Mir For Aluminium Ladder
Mir For Aluminium Ladder
Mir For Aluminium Ladder
Sl.
DESCRIPTION Unit Qty Remarks
No.
A
B
QIBLA
-Contractor to coordinate with architectural drawings for ladder setting out, C
D
-All connection details to be as per the latest approved design calculation. H POLOR
J
ABU DHABI OCEAN
-Steel framing,arrangement,members sizes and setting out to be fully K
L
M
OCEAN
coordinated with the latest design IFC drawings and BIM models and the N
P
RFI responses. R
S
T
BLUE WORLD
-To be coordinated and read in conjunction with the latest approved GA U
V
SEA OF
and builders work drawings in coordination with the concrete elements, W
X
DELIGHT TROPICAL
levels, MEP platforms, MEP openings etc.
Y
Z ENDLESS OCEAN
AA
OCEAN
-Connection name/tag to be shown on plans and elevations/sections. AB
AC
AD
AE
AF
AG
AH
GENERAL NOTES :
D' D'
1
Approved Approved As Noted Revise and Resubmit
AECOM: N.Richie
Reviewed by:...................................................................................................................................................
22/03/2023
RE Sig:.......................................................................................Date:............................................................
Structure:_____________________ MEP:_____________________
10000
A
5 Architectural:__________________ ALSS:____________________
267
Facade:______________________ VT:______________________
50
53
B 0
50 CONTRACTOR CERTIFICATION :
THE CONTRACTOR CERTIFIES THAT IT HAS PREPARED AND REVIEWED THIS SHOP DRAWING (OR AS-BUILT) IN
1 ACCORDANCE WITH THE CONTRACT DOCUMENTS (AND ALL VARIATIONS THERETO). SPECIFICALLY, THE
CONTRACTOR ATTESTS THAT IT HAS COORDINATED WITH ALL RELATED WORKS AND TRADES, PRODUCT DATA,
SEA WATER DISCHARGE SAMPLES, OTHER SUBMITTALS AND HAS VERIFIED ALL DIMENSIONS, QUANTITIES, FIELD DIMENSIONS TO EXISTING
20
WETLAND FLOW CONTROL 75 WORKS AND/OR WORKS TO BE INSTALLED AND OTHER ATTRIBUTES INCLUDING TOLLERANCE, CLEARANCE,
21
0
FABRICATION PROCESS AND TECHNIQUES OF CONSTRUCTION IN FULL COMPLIANCE WITH THE CONTRACT
DOCUMENTS.
DISTRIBUTION CHAMBER 1
...................................................
NAME
B
................................................... ...................................................
DATE AUTHORIZED SIGNATURE
EMPLOYER: LICENSOR:
C' C'
1 MAIN CONTRACTOR: SUB CONTRACTOR:
20
UNITED STEEL WORKS LLC
0
KHIA-5, 39a
75 KIZAD
26 PO Box No. 93026, ABU DHABI, UAE
Tel.+971 25868930
B ALEC Engineering and Conreacting L.L.C.
P.O. Box 27639 Dubai U.A.E.
1 Tel: 04-429 0599 Fax: 04-429 0216
0 PROJECT NAME:
50 50
53
SEAWORLD ABU DHABI
75
21 B
THIS DOCUMENT CONTAINS INTELLECTUAL PROPERTY MATERIAL, CONFIDENTIAL
A INFORMATION AND/OR PROPRIETARY INFORMATION OF SEAWORLD PARKS &
ENTERTAINMENT INTERNATIONAL, INC. AND MIRAL ASSET MANAGEMENT LLC
SECTOR NO. YS 6 PLOT NO. C1
10 11
STRUCTURES
DRAWING NUMBER: REVISION
1
TP9-USW-051000-TO2A -DG-ST- 310006 A1
4 RETRACTABLE LADDER RAILING TP9-ACM-010000-BB0A-SK-AR-000663 C0
3 TYPICAL LADDER DETAILS - SHEET 1 OF 2 TP9-ACM-010000-BB0A-DG-AR-560240 C2
DATE SHEET SCALE DRAWN BY CHECKED BY APPROVED BY
2 SEAWATER DISCHARGE WETLAND FLOW CONTROL DISTRIBUTION CHAMBER TP9-ACM-249000-XX9A-DG-SW-445006 C0 ALE-TRANSMIT-118390
1 DESIGN CALCULATION OF ALUMINUM LADDER TP9-USW-051000-DE-000008 A0 1 SEAWATER DISCHARGE WETLAND FLOW CONTROL CHAMBER ISOMETRIC 3D VIEW TP9-ACM-249000-XX9A-DG-SW-445007 C0 ALE-TRANSMIT-118390
24/02/2023 A0 As indicated MSK NS NS
SI No DRAWING TITLE DRAWING NO REV SI No DRAWING TITLE DRAWING NO REV SI No DRAWING TITLE DRAWING NO REV TRANSMITTAL SI No DRAWING TITLE DRAWING NO REV TRANSMITTAL SI No DRAWING TITLE DRAWING NO REV TRANSMITTAL
KEY PLAN N
Arch comments: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41
-Contractor to coordinate with architectural drawings for ladder setting out, SAFETY POST ASSEMBLY B
C
D
QIBLA
-All connection details to be as per the latest approved design calculation. H POLOR
-Steel framing,arrangement,members sizes and setting out to be fully "LU-4" TYPE FROM BILCO J
K
L
M
ABU DHABI
OCEAN
OCEAN
coordinated with the latest design IFC drawings and BIM models and the
1
N
P
RFI responses. R
S
T
BLUE WORLD
-To be coordinated and read in conjunction with the latest approved GA U
V
SEA OF
and builders work drawings in coordination with the concrete elements, W
X
DELIGHT TROPICAL
levels, MEP platforms, MEP openings etc.
Y
Z ENDLESS OCEAN
1 OCEAN
AA
150
150
GENERAL NOTES :
1 . DO NOT SCALE FROM THE DRAWINGS.
ROOF LEVEL 2. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS IN METRES
450
UNLESS NOTED OTHERWISE.
4500 mm 3. ALL STEELS ARE ALUMINUM OF GRADE "AA1100" AND MILL FINISH (UNO)
300
300
325
50
BIM MODEL REFERENCE:
1. TP9-ALE-032000-BB0A-MB-ST-MANTA COASTER THEMING
175
4mm THICK 2. TP9-USW-051000-XI0A-MB-ST
50
CAP PLATES
937
(7 RUNGS AT 300mm)
TYP 10mm THICK
04 04 BENT PLATE
LEGEND: What this empty
2625
legend is for?
50
2100
SSL - STRUCTURAL SLAB LEVEL
2475
FFL - FINISHED FLOOR LEVEL
2325
2475
TOC - TOP OF CONCRETE
CONN. PLATE
50
AECOM - APPROVAL STAMP
RHS100*50*5.0
LADDER POST Approved Approved As Noted Revise and Resubmit
938
TYP AECOM: N.Richie
Reviewed by:...................................................................................................................................................
03 03 22/03/2023
RE Sig:.......................................................................................Date:............................................................
50
REVIEWED FOR COORDINATION :
1875 mm
200
300
50
Architectural:__________________ ALSS:____________________
CONTRACTOR CERTIFICATION :
THE CONTRACTOR CERTIFIES THAT IT HAS PREPARED AND REVIEWED THIS SHOP DRAWING (OR AS-BUILT) IN
ACCORDANCE WITH THE CONTRACT DOCUMENTS (AND ALL VARIATIONS THERETO). SPECIFICALLY, THE
CONTRACTOR ATTESTS THAT IT HAS COORDINATED WITH ALL RELATED WORKS AND TRADES, PRODUCT DATA,
SAMPLES, OTHER SUBMITTALS AND HAS VERIFIED ALL DIMENSIONS, QUANTITIES, FIELD DIMENSIONS TO EXISTING
WORKS AND/OR WORKS TO BE INSTALLED AND OTHER ATTRIBUTES INCLUDING TOLLERANCE, CLEARANCE,
FABRICATION PROCESS AND TECHNIQUES OF CONSTRUCTION IN FULL COMPLIANCE WITH THE CONTRACT
................................................... ...................................................
DATE AUTHORIZED SIGNATURE
EMPLOYER: LICENSOR:
35
Tel: 04-429 0599 Fax: 04-429 0216
120
50
PROJECT NAME:
70
02 02
70
SEAWORLD ABU DHABI
50
EMBED
35
70
100
ANCHOR RODS
STRUCTURES
DRAWING NUMBER: REVISION
1
TP9-USW-051000-TO2A -DG-ST- 310007 A1
4 RETRACTABLE LADDER RAILING TP9-ACM-010000-BB0A-SK-AR-000663 C0
3 TYPICAL LADDER DETAILS - SHEET 1 OF 2 TP9-ACM-010000-BB0A-DG-AR-560240 C2
DATE SHEET SCALE DRAWN BY CHECKED BY APPROVED BY
2 SEAWATER DISCHARGE WETLAND FLOW CONTROL DISTRIBUTION CHAMBER TP9-ACM-249000-XX9A-DG-SW-445006 C0 ALE-TRANSMIT-118390
1 DESIGN CALCULATION OF ALUMINUM LADDER TP9-USW-051000-DE-000008 A0 1 SEAWATER DISCHARGE WETLAND FLOW CONTROL CHAMBER ISOMETRIC 3D VIEW TP9-ACM-249000-XX9A-DG-SW-445007 C0 ALE-TRANSMIT-118390
24/02/2023 A0 As indicated MSK NS NS
SI No DRAWING TITLE DRAWING NO REV SI No DRAWING TITLE DRAWING NO REV SI No DRAWING TITLE DRAWING NO REV TRANSMITTAL SI No DRAWING TITLE DRAWING NO REV TRANSMITTAL SI No DRAWING TITLE DRAWING NO REV TRANSMITTAL
KEY PLAN N
Arch comments: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41
A
B
QIBLA
-Contractor to coordinate with architectural drawings for ladder setting out, C
D
-All connection details to be as per the latest approved design calculation. H POLOR
J
ABU DHABI OCEAN
-Steel framing,arrangement,members sizes and setting out to be fully K
L
M
OCEAN
coordinated with the latest design IFC drawings and BIM models and the N
P
RFI responses. R
S
T
BLUE WORLD
-To be coordinated and read in conjunction with the latest approved GA U
V
SEA OF
and builders work drawings in coordination with the concrete elements, W
X
DELIGHT TROPICAL
levels, MEP platforms, MEP openings etc.
Y
Z ENDLESS OCEAN
AA
OCEAN
-Connection name/tag to be shown on plans and elevations/sections. AB
AC
AD
AE
AF
AG
AH
EMBED
100
LEGEND: What this empty
(LAST RUNG TO TOP OF LADDER POST)
150
AECOM - APPROVAL STAMP
50
200
CODE A CODE B CODE C
Ø20mm ROD
RUNGS RHS100*50*5.0 Approved Approved As Noted Revise and Resubmit
LADDER POST
5mm THICK AECOM: N.Richie
Reviewed by:...................................................................................................................................................
100
1120 (44")
BOLTS
500 REVIEWED FOR COORDINATION :
Structure:_____________________ MEP:_____________________
1
Facade:______________________ VT:______________________
SECTION : 03 - 03
( SCALE = 1:5 )
CONTRACTOR CERTIFICATION :
THE CONTRACTOR CERTIFIES THAT IT HAS PREPARED AND REVIEWED THIS SHOP DRAWING (OR AS-BUILT) IN
ACCORDANCE WITH THE CONTRACT DOCUMENTS (AND ALL VARIATIONS THERETO). SPECIFICALLY, THE
5mm THICK CONTRACTOR ATTESTS THAT IT HAS COORDINATED WITH ALL RELATED WORKS AND TRADES, PRODUCT DATA,
SAMPLES, OTHER SUBMITTALS AND HAS VERIFIED ALL DIMENSIONS, QUANTITIES, FIELD DIMENSIONS TO EXISTING
WORKS AND/OR WORKS TO BE INSTALLED AND OTHER ATTRIBUTES INCLUDING TOLLERANCE, CLEARANCE,
BRACKET FABRICATION PROCESS AND TECHNIQUES OF CONSTRUCTION IN FULL COMPLIANCE WITH THE CONTRACT
DOCUMENTS.
...................................................
NAME
................................................... ...................................................
"U" BOLT / DATE AUTHORIZED SIGNATURE
Ø20mm ROD 1
RUNGS
50
PROJECT MANAGER: CONSULTANT:
50
TYP
RHS100*50*5.0
LADDER POST
MAIN CONTRACTOR: SUB CONTRACTOR:
TO2A
SHOP DRAWING REF:- ABBREVATIONS & SYMBOLS LEGEND NOTES RFI REF:- IFC DRAWING REF:- DISCIPLINE:
STRUCTURES
DRAWING NUMBER: REVISION
1
TP9-USW-051000-TO2A -DG-ST- 310008 A0
4 RETRACTABLE LADDER RAILING TP9-ACM-010000-BB0A-SK-AR-000663 C0
3 TYPICAL LADDER DETAILS - SHEET 1 OF 2 TP9-ACM-010000-BB0A-DG-AR-560240 C2
DATE SHEET SCALE DRAWN BY CHECKED BY APPROVED BY
2 SEAWATER DISCHARGE WETLAND FLOW CONTROL DISTRIBUTION CHAMBER TP9-ACM-249000-XX9A-DG-SW-445006 C0 ALE-TRANSMIT-118390
1 DESIGN CALCULATION OF ALUMINUM LADDER TP9-USW-051000-DE-000008 A0 1 SEAWATER DISCHARGE WETLAND FLOW CONTROL CHAMBER ISOMETRIC 3D VIEW TP9-ACM-249000-XX9A-DG-SW-445007 C0 ALE-TRANSMIT-118390
24/02/2023 A0 As indicated MSK NS NS
SI No DRAWING TITLE DRAWING NO REV SI No DRAWING TITLE DRAWING NO REV SI No DRAWING TITLE DRAWING NO REV TRANSMITTAL SI No DRAWING TITLE DRAWING NO REV TRANSMITTAL SI No DRAWING TITLE DRAWING NO REV TRANSMITTAL
Fitup inspection report
United Steel Works LLC
Project: Sea world Client:‐ ALEC Report No:‐ USW‐ALEC‐FT‐001 Date: 01.04.2023
ITEM : ‐ Aluminium ladder
Joint
Sl No Material. (Item / part No.) Thickness Weld Type Root Gap Bevel Angle Alignment Straightness Remarks
Number
Note:
Name Niaz shanavaz
Sign
Date
01.04.2023
401‐USW‐QC‐FR‐008
Weld Visual &
NDT Inspection Report
Project: SEA WORLD Client:‐ ALEC Report No:‐ USW‐ALEC‐WIR‐001 Date 03.04.2023
ITEM : Aluminium Ladder
Material Weld Type
Sl No Thickness Joint Number Welder No WPS No Remarks
(Item or Part No.)
Remarks:
Sign
Date
03.04.2023
401‐USW‐QC‐FR‐005
MATERIAL SUBMITTAL
MATERIAL DETAILS
Material Name Aluminium ladder
Material Type Aluminium rod,Flat bar, Rectangular Hollow Section
CSI Code | Discipline 055000 Metal fabrication
Model | Dimension
The Contractor certifies that the materials submitted have been reviewed and are in accordance with the contract drawings and specifications, except as otherwise stated.
ORIGINATOR’S INFORMATION
REVIEWED AND APPROVED BY GENERAL
REQUESTED BY: REVIEWED AND RECOMMENDED BY:
CONTRACTOR FOR ISSUE
Distribution