STPP Dates
STPP Dates
Name of work:- Tender Specification No.e-TSTLI-01/2021-Design, Engineering, Supply, Erection, Testing and Commissioning of (i) 400/220kV Annaram
Substattion including Supply of 3 Nos 500MVA Transformers and 1 Nos 125MVAR Reactor (ii) 2Nos 400kV Feeder bay Extension at 400kV Switchyard at
SCCL (Jaipur) and (iii) 400KV QMDC line from STPP (Jaipur) to Proposed 400kV at Annaram pump house (22.5 KM) near Gunjapadugu village, Manthani
mandal in Peddapally District under Additional 1 TMC of Kaleshwaram Lift Irrigation Project on Turnkey basis
Name of the Contractor:- M/s Megha Engineering Infrastructures Ltd., S-2,Tecncrat Indl. Estate Balanagar,Hyderabad 500037
LS Agt No. 6/2017-18 of Superintending Engineer /LIS/Karimnagar
Date of Handing over of Site:- 8/11/2021 Agreement Period (Months): SS 18 Months
Due Date of Completion of Work:- 2/10/2023
QUANTITIES FOR PRICE VARIATION (Qty.within.Agt.Period)
M.B Cement Qty.of Cement/
S.No Month Date P.No Item.No Qty. Unit Description of Item Unit
No factor Steel
B(V) Annaram SS
Schedule B6
(STPP BAYS) Cement
5/17/2022 259 2 6/34 6.675 Rm RCC M25 74.613 498.042 Kgs
5/19/2022 259 3 6/34 26.700 Rm RCC M25 74.613 1992.167 Kgs
5/20/2022 259 4 6/34 26.700 Rm RCC M25 74.613 1992.167 Kgs
5/21/2022 259 5 6/34 20.025 Rm RCC M25 74.613 1494.125 Kgs
5/23/2022 259 6 6/34 40.050 Rm RCC M25 74.613 2988.251 Kgs
5/24/2022 259 7 6/34 40.050 Rm RCC M25 74.613 2988.251 Kgs
5/26/2022 259 8 6/34 60.075 Rm RCC M25 74.613 4482.376 Kgs
5/27/2022 259 9 6/34 66.750 Rm RCC M25 74.613 4980.418 Kgs
5/28/2022 259 10 6/34 26.700 Rm RCC M25 74.613 1992.167 Kgs
Total: 23.408 MT
15 May-22
Steel
5/17/2022 259 2 6/20 0.2076 HYSD R/F 0.2076 MT
5/19/2022 259 3 6/20 0.8306 HYSD R/F 0.8306 MT
5/20/2022 259 4 6/20 0.8306 HYSD R/F 0.8306 MT
5/21/2022 259 5 6/20 0.6229 HYSD R/F 0.6229 MT
5/23/2022 259 6 6/20 1.3926 HYSD R/F 1.3926 MT
5/24/2022 259 7 6/20 0.5998 HYSD R/F 0.5998 MT
5/26/2022 259 8 6/20 1.2961 HYSD R/F 1.2961 MT
5/27/2022 259 9 6/20 1.7925 HYSD R/F 1.7925 MT
5/28/2022 259 10 6/20 0.3999 HYSD R/F 0.3999 MT
Total: 7.97 MT
Steel
6/1/2022 259 11 6/34 40.050 Rm RCC M25 74.613 2988.251 Kgs
6/2/2022 259 12 6/34 40.050 Rm RCC M25 74.613 2988.251 Kgs
6/6/2022 259 13 6/34 33.375 Rm RCC M25 74.613 2490.209 Kgs
6/7/2022 259 14 6/34 26.700 Rm RCC M25 74.613 1992.167 Kgs
6/10/2022 259 15 6/34 26.700 RCC M25 74.613 1992.167 Kgs
6/13/2022 259 16 6/34 33.375 RCC M25 74.613 2490.209 Kgs
6/14/2022 259 17 6/34 26.700 Rm RCC M25 74.613 1992.167 Kgs
6/18/2022 259 18 6/34 53.400 RCC M25 74.613 3984.334 Kgs
Total: 20.918 MT
Steel
16 Jun-22 6/1/2022 259 11 6/20 0.5998 HYSD R/F 0.5998 MT
19 Sep-22 2.490 MT