This document outlines the planned activities for improving and extending a water supply system in Rasul Nagar. It lists over 20 sub-activities involved in the distribution network project, including dismentling existing pipes and structures, excavation, laying new HDPE pipes of various diameters, concrete pouring, restoration work, valve chamber construction, masonry work, and installation of valves and hydrants. The final activities include painting, lettering, testing and commissioning once the extension and improvements are completed.
This document outlines the planned activities for improving and extending a water supply system in Rasul Nagar. It lists over 20 sub-activities involved in the distribution network project, including dismentling existing pipes and structures, excavation, laying new HDPE pipes of various diameters, concrete pouring, restoration work, valve chamber construction, masonry work, and installation of valves and hydrants. The final activities include painting, lettering, testing and commissioning once the extension and improvements are completed.
This document outlines the planned activities for improving and extending a water supply system in Rasul Nagar. It lists over 20 sub-activities involved in the distribution network project, including dismentling existing pipes and structures, excavation, laying new HDPE pipes of various diameters, concrete pouring, restoration work, valve chamber construction, masonry work, and installation of valves and hydrants. The final activities include painting, lettering, testing and commissioning once the extension and improvements are completed.
This document outlines the planned activities for improving and extending a water supply system in Rasul Nagar. It lists over 20 sub-activities involved in the distribution network project, including dismentling existing pipes and structures, excavation, laying new HDPE pipes of various diameters, concrete pouring, restoration work, valve chamber construction, masonry work, and installation of valves and hydrants. The final activities include painting, lettering, testing and commissioning once the extension and improvements are completed.
Improvement and Extension of Water Supply System Plan Vs Actual 09-Jul-23 12:57
Activity ID Activity Name
WS Improvement and Extension
Extensio of Water Supply System WS.1 Distribution Network of Rasul Nagar WS.1.1 Dismentling work Pipe Line WS.1.1.1 Dismentling of PCC 1:2:4 WS.1.1.2 Dismentling & Removing o of Road Metalling and Pavement WS.1.1.3 Dismentling of Brick or Flagged Fla Flooring WS.1.1.4 Dismentling of RCC WS.1.2 Earth Work WS.1.2.1 Excavation of Trenches WS.1.2.2 Supply and Filling Sand WS.1.3 Laying of HDPE Pipe cutting/Jointing cutting WS.1.3.1 Laying of HDPE pipe 90 mm m WS.1.3.2 Laying of HDPE Pipe 125 mm m WS.1.3.3 Laying of HDPE Pipe 180 mm m WS.1.3.4 Laying of HDPE Pipe 225 mm m WS.1.3.5 Laying of HDPE Pipe 315 mm m WS.1.3.6 Laying of HDPE Pipe 335 mm m WS.1.4 Pouring of Conceret WS.1.4.1 Pouring of PCC WS.1.4.2 Pouring of RCC WS.1.5 Restoration Work WS.1.5.1 Restoration of Brick Pavement Pavem WS.1.5.2 Providing & Laying Base CCourse WS.1.6 Earh Work for Valve Chambers Chambe WS.1.6.1 Excavation work WS.1.6.2 Supply and Filling Sand WS.1.7 Concrete Pouring For valvel Chamber WS.1.7.1 Pouring of PCC 1:4:8 WS.1.7.2 Pouring of PCC 1:2:4 WS.1.7.3 Pouring of RCC WS.1.8 Masonary Work for Valve Ch Chambers WS.1.8.1 Brick Work WS.1.8.2 Plaster Work WS.1.8.3 Providing and Fixing of Manhole Ma Chamber WS.1.9 Installation of Valve WS.1.9.1 Providing & Fixing of Sluice Sluic Valve