAQC DOSSIER PT/QCR/16
14 DOCUMENT TRANSMITTAL FORM PT/QCR/17
15 DPT REPORT or 3rd Party Report PT/QCR/21
16 PWHT REPORT (3rd Party) -
17 OBSERVATION SHEET PT/QCR/23
FLANGE INTEGRITY AND TRACKING
18 PT/QCR/24
(FIAT)
INSPECTION CHECKLIST FOR
19 PT/QCR/34
ISOLATION DEVICES
20 INSPECTION CHECKLIST FOR PRD PT/QCR/35
Page 19 of 20
QUALITY PLAN 2022
PLANT TECH
Date 10/10/2022
PT/QCR/13-REV-00
Page 20 of 20