902 G2 Dar 038 Cal 910 A
902 G2 Dar 038 Cal 910 A
902 G2 Dar 038 Cal 910 A
Mechanical
Haykstep Station Firefighting Tank and Pump Room HVAC Calculation Notes.
902-G2-DAR-038-CAL-910 REV A
Haykstep Station
Firefighting Tank and Pump Room
HVAC Calculation Report
902-G2-DAR-038-CAL-910-A
August 2019
Page 1 of 8
Greater Cairo Metro Line 3 Phase 4B
1 HVAC
Ventilation
902-G2-DAR-038-CAL-910-A
August 2019
Page 2 of 8
Greater Cairo Metro Line 3 Phase 4B
1. HVAC
902-G2-DAR-038-CAL-910-A
August 2019
Page 3 of 8
Greater Cairo Metro Line 3 Phase 4B
1.1. VENTILATION
902-G2-DAR-038-CAL-910-A
August 2019
Page 4 of 8
Greater Cairo Metro Line 3 Phase 4B
902-G2-DAR-038-CAL-910-A
August 2019
Page 5 of 8
Design calculation sheet
Project no: E14155-0100D Date: Sheet no. : 1 of 1 Computed by: A.S.
Subject : Fans Calculation Sheet Checked by: A.AD.
Firefighting Pump Room Approved by: N.E.
Page 6 of 8
Greater Cairo Metro Line 3 Phase 4B
902-G2-DAR-038-CAL-910-A
August 2019
Page 7 of 8
Design calculation sheet
Project no: E14155-0100D - Firefighting Pump Room Sheet no.: 1 of 1 Computed by: A.S.
Subject: EF-01 Checked by: A.E.
Static Pressure Calculations: Approved by: T.Z.
Note: To the exception of the airflows, only cells shaded cells are to be filled by user.
Total Exhaust
lps cfm
300 636
Page 8 of 8